Thomas Achongo received an electricity bill from Kenya Power & Lighting Company for account 3017966-01. The bill shows consumption of 46kWh for the period of January 1st to April 15th 2021. The total amount due by April 28th is Ksh 764.89. Failure to pay by the due date will result in disconnection and reconnection fees will apply once payment is made.
Thomas Achongo received an electricity bill from Kenya Power & Lighting Company for account 3017966-01. The bill shows consumption of 46kWh for the period of January 1st to April 15th 2021. The total amount due by April 28th is Ksh 764.89. Failure to pay by the due date will result in disconnection and reconnection fees will apply once payment is made.
Thomas Achongo received an electricity bill from Kenya Power & Lighting Company for account 3017966-01. The bill shows consumption of 46kWh for the period of January 1st to April 15th 2021. The total amount due by April 28th is Ksh 764.89. Failure to pay by the due date will result in disconnection and reconnection fees will apply once payment is made.
Thomas Achongo received an electricity bill from Kenya Power & Lighting Company for account 3017966-01. The bill shows consumption of 46kWh for the period of January 1st to April 15th 2021. The total amount due by April 28th is Ksh 764.89. Failure to pay by the due date will result in disconnection and reconnection fees will apply once payment is made.
UPPER HILL 00100-NAIROBI KENYA Bill Number: Date of Issue Date Due Maximum Load(KW) 3017966-01-16/04/2021 16/04/2021 28/04/2021 3 Method of Charge No: Supply Location: DOMESTIC CONSUMERS(DC) Deposit: Ksh , 2,500.00 9641/28 BLK 43 WESTLANDS
CONSUMPTION DATA BILLING DETAILS
Consumption Type Meter Previous Current Conversion Consumption BILLING CONCEPT ACCOUNT (KSH) Number Balance Balance Factor BALANCE BROUCH FORWARD 211.38
FIXED CHARGE 150.00
ACTIVE (AO) 62814293 1095 1141 1 46 CONSUMPTION 115.00
FUEL COST CHARGE 599.0 238.74
CENTS/KWH
FOREX ADJ 9.0 17.04
WARMA LEVY 5,0 4.14
ERC LEVY 3.0 2.18
CENTS/KWH
REP LEVY 5.0 % 26.43
KVAh/KWH Consumprtion Period: Power Factor :
01/01/2021-15/04/2021
The monthly bill is Ksh. 764.89
V2.01 EIMANOR-2021922_0809af307 2217 29
This electricity bill is payable before 28/04/2021.Notice is hereby given that
if this bill is not paid within thriteen days from 16/04/2021 to 28/04/2021, your supply shall be liable to disconnection without any further notice to you ,should you be disconnected , in addition to settling the outstanding amount, you will be required to pay the applicable Reconnection (RC) fee before reconnection. The RC fees are as follows : Ksh 580.00 for cut-off of Total Amount Ksh , 764.89 Ksh 3,828.00 for pole RC or Ksh, 23,920.00 for service line RC.The said RC fees are inclusive of 16% VAT charge.In addition , you will also be required to top up your deposit 2 times your average monthly bill.
All enquires to customer service Eng.Nairobii,P.o.Box 30099