Al Fadhili Natural Gas Plant Thabat 90518: Cover Sheet 01 NTS
Al Fadhili Natural Gas Plant Thabat 90518: Cover Sheet 01 NTS
Al Fadhili Natural Gas Plant Thabat 90518: Cover Sheet 01 NTS
F F
C C
B B
01. TYPE OF ENCLOSURE AS PER NEMA 250 NEMA-1 NEMA-3R NEMA-4 NEMA-4X NEMA-12 NEMA-7 NEMA-3
E E
AS PER IEC 60529 IP 21 IP 40 IP 41 IP 42 IP 54 IP 66
D D
04. INSTALLATION OF ENCLOSURE OUTDOOR INDOOR
C C
07. SEVERELY CORROSIVE ENVIRONMENT YES NO NOT APPLICABLE
11. FINISH
FRAME FINISH RAL 7032 RAL 7035 RAL 7038 HOT-DIP GALVANIZED
PANELS FINISH RAL 7032 RAL 7035 RAL 7038 NATURAL FINISH
B B
12. QUANTITY 1
F F
E E
D D
C C
B B
F F
PARTS SCHEDULE
260
500
1 INDICATION LAMP
6 FUSE -1+2+3+4+5 8
1 2 3
X X X X X
1 2 3 4 5 6
TB1
7 8 9 10 11 12 13 14 15
2 3 POS. SELECTOR SWITCH
X X X X X
550
NAME PLATE
3
CONTROL TRANSFORMER
6
4 100VA, 380/220V
9
6 7 ASTRONOMIC TIMER
MCCB 20A
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
8 TERMINAL BLOCK
D 9 D
N
TB3 TB2 E 9 CABLE DUCT 20 MMX80MM
8
10-A 1X M2O FOR DRAIN & BREATHER
SPECIFICATION
C SYSTEM VOLTAGE 380/220V, 3Ph, 4w, 60Hz. C
PROTECTION NEMA 4X
PANEL MOUNTING WALL MOUNTING
500
CABLE ENTRY
INCOMING BOTTOM
100 Ø3.5 OUTGOING BOTTOM
200
10-B
20
D49-313-LCP-001
10-A
QUANTITY 01 No.
04 Drawn by: Project: Title: Reference No: Scale:
GA FADHILI NATURAL GAS PLANT NTS
A 03 259-345 PANEL LAYOUT DETAIL Work Order No: A
02 Checked by: Sheet:
01 GA Customer: Drawing No: Rev. No.: 04
AL ABDULKARIM HOLDING COMPANY
00 04.10.17
IND DATE
FIRST ISSUE
NATURE OF REVISION
MA Approved by:
BY HJ
THABAT Armaco Vendor ID 10011901 PE 50142 00 Next Sht:
05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F PARTS SCHEDULE F
INCOMER
380/220V, 3PH, 4W, 60Hz.
E R Y B E
Q1
MCCB, 20A
D D
SPECIFICATION
SYSTEM VOLTAGE 380/220V, 3Ph, 4w, 60Hz.
PROTECTION NEMA 4X
380/220V, 3PH, 4W, 60Hz. PANEL MOUNTING WALL MOUNTING
C C
CABLE ENTRY
20A, 1P INCOMING BOTTOM
20A, 1P 20A, 1P 20A, 1P 20A, 1P 20A, 1P 20A, 1P 20A, 1P 20A, 1P
C
OUTGOING BOTTOM
C C C C C C C C
B B
QUANTITY 01 No.
04 Drawn by: Project: Title: Reference No: Scale:
GA FADHILI NATURAL GAS PLANT NTS
A 03 259-345 SINGLE LINE DIAGRAM Work Order No: A
02 Checked by: Sheet:
01 GA Customer: Drawing No: Rev. No.: 05
AL ABDULKARIM HOLDING COMPANY
00 04.10.17
IND DATE
FIRST ISSUE
NATURE OF REVISION
MA Approved by:
BY HJ
THABAT Armaco Vendor ID 10011901 PE 50142 00 Next Sht:
06
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F F
TB1
SW
3
HAND AUTO C C
2 4 TB1:4 CT 1:1/ TB1:4
14 22 4
OFF
TO LIGHTING
1 TB2 3 TB1:5 CT 1:2/ TB1:5
TB2 5
1 1
6
D NO PE D
7
2 2
2 4
A1
L1 L2 L3
TB2 TB2 TB2
TM
SW: 4/TB2:1 TB2:1/1: NO CONTACT PHOTO CELL
A1 X1 X1 1
A2
PHOTO CELL - NO CONTACT :2/TB2: 2 TB2:2/C:A1
C 2 C
C ON R G OFF
T1 TB2:3/PE:1 PHOTOCELL POWER
3
A2 X2 X2
PHOTO CELL POWER PC:2/TB2:4 TB2:4 /C:A2
4
4
TB1
5
7
B B
TO
LIGHTING
NOTE : THE ABOVE CONTROL CIRCUIT IS FOR ONE BRANCH AND IT IS IDENTICAL FOR OTHER OUTGOING BRANCHES QUANTITY 01 No.
F F
BILL OF MATERIAL
Incomer
02 MCCB 20A, 3P 1 ABB 1SDA066800R1
Branches
D D
Meetering & Indications
04 FUSE WITH FUSE HOLDER 5 ABB 2CSM200923R1801
B B
QUANTITY 01 No.
04 Drawn by: Project: Title: Reference No: Scale:
GA FADHILI NATURAL GAS PLANT NTS
A 03 259-345 BILL OF MATERIAL Work Order No: A
02 Checked by: Sheet:
01 GA Customer: Drawing No: Rev. No.: 07
AL ABDULKARIM HOLDING COMPANY
00 04.10.17
IND DATE
FIRST ISSUE
NATURE OF REVISION
MA Approved by:
BY HJ
THABAT Armaco Vendor ID 10011901 PE 50142 00 Next Sht:
00
1 2 3 4 5 6 7 8