Tower Load Calculations
Tower Load Calculations
CONTRACTOR GE&CCCS
PROJECT AIRPORT
Vertical Loads
Weight of Earth wire SF*Ne*We*Swt = 6.944 1.736 kN
Additional Weight = 0 0
Total = 6.944 1.736 kN
Litudinal Lods =
FOR CONDUCTOR =
Wind Load on conductor SF*Nc*Dc*Swn*Pc*Cxc 8.1432 8.1432 kN
wind Load on Insulato SF*Ni*Li*Di*Pi*Cxi = 0.4010472 0.4010472 kN
Due to Deviation SF*2*Ne*Te*Sin(Thita/2) 2.8288136 0 kN
Vertical Load
Weight of Condutor SF*Nc*Wc*Swt = 6.818 1.7045 kN
Weight of Inulator & Acc SF*Ni*Wi = 0.88 0.88 kN
Total = 7.698 2.5845 kN
Longitudinal Loads
EMPLOYER ETHIOPIAN ELECTRIC POWER (EEP), ADDIS ABABA ETHOIPIA
CONTRACTOR GE&CCCS
PROJECT AIRPORT
Total =
Vertical Loads
Weight of Earth wire SF*Ne*We*Swt =
Additional Weight =
Total =
Longtidunal Loads =
FOR CONDUCTOR
Wind Load on conductor SF*Nc*Dc*Swn*Pc*Cxc*Cos 45 =
wind Load on Insulato SF*Ni*Li*Di*Pi*Cxi*Cos 45 =
Due to Deviation SF*2*Nc*Tc*Sin(Thita/2)
Total =
Vertical Load
Weight of Condutor SF*Nc*Wc*Swt =
Weight of Inulator & Acc SF*Ni*Wi =
Total =
Longitudinal Loads
Wind load on insulator SF*Ni*Li*Di*Pi*Cxi*Sin 45 =
Total
ETHOIPIA
E LD (0-2 o)
Number Ni = 1
ameter Di (m) = 0.135
ight Wi (kN/m) = 0.44
Length Li(m) = 2.063
rag Coeff Cxi = 1.2
kN/m2 = 0.510
kN/m 2
= 0.510
kN/m2 = 0.590
kN/m2 = 0.843
Oblique condition
ALL INTACT WIRES
Max. Min.
Weight Weight
4.18685 4.18685 kN
1.408409 0 kN
5.595259 4.18685 kN
6.944 1.736 kN
0 0
6.944 1.736 kN
5.647379 5.647379 kN
0.278857 0.278857 kN
1.414622 0 kN
7.340858 5.926236 kN
6.818 1.7045 kN
0.88 0.88 kN
7.698 2.5845 kN
0 0
0.278857 0.278857
0.278857 0.278857