Laboratory Test Result
Laboratory Test Result
Laboratory Test Result
Ethiopia
Procurement of Plant, Design, Supply, Installation, Test and Commissioning of MV Distribution Lines
Project : for Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (Lot-2)
Client : Ethiopian Electric Utility
Consultant: Intec Gopa International Energy Consultants
Contractor: China Electric Power Equipment and Technology CO. LTD
Sampled by : China Electric Power Equipment and Technology CO. LTD
Lab. No. : BL/RUB/GR/001-5292/20
Station: 38.645294,8.815216
Depth (m): -
Material Type: Disturbed Soil
Date Reported : December 28, 2020
Sieve Analysis
(AASHTO-T88) (WET-SIEVE)
Weight of Total Sample Before Washing (gm) 553.00
%Pass
0.85 3.40 0.61 68.6
50.0
0.60 3.80 0.69 68.0
0.425 3.70 0.67 67.3
0.30 5.70 1.03 66.3
40.0
0.15 11.00 1.99 64.3
0.075 3.40 0.61 63.7 30.0
Sub total 201.00
Pan 352.00 63.7 20.0
Total. 553.00 100.00
10.0
0.0
Remarks:
Procurement of Plant, Design, Supply, Installation, Test and Commissioning of MV Distribution Lines
Project : for Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (Lot-2)
Client : Ethiopian Electric Utility
Consultant: Intec Gopa International Energy Consultants
Contractor: China Electric Power Equipment and Technology CO. LTD
Sampled by : China Electric Power Equipment and Technology CO. LTD
Lab. No. : BL/RUB/GR/001-5292/20
Station: 39.034933,8.631631
Depth (m): -
Material Type: Disturbed Soil
Date Reported : December 28, 2020
Sieve Analysis
(AASHTO-T88) (WET-SIEVE)
Weight of Total Sample Before Washing (gm) 315.50
%Pass
0.85 1.80 0.57 94.4
50.0
0.60 2.30 0.73 93.7
0.425 2.20 0.70 93.0
0.30 3.00 0.95 92.0
40.0
0.15 4.50 1.43 90.6
0.075 1.90 0.60 90.0 30.0
Sub total 31.50
Pan 284.00 90.0 20.0
Total. 315.50 100.00
10.0
0.0
Remarks:
Procurement of Plant, Design, Supply, Installation, Test and Commissioning of MV Distribution Lines
Project : for Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (Lot-2)
Client : Ethiopian Electric Utility
Consultant: Intec Gopa International Energy Consultants
Contractor: China Electric Power Equipment and Technology CO. LTD
Sampled by : China Electric Power Equipment and Technology CO. LTD
Lab. No. : BL/RUB/GR/001-5292/20
Station: 39.034933,8.638339
Depth (m): -
Material Type: Disturbed Soil
Date Reported : December 28, 2020
Sieve Analysis
(AASHTO-T88) (WET-SIEVE)
Weight of Total Sample Before Washing (gm) 678.50
%Pass
0.85 15.10 2.23 41.9
50.0
0.60 14.40 2.12 39.8
0.425 11.20 1.65 38.1
0.30 13.10 1.93 36.2
40.0
0.15 21.00 3.10 33.1
0.075 8.20 1.21 31.9 30.0
Sub total 462.20
Pan 216.30 31.9 20.0
Total. 678.50 100.00
10.0
0.0
Remarks:
Procurement of Plant, Design, Supply, Installation, Test and Commissioning of MV Distribution Lines
Project : for Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (Lot-2)
Client : Ethiopian Electric Utility
Consultant: Intec Gopa International Energy Consultants
Contractor: China Electric Power Equipment and Technology CO. LTD
Sampled by : China Electric Power Equipment and Technology CO. LTD
Lab. No. : BL/RUB/GR/001-5292/20
Station: 38.654730,8.815260
Depth (m): -
Material Type: Disturbed Soil
Date Reported : December 28, 2020
Sieve Analysis
(AASHTO-T88) (WET-SIEVE)
Weight of Total Sample Before Washing (gm) 319.80
%Pass
0.85 0.40 0.13 95.8
50.0
0.60 0.40 0.13 95.7
0.425 0.70 0.22 95.5
0.30 1.00 0.31 95.2
40.0
0.15 0.30 0.09 95.1
0.075 0.30 0.09 95.0 30.0
Sub total 16.10
Pan 303.70 95.0 20.0
Total. 319.80 100.00
10.0
0.0
Remarks:
Procurement of Plant, Design, Supply, Installation, Test and Commissioning of MV Distribution Lines
Project : for Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (Lot-2)
Client : Ethiopian Electric Utility
Consultant: Intec Gopa International Energy Consultants
Contractor: China Electric Power Equipment and Technology CO. LTD
Sampled by : China Electric Power Equipment and Technology CO. LTD
Lab. No. : BL/RUB/GR/001-5292/20
Station: 38.655787,8844598
Depth (m): -
Material Type: Disturbed Soil
Date Reported : December 28, 2020
Sieve Analysis
(AASHTO-T88) (WET-SIEVE)
Weight of Total Sample Before Washing (gm) 2332.90
%Pass
0.85 23.80 1.02 23.4
50.0
0.60 19.50 0.84 22.5
0.425 15.70 0.67 21.9
0.30 21.30 0.91 20.9
40.0
0.15 31.80 1.36 19.6
0.075 8.70 0.37 19.2 30.0
Sub total 1884.80
Pan 448.10 19.2 20.0
Total. 2332.90 100.00
10.0
0.0
Remarks:
Procurement of Plant, Design, Supply, Installation, Test and Commissioning of MV Distribution Lines
Project : for Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (Lot-2)
Client : Ethiopian Electric Utility
Consultant: Intec Gopa International Energy Consultants
Contractor: China Electric Power Equipment and Technology CO. LTD
Sampled by : China Electric Power Equipment and Technology CO. LTD
Lab. No. : BL/RUB/GR/001-5292/20
Station: 39.038171,8.685299
Depth (m): -
Material Type: Disturbed Soil
Date Reported : December 28, 2020
Sieve Analysis
(AASHTO-T88) (WET-SIEVE)
Weight of Total Sample Before Washing (gm) 322.10
%Pass
0.85 0.70 0.22 99.4
50.0
0.60 0.80 0.25 99.1
0.425 1.10 0.34 98.8
0.30 1.80 0.56 98.2
40.0
0.15 3.50 1.09 97.1
0.075 1.50 0.47 96.7 30.0
Sub total 10.70
Pan 311.40 96.7 20.0
Total. 322.10 100.00
10.0
0.0
Remarks:
Procurement of Plant, Design, Supply, Installation, Test and Commissioning of MV Distribution Lines
Project : for Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (Lot-2)
Client : Ethiopian Electric Utility
Consultant: Intec Gopa International Energy Consultants
Contractor: China Electric Power Equipment and Technology CO. LTD
Sampled by : China Electric Power Equipment and Technology CO. LTD
Lab. No. : BL/RUB/GR/001-5292/20
Station: 39.795326,8.853752,8.853752
Depth (m): -
Material Type: Disturbed Soil
Date Reported : December 28, 2020
Sieve Analysis
(AASHTO-T88) (WET-SIEVE)
Weight of Total Sample Before Washing (gm) 328.50
%Pass
0.85 0.30 0.09 96.2
50.0
0.60 0.50 0.15 96.1
0.425 0.70 0.21 95.9
0.30 0.90 0.27 95.6
40.0
0.15 1.10 0.33 95.3
0.075 0.30 0.09 95.2 30.0
Sub total 15.90
Pan 312.60 95.2 20.0
Total. 328.50 100.00
10.0
0.0
Remarks:
Procurement of Plant, Design, Supply, Installation, Test and Commissioning of MV Distribution Lines
Project : for Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (Lot-2)
Client : Ethiopian Electric Utility
Consultant: Intec Gopa International Energy Consultants
Contractor: China Electric Power Equipment and Technology CO. LTD
Sampled by : China Electric Power Equipment and Technology CO. LTD
Lab. No. : BL/RUB/GR/001-5292/20
Station: 38.805154,826994
Depth (m): -
Material Type: Disturbed Soil
Date Reported : December 28, 2020
Sieve Analysis
(AASHTO-T88) (WET-SIEVE)
Weight of Total Sample Before Washing (gm) 316.90
%Pass
0.85 0.20 0.06 97.0
50.0
0.60 0.80 0.25 96.8
0.425 1.40 0.44 96.3
0.30 3.00 0.95 95.4
40.0
0.15 6.40 2.02 93.4
0.075 2.40 0.76 92.6 30.0
Sub total 23.40
Pan 293.50 92.6 20.0
Total. 316.90 100.00
10.0
0.0
Remarks:
Procurement of Plant, Design, Supply, Installation, Test and Commissioning of MV Distribution Lines
Project : for Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (Lot-2)
Client : Ethiopian Electric Utility
Consultant: Intec Gopa International Energy Consultants
Contractor: China Electric Power Equipment and Technology CO. LTD
Sampled by : China Electric Power Equipment and Technology CO. LTD
Lab. No. : BL/RUB/GR/001-5292/20
Station: 38.949148,8.739782
Depth (m): -
Material Type: Disturbed Soil
Date Reported : December 28, 2020
Sieve Analysis
(AASHTO-T88) (WET-SIEVE)
Weight of Total Sample Before Washing (gm) 616.90
%Pass
0.85 8.50 1.38 18.5
50.0
0.60 6.50 1.05 17.4
0.425 5.40 0.88 16.6
0.30 6.10 0.99 15.6
40.0
0.15 14.00 2.27 13.3
0.075 14.70 2.38 10.9 30.0
Sub total 549.60
Pan 67.30 10.9 20.0
Total. 616.90 100.00
10.0
0.0
Remarks:
Procurement of Plant, Design, Supply, Installation, Test and Commissioning of MV Distribution Lines
Project : for Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (Lot-2)
Client : Ethiopian Electric Utility
Consultant: Intec Gopa International Energy Consultants
Contractor: China Electric Power Equipment and Technology CO. LTD
Sampled by : China Electric Power Equipment and Technology CO. LTD
Lab. No. : BL/RUB/GR/001-5292/20
Station: 38.9408444,8.741263
Depth (m): -
Material Type: Disturbed Soil
Date Reported : December 28, 2020
Sieve Analysis
(AASHTO-T88) (WET-SIEVE)
Weight of Total Sample Before Washing (gm) 321.10
%Pass
0.85 3.80 1.18 88.8
50.0
0.60 4.00 1.25 87.6
0.425 3.70 1.15 86.4
0.30 5.80 1.81 84.6
40.0
0.15 11.40 3.55 81.1
0.075 7.10 2.21 78.9 30.0
Sub total 67.90
Pan 253.20 78.9 20.0
Total. 321.10 100.00
10.0
0.0
Remarks: