All images are typical examples; please refer to project specific drawings.
1. General
The open area solar mounting frame ZM 2V, is to be used exclusively as a Photovoltaic
assembly frame and is projected individually on the local conditions.
This includes a static according the local conditions to determining the cross sections, as well
as a geotechnical certificate to regulate the pile driving deepness. It has to be rammed and
assembled after the given planning documents.
3. Detailed Views
Before starting assembly please read all safety guidelines. The PV mounting
frames are made of hot-dip-galvanized steel, stainless steel, and aluminium
components.
Tools:
You need the following tools
- ring spanner (wrench) 13mm, 19mm, 32mm
- Allen wrench (Allen key) 5 mm, 6 mm
4. Post Driving
The post-driving has to be done by a specialist company with suitable post driving rigs. They
need to create a piling plan according to the table layout. To this plan all V-Post must be
driven. Post length and foundation depth are given for each project.
We recommend coating the area between ground and air level of each post with an
additional protective coat. The additional protective coat should be painted before ramming
about 20cm below the earth surface line and up to 15cm above the earth surface. We
recommend as coating material PHARMOL: 2K Acrylan-ESL
In the case of aggressive soils being found in the geological survey the posts can be powder
coated, albeit at an additional cost.
5. General Overview
⑬⑭⑮⑯⑰
The vertical main tubes (Pos. 1 and Pos. 2) need to be bolted to V Post (Pos. 4 and Pos. 5).
The inclined tube (Pos. 3) needs to be inserted into the recesses of the main tubes (Pos. 1
and 2). Fasteners: (Pos. 13, Pos. 12, Pos 10).
8. Brace Assembly
Assemble brace (Pos. 6) to inclined tube (Pos.3) and to main tube (Pos. 1 and Pos.2). Insert
the brace into the dedicated recesses and fasten with fixings to main tube. Fasteners:
Preassembly of the rail clamp (Pos 13, 14, 15, 16) (pre-assembly possible) and insert into
the keyholes, on the inclined tube (No. 3).
Then mount the rails on, insert into the preassembled clamp, adjust by using the provided
assembly jig and observe the cantilever (individually according to the assembly table layout).
When connecting the C-Rail with 6 bolts (see section 9) to each other please make sure that
the rails are square to each other and that the pitch (dimension X) between the key holes is
repeated over the connection points.
As you can see in the images, the distance from keyhole to keyhole is critical. The jig needs
to be set to this distance and this distance needs to be transferred rail to rail across the rail
joint.
- There are different ways of fixing the panel to the frame, these options are
shown on the next page(s)
General note:
The distance between the modules is 19mm. Should the fastening of the panels with the
clamps in the keyholes become impossible due to uneven terrain or due to tolerances
occurring in the rail lengths and module dimensions, the following mounting solutions should
be considered:
- Alignment of the rails to each other - see point 9.2
- Use of 13mm wide panel clamps
- Use of 22mm wide panel clamps
- Use of two end clamps in the same keyhole
- Use of two end clamps in the same keyhole Module mounting with latch
bracket (see section 10 - Panel Assembly with Fixing Bracket)
Caution: The gap between side of the clamp and the side of the panels should not
exceed 2mm on each side.
The fitting instructions and safety guidelines from the panel manufacturer must
be adhered to.
Please note the clamping torque. Tighten screw only with a cordless screwdriver
or by hand. Please do not use impact wrench.
Please note the clamping torque. Tighten screw only with a cordless screwdriver
or by hand. Please do not use impact wrench.
Please note the clamping torque. Tighten screw only with a cordless screwdriver
or by hand. Please do not use impact wrench.
Please note the clamping torque. Tighten screw only with a cordless screwdriver
or by hand. Please do not use impact wrench.
Please note the clamping torque. Tighten screw only with a cordless screwdriver
or by hand. Please do not use impact wrench.
We don’t recommend fastening balls into the hexagon bolts for the anti-theft protection
device. It may cause damage to the panels.
- Glue panel clamps with PATTEX™ special glue (1 component heavy duty glue with
Silvan Polymer
12. Grounding
For grounding we recommend a hot dip galvanised grounding cable to EN ISO 1461.
If a wind brace is required to stiffen up the construction the following assembly notes should
be adhered to.
The bolts at the main tubes need to be inserted with the threads opposing each other. The
chain needs to fixed to the main tubes next to each other (north end) so the cross. Fix the
ring nut to the existing hex bolts, without the M12 nut. Please fix one end of the chain with
the rod strainer to the ring nut, use a shackle on the other end and tighten the chain.
The wind bracing needs to be checked for tension about two weeks after installation.
If necessary adjust the turnbuckle by hand. Please do not over tighten the chain! For
maintenance, please check in regular intervals the tension of the chain. (Annually)
The wind brace cannot be fitted in sections where the rails are joined together.
Fastener:
Pos. Pieces Number Description
- 4020000018 Steel chain
2 2 2500102508 !!! Text nicht vorhanden !!!
4 2 2500102509 !!! Text nicht vorhanden !!!
2 2 4012412035 Hex Bolt HDG DIN 933, M12x35
2 2 4012093412 Hex Nut HDG M12 DIN 934-8
2 6 4012012512 Washer HDG DIN 125, M12, 13x24x2,5
Example
The clamps can be pre-assembled.
We recommend reading carefully the following information, because they are very important
for a correct installation of the system. Please follow them and get informed about the health
and safety regulations of other site components.
- Please observe all notes in the operating instructions for all works on the PV solar
plant. Assembly, repairs and maintenance has to be carried out by certified and
qualified personal.
- The valid regulations and safety guidelines need to be followed.
Some regulations need to be respected.
- BGV A 1 – General regulations
- BGV A 2 – Electrical plants and Equipment
- BGV C 22 – Construction work
- PPE and health and safety regulations are to be adhered to according to the local
regulations and laws.
DIN / EN Standards need to be respected.
- DIN 18299 – General regulations for construction work of every kind.
- DIN 18360 – Metal construction work, locksmith
Conservation / Environmental
- The whole system is completely recyclable, as it is made of high quality, reusable
components.
Maintenance regulations
All bolted connections on the mounting system must be checked at least once a year.
-
This has to be checked in regular intervals.
- All rod strainers have to be checked at least once a year. This has to be checked in
regular intervals.
- The assembly company is responsible for the correct execution for the assembly.
- The Zimmermann PV Stahlbau GmbH & Co. KG is not liable for any damages caused
from disregard of the assembly instructions and the safety guidelines, as well as by
not material-appropriate use of our products.
- Construction in a proximity of less the 2km to the sea need to be request separately,
as additional protections against corrosion are necessary.
-
Our instructions, our project-related plan documents and the general approved
standards and principles of the system are valid for the assembly and use of the
products delivered by us. The assembly is to be performed in general by specialists.
Part of our product is the technical documentation. All general Terms and
Conditions apply (retrievable at www.pv-stahlbau.de/en/).