NO PROBLEM FOUND ROOT CAUSE COUNTER MEASURE RELATED DWG NOTE / RECOMMENDATION
ORDER SHEET
ZN.B M12X75 cant' install due to head of bolt crash with tank Althom 1. Tank alsthom there is like fan or stiffner, and Replace ZN.B M12X75 with Stud.bolt M12x90 two side per D# 1HB05950 R1 BUS-U H500565-S072 Take Revise Drawing to add budjet ZN.B M12x75
B95 only two side per busbar busbar D# 1HB05952 R1 BUS-U Stock and cutting stud
D# 1HB05953 R1 BUS-U M12x90

1. Cond can't crash while install process, only at busbar 2, Phase S, 1. Sipil contractor mistake of reference while make a 1. Re-Check distance all phase on two busbar, and get result D# 1HB05950 R1 BUS-U Modif by Memo Re-Check distance all phase on two busbar
and busbar 2 phase R foundation. final dimension. D# 1HB05952 R1 BUS-U overall
2. HPSI after measure the distance didn't re confirm all 2. Modif Cond according to actual dimension D# 1HB05953 R1 BUS-U
dimension is different but PE inform and justification that all
shifted 15mm

Bus unit phase S and T cant't install due to GIS Alsthom GIS Alsthom Construction 1. Make JIG for Lifting and Docking D#HV6165454 H500565-S100
Construction

for other project like Danayasa Ext, can Re-


3
used again this JIG

Inserting value of Cond to Contact Alsthom less than 10mm 1. Radius of Cond R8 and too large 1. Modif HPSI Cond by cutting surface of R8 D#3HB08788A Memo 1. Applied R3 of Cond
2. HPSI after measure the distance didn't re confirm all 2. Mfg Additional Liner D#3HB08788B 2. For other project like Gandaria Extension
dimension is different but PE inform and justtification that and Senayan Ext should be prepare by Mfg
all shifted 15mm of liner