MCP 05
MCP 05
MCP 05
QUANTITY : 01 No.
C C
MANUFACTURER :
X FOR APPROVAL
FOR PRODUCTION
Drawn by : Date : 04 20.Mar.19 AS PER TICKET # 159018 A.H Scale :
A
A.KHALED 03 10.Mar.19 AS PER TICKET # 156851 A.K NTS A
AS BUILT Checked by : Date : 02 09.Dec.18 AS PER CUSTOMER COMMENTS A.K Sheet No.
S.HAMED 01 19.Nov.18 AS PER CUSTOMER COMMENTS ALAM 01
Approved by : Date : 00 11.Nov.18 FIRST ISSUE A.K Next sht.
ALAA REV. No. DATE NATURE OF REVISION DRAWN 02
1 2 3 4 5 6 7 8
This drawing and design is the exclusive property of Alfanar Electrical Systems and must not be copied or lent without its permission in writing. 1 2 3 4 5 6 7 8
E E
D D
C C
L1 L2 L3
B B
T1 T2 T3
04 20.Mar.19 AS PER TICKET # 159018 A.H Drawn by: Project: Title: Code: Reference No: Scale:
A.K A.KHALED METRO BACS- 1F8 STATION MCP-05 RT-8826 Rev.06
NTS
A 03 10.Mar.19
02 09.Dec.18
AS PER TICKET # 156851
AS PER CUSTOMER COMMENTS A.K Checked by:
LEGENDS - Work Order No:
- Sheet:
A
F F
3040
640
1000 1000 1000 1000 1000 1000
08 05
1 1 1
09 13 E 06
N
12
16 DM 6
FU1-4 FU5-8
Z1
6 6
ELR
E 9
VMR
9 9 E
Q1
INCOMING
F9 F18 02
TD
01
F1 F10 F19
15 15 15
16
F2
16
F11
16
F20
03
20
F3 20
F12 20
F21
2250
11
F4 F13 F22
25 25 25
F5 F14 F23
10
D 28 28 28
D
F6 F15
30 30 30 F24
F7 F16
34 34 34
F8 F17 15
04 37 37 37
40 40 40
14
43 43 43
07
SIDE VIEW
C FRONT VIEW FRONT VIEW C
20 1000 1000 1000 20 (DOOR REMOVED)
80
20
640
600
40
(STATION-1F8)
400/230V , 3PH/5W, 60HZ.
20
5 70 5
3040
B B
NAME PLATE DETAILS
PLAN VIEW
04 20.Mar.19 AS PER TICKET # 159018 A.H Drawn by: Project: Title: Code: Reference No: Scale:
A.K ALAMGIR METRO BACS- 1F8 STATION MCP-05 RT-8826 Rev.07
NTS
A 03 10.Mar.19
07 09.Dec.18
AS PER TICKET # 156851
AS PER CUSTOMER COMMENTS A.K Checked by:
PANEL LAYOUT DETAIL - Work Order No:
- Sheet:
A
01 - FRONT DOOR (2mm THICK E.G.S) SYSTEM VOLTAGE - 400/230V, 60HZ, 3PH/5W
02 - REMOVABLE SIDE COVER (2mm THICK E.G.S) RATED INSULATION VOLTAGE - 690VAC
03 - REMOVABLE REAR COVER (2mm THICK E.G.S) RATED IMPULSE WITHSTAND VOLTAGE-6 KV
04 - 1 PT CATCH LOCK WITH KEY CONTROL VOLTAGE - 110VAC
05 - PANEL CANOPY (2mm THICK E.G.S) PROTECTION - IP-55 (INDOOR) FORM-2B
E E
06 - LIFTING EYEBOLTS (2mm THICK E.G.S) PANEL MOUNTING - FREE STANDING
07 - PANEL MOUNTING BASE (2mm THICK E.G.S) PANEL CONSTRUCTION - 2mm THICK E.G.S FOR FRAMES &
08 - MANUFACTURER'S LOGO 2mm THICK E.G.S FOR COVERS
09 - PANEL NAME PLATE (TRAFOLITE THICK 1.5mm) PANEL FINISH - RAL 7035
10 - MAIN CIRCUIT BREAKER - EPOXY POWDER COATED
11 - BRANCH CIRCUIT BREAKER S.C.LEVEL - 25 KA
D
12 - NEUTRAL BAR D
13 - EARTH BAR
14 - SPECIFICATION NAME PLATE (ALUMINUM THICK 1mm) CABLE ENTRY
15 - DRAWING POCKET INCOMING - TOP
16 - PANEL METERING
OUTGOING - TOP
ABBREVIATION
C C
E.G.S. - Electro-galvanized steel VAC - Volts (alternating)
IP - Ingress Protection kA - Kilo Amperes
V - Volts Hz - Herts
3PH/5W - 3 Phase / 5 Wires
BUSBAR SYSTEM NOTE:L1=BROWN, L2=BLACK, L3=GRAY, N=BLUE & E=YELLOW/GREEN
04 20.Mar.19 AS PER TICKET # 159018 A.H Drawn by: Project: Title: Code: Reference No: Scale:
A.K ALAMGIR METRO BACS- 1F8 STATION MCP-05 RT-8826 Rev.07 NTS
A 03 10.Mar.19
07 09.Dec.18
AS PER TICKET # 156851
AS PER CUSTOMER COMMENTS A.K Checked by:
SPECIFICATION - Work Order No:
- Sheet:
A
F F
01-305 01-305 01-305 01-305 01-309 01-343 01-320 01-320 01-319 01-319 01-317 01-305 01-307 01-308 01-318 01-333 01-301 01-335
AHU 02 AHU 02 AHU 02 AHU 02 FCU 12 FCU 13 FCU 14 FCU 15, FCU 16 FCU 17 FCU 18 FCU 19 FCU 20 FCU 21 FCU 22 FCU 70 FCU 71 FCU 116
Supply Fan Extract Fan Elec Heater Ionisation
Motor Motor Battery Filter
M 30 kW M 15 kW 66 kW L 0.05 kW M M M M M M M M M M M M M M
E PF = 0.78
Eff = 0.91
PF = 0.78
Eff = 0.9
PF = 1
Eff = 1
PF = 1
Eff = 1
FLA=3.6 A
TCL =0.83 kVA
FLA=3.0 A
TCL =0.69 kVA
FLA=4.0 A
TCL =2.77 kVA
FLA=4.0 A
TCL =2.77 kVA
FLA=4 A
TCL =2.77 kVA
FLA=4 A
TCL =2.77 kVA
FLA= 1.78 A
TCL = 0.41 kVA
FLA= 1.78 A
TCL = 0.41 kVA
FLA= 1.78 A
TCL = 0.41 kVA
FLA= 3.6 A
TCL = 0.83 kVA
FLA= 1.17 A
TCL = 0.27 kVA
FLA= 0.71 A
TCL = 0.16 kVA
FLA= 1.42 A
TCL = 0.33 kVA
FLA= 0.39 A
TCL = 0.09 kVA E
TCL = 41.81 kVA TCL = 21.37 kVA TCL = 66 kVA TCL = 0.05 kVA DF =1 DF =1 DF =1 DF =1 DF =1 DF =1 DF =1 DF =1 DF =1 DF =1 DF =1 DF =1 DF =1 DF =1
DF =1 DF =1 DF =1 DF =1 TDL =0.83 kVA TDL =0.69 kVA TDL =2.77 kVA TDL =2.77 kVA TDL =2.77 kVA TDL =2.77 kVA TDL = 0.41 kVA TDL = 0.41 kVA TDL = 0.41 kVA TDL = 0.83 kVA TDL = 0.27 kVA TDL = 0.16 kVA TDL = 0.33 kVA TDL = 0.09 kVA
TDL = 41.81 kVA TDL = 21.37 kVA TDL = 66 kVA TDL = 0.05 kVA
TO
BMS
OLR OLR EHBC
TO TO
BMS BMS
VFD VFD
7 6 20 4 4 4 2 6 2 2 4 4 4 4 4 4 4 4
SPACE
SPARE
SPARE
SPARE
D D
F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 F19 F20 F21 F22-F24
MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P MCCB,3P
125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF 125AF
100AT 50AT 100AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT
Adj @ 80A Adj @ 40A Adj @ 16A Con as 1P Con as 1P Con as 1P Con as 1P Con as 1P Con as 1P Con as 1P Con as 1P Con as 1P
Con as 1P Con as 1P Con as 1P
250A, 400V, 60Hz 3PH+N+E,25kA CT1-3
250/5A
DM
B Y R FU1-FU4
C TO BMS C
PFR
Q1 SHT
ELR*
IP55, 400V, 25kA TD
HVR/AHU/ACU 6
4C 185sq.mm Cu/XLPE/LS0H
1C 95sq.mm G/Y/Cu/LS0H TCL= 144.65 kVA
DF= 1
TDL= 144.65 kVA
SP= 21.70 kVA (15%)
MDB02 TOTAL LOADS = 166.35 kVA
B B
04 20.Mar.19 AS PER TICKET # 159018 A.H Drawn by: Project: Title: Code: Reference No: Scale:
A.K A.KHALED METRO BACS- 1F8 STATION MCP-05 RT-8826 Rev.06
NTS
A 03 10.Mar.19
02 09.Dec.18
AS PER TICKET # 156851
AS PER CUSTOMER COMMENTS A.K Checked by:
SINGLE LINE DIAGRAM - Work Order No:
- Sheet:
A
1
4C 6sq.mm 1C 6sq.mm
Cu/XLPE/LS0H G/Y/XLPE/LS0H
2
4C 4sq.mm 1C 4sq.mm
Cu/XLPE/LS0H G/Y/XLPE/LS0H
3
3C 6sq.mm -
Cu/XLPE/LS0H
3C 4sq.mm
E 4 - E
Cu/XLPE/LS0H
4C 16sq.mm 1C 16sq.mm
5 Cu/XLPE/LS0H G/Y/XLPE/LS0H
4C 10sq.mm 1C 10sq.mm
6
Cu/XLPE/LS0H G/Y/XLPE/LS0H
7
4C 25sq.mm 1C 16sq.mm
Cu/XLPE/LS0H G/Y/XLPE/LS0H
4C 150sq.mm 1C 95sq.mm
8 Cu/XLPE/LS0H G/Y/XLPE/LS0H
9 3C 10sq.mm
D Cu/XLPE/LS0H - D
4C 50sq.mm 1C 25sq.mm
10 Cu/XLPE/LS0H G/Y/XLPE/LS0H
4C 35sq.mm 1C 16sq.mm
11
Cu/XLPE/LS0H G/Y/XLPE/LS0H
4C 70sq.mm 1C 35sq.mm
12 G/Y/XLPE/LS0H
Cu/XLPE/LS0H
4C 95sq.mm 1C 50sq.mm
13
Cu/XLPE/LS0H G/Y/XLPE/LS0H
3C 4sq.mm 1C 4sq.mm
14
C Cu/XLPE/LS0H G/Y/XLPE/LS0H C
15 3C 6sq.mm 1C 6sq.mm
Cu/XLPE/LS0H G/Y/XLPE/LS0H
3C 10sq.mm 1C 10sq.mm
16
Cu/XLPE/LS0H G/Y/XLPE/LS0H
3C 16sq.mm 1C 16sq.mm
17
Cu/XLPE/LS0H G/Y/XLPE/LS0H
3C 25sq.mm 1C 16sq.mm
18
Cu/XLPE/LS0H G/Y/XLPE/LS0H
3C 35sq.mm 1C 16sq.mm
19 Cu/XLPE/LS0H
B G/Y/XLPE/LS0H B
3C 50sq.mm 1C 25sq.mm
20
Cu/XLPE/LS0H G/Y/XLPE/LS0H
21 3C 70sq.mm 1C 35sq.mm
Cu/XLPE/LS0H G/Y/XLPE/LS0H
3C 120sq.mm 1C 70sq.mm
22
Cu/XLPE/LS0H G/Y/XLPE/LS0H
04 20.Mar.19 AS PER TICKET # 159018 A.H Drawn by: Project: Title: Code: Reference No: Scale:
A.K A.KHALED METRO BACS- 1F8 STATION MCP-05 RT-8826 Rev.06 NTS
A 03 10.Mar.19
02 09.Dec.18
AS PER TICKET # 156851
AS PER CUSTOMER COMMENTS A.K Checked by:
CABLE DETAILS - Work Order No:
- Sheet:
A
R Y B
FU5-FU7 FU1-FU3 X1 X1 X1
2A
E1
2A
E4
DM
*-24 2 1 E1 1 2
VMR
2 L1
VOLTAGE MEASURING
9
CURRENT MEASURING
*-25 2 1 E2 E2 1 2 E5 7
5 L2
INPUT
INPUT
6
16
*-26 2 1 E3 E3 1 2 E6 4
15
18
8 L3
E 3 E
E0 E0 Z1
11 N 1
1
E1
BACnet / IP
E0 E0 AUXILIARY SUPPLY
1
FU9
FU4
2A
2A
FU8 12 13
2A
2
4 1 2 1E1
2
1 3 5 7
E7
FAULT ELR2
VMR1
ELR1
CONTREL ELR-3C
12 10 14 18 17 16
D 5 CT1M 1
D
3
C1
6 2
5 TD SHT
1
C2
6
2
S1 C1 Z1
CT1-CT3 2
C2
S2 3
S1 C3
4
C4
C S2 5 C
S1 C5
6
C6
S2 7
1 3 5
8
Q1
MCCB, 3P SWITCHABLE CROSS LINKS :- LEGEND:-
2 3
2 4 6
1. Q1 --- MAIN SWITCH DISCONNECTOR
4 5 2. CT1-CT3 --- CURRENT TRANSFORMER
B --- DIGITAL METER B
3. DM
6 7
4. ELR --- EARTH LEAKAGE RELAY
5. TD --- CLOSED TOROID
NOTE :-
NOTE :- 6. FU1-FU3 --- 2A CONTROL FUSE
WHEN DIGITAL METER IS REMOVED SHORT TERMINALS --- TERMINAL BLOCKS
7. X1
TO BRANCH CONTROL WIRING 1.5mm²(BLACK) 2 & 3, 4 & 5 , 6 & 7 (WITH SHORTING LINKS)
04 20.Mar.19 AS PER TICKET # 159018 A.H Drawn by: Project: Title: Code: Reference No: Scale:
A.KHALED METRO BACS- 1F8 STATION MCP-05 RT-8826 Rev.06
NTS
A 03 10.Mar.19
02 09.Dec.18
AS PER TICKET # 156851
AS PER CUSTOMER COMMENTS
A.K
A.K Checked by:
METERING DIAGRAM - Work Order No:
- Sheet:
A
1088073 S250-PE, MCCB, 3P 250AT/250AF, 70KA@400V, ELECTRONIC TRIP UNIT (LSI)-A 1 319006 ALFANAR-TERASAKI
1079509 INTERPOLE BARRIERS FOR E250-** AND S250-** MCCB's 2 43161 ALFANAR-TERASAKI
1057380 MULTI FUN. RELAY 3-PH 220-500V 1 GKRC-20F ENTES
1049175 SHUNT TRIP, AC 200-240V FOR S125 to S1600A 1 911 ALFANAR-TERASAKI
1053749 EARTH LEAKAGE RELAY, 110VAC/DC / 230-400VAC 1 ELR-3C CONTREL
E E
1053750 CLOSED TOROID, 110MM DIA 1 CT-1/110 CONTREL
1166502 CONTREL EXTERNAL MULTIPLIER TOROID CT-1M 1 CT-1M CONTREL
1084885 FUSE, 2A, 500VAC, 10.3X38MM 1 1421002 ITALWEBER
1084892 FUSE BASE, 1P, 10X38 1 2301038 ITALWEBER
METERING:
1079117 CURRENT TRANSFORMER, 250/5A, ACCURACY CLASS-1, BURDEN-5VA 3 TU30 ALFANAR-SACI
D 1159898 SIFAM-POWER NETWORK ANALYZER INPUT (1 OR 5)A with BACnet/IP Communication 1 D30BNET11100E0 SIFAM D
04 20.Mar.19 AS PER TICKET # 159018 A.H Drawn by: Project: Title: Code: Reference No: Scale:
A.K A.KHALED METRO BACS- 1F8 STATION MCP-05 RT-8826 Rev.06
NTS
A 03 10.Mar.19
02 09.Dec.18
AS PER TICKET # 156851
AS PER CUSTOMER COMMENTS A.K Checked by:
BILL OF MATERIALS - Work Order No:
- Sheet:
A