Project Stages Stage Percentages ECSA Fee Scale Professional Fees Based On Contract Value
Project Stages Stage Percentages ECSA Fee Scale Professional Fees Based On Contract Value
Project Stages Stage Percentages ECSA Fee Scale Professional Fees Based On Contract Value
SUM R382,350.91
All amount based on the initial Professional fees have been been paid.
1) Stage 3 - Detailed Design Amount due = R212 423,62 - R95 587,72
A detailed design had to be done for the variation works on site.
A design for the earthworks was produced by the engineers.
R849,694.46 R467,343.55