Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Hill Limit: Saudi Arabian Oil Company

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SAUDIARAMCO.

EXISTING GUARDRAIL TO BE MODIFIED


W)
A.05
(NE NOTES:
ST 2
50
6.
10
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED.
VB
VB
M101.58 2. PIPE SIZES ARE IN INCHES UNLESS OTHERWISE NOTED.
PI
PES
TO B
PI (A/G) E RE 3. ALL THE MATERIAL USED IN THE PROJECT MUST BE:
PE T AND MOVE
C O PI INSTAL D
REMA PES B L NE 3.1 ACQUIRED FROM SAUDI ARAMCO APPROVED VENDORS.
IN P ELOW W
K ROPO
SED THE
NEW 3.2 INSPECTED AND CERTOFIED BY INSPECTION DEPARTMENT PERSONNEL,
ROAD PIPE T
O
12 6

REMA BEFORE INSTALLATION.


IN
12

12 4

4. COORDINATE WITH THE "AUTHORITY HAVING JURISDICTION " PRIOR TO

350
GAP
2

START OF ANY WORK.

OF
200
mm.

10
{ SWE
ET
WAT
5. ROUTING OF SEWER AND WATER LINES AS SHOWN ARE APPROXIMATE. THE
0

0
ERL
INE CONTRACTOR SHALL VERIFY ACTUAL LOCATION ON SITE AND ADJUST
2 N
12

os.

CONSENT
ACCORDINGLY. THE CONTRACTOR SHALL ADVICE THE SAUDI ARAMCO ENGINEER
M119.12 OF ANY DISCREPANCY FOUND BEFORE PERFORMING ANY WORK.

6. ALL NEW PLUMBING INSTALLATION SHALL BE PROTECTED FROM CONTAMINATION


M101.21 DURING INSTALLATION IN ACCORDANCE WITH SAES-060, CHAPTER 6 SECTION 610.15
M117.46

NE
7. ALL NEW WATER SUPPLY PIPING INSTALLATION SHALL BE DISINFECTED

8" SW EET W ATERLI


3"{ STL RWS TO REMAIN BEFORE BEING PUT INTO SERVICE IN ACCORDANCE WITH SAES-S-060,

TTEN
CHAPTER SECTION 610.15 AND SASC-S-01 SECTION 9 AND GI-0151.006
M100.26 M
1/2"{ PVC RWS TO REMAIN
8. WHEN THREADED PIPE IS NECESSARY, ONLY FACTORY THREADED SCH. 80, CPVC
NE
LI

WRI
$ NIPPLES SHALL BE USED AND SHALL BE INSTALLED IN ACCORDANCE WITH
M127.90 GA
S $
D SAES-S-060,SECTION 316.1.1
M130.70 NE
DO
0 AB
AN NE
LI BE
28
9. WATER SUPPLY PIPES SHALL BE TESTED & PROVEN TIGHT UNDER A WATER
13
{ TE
R TO

26
m. &

THE
0m WA PIPE D PRESSURE OF 150 PSIG (1034 KPA) FOR A PERIOD OF NOT LESS THAN 4 HOURS
VE
1

24
10 W O
RA M D

P EM
RE

22
1 CE IN ACCORDANCE WITH SAES-S-060, CHAPTER 1, SEC.103.5.3.3 a & b.

IP A
PE LA

R
{
m.

20
PI P

E IN
1
0m RE

T
0

1
4 TO

O
8
IN 10. PROVIDE IDENTIFICATION TAGS TO ALL ISOLATION VALVES.

1
MA

THOUT
M

1
RE

P M )
IP O
11. ALL BOUNDARY VALVES SHALL BE SHUT-OFF BEFORE START OF WORK.

R /G
M 85.64

90
E V
E
(A

T D
7

94
7

O
12. OTHER INFORMATION AS PER THE SCOPE OF WORK.

96
E
86

O N

WI
I
F
13. BEFORE EXECUTION OF ANY PIPING WORKS, THE CONTRACTOR SHALL COORDINATE

E MA

F
D
WITH SAUDI ARAMCO ENGINEER FOR ANY FURTHER INSTRUCTION.

P RE
O LO LL VE
LP

D
P BE TA MO
7

O
P
88

T
14. SAUDI ARAMCO PROJECT ENGINEER SHALL COORDINATE WITH U&FSD

NG
S E
TR VB #

A
D E E IN R

O W
D

A IPE
C FOR RELOCATION OF AFFECTED WATER AND GAS LINE

E
DH-0649
90

A N IP D E
M TR

DRAWI
S
VB

D BE

D
P
R E P AN B
SMH #

N
02
TO BE

P
T EW ) TO

98
20

/ OV TO
DH-965 2

W S
R
REMOVED & 15. NEW RAW AND SWEET WATER PIPES MATERIAL SHALL BE USED AS FOLLOWS:

) E
7 9

1
(A IPE
1
TO BE

R IPE
1
DEMOLISHED

2
M

N /G
0
1

08
1

P
1
REMOVED &

(A EM
P
1

06
A. STEEL PIPE SCHEDULE 40 WITH INTERNAL CEMENT LINE AND

1
1

G
1
DEMOLISHED

04
EXTERIOR FULLY BONDED EPOXY (FBE) COATED INCLUDING

H
HILL LIMIT

1
S
NO FH# DH-333

A TO

O
M
12 NECESSARY FITTINGS CLS (CEMENT LINE STEEL) SHALL BE

S
TO BE

THI
IN
$
$
7

E E
ASTM A-106 OR API SPEC 5L AS PER 01-SAMSS-005.

P
I REMOVED & $
$
7SMH #

M
P
M DEMOLISHED B. PVC PIPE, SCHEDULE 80, ASTM D1785, PVC 1120 OR 1220 (0-49°C) INCLUDING
R VB NT GS
I DH-966
PA KI N
NECESSARY FITTINGS.
R TO BE
K a MA
REMOVED &

FROM
7 16. PIPE SLEEVE LOCATED IN NEW VALVE BOX SHALL BE PVC, SCHEDULE 40,
7 RB
/
TE DEMOLISHED

PVC
VB#DH-0650 CU CRE FH ASTM D-2665.
N Y
TR CO WA
TO BE REMOVED TR LK
WA
7

M
400mm{ (16"{) A & 17. CONTRACTOR TO PROVIDE NECESSARY MECHANICAL PIPE SUPPORT FOR ALL
& DEMOLISHED 7 PIPE MA
IN

{
LP

6"
E M 96.56 NEW STEEL WATER PIPES LOCATED @ ABOVE GROUND.
STL RWS (A/G) GN R
-O
FF a G)
SI TO U/
00 ED

NED
TO REMAIN OP ( 18. ALL PIPES TO BE ABANDONED SHALL BE CAPPED-OFF.
1 ST
CA
P P
m{ I E
7 0m PP

D
C
E G) NT GS 0

PV
PIP U/ I 1 L 19. ALL THE DEMOLISHED FIRE HYDRANTS, GATE VALVES, VALVE BOX STEEL

AN
( PA KIN
E R EE M97.19

OBTAI
B ED MA
TO DO
N ST COVER & H-BEAM SUPPORT, SEWER MANHOLE COVER WITH FRAME, ETC. WHICH

SL
AN

6"
A AB ARE IN GOOD CONDITION SHALL BE HAULED TO DNO & MU YARD.

I
L P
S
NO VB #
15

RS
NG VB # 20. PURGE THE EXISTING GAS LINE WITH NITROGEN AND CUT THE PIPE WITH
DH-0651 VI
FH# DH-334 PA CKS M COLD CUTTING MACHINE TO PREVENT FIRE OR EXPLOSION. CONTRACTOR SHALL
TO BE O
BE DH-0648

VE
BL
TO BE REMOVED & TO TO BE PREPARE AND SUBMIT THE COLD CUTTING/TIE-IN PROCEDURE TO U&FSD

BE
$
E ED $

PA
REMOVED & PIP ON REMOVED &
DEMOLISHED VB D FURTHER REVIEW AND APPROVAL.
N

AD
DEMOLISHED & A
PE IN AB DEMOLISHED
PI EMA F

CK
R

RO
OF

PART,SHALL
LP TO D-
PE

I
P LP
FH CA E
AG RS

BR
M RB NE

T
H GA TAI
N PE
PI

AL
CO

AD
K A SMH #
ER
AN
T
L
EE
PL
NG

PH
VI
PA CKS DH-968 ST $
$ $
$

RO
A L O
PE 7 mm{ I PE

84
B TO BE PI

AS
M109.28 VB BE F 0 N PI
REMOVED & OF A
TO D- S ED 10 REM ED

T
DEMOLISHED 7 P
IE
NT
NG N AT
P DO

AL
A7 A
CAPMARK
I
AN TO C O
K TO AB {

PH
7 & m N M
PE S m AI
PI 50 REM
77-969880
NO LP M
VB # a MA
IN 15

AS
K
7 RE TO 7

N
DH-0652 DH 96. 30 SMH #

I
H = 6
7 TO BE 7 SM
P
EL 95.
= DH-967 KING
TO EL H R
REMOVED & 7 NV
I 68 90 TO BE 7 EM PA
EA

FULL,OR
-9 7. 1
DEMOLISHED H
DH
=
9
.99
0 REMOVED & AR { PE
M L 5
7 7 {
3"
a S
P
TO EL
E
=
9
DEMOLISHED 0mm PI LEGEND:
7 INV GN
SI
5 L
7 OP EE X
ST ST BO 254
A 7 6"{ STL A
RWSIN GS
(U/G) $
$
0 E . SYMBOLS ABBR. DESCRIPTION
29
RK
NT
M M 9 ALV L=92
7 3"{PAI
PVC SWS (U/G) M V E
09
9
PIPE TO BE VB OP - EXISTING PIPE TO REMAIN
K 7 #SMH # T
2

7 A PE
D
ABANDONED AND
1

DH-969
0

N L
'
MM - EXISTING PIPE TO BE REMOVED

N
08

A
1
1

CO EST

I
TO BE CAPPED OFF
1

D
PE
06

E
7 A NC
M113.74 INSIDE SMH A 4
REMOVED & 9 - EXISTING PIPE TO BE ABANDONED
1

04

FE 86

ON
DEMOLISHED
7
1

EM
H
RIAN LP
LP
NK
LI GV/BV BALL VALVE / GATE VALVE
1

7 ST G -

REPRODUCTI
TR DE
PE SSI
N N
AI
7 400mm{ (16"{)
O
CR N S CH CV CHECK VALVE
VB#DH-0653 SIG ING
RK
7 STL RWS (A/G)
AR
D (TO REMAIN) INT
MA
VE
RS
BO
X 0 88 - POINT OF CONNECTION
SMH DH# 950
K
7 TO REMAIN
E
GU NOS
) PA
ICK
PA
Y LVE = 96
.70 $
$ $
$
TO BE REMOVED PIP 8
( FH# DH-335 # BR KWA VA EL - NEW CAPPED-END
ST S H WA
L P
PO TO
K M'
N
& DEMOLISHED 7K 0 6"{ STL TO BE NO SM 970 I LP
96 90
77 AN
M 09 9
-
CO #
24"{
D CLS RWS TO REMAIN RWS TO REMOVED DH REM - NEW GRADE ELEVATION
7 M M'N L P
A
E
REMAIN -9
70 TO M Q
CO EST 20"{ CLS RWS
D TO REMAIN DH LP PORTION OF 3"{
7 D UN .) M 97.26 92 - EXISTING GRADE ELEVATION

92
T
PE O
SM
H LE TYP
GR LP I PVC SWS AND 6"{
TO D ( VB
77
FH
2"{ PVC SWS TO BE ABANDONED LE VE -7
PV
C AB EMO STL RWS TO
043 SMH SEWER MANHOLE
7 6"{ CLS SWS TO REMAIN 8" PORT
B E
R
BE REMOVED A.0 9 94
7 VC
E TO LP ST .85 94

SAUDIARAMCO.NO
VB# DH-0659 UG 1 VB VALVE BOX
7 6" GA
VB LP =9
TO BE
7 50 90 ES
SU
RE
VB
GA
TE
4"{ PVC EL
K -9 7. 7 10"{ CLS PR DH#0656 SEWER PIPE 96 U/G UNDER GROUND
REMOVED & DH 9 0 W #
H L = .54 /S HT 1
DEMOLISHED 7 K SM
P
TO EL
E
=
95 (TO REMAIN) RW (TO REMAIN)
GN
SI SA
P
MN
I
R-
K9
I7
NGS
IN
(U/G)
M RWS RAW WATER SUPPLY
7 T
I
ST
OP
DAH MA
INV DH#0657 M
RE
7 VB
VB
PO
ST
OU
ND
TO BE
BU
S
TO LP 96
ARD GR 71
SWS SWEET WATER SUPPLY
7 G U
6"{ VC SEWER SH
MODIFIED
ED
DH
-9
6
M
7 (TO BE T
AI
NG
I SM
H LP
VING
9 M 96.83 FH FIRE HYDRANT
WREFER TO PA CKS 3"{ PVC SWS (U/G) TO REMAIN
7 ABANDONED (U/G)) STRUCL. DWG. BL
O
7 VB
6"{ STL RWS (U/G) TO REMAIN A/G ABOVE GROUND
7 LL
VB
DH#0654
7 PIPEI TO
WA PIPE TO BE REMOVED
(TO REMAIN)
VB
7 NN
I
G
TAABANDONED OUN
D
GN
LP M
BE SI
7 7 RE
GR NG
SI WA
LL
D

(U/G) (TYPICAL) ED OS VB NG
SH
NE

CR GN INI
N G
AN SI VB TA VB
VB DH#0660ITI RI P RE
DO

A T O
W S ST LP
DE S VB DH#0655
(TO REMAIN)PE BU
BE
N

OF
M97.10

7
M102.64 (TO REMAIN)
F ABA

VB
M 96.56
K

TO
N
PE

I
TO

)
P.
JEBEL

MA
PI

RS TY
( M
VE
7
Y
PA CUR
B WA $
$ $
$

E
1 LK

RE

PROPERTY
02 K LP

P
IC R A

I
OF

VB# BR NTE W
RS

P
A RS -4
VE PL
D-

VE ED VB#DH-0646
7 A CK
PA
Y
DH 0658 AN
TE
R
PA
-3
SH
G)

I PL

D
BR KWA TO BE
E

(TO REMAIN) CK ED
A
7
I
BE

NE
L
PP

WA BR SH
U/

REMOVED &

FF
A LP

DO
CA
(
PE

LL DEMOLISHED
TO

TE

-O
A RE WA
PI

T.

N
K 7 ONC NO
S
RE

ED
A
C
15 IN OL
E M 96.88
A mm H MA

AB
K 20 B 49 2 5M
S NH
RE

BE
MA

P
K A CU
R
DH
-9 5.7 C 95

P
9 5O ST
4 T
0
H =
a H

CA
EL 93.

&
PE
SM EM

TO
4
A 3-
7
$ P =
TO EL

PI
LP
1
00 04

SOLE
00 A
.0 NV $
ST
A I LP M
1 A STA. OLD)
02(
a M
98 A 352
96.
C TE M97.14 DRAWING CERTIFIED
A 98 8"
PV
VB O
RE
NC ATION
AU LK
WA
Y C
UN
D
A RS
WA
M A LP
FO
DATE: 12 / 23 / 2020

THE
VE
PA E
CK AG
GN
I
BR

96. SI
06
K LP
CSTSD REF. NO. IC-0064
K H N
AI LL
-1 SM REM WA
U LP
TY
$
ED -2 T.
LI
A 96

ARE
SH ED RE
TO I 7
Q

$ M 96. SH
$ 13
Q 7 RS
WA
LK
WA
Y

213 FA
C
94 7
ON
51 77 VE
PARKI H N
AI DH
-9 5.
9
4
PA A I
NG AREA SM REM SM
H
EL
= ICK T

N
BR A
RE

HEREI
P
TO TO Q M 92.57
a
C 7
LP
RE
Q

T H
A M 0 10.0 20.0 30.0 40.0 50.0
EE
$ $
$ FH 7
Q

LP $
R A
ST $
$ VB
Q
94 LP
a 7
Q a
ST
$ C METERS
Q

I
U 1 Q TY
RI JE
ST
A
S

Q CU CE MA

NED
CK

SE FI
Q

a
a
$
$ a OF M 95.
39 A
I

1 : 500M
BR

SCALE:
LP
7
Q

CONTAI
$
$ $ A H M M 95.98
$ EA EM
$ Q 7 RA
H a ING
AR
NI 3 AL RK
MU 5 ST PA REVISION VALIDATION
$
$ AL E
T
#
Q
TR
Y
DE
PE 9
22
GA M
$ Q NO N
EN VB CO H=
D THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
106 7 SIG LP
#
AR
EA
A $
NG
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
H

$ A ND RK
I
A/C SERVICE PA

ON
N
I OU M
GR 20U033-033
Q RA
L

NFORMATI
TU
NA
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
$ a OU
T
A (DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
$
RS D a
$

107
a 7 ICK
BR BE
TO
R
VE
PA MOV
E
E LP
LP ENGG./DATE

IMR
12/23/20
CERTIFIED BY/DATE CONST. AGENCY/DATE

HAK
12/23/20
MAA
12/27/20
OPERATIONS/DATE

NMK
12/27/20
BY/DATE

T
EA LP EE
AR R
$
U AL-MUNIRAH ING $ D
ST
AR
EA REV.NO. DATE REVISION DESCRIPTION
RK 2N
$
PP Q PA LP G

I
58 28
Q

N
I
RK
INDOOR THEATER H
DH
-9 4.
=
9
3
$ PA
RA
MP
GA
TE
VE
RS 7 00 ISSUED FOR CONSTRUCTION

U
UU SM
P
EL GN
SI
LP
CK
PA LP

THE
TO I
a
a a
a $
S
ST
OP
a BR
FE
NC
E JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
$ BU NK
LI
Q AIN- 20U033 CONSTRUCTION UNTIL CERTIFIED AND DATED
$ $ AL MUNIRAH CH
Q $
A EA
NG

$
$ AR
SAUDI ARABIAN OIL COMPANY

AND
INDOOR A a
a ING LP
I

94.25
M RK
U Q Q
Q PA
K

A H #
THEATER DRAWING TYPE
AR

$
U EA 7 TE
RS #
# EXIT'G/DEM NON-ELEC SITE L'OUT
AR UTI
Q

LP AN
RY ING PL K
P

Q RK

NG
A 1 EXIST'G/DEMOLITION NON-ELECTRICAL SITE LAYOUT
PA
SS
$ S
CK RS
7 5 I BR
I
TE VE
RS
SURFACE PARKING AT MUNIRAH COMPLEX
MM

DRAWI
NG

AN
Q Q 14 -004773
PL
CK
PA
O I Y
Q

SCALE BR KWA 1 :500M


TI

$ M K C AL M
Q

SH 001
$ AH W
COMMUNITY SERVICES FACILITIES DH.
S

$
R
I

NI
Q Q
U
EX

$ 7
A a MU DHAHRAN SAUDI ARABIA
a -
Q AL
Q

$
$

S
$ EA PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
AR
$ PARKI
NG AREA ING Q A #
#
$$
RK
a Q
Q

$ K
K PA
Q M 93.58
$
$

$
$
S61 S HA-004773 001 00
Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-01

You might also like