Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
220 views

Active Doc List

Uploaded by

nadeem Uddin
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
220 views

Active Doc List

Uploaded by

nadeem Uddin
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 405

Document Type Document No

Inspection Procedures 00-SAIP-08


Inspection Procedures 00-SAIP-11
Inspection Procedures 00-SAIP-72
Inspection Procedures 00-SAIP-73

Inspection Procedures 00-SAIP-74


Inspection Procedures 00-SAIP-75
Inspection Procedures 00-SAIP-76
Inspection Procedures 00-SAIP-77
Inspection Procedures 00-SAIP-78
Inspection Procedures 00-SAIP-80

Inspection Procedures 00-SAIP-81


Inspection Procedures 01-SAIP-01
Inspection Procedures 01-SAIP-02
Inspection Procedures 01-SAIP-04
Inspection Procedures 01-SAIP-06

Inspection Procedures 01-SAIP-38

SAMSS-Material Specifications 01-SAMSS-005


SAMSS-Material Specifications 01-SAMSS-010
SAMSS-Material Specifications 01-SAMSS-012

SAMSS-Material Specifications 01-SAMSS-016


SAMSS-Material Specifications 01-SAMSS-023

SAMSS-Material Specifications 01-SAMSS-025


SAMSS-Material Specifications 01-SAMSS-029
SAMSS-Material Specifications 01-SAMSS-034
SAMSS-Material Specifications 01-SAMSS-035
SAMSS-Material Specifications 01-SAMSS-039
SAMSS-Material Specifications 01-SAMSS-041

SAMSS-Material Specifications 01-SAMSS-042


SAMSS-Material Specifications 01-SAMSS-043
SAMSS-Material Specifications 01-SAMSS-044

SAMSS-Material Specifications 01-SAMSS-045


SAMSS-Material Specifications 01-SAMSS-046
SAMSS-Material Specifications 01-SAMSS-047

Saudi Aramco: Company General Use


SAMSS-Material Specifications 01-SAMSS-048

SAMSS-Material Specifications 01-SAMSS-049

SAMSS-Material Specifications 01-SAMSS-050


SAMSS-Material Specifications 01-SAMSS-051
SAMSS-Material Specifications 01-SAMSS-052
SAMSS-Material Specifications 01-SAMSS-053
SAMSS-Material Specifications 01-SAMSS-054
SAMSS-Material Specifications 01-SAMSS-333
SAMSS-Material Specifications 02-SAMSS-005
SAMSS-Material Specifications 02-SAMSS-006
SAMSS-Material Specifications 02-SAMSS-009

SAMSS-Material Specifications 02-SAMSS-010


SAMSS-Material Specifications 02-SAMSS-011
SAMSS-Material Specifications 02-SAMSS-012

SAMSS-Material Specifications 02-SAMSS-013


SAMSS-Material Specifications 04-SAMSS-001
SAMSS-Material Specifications 04-SAMSS-002
SAMSS-Material Specifications 04-SAMSS-003
SAMSS-Material Specifications 04-SAMSS-005
SAMSS-Material Specifications 04-SAMSS-035
SAMSS-Material Specifications 04-SAMSS-041
SAMSS-Material Specifications 04-SAMSS-042

SAMSS-Material Specifications 04-SAMSS-047


SAMSS-Material Specifications 04-SAMSS-048
SAMSS-Material Specifications 04-SAMSS-050
SAMSS-Material Specifications 04-SAMSS-051
SAMSS-Material Specifications 04-SAMSS-053
SAMSS-Material Specifications 04-SAMSS-055
SAMSS-Material Specifications 05-SAMSS-002

SAMSS-Material Specifications 06-SAMSS-001

SAMSS-Material Specifications 09-SAMSS-002

SAMSS-Material Specifications 09-SAMSS-035


SAMSS-Material Specifications 09-SAMSS-060

SAMSS-Material Specifications 09-SAMSS-067

Saudi Aramco: Company General Use


SAMSS-Material Specifications 09-SAMSS-069

SAMSS-Material Specifications 09-SAMSS-070

SAMSS-Material Specifications 09-SAMSS-071


SAMSS-Material Specifications 09-SAMSS-075

SAMSS-Material Specifications 09-SAMSS-087


SAMSS-Material Specifications 09-SAMSS-088

SAMSS-Material Specifications 09-SAMSS-089

SAMSS-Material Specifications 09-SAMSS-091


SAMSS-Material Specifications 09-SAMSS-093
SAMSS-Material Specifications 09-SAMSS-097
SAMSS-Material Specifications 09-SAMSS-098

SAMSS-Material Specifications 09-SAMSS-101

SAMSS-Material Specifications 09-SAMSS-103


SAMSS-Material Specifications 09-SAMSS-106

SAMSS-Material Specifications 09-SAMSS-107

SAMSS-Material Specifications 09-SAMSS-113


SAMSS-Material Specifications 12-SAMSS-005
SAMSS-Material Specifications 12-SAMSS-007
SAMSS-Material Specifications 12-SAMSS-008
SAMSS-Material Specifications 12-SAMSS-010
SAMSS-Material Specifications 12-SAMSS-014

SAMSS-Material Specifications 12-SAMSS-018

SAMSS-Material Specifications 12-SAMSS-023

SAMSS-Material Specifications 12-SAMSS-024

SAMSS-Material Specifications 13-SAMSS-001

SAMSS-Material Specifications 13-SAMSS-003


SAMSS-Material Specifications 14-SAMSS-531
SAMSS-Material Specifications 14-SAMSS-533

Saudi Aramco: Company General Use


SAMSS-Material Specifications 14-SAMSS-534
SAMSS-Material Specifications 14-SAMSS-536

SAMSS-Material Specifications 14-SAMSS-600

SAMSS-Material Specifications 14-SAMSS-602

SAMSS-Material Specifications 14-SAMSS-603

SAMSS-Material Specifications 15-SAMSS-502

SAMSS-Material Specifications 15-SAMSS-503

SAMSS-Material Specifications 15-SAMSS-504

SAMSS-Material Specifications 16-SAMSS-502


SAMSS-Material Specifications 16-SAMSS-503
SAMSS-Material Specifications 16-SAMSS-504
SAMSS-Material Specifications 16-SAMSS-506
SAMSS-Material Specifications 16-SAMSS-507

SAMSS-Material Specifications 16-SAMSS-508

SAMSS-Material Specifications 16-SAMSS-510


SAMSS-Material Specifications 16-SAMSS-512

SAMSS-Material Specifications 16-SAMSS-513

SAMSS-Material Specifications 16-SAMSS-514


SAMSS-Material Specifications 16-SAMSS-517
SAMSS-Material Specifications 16-SAMSS-518
SAMSS-Material Specifications 16-SAMSS-519

SAMSS-Material Specifications 16-SAMSS-520


SAMSS-Material Specifications 16-SAMSS-521

SAMSS-Material Specifications 16-SAMSS-522

SAMSS-Material Specifications 16-SAMSS-523

SAMSS-Material Specifications 17-SAMSS-004


SAMSS-Material Specifications 17-SAMSS-005
SAMSS-Material Specifications 17-SAMSS-006
SAMSS-Material Specifications 17-SAMSS-007
SAMSS-Material Specifications 17-SAMSS-008

Saudi Aramco: Company General Use


SAMSS-Material Specifications 17-SAMSS-012
SAMSS-Material Specifications 17-SAMSS-017

SAMSS-Material Specifications 17-SAMSS-018


SAMSS-Material Specifications 17-SAMSS-502

SAMSS-Material Specifications 17-SAMSS-503


SAMSS-Material Specifications 17-SAMSS-510

SAMSS-Material Specifications 17-SAMSS-511

SAMSS-Material Specifications 17-SAMSS-514

SAMSS-Material Specifications 17-SAMSS-515

SAMSS-Material Specifications 17-SAMSS-516


SAMSS-Material Specifications 17-SAMSS-518
SAMSS-Material Specifications 17-SAMSS-520
Supplement Pages 17-SAMSS-520B
Inspection Requirements 175-000000

Inspection Requirements 175-000003


Inspection Requirements 175-000175

Inspection Requirements 175-010000

Inspection Requirements 175-010200


Inspection Requirements 175-010210

Inspection Requirements 175-010300

Inspection Requirements 175-010700

Inspection Requirements 175-010710

Inspection Requirements 175-010800


Inspection Requirements 175-010900
Inspection Requirements 175-011000
Inspection Requirements 175-011100

Inspection Requirements 175-012000

Saudi Aramco: Company General Use


Inspection Requirements 175-012200
Inspection Requirements 175-012300
Inspection Requirements 175-012400
Inspection Requirements 175-012401

Inspection Requirements 175-012500

Inspection Requirements 175-012800

Inspection Requirements 175-013100


Inspection Requirements 175-013200

Inspection Requirements 175-014300


Inspection Requirements 175-014301

Inspection Requirements 175-014400

Inspection Requirements 175-017800

Inspection Requirements 175-018000

Inspection Requirements 175-018200


Inspection Requirements 175-019800
Inspection Requirements 175-019900
Inspection Requirements 175-020000
Inspection Requirements 175-022500

Inspection Requirements 175-022501


Inspection Requirements 175-022502

Inspection Requirements 175-022503


Inspection Requirements 175-022504

Inspection Requirements 175-023400

Inspection Requirements 175-023800


Inspection Requirements 175-026100

Inspection Requirements 175-026400

Saudi Aramco: Company General Use


Inspection Requirements 175-026500
Inspection Requirements 175-026510

Inspection Requirements 175-026520


Inspection Requirements 175-026600

Inspection Requirements 175-026800


Inspection Requirements 175-030100

Inspection Requirements 175-043000

Inspection Requirements 175-043600

Inspection Requirements 175-043601

Inspection Requirements 175-045600


Inspection Requirements 175-070600

Inspection Requirements 175-071300


Inspection Requirements 175-080100

Inspection Requirements 175-080101


Inspection Requirements 175-090700
Inspection Requirements 175-091300
Inspection Requirements 175-091400

Inspection Requirements 175-091450

Inspection Requirements 175-091900

Inspection Requirements 175-092100

Inspection Requirements 175-100100

Inspection Requirements 175-120100


Inspection Requirements 175-120150

Saudi Aramco: Company General Use


Inspection Requirements 175-120200
Inspection Requirements 175-120300

Inspection Requirements 175-120400


Inspection Requirements 175-120500

Inspection Requirements 175-121400

Inspection Requirements 175-121600


Inspection Requirements 175-121900

Inspection Requirements 175-130300

Inspection Requirements 175-130900

Inspection Requirements 175-131000

Inspection Requirements 175-140200

Inspection Requirements 175-140300


Inspection Requirements 175-140500

Inspection Requirements 175-140600


Inspection Requirements 175-140700
Inspection Requirements 175-140800

Inspection Requirements 175-142100

Inspection Requirements 175-142101

Inspection Requirements 175-150100

Inspection Requirements 175-150200

Inspection Requirements 175-150400

Inspection Requirements 175-160100

Inspection Requirements 175-160300


Inspection Requirements 175-160350

Inspection Requirements 175-160400

Saudi Aramco: Company General Use


Inspection Requirements 175-160500

Inspection Requirements 175-160700


Inspection Requirements 175-160800

Inspection Requirements 175-162000

Inspection Requirements 175-162600

Inspection Requirements 175-162700

Inspection Requirements 175-162800


Inspection Requirements 175-165000

Inspection Requirements 175-170200

Inspection Requirements 175-170300

Inspection Requirements 175-170301

Inspection Requirements 175-170400

Inspection Requirements 175-170700


Inspection Requirements 175-171300

Inspection Requirements 175-171400


Inspection Requirements 175-171500

Inspection Requirements 175-172500

Inspection Requirements 175-172600

Inspection Requirements 175-173100

Inspection Requirements 175-173400

Inspection Requirements 175-173700

Inspection Requirements 175-173800


Inspection Requirements 175-180300
Inspection Requirements 175-180400

Saudi Aramco: Company General Use


Inspection Requirements 175-180500

Inspection Requirements 175-220200


Inspection Requirements 175-220300
Inspection Requirements 175-230100

Inspection Requirements 175-230200

Inspection Requirements 175-230300


Inspection Requirements 175-230400

Inspection Requirements 175-270200

Inspection Requirements 175-270300

Inspection Requirements 175-270350

Inspection Requirements 175-270400


Inspection Requirements 175-270500

Inspection Requirements 175-270600

Inspection Requirements 175-270700


Inspection Requirements 175-270800
Inspection Requirements 175-270900

Inspection Requirements 175-271000


Inspection Requirements 175-300100

Inspection Requirements 175-310100


Inspection Requirements 175-310200
Inspection Requirements 175-310300
Inspection Requirements 175-310400

Inspection Requirements 175-310500

Inspection Requirements 175-310510


Inspection Requirements 175-310520
Inspection Requirements 175-310530
Inspection Requirements 175-310600
Inspection Requirements 175-310610
Inspection Requirements 175-310620

Inspection Requirements 175-310700


Inspection Requirements 175-310800

Saudi Aramco: Company General Use


Inspection Requirements 175-310900

Inspection Requirements 175-311500

Inspection Requirements 175-311800

Inspection Requirements 175-311900

Inspection Requirements 175-311901

Inspection Requirements 175-311902

Inspection Requirements 175-312200

Inspection Requirements 175-312400

Inspection Requirements 175-312500

Inspection Requirements 175-312600

Inspection Requirements 175-313100


Inspection Requirements 175-313200
Inspection Requirements 175-313300

Inspection Requirements 175-320000

Inspection Requirements 175-320200

Inspection Requirements 175-320300


Inspection Requirements 175-321300

Inspection Requirements 175-321500


Inspection Requirements 175-321900
Inspection Requirements 175-321950
Inspection Requirements 175-323100
Inspection Requirements 175-323300
Inspection Requirements 175-323400
Inspection Requirements 175-323500
Inspection Requirements 175-323600
Inspection Requirements 175-323700

Saudi Aramco: Company General Use


Inspection Requirements 175-324400

Inspection Requirements 175-324900

Inspection Requirements 175-324901

Inspection Requirements 175-324920

Inspection Requirements 175-324925


Inspection Requirements 175-325000

Inspection Requirements 175-325100


Inspection Requirements 175-325300
Inspection Requirements 175-325400

Inspection Requirements 175-325500

Inspection Requirements 175-325501

Inspection Requirements 175-325502

Inspection Requirements 175-325503


Inspection Requirements 175-325504

Inspection Requirements 175-325505

Inspection Requirements 175-325506

Inspection Requirements 175-325507

Inspection Requirements 175-325508

Inspection Requirements 175-325509

Inspection Requirements 175-325510

Saudi Aramco: Company General Use


Inspection Requirements 175-325511
Inspection Requirements 175-325512

Inspection Requirements 175-325513

Inspection Requirements 175-325514

Inspection Requirements 175-325515

Inspection Requirements 175-325516

Inspection Requirements 175-325517

Inspection Requirements 175-325518

Inspection Requirements 175-325519

Inspection Requirements 175-325520

Inspection Requirements 175-326100

Inspection Requirements 175-326700


Inspection Requirements 175-327300

Inspection Requirements 175-328110


Inspection Requirements 175-329000

Inspection Requirements 175-340000

Inspection Requirements 175-340100


Inspection Requirements 175-340150
Inspection Requirements 175-340167
Inspection Requirements 175-340168
Inspection Requirements 175-340200

Inspection Requirements 175-341000

Inspection Requirements 175-341001


Inspection Requirements 175-341200

Saudi Aramco: Company General Use


Inspection Requirements 175-341210
Inspection Requirements 175-341700
Inspection Requirements 175-341900
Inspection Requirements 175-342800
Inspection Requirements 175-342810
Inspection Requirements 175-342900

Inspection Requirements 175-343100


Inspection Requirements 175-343200
Inspection Requirements 175-343600
Inspection Requirements 175-344000

Inspection Requirements 175-344200


Inspection Requirements 175-344300

Inspection Requirements 175-344400

Inspection Requirements 175-344500

Inspection Requirements 175-344600

Inspection Requirements 175-344700

Inspection Requirements 175-344900

Inspection Requirements 175-345100


Inspection Requirements 175-345300

Inspection Requirements 175-347500

Inspection Requirements 175-347600


Inspection Requirements 175-348000
Inspection Requirements 175-349000

Inspection Requirements 175-450100

Inspection Requirements 175-450400

Inspection Requirements 175-450500

Inspection Requirements 175-450600

Inspection Requirements 175-450700

Saudi Aramco: Company General Use


Inspection Requirements 175-451400

Inspection Requirements 175-451600

Inspection Requirements 175-451700

Inspection Requirements 175-451900

Inspection Requirements 175-452000

Inspection Requirements 175-452100

Inspection Requirements 175-452300

Inspection Requirements 175-452400

Inspection Requirements 175-453600

Inspection Requirements 175-453800

Inspection Requirements 175-453900

Inspection Requirements 175-453950

Inspection Requirements 175-454000


Inspection Requirements 175-454100

Inspection Requirements 175-454400

Inspection Requirements 175-454500


Inspection Requirements 175-456000
Inspection Requirements 175-457000

Inspection Requirements 175-460100


Inspection Requirements 175-720100

Inspection Requirements 175-730100

Inspection Requirements 175-740100

Inspection Requirements 175-780000

Saudi Aramco: Company General Use


Inspection Requirements 175-790700

Inspection Requirements 175-791100

Inspection Requirements 175-791200

Inspection Requirements 175-791300

SAMSS-Material Specifications 18-SAMSS-005

SAMSS-Material Specifications 18-SAMSS-006

SAMSS-Material Specifications 18-SAMSS-008


SAMSS-Material Specifications 18-SAMSS-493

SAMSS-Material Specifications 18-SAMSS-625

SAMSS-Material Specifications 20-SAMSS-001


SAMSS-Material Specifications 21-SAMSS-008
SAMSS-Material Specifications 21-SAMSS-009

SAMSS-Material Specifications 21-SAMSS-010

SAMSS-Material Specifications 21-SAMSS-011


SAMSS-Material Specifications 21-SAMSS-013
SAMSS-Material Specifications 21-SAMSS-014

SAMSS-Material Specifications 22-SAMSS-003


SAMSS-Material Specifications 22-SAMSS-004
SAMSS-Material Specifications 23-SAMSS-007
SAMSS-Material Specifications 23-SAMSS-010

SAMSS-Material Specifications 23-SAMSS-020


SAMSS-Material Specifications 23-SAMSS-030
SAMSS-Material Specifications 23-SAMSS-050
SAMSS-Material Specifications 23-SAMSS-070
SAMSS-Material Specifications 23-SAMSS-071
SAMSS-Material Specifications 23-SAMSS-072
SAMSS-Material Specifications 23-SAMSS-073
SAMSS-Material Specifications 23-SAMSS-701
SAMSS-Material Specifications 26-SAMSS-045
SAMSS-Material Specifications 26-SAMSS-046
SAMSS-Material Specifications 26-SAMSS-047

Saudi Aramco: Company General Use


SAMSS-Material Specifications 26-SAMSS-048
SAMSS-Material Specifications 26-SAMSS-050
SAMSS-Material Specifications 26-SAMSS-051
SAMSS-Material Specifications 26-SAMSS-052
SAMSS-Material Specifications 26-SAMSS-053
SAMSS-Material Specifications 26-SAMSS-054
SAMSS-Material Specifications 26-SAMSS-055
SAMSS-Material Specifications 26-SAMSS-056
SAMSS-Material Specifications 26-SAMSS-058
SAMSS-Material Specifications 26-SAMSS-059
SAMSS-Material Specifications 26-SAMSS-060
SAMSS-Material Specifications 26-SAMSS-061
SAMSS-Material Specifications 26-SAMSS-062
SAMSS-Material Specifications 26-SAMSS-063
SAMSS-Material Specifications 26-SAMSS-064
SAMSS-Material Specifications 26-SAMSS-065
SAMSS-Material Specifications 26-SAMSS-066
SAMSS-Material Specifications 26-SAMSS-067
SAMSS-Material Specifications 26-SAMSS-068
SAMSS-Material Specifications 26-SAMSS-069
SAMSS-Material Specifications 26-SAMSS-076
SAMSS-Material Specifications 26-SAMSS-077
SAMSS-Material Specifications 26-SAMSS-078
SAMSS-Material Specifications 26-SAMSS-079
SAMSS-Material Specifications 26-SAMSS-081
SAMSS-Material Specifications 26-SAMSS-082
SAMSS-Material Specifications 26-SAMSS-084
SAMSS-Material Specifications 26-SAMSS-085

SAMSS-Material Specifications 27-SAMSS-001

SAMSS-Material Specifications 27-SAMSS-002


SAMSS-Material Specifications 27-SAMSS-003
SAMSS-Material Specifications 27-SAMSS-006
SAMSS-Material Specifications 27-SAMSS-010
SAMSS-Material Specifications 29-SAMSS-006
SAMSS-Material Specifications 29-SAMSS-008
SAMSS-Material Specifications 29-SAMSS-009
SAMSS-Material Specifications 29-SAMSS-010
SAMSS-Material Specifications 29-SAMSS-011
SAMSS-Material Specifications 29-SAMSS-013
SAMSS-Material Specifications 29-SAMSS-014

SAMSS-Material Specifications 29-SAMSS-015

Saudi Aramco: Company General Use


SAMSS-Material Specifications 30-SAMSS-001

SAMSS-Material Specifications 31-SAMSS-001

SAMSS-Material Specifications 31-SAMSS-002

SAMSS-Material Specifications 31-SAMSS-003


SAMSS-Material Specifications 31-SAMSS-004

SAMSS-Material Specifications 31-SAMSS-006


SAMSS-Material Specifications 31-SAMSS-009

SAMSS-Material Specifications 31-SAMSS-010

SAMSS-Material Specifications 31-SAMSS-012


SAMSS-Material Specifications 31-SAMSS-685
Inspection Procedures 32-SAIP-11

SAMSS-Material Specifications 32-SAMSS-001


SAMSS-Material Specifications 32-SAMSS-002
SAMSS-Material Specifications 32-SAMSS-004
SAMSS-Material Specifications 32-SAMSS-005
SAMSS-Material Specifications 32-SAMSS-006
SAMSS-Material Specifications 32-SAMSS-007

SAMSS-Material Specifications 32-SAMSS-008

SAMSS-Material Specifications 32-SAMSS-009

SAMSS-Material Specifications 32-SAMSS-010


SAMSS-Material Specifications 32-SAMSS-011

SAMSS-Material Specifications 32-SAMSS-013

SAMSS-Material Specifications 32-SAMSS-016


SAMSS-Material Specifications 32-SAMSS-017
SAMSS-Material Specifications 32-SAMSS-019
SAMSS-Material Specifications 32-SAMSS-020
SAMSS-Material Specifications 32-SAMSS-021
SAMSS-Material Specifications 32-SAMSS-022
SAMSS-Material Specifications 32-SAMSS-027
SAMSS-Material Specifications 32-SAMSS-028
SAMSS-Material Specifications 32-SAMSS-029

SAMSS-Material Specifications 32-SAMSS-030

Saudi Aramco: Company General Use


SAMSS-Material Specifications 32-SAMSS-031
SAMSS-Material Specifications 32-SAMSS-033
SAMSS-Material Specifications 32-SAMSS-034
SAMSS-Material Specifications 32-SAMSS-035
SAMSS-Material Specifications 32-SAMSS-036

SAMSS-Material Specifications 32-SAMSS-038


SAMSS-Material Specifications 32-SAMSS-100
SAMSS-Material Specifications 34-SAMSS-001

SAMSS-Material Specifications 34-SAMSS-010


SAMSS-Material Specifications 34-SAMSS-112
SAMSS-Material Specifications 34-SAMSS-117
SAMSS-Material Specifications 34-SAMSS-119
SAMSS-Material Specifications 34-SAMSS-122
SAMSS-Material Specifications 34-SAMSS-167
SAMSS-Material Specifications 34-SAMSS-180
SAMSS-Material Specifications 34-SAMSS-319

SAMSS-Material Specifications 34-SAMSS-321


SAMSS-Material Specifications 34-SAMSS-510
SAMSS-Material Specifications 34-SAMSS-514
SAMSS-Material Specifications 34-SAMSS-525
SAMSS-Material Specifications 34-SAMSS-611
SAMSS-Material Specifications 34-SAMSS-617

SAMSS-Material Specifications 34-SAMSS-621


SAMSS-Material Specifications 34-SAMSS-622
SAMSS-Material Specifications 34-SAMSS-623
SAMSS-Material Specifications 34-SAMSS-624
SAMSS-Material Specifications 34-SAMSS-625

SAMSS-Material Specifications 34-SAMSS-626

SAMSS-Material Specifications 34-SAMSS-627

SAMSS-Material Specifications 34-SAMSS-628

SAMSS-Material Specifications 34-SAMSS-629


SAMSS-Material Specifications 34-SAMSS-634
SAMSS-Material Specifications 34-SAMSS-711
SAMSS-Material Specifications 34-SAMSS-716
SAMSS-Material Specifications 34-SAMSS-717
SAMSS-Material Specifications 34-SAMSS-718
SAMSS-Material Specifications 34-SAMSS-820

Saudi Aramco: Company General Use


SAMSS-Material Specifications 34-SAMSS-830
SAMSS-Material Specifications 34-SAMSS-831

SAMSS-Material Specifications 34-SAMSS-841

SAMSS-Material Specifications 34-SAMSS-846

SAMSS-Material Specifications 34-SAMSS-847

SAMSS-Material Specifications 34-SAMSS-851


SAMSS-Material Specifications 34-SAMSS-913

SAMSS-Material Specifications 45-SAMSS-005

SAMSS-Material Specifications 45-SAMSS-006

SAMSS-Material Specifications 45-SAMSS-007

SAMSS-Material Specifications 45-SAMSS-008

SAMSS-Material Specifications 45-SAMSS-009


SAMSS-Material Specifications 55-SAMSS-001
SAMSS-Material Specifications 55-SAMSS-002
SAMSS-Material Specifications 55-SAMSS-003
SAMSS-Material Specifications 74-SAMSS-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AA-036006-001
SASD-Standard Drawings AA-036007-001
SASD-Standard Drawings AA-036007-002

SASD-Standard Drawings AA-036015-001


SASD-Standard Drawings AA-036024-001
SASD-Standard Drawings AA-036024-002

SASD-Standard Drawings AA-036025-001

SASD-Standard Drawings AA-036025-002


SASD-Standard Drawings AA-036026-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AA-036026-002
SASD-Standard Drawings AA-036026-003
SASD-Standard Drawings AA-036035-001
SASD-Standard Drawings AA-036047-001
SASD-Standard Drawings AA-036051-001

SASD-Standard Drawings AA-036052-001

SASD-Standard Drawings AA-036052-002


SASD-Standard Drawings AA-036057-001

SASD-Standard Drawings AA-036058-001

SASD-Standard Drawings AA-036058-002

SASD-Standard Drawings AA-036062-001

SASD-Standard Drawings AA-036062-002


SASD-Standard Drawings AA-036065-001
SASD-Standard Drawings AA-036065-002
SASD-Standard Drawings AA-036065-003

SASD-Standard Drawings AA-036067-001

SASD-Standard Drawings AA-036069-001

SASD-Standard Drawings AA-036073-001

SASD-Standard Drawings AA-036073-002


SASD-Standard Drawings AA-036091-001
SASD-Standard Drawings AA-036105-001
SASD-Standard Drawings AA-036105-002
SASD-Standard Drawings AA-036107-001
SASD-Standard Drawings AA-036107-002

SASD-Standard Drawings AA-036108-001


SASD-Standard Drawings AA-036119-001
SASD-Standard Drawings AA-036119-002
SASD-Standard Drawings AA-036119-003

SASD-Standard Drawings AA-036121-001

SASD-Standard Drawings AA-036121-002

SASD-Standard Drawings AA-036123-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AA-036139-001

SASD-Standard Drawings AA-036140-001

SASD-Standard Drawings AA-036140-002

SASD-Standard Drawings AA-036140-003

SASD-Standard Drawings AA-036140-004

SASD-Standard Drawings AA-036142-001

SASD-Standard Drawings AA-036142-002

SASD-Standard Drawings AA-036142-003

SASD-Standard Drawings AA-036142-004

SASD-Standard Drawings AA-036142-005

SASD-Standard Drawings AA-036142-006

SASD-Standard Drawings AA-036142-007

SASD-Standard Drawings AA-036142-008

SASD-Standard Drawings AA-036142-009

SASD-Standard Drawings AA-036142-010

SASD-Standard Drawings AA-036142-011

SASD-Standard Drawings AA-036142-012

SASD-Standard Drawings AA-036142-013

SASD-Standard Drawings AA-036142-014

SASD-Standard Drawings AA-036142-015

SASD-Standard Drawings AA-036142-016

Saudi Aramco: Company General Use


SASD-Standard Drawings AA-036142-017

SASD-Standard Drawings AA-036142-018

SASD-Standard Drawings AA-036142-019

SASD-Standard Drawings AA-036145-001

SASD-Standard Drawings AA-036146-001


SASD-Standard Drawings AA-036157-001

SASD-Standard Drawings AA-036161-001

SASD-Standard Drawings AA-036197-001

SASD-Standard Drawings AA-036239-001

SASD-Standard Drawings AA-036242-001

SASD-Standard Drawings AA-036243-001

SASD-Standard Drawings AA-036246-001

SASD-Standard Drawings AA-036248-001

SASD-Standard Drawings AA-036248-002


SASD-Standard Drawings AA-036249-001

SASD-Standard Drawings AA-036256-001

SASD-Standard Drawings AA-036257-001

SASD-Standard Drawings AA-036259-001

SASD-Standard Drawings AA-036276-001

SASD-Standard Drawings AA-036277-001

SASD-Standard Drawings AA-036278-001

SASD-Standard Drawings AA-036280-001

SASD-Standard Drawings AA-036281-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AA-036304-001

SASD-Standard Drawings AA-036306-001

SASD-Standard Drawings AA-036313-001

SASD-Standard Drawings AA-036313-002

SASD-Standard Drawings AA-036322-001

SASD-Standard Drawings AA-036335-001

SASD-Standard Drawings AA-036346-001

SASD-Standard Drawings AA-036346-002

SASD-Standard Drawings AA-036347-001

SASD-Standard Drawings AA-036348-001

SASD-Standard Drawings AA-036349-001

SASD-Standard Drawings AA-036350-001

SASD-Standard Drawings AA-036352-001

SASD-Standard Drawings AA-036352-002

SASD-Standard Drawings AA-036353-001

SASD-Standard Drawings AA-036354-001

SASD-Standard Drawings AA-036355-001

SASD-Standard Drawings AA-036355-002

SASD-Standard Drawings AA-036356-001

SASD-Standard Drawings AA-036361-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AA-036362-001

SASD-Standard Drawings AA-036366-001

SASD-Standard Drawings AA-036371-001

SASD-Standard Drawings AA-036373-001

SASD-Standard Drawings AA-036373-002

SASD-Standard Drawings AA-036374-001

SASD-Standard Drawings AA-036374-002

SASD-Standard Drawings AA-036374-003

SASD-Standard Drawings AA-036374-004

SASD-Standard Drawings AA-036384-001


SASD-Standard Drawings AA-036385-001

SASD-Standard Drawings AA-036388-001


SASD-Standard Drawings AA-036389-001

SASD-Standard Drawings AA-036390-001

SASD-Standard Drawings AA-036390-002

SASD-Standard Drawings AA-036391-001


SASD-Standard Drawings AA-036399-001
SASD-Standard Drawings AA-036454-001

SASD-Standard Drawings AA-036458-001


SASD-Standard Drawings AA-036463-001
SASD-Standard Drawings AA-036488-001
SASD-Standard Drawings AA-036488-002
SASD-Standard Drawings AA-036496-001

SASD-Standard Drawings AA-036504-001

SASD-Standard Drawings AA-036506-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AA-036513-001

SASD-Standard Drawings AA-036513-002

SASD-Standard Drawings AA-036513-003

SASD-Standard Drawings AA-036525-001

SASD-Standard Drawings AA-036525-002

SASD-Standard Drawings AA-036529-001


SASD-Standard Drawings AA-036531-001

SASD-Standard Drawings AA-036537-001

SASD-Standard Drawings AA-036565-001

SASD-Standard Drawings AA-036572-001


SASD-Standard Drawings AA-036602-001

SASD-Standard Drawings AA-036629-001

SASD-Standard Drawings AA-036629-002

SASD-Standard Drawings AA-036637-001

SASD-Standard Drawings AA-036638-001


SASD-Standard Drawings AA-036638-002

SASD-Standard Drawings AA-036654-001

SASD-Standard Drawings AA-036658-001

SASD-Standard Drawings AA-036674-001

SASD-Standard Drawings AA-036675-001

SASD-Standard Drawings AA-036678-001

SASD-Standard Drawings AA-036742-001


SASD-Standard Drawings AA-036744-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AA-036748-001

SASD-Standard Drawings AA-036748-002

SASD-Standard Drawings AA-036748-003

SASD-Standard Drawings AA-036749-001

SASD-Standard Drawings AA-036754-001

SASD-Standard Drawings AA-036754-002

SASD-Standard Drawings AA-036754-003

SASD-Standard Drawings AA-036755-001

SASD-Standard Drawings AA-036755-002

SASD-Standard Drawings AA-036759-001

SASD-Standard Drawings AA-036759-002

SASD-Standard Drawings AA-036759-003

SASD-Standard Drawings AA-036759-004

SASD-Standard Drawings AA-036759-005

SASD-Standard Drawings AA-036759-006


SASD-Standard Drawings AA-036759-008

SASD-Standard Drawings AA-036762-001

SASD-Standard Drawings AA-036765-001

SASD-Standard Drawings AA-036777-001

SASD-Standard Drawings AA-036780-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AA-036783-001

SASD-Standard Drawings AA-036784-001

SASD-Standard Drawings AA-036792-001

SASD-Standard Drawings AA-036792-002

SASD-Standard Drawings AA-036793-001

SASD-Standard Drawings AA-036794-001

SASD-Standard Drawings AA-036794-002

SASD-Standard Drawings AA-036794-003

SASD-Standard Drawings AA-036794-004

SASD-Standard Drawings AA-036794-005

SASD-Standard Drawings AA-036819-001

SASD-Standard Drawings AA-036858-001

SASD-Standard Drawings AA-036859-001

SASD-Standard Drawings AA-036865-001


SASD-Standard Drawings AA-036873-001

SASD-Standard Drawings AA-036873-002


SASD-Standard Drawings AA-036878-001
SASD-Standard Drawings AA-036878-002
SASD-Standard Drawings AA-036886-001

SASD-Standard Drawings AA-036905-001


SASD-Standard Drawings AA-036911-001
SASD-Standard Drawings AA-036912-001
SASD-Standard Drawings AA-036913-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AA-036913-002

SASD-Standard Drawings AA-036943-001

SASD-Standard Drawings AA-036943-002

SASD-Standard Drawings AA-036944-001

SASD-Standard Drawings AA-036944-002

SASD-Standard Drawings AA-036970-001

SASD-Standard Drawings AA-036970-002

SASD-Standard Drawings AA-036971-001

SASD-Standard Drawings AA-036971-002

SASD-Standard Drawings AA-036972-001


SASD-Standard Drawings AB-036003-001

SASD-Standard Drawings AB-036008-001

SASD-Standard Drawings AB-036013-001


SASD-Standard Drawings AB-036019-001

SASD-Standard Drawings AB-036029-001

SASD-Standard Drawings AB-036029-002

SASD-Standard Drawings AB-036029-003


SASD-Standard Drawings AB-036033-001

SASD-Standard Drawings AB-036054-001


SASD-Standard Drawings AB-036090-001
SASD-Standard Drawings AB-036094-001
SASD-Standard Drawings AB-036094-002

SASD-Standard Drawings AB-036100-001


SASD-Standard Drawings AB-036106-001
SASD-Standard Drawings AB-036106-002
SASD-Standard Drawings AB-036155-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AB-036180-001

SASD-Standard Drawings AB-036180-002

SASD-Standard Drawings AB-036180-003

SASD-Standard Drawings AB-036180-004

SASD-Standard Drawings AB-036180-005

SASD-Standard Drawings AB-036180-006

SASD-Standard Drawings AB-036180-007


SASD-Standard Drawings AB-036204-001
SASD-Standard Drawings AB-036207-001

SASD-Standard Drawings AB-036227-001

SASD-Standard Drawings AB-036255-001

SASD-Standard Drawings AB-036260-001

SASD-Standard Drawings AB-036262-001

SASD-Standard Drawings AB-036262-002

SASD-Standard Drawings AB-036262-003

SASD-Standard Drawings AB-036273-001

SASD-Standard Drawings AB-036274-001

SASD-Standard Drawings AB-036275-001


SASD-Standard Drawings AB-036305-001

SASD-Standard Drawings AB-036319-001


SASD-Standard Drawings AB-036326-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AB-036351-001

SASD-Standard Drawings AB-036367-001

SASD-Standard Drawings AB-036378-001

SASD-Standard Drawings AB-036378-002

SASD-Standard Drawings AB-036380-001

SASD-Standard Drawings AB-036381-001

SASD-Standard Drawings AB-036386-001

SASD-Standard Drawings AB-036387-001

SASD-Standard Drawings AB-036395-001


SASD-Standard Drawings AB-036396-001

SASD-Standard Drawings AB-036398-001

SASD-Standard Drawings AB-036400-001

SASD-Standard Drawings AB-036401-001

SASD-Standard Drawings AB-036402-001

SASD-Standard Drawings AB-036408-001


SASD-Standard Drawings AB-036414-001

SASD-Standard Drawings AB-036414-002

SASD-Standard Drawings AB-036453-001

SASD-Standard Drawings AB-036462-001

SASD-Standard Drawings AB-036465-001

SASD-Standard Drawings AB-036478-001

SASD-Standard Drawings AB-036492-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AB-036492-002

SASD-Standard Drawings AB-036493-001

SASD-Standard Drawings AB-036493-002

SASD-Standard Drawings AB-036507-001

SASD-Standard Drawings AB-036521-001

SASD-Standard Drawings AB-036526-001


SASD-Standard Drawings AB-036528-001

SASD-Standard Drawings AB-036535-001

SASD-Standard Drawings AB-036536-001

SASD-Standard Drawings AB-036540-001

SASD-Standard Drawings AB-036570-001

SASD-Standard Drawings AB-036648-001

SASD-Standard Drawings AB-036661-001

SASD-Standard Drawings AB-036665-001

SASD-Standard Drawings AB-036665-002

SASD-Standard Drawings AB-036667-001

SASD-Standard Drawings AB-036677-001

SASD-Standard Drawings AB-036679-001


SASD-Standard Drawings AB-036685-001

SASD-Standard Drawings AB-036719-001


SASD-Standard Drawings AB-036727-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AB-036745-001

SASD-Standard Drawings AB-036747-001

SASD-Standard Drawings AB-036750-001

SASD-Standard Drawings AB-036756-001

SASD-Standard Drawings AB-036760-001

SASD-Standard Drawings AB-036760-002

SASD-Standard Drawings AB-036764-001

SASD-Standard Drawings AB-036766-001

SASD-Standard Drawings AB-036766-002

SASD-Standard Drawings AB-036766-003

SASD-Standard Drawings AB-036766-004

SASD-Standard Drawings AB-036774-001


SASD-Standard Drawings AB-036787-001

SASD-Standard Drawings AB-036837-001

SASD-Standard Drawings AB-036837-002


SASD-Standard Drawings AB-036880-001

SASD-Standard Drawings AB-036897-001

SASD-Standard Drawings AB-036907-001

SASD-Standard Drawings AB-036914-001

SASD-Standard Drawings AB-036949-001

SASD-Standard Drawings AB-036949-002

Saudi Aramco: Company General Use


SASD-Standard Drawings AB-036964-001
SASD-Standard Drawings AB-036998-001

SASD-Standard Drawings AC-036021-001

SASD-Standard Drawings AC-036022-001

SASD-Standard Drawings AC-036045-001

SASD-Standard Drawings AC-036078-001

SASD-Standard Drawings AC-036079-001

SASD-Standard Drawings AC-036085-001

SASD-Standard Drawings AC-036102-001

SASD-Standard Drawings AC-036104-001

SASD-Standard Drawings AC-036112-001


SASD-Standard Drawings AC-036198-001

SASD-Standard Drawings AC-036228-001


SASD-Standard Drawings AC-036261-001

SASD-Standard Drawings AC-036263-001

SASD-Standard Drawings AC-036268-001


SASD-Standard Drawings AC-036279-001

SASD-Standard Drawings AC-036397-001

SASD-Standard Drawings AC-036404-001

SASD-Standard Drawings AC-036404-002


SASD-Standard Drawings AC-036413-001

SASD-Standard Drawings AC-036413-002

SASD-Standard Drawings AC-036437-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AC-036442-001

SASD-Standard Drawings AC-036443-001

SASD-Standard Drawings AC-036456-001

SASD-Standard Drawings AC-036459-001

SASD-Standard Drawings AC-036480-001

SASD-Standard Drawings AC-036484-001

SASD-Standard Drawings AC-036486-001


SASD-Standard Drawings AC-036489-001

SASD-Standard Drawings AC-036541-001

SASD-Standard Drawings AC-036541-002

SASD-Standard Drawings AC-036548-001


SASD-Standard Drawings AC-036600-001

SASD-Standard Drawings AC-036630-001

SASD-Standard Drawings AC-036655-001


SASD-Standard Drawings AC-036660-001
SASD-Standard Drawings AC-036660-002
SASD-Standard Drawings AC-036660-003
SASD-Standard Drawings AC-036660-004

SASD-Standard Drawings AC-036680-001

SASD-Standard Drawings AC-036681-001

SASD-Standard Drawings AC-036688-001

SASD-Standard Drawings AC-036697-001

SASD-Standard Drawings AC-036915-001


SASD-Standard Drawings AC-036950-001

SASD-Standard Drawings AC-036963-001


SASD-Standard Drawings AD-036004-001
SASD-Standard Drawings AD-036009-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AD-036010-001

SASD-Standard Drawings AD-036016-001

SASD-Standard Drawings AD-036023-001

SASD-Standard Drawings AD-036023-002

SASD-Standard Drawings AD-036023-003


SASD-Standard Drawings AD-036061-001

SASD-Standard Drawings AD-036063-001

SASD-Standard Drawings AD-036064-001

SASD-Standard Drawings AD-036066-001

SASD-Standard Drawings AD-036066-002

SASD-Standard Drawings AD-036066-003

SASD-Standard Drawings AD-036070-001

SASD-Standard Drawings AD-036080-001

SASD-Standard Drawings AD-036132-001

SASD-Standard Drawings AD-036133-001

SASD-Standard Drawings AD-036135-001

SASD-Standard Drawings AD-036136-001


SASD-Standard Drawings AD-036204-001

SASD-Standard Drawings AD-036393-001

SASD-Standard Drawings AD-036393-002

SASD-Standard Drawings AD-036393-003

SASD-Standard Drawings AD-036393-004

SASD-Standard Drawings AD-036393-005

Saudi Aramco: Company General Use


SASD-Standard Drawings AD-036393-006

SASD-Standard Drawings AD-036393-007

SASD-Standard Drawings AD-036393-008

SASD-Standard Drawings AD-036393-009

SASD-Standard Drawings AD-036393-010

SASD-Standard Drawings AD-036393-011

SASD-Standard Drawings AD-036393-012

SASD-Standard Drawings AD-036393-013

SASD-Standard Drawings AD-036393-014

SASD-Standard Drawings AD-036393-015

SASD-Standard Drawings AD-036393-016

SASD-Standard Drawings AD-036393-017

SASD-Standard Drawings AD-036393-018

SASD-Standard Drawings AD-036393-019

SASD-Standard Drawings AD-036393-020

SASD-Standard Drawings AD-036393-021

SASD-Standard Drawings AD-036393-022

SASD-Standard Drawings AD-036393-023

Saudi Aramco: Company General Use


SASD-Standard Drawings AD-036393-024

SASD-Standard Drawings AD-036393-025

SASD-Standard Drawings AD-036393-026

SASD-Standard Drawings AD-036393-027

SASD-Standard Drawings AD-036393-028

SASD-Standard Drawings AD-036439-001

SASD-Standard Drawings AD-036461-001


SASD-Standard Drawings AD-036467-001

SASD-Standard Drawings AD-036491-001

SASD-Standard Drawings AD-036495-001

SASD-Standard Drawings AD-036555-001

SASD-Standard Drawings AD-036627-001

SASD-Standard Drawings AD-036631-001

SASD-Standard Drawings AD-036633-001

SASD-Standard Drawings AD-036634-001

SASD-Standard Drawings AD-036636-001

SASD-Standard Drawings AD-036643-001

SASD-Standard Drawings AD-036673-001


SASD-Standard Drawings AD-036696-001

SASD-Standard Drawings AD-036698-001

SASD-Standard Drawings AD-036711-001

SASD-Standard Drawings AD-036715-001

SASD-Standard Drawings AD-036715-002

Saudi Aramco: Company General Use


SASD-Standard Drawings AD-036731-001

SASD-Standard Drawings AD-036734-001

SASD-Standard Drawings AD-036735-001

SASD-Standard Drawings AD-036736-001

SASD-Standard Drawings AD-036763-001

SASD-Standard Drawings AD-036771-001

SASD-Standard Drawings AD-036771-002


SASD-Standard Drawings AD-036785-001

SASD-Standard Drawings AD-036821-001

SASD-Standard Drawings AD-036821-002

SASD-Standard Drawings AD-036874-001


SASD-Standard Drawings AD-036916-001

SASD-Standard Drawings AD-036973-001

SASD-Standard Drawings AD-036990-001

SASD-Standard Drawings AD-036991-001

SASD-Standard Drawings AE-036005-001

SASD-Standard Drawings AE-036014-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AE-036014-002

SASD-Standard Drawings AE-036034-001

SASD-Standard Drawings AE-036036-001

SASD-Standard Drawings AE-036037-001


SASD-Standard Drawings AE-036038-001
SASD-Standard Drawings AE-036046-001
SASD-Standard Drawings AE-036082-001
SASD-Standard Drawings AE-036083-001

SASD-Standard Drawings AE-036083-002


SASD-Standard Drawings AE-036084-001

SASD-Standard Drawings AE-036137-001

SASD-Standard Drawings AE-036141-001

SASD-Standard Drawings AE-036175-001

SASD-Standard Drawings AE-036208-001


SASD-Standard Drawings AE-036250-001
SASD-Standard Drawings AE-036250-002
SASD-Standard Drawings AE-036254-001

SASD-Standard Drawings AE-036265-001


SASD-Standard Drawings AE-036309-001

SASD-Standard Drawings AE-036309-002


SASD-Standard Drawings AE-036311-001

SASD-Standard Drawings AE-036343-001


SASD-Standard Drawings AE-036411-001
SASD-Standard Drawings AE-036411-002

SASD-Standard Drawings AE-036411-003


SASD-Standard Drawings AE-036412-001

SASD-Standard Drawings AE-036421-001

Saudi Aramco: Company General Use


SASD-Standard Drawings AE-036422-001

SASD-Standard Drawings AE-036434-001

SASD-Standard Drawings AE-036436-001


SASD-Standard Drawings AE-036438-001

SASD-Standard Drawings AE-036448-001

SASD-Standard Drawings AE-036448-002


SASD-Standard Drawings AE-036451-001

SASD-Standard Drawings AE-036451-002

SASD-Standard Drawings AE-036451-003

SASD-Standard Drawings AE-036451-004

SASD-Standard Drawings AE-036451-005

SASD-Standard Drawings AE-036451-006

SASD-Standard Drawings AE-036451-007

SASD-Standard Drawings AE-036451-008

SASD-Standard Drawings AE-036549-001


SASD-Standard Drawings AE-036550-001
SASD-Standard Drawings AE-036625-001

SASD-Standard Drawings AE-036700-001

SASD-Standard Drawings AE-036757-001

SASD-Standard Drawings AE-036757-002

SASD-Standard Drawings AE-036757-003

Saudi Aramco: Company General Use


SASD-Standard Drawings AE-036757-004
SASD-Standard Drawings AE-036768-001

SASD-Standard Drawings AE-036818-001

SASD-Standard Drawings AE-036818-002

SASD-Standard Drawings AE-036818-003

SASD-Standard Drawings AE-036818-004

SASD-Standard Drawings AE-036818-005


SASD-Standard Drawings AE-036833-001
SASD-Standard Drawings AE-036834-001

SASD-Standard Drawings AE-036881-001

SASD-Standard Drawings AE-036881-002

SASD-Standard Drawings AE-036881-003

SASD-Standard Drawings AE-036881-004

SASD-Standard Drawings AE-036881-005

SASD-Standard Drawings AE-036881-006

SASD-Standard Drawings AE-036881-007

SASD-Standard Drawings AE-036881-008

SASD-Standard Drawings AE-036881-009

SASD-Standard Drawings AE-036882-001

SASD-Standard Drawings AE-036882-002

SASD-Standard Drawings AE-036882-003

SASD-Standard Drawings AE-036882-004

SASD-Standard Drawings AE-036882-005

SASD-Standard Drawings AE-036882-006

Saudi Aramco: Company General Use


SASD-Standard Drawings AE-036882-007

SASD-Standard Drawings AE-036882-008

SASD-Standard Drawings AE-036882-009

SASD-Standard Drawings AE-036883-001

SASD-Standard Drawings AE-036883-002

SASD-Standard Drawings AE-036883-003

SASD-Standard Drawings AE-036883-004

SASD-Standard Drawings AE-036883-005

SASD-Standard Drawings AE-036883-006

SASD-Standard Drawings AE-036883-007

SASD-Standard Drawings AE-036883-008

SASD-Standard Drawings AE-036884-001

SASD-Standard Drawings AE-036884-002

SASD-Standard Drawings AE-036884-003

SASD-Standard Drawings AE-036884-004

SASD-Standard Drawings AE-036884-005

SASD-Standard Drawings AE-036884-006

SASD-Standard Drawings AE-036884-007

SASD-Standard Drawings AE-036884-008

SASD-Standard Drawings AE-036904-001

SASD-Standard Drawings AE-036904-002

SASD-Standard Drawings AE-036904-003

Saudi Aramco: Company General Use


SASD-Standard Drawings AE-036904-004

SASD-Standard Drawings AE-036904-005

SASD-Standard Drawings AE-036904-006

SASD-Standard Drawings AE-036904-007

SASD-Standard Drawings AE-036904-008

SASD-Standard Drawings AE-036940-001

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
Manuals CTA-Guide

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
SALD-Library Drawings DA-950011-001

SALD-Library Drawings DA-950028-001

SALD-Library Drawings DA-950032-001


SALD-Library Drawings DA-950035-001

SALD-Library Drawings DA-950065-001

SALD-Library Drawings DA-950065-002

SALD-Library Drawings DA-950068-001

SALD-Library Drawings DA-950068-002

SALD-Library Drawings DA-950068-003

SALD-Library Drawings DA-950075-001


SALD-Library Drawings DA-950091-001

SALD-Library Drawings DA-950092-001

SALD-Library Drawings DA-950093-001

SALD-Library Drawings DA-950104-001

SALD-Library Drawings DA-950119-001

SALD-Library Drawings DA-950130-001

SALD-Library Drawings DA-950131-001

SALD-Library Drawings DA-950136-001

Saudi Aramco: Company General Use


SALD-Library Drawings DA-950146-001

SALD-Library Drawings DA-950148-001


SALD-Library Drawings DA-950151-001
SALD-Library Drawings DA-950152-001

SALD-Library Drawings DA-950153-001

SALD-Library Drawings DA-950153-002

SALD-Library Drawings DA-950154-001

SALD-Library Drawings DA-950154-002


SALD-Library Drawings DA-950155-001
SALD-Library Drawings DA-950155-002

SALD-Library Drawings DA-950156-001

SALD-Library Drawings DA-950156-002

SALD-Library Drawings DA-950157-001

SALD-Library Drawings DA-950157-002

SALD-Library Drawings DA-950158-001

SALD-Library Drawings DA-950158-002

SALD-Library Drawings DA-950158-003

SALD-Library Drawings DA-950158-004

SALD-Library Drawings DA-950158-005

SALD-Library Drawings DA-950158-006

SALD-Library Drawings DA-950158-007

SALD-Library Drawings DA-950158-008

SALD-Library Drawings DA-950158-009

SALD-Library Drawings DA-950158-010

Saudi Aramco: Company General Use


SALD-Library Drawings DA-950158-011

SALD-Library Drawings DA-950158-012

SALD-Library Drawings DA-950158-013

SALD-Library Drawings DA-950159-001

SALD-Library Drawings DA-950159-002


SALD-Library Drawings DA-950159-003
SALD-Library Drawings DA-950159-004
SALD-Library Drawings DA-950159-005

SALD-Library Drawings DA-950160-001

SALD-Library Drawings DA-950160-002

SALD-Library Drawings DA-950161-001

SALD-Library Drawings DA-950162-001

SALD-Library Drawings DA-950162-002


SALD-Library Drawings DA-950163-001
SALD-Library Drawings DA-950163-002
SALD-Library Drawings DA-950163-003
SALD-Library Drawings DA-950163-004
SALD-Library Drawings DA-950163-005
SALD-Library Drawings DA-950163-006

SALD-Library Drawings DA-950164-001

SALD-Library Drawings DA-950164-002


SALD-Library Drawings DA-950164-003

SALD-Library Drawings DA-950164-004

SALD-Library Drawings DA-950164-005

SALD-Library Drawings DA-950164-006

SALD-Library Drawings DA-950164-007

SALD-Library Drawings DA-950165-001

Saudi Aramco: Company General Use


SALD-Library Drawings DA-950165-002

SALD-Library Drawings DA-950165-003

SALD-Library Drawings DA-950165-004

SALD-Library Drawings DA-950165-005

SALD-Library Drawings DA-950165-006

SALD-Library Drawings DA-950165-007


SALD-Library Drawings DA-950166-001

SALD-Library Drawings DA-950166-002

SALD-Library Drawings DA-950166-003

SALD-Library Drawings DA-950166-004

SALD-Library Drawings DA-950166-005


SALD-Library Drawings DA-950167-001

SALD-Library Drawings DA-950167-002


SALD-Library Drawings DA-950167-003
SALD-Library Drawings DA-950167-004

SALD-Library Drawings DA-950167-005


SALD-Library Drawings DA-950167-006

SALD-Library Drawings DA-950167-007

SALD-Library Drawings DA-950167-008

SALD-Library Drawings DA-950167-009

SALD-Library Drawings DA-950167-010

SALD-Library Drawings DA-950167-011

SALD-Library Drawings DA-950167-012

SALD-Library Drawings DA-950167-013


SALD-Library Drawings DA-950167-014

Saudi Aramco: Company General Use


SALD-Library Drawings DA-950167-015

SALD-Library Drawings DA-950167-016


SALD-Library Drawings DA-950167-017

SALD-Library Drawings DA-950167-018

SALD-Library Drawings DA-950167-019

SALD-Library Drawings DA-950167-020

SALD-Library Drawings DA-950167-021

SALD-Library Drawings DA-950167-022

SALD-Library Drawings DA-950167-023

SALD-Library Drawings DA-950168-001

SALD-Library Drawings DA-950168-002

SALD-Library Drawings DA-950168-003

SALD-Library Drawings DA-950168-004

SALD-Library Drawings DA-950168-005

SALD-Library Drawings DA-950168-006


SALD-Library Drawings DA-950168-007

SALD-Library Drawings DA-950169-001

SALD-Library Drawings DA-950169-002

SALD-Library Drawings DA-950169-003

SALD-Library Drawings DA-950169-004

SALD-Library Drawings DA-950169-005

SALD-Library Drawings DA-950169-006

SALD-Library Drawings DA-950169-007

Saudi Aramco: Company General Use


SALD-Library Drawings DA-950169-008

SALD-Library Drawings DA-950169-009

SALD-Library Drawings DA-950170-001

SALD-Library Drawings DA-950170-002

SALD-Library Drawings DA-950170-003

SALD-Library Drawings DA-950170-004

SALD-Library Drawings DA-950170-005

SALD-Library Drawings DA-950170-006

SALD-Library Drawings DA-950170-007

SALD-Library Drawings DA-950170-008


SALD-Library Drawings DA-950170-009

SALD-Library Drawings DA-950170-010

SALD-Library Drawings DA-950170-011

SALD-Library Drawings DA-950170-012

SALD-Library Drawings DA-950170-013

SALD-Library Drawings DA-950170-014

SALD-Library Drawings DA-950170-015

SALD-Library Drawings DA-950170-016

SALD-Library Drawings DA-950170-017

SALD-Library Drawings DA-950170-018


SALD-Library Drawings DA-950171-001
SALD-Library Drawings DA-950171-002

SALD-Library Drawings DA-950180-001

SALD-Library Drawings DA-950180-002

Saudi Aramco: Company General Use


SALD-Library Drawings DA-950180-003

SALD-Library Drawings DA-950180-004

SALD-Library Drawings DA-950180-005

SALD-Library Drawings DA-950180-006


SALD-Library Drawings DA-950180-007

SALD-Library Drawings DA-950180-008

SALD-Library Drawings DA-950180-009

SALD-Library Drawings DA-950180-010

SALD-Library Drawings DA-950180-011

SALD-Library Drawings DA-950180-012

SALD-Library Drawings DA-950180-013

SALD-Library Drawings DA-950180-014

SALD-Library Drawings DA-950180-015

SALD-Library Drawings DA-950180-016

SALD-Library Drawings DA-950180-017

SALD-Library Drawings DA-950180-018

SALD-Library Drawings DA-950180-019

SALD-Library Drawings DA-950180-020

SALD-Library Drawings DA-950180-021

SALD-Library Drawings DA-950180-022

SALD-Library Drawings DA-950180-023


SALD-Library Drawings DA-950182-001

SALD-Library Drawings DA-950183-001

Saudi Aramco: Company General Use


SALD-Library Drawings DA-950184-001
SALD-Library Drawings DA-950185-001

SALD-Library Drawings DA-950214-001

SALD-Library Drawings DA-950214-002

SALD-Library Drawings DA-950214-003

SALD-Library Drawings DA-950214-004

SALD-Library Drawings DA-950214-005

SALD-Library Drawings DA-950214-006

SALD-Library Drawings DA-950214-007

SALD-Library Drawings DA-950214-008

SALD-Library Drawings DA-950214-009

SALD-Library Drawings DA-950214-010

SALD-Library Drawings DA-950214-011

SALD-Library Drawings DA-950214-012

SALD-Library Drawings DA-950214-013

SALD-Library Drawings DA-950214-014

SALD-Library Drawings DA-950214-015

SALD-Library Drawings DA-950214-016

Saudi Aramco: Company General Use


SALD-Library Drawings DA-950214-017

SALD-Library Drawings DA-950214-018

SALD-Library Drawings DA-950214-019

SALD-Library Drawings DA-950214-020

SALD-Library Drawings DA-950214-021

SALD-Library Drawings DA-950214-022

SALD-Library Drawings DA-950214-023

SALD-Library Drawings DA-950214-024

SALD-Library Drawings DA-950214-025

SALD-Library Drawings DA-950214-026

SALD-Library Drawings DA-950214-027

SALD-Library Drawings DA-950214-028

SALD-Library Drawings DA-950214-029

SALD-Library Drawings DA-950214-030

SALD-Library Drawings DA-950214-031

SALD-Library Drawings DA-950214-032

SALD-Library Drawings DA-950214-033

SALD-Library Drawings DA-950214-034

SALD-Library Drawings DA-950214-035

Saudi Aramco: Company General Use


SALD-Library Drawings DA-950214-036

SALD-Library Drawings DA-950214-037

SALD-Library Drawings DA-950214-038

SALD-Library Drawings DA-950214-039

SALD-Library Drawings DA-950214-040

SALD-Library Drawings DA-950214-041

SALD-Library Drawings DA-950214-042

SALD-Library Drawings DA-950214-043

SALD-Library Drawings DA-950214-044

SALD-Library Drawings DA-950214-045

SALD-Library Drawings DA-950266-001

SALD-Library Drawings DA-950266-002

SALD-Library Drawings DA-950266-003


SALD-Library Drawings DA-950301-001

SALD-Library Drawings DA-950303-001

SALD-Library Drawings DA-950306-001


SALD-Library Drawings DA-950308-001
SALD-Library Drawings DA-950310-001
SALD-Library Drawings DB-950002-001

SALD-Library Drawings DB-950006-001

SALD-Library Drawings DB-950009-001


SALD-Library Drawings DB-950027-001

SALD-Library Drawings DB-950039-001

SALD-Library Drawings DB-950046-001

SALD-Library Drawings DB-950047-001

Saudi Aramco: Company General Use


SALD-Library Drawings DB-950048-001

SALD-Library Drawings DB-950050-001

SALD-Library Drawings DB-950054-001

SALD-Library Drawings DB-950055-001

SALD-Library Drawings DB-950055-002

SALD-Library Drawings DB-950067-001

SALD-Library Drawings DB-950074-001


SALD-Library Drawings DB-950076-001

SALD-Library Drawings DB-950077-001

SALD-Library Drawings DB-950078-001

SALD-Library Drawings DB-950095-001

SALD-Library Drawings DB-950097-001

SALD-Library Drawings DB-950098-001

SALD-Library Drawings DB-950098-002

SALD-Library Drawings DB-950098-003

SALD-Library Drawings DB-950098-004

SALD-Library Drawings DB-950098-005

SALD-Library Drawings DB-950098-006

SALD-Library Drawings DB-950098-007

SALD-Library Drawings DB-950098-008

SALD-Library Drawings DB-950098-009

SALD-Library Drawings DB-950098-010

Saudi Aramco: Company General Use


SALD-Library Drawings DB-950098-011

SALD-Library Drawings DB-950098-012


SALD-Library Drawings DB-950098-013

SALD-Library Drawings DB-950099-001

SALD-Library Drawings DB-950099-002

SALD-Library Drawings DB-950099-003

SALD-Library Drawings DB-950100-001

SALD-Library Drawings DB-950100-002

SALD-Library Drawings DB-950100-003

SALD-Library Drawings DB-950100-004

SALD-Library Drawings DB-950100-005

SALD-Library Drawings DB-950100-006


SALD-Library Drawings DB-950106-001
SALD-Library Drawings DB-950106-002

SALD-Library Drawings DB-950109-001

SALD-Library Drawings DB-950110-001

SALD-Library Drawings DB-950112-001

SALD-Library Drawings DB-950120-001

SALD-Library Drawings DB-950120-002

SALD-Library Drawings DB-950123-001

SALD-Library Drawings DB-950125-001

SALD-Library Drawings DB-950129-001

SALD-Library Drawings DB-950129-002

Saudi Aramco: Company General Use


SALD-Library Drawings DB-950132-001

SALD-Library Drawings DB-950133-001

SALD-Library Drawings DB-950134-001

SALD-Library Drawings DB-950144-001

SALD-Library Drawings DB-950145-001

SALD-Library Drawings DB-950174-001

SALD-Library Drawings DB-950175-001

SALD-Library Drawings DB-950176-001


SALD-Library Drawings DB-950177-001

SALD-Library Drawings DB-950178-001

SALD-Library Drawings DB-950179-001


SALD-Library Drawings DB-950181-001
SALD-Library Drawings DB-950181-002

SALD-Library Drawings DB-950304-001

SALD-Library Drawings DB-950304-002

SALD-Library Drawings DB-950305-001

SALD-Library Drawings DB-950307-001


SALD-Library Drawings DB-950309-001

SALD-Library Drawings DC-950012-001


SALD-Library Drawings DC-950014-001

SALD-Library Drawings DC-950017-001

SALD-Library Drawings DC-950018-001

SALD-Library Drawings DC-950020-001

SALD-Library Drawings DC-950023-001

Saudi Aramco: Company General Use


SALD-Library Drawings DC-950024-001

SALD-Library Drawings DC-950040-001

SALD-Library Drawings DC-950041-001

SALD-Library Drawings DC-950042-001

SALD-Library Drawings DC-950043-001


SALD-Library Drawings DC-950045-001
SALD-Library Drawings DC-950051-001

SALD-Library Drawings DC-950057-001

SALD-Library Drawings DC-950059-001

SALD-Library Drawings DC-950060-001

SALD-Library Drawings DC-950061-001

SALD-Library Drawings DC-950062-001

SALD-Library Drawings DC-950063-001

SALD-Library Drawings DC-950069-001

SALD-Library Drawings DC-950070-001

SALD-Library Drawings DC-950071-001

SALD-Library Drawings DC-950072-001

SALD-Library Drawings DC-950073-001

SALD-Library Drawings DC-950080-001

SALD-Library Drawings DC-950081-001

Saudi Aramco: Company General Use


SALD-Library Drawings DC-950082-001

SALD-Library Drawings DC-950083-001

SALD-Library Drawings DC-950084-001

SALD-Library Drawings DC-950085-001

SALD-Library Drawings DC-950102-001

SALD-Library Drawings DC-950103-001

SALD-Library Drawings DC-950108-001

SALD-Library Drawings DC-950111-001

SALD-Library Drawings DC-950113-001

SALD-Library Drawings DC-950117-001

SALD-Library Drawings DC-950124-001

SALD-Library Drawings DC-950126-001

SALD-Library Drawings DC-950127-001

SALD-Library Drawings DC-950128-001

SALD-Library Drawings DC-950137-001

SALD-Library Drawings DC-950138-001

SALD-Library Drawings DC-950139-001

SALD-Library Drawings DC-950140-001

SALD-Library Drawings DC-950141-001

SALD-Library Drawings DC-950142-001

SALD-Library Drawings DC-950143-001

SALD-Library Drawings DC-950147-001

Saudi Aramco: Company General Use


SALD-Library Drawings DC-950150-001

SALD-Library Drawings DC-950599-001

SALD-Library Drawings DD-950003-001

SALD-Library Drawings DD-950004-001

SALD-Library Drawings DD-950005-001


SALD-Library Drawings DD-950007-001

SALD-Library Drawings DD-950008-001

SALD-Library Drawings DD-950016-001

SALD-Library Drawings DD-950022-001

SALD-Library Drawings DD-950022-002

SALD-Library Drawings DD-950022-003

SALD-Library Drawings DD-950022-004

SALD-Library Drawings DD-950022-005

SALD-Library Drawings DD-950022-006

SALD-Library Drawings DD-950022-007

SALD-Library Drawings DD-950022-008

SALD-Library Drawings DD-950022-009

SALD-Library Drawings DD-950022-010

SALD-Library Drawings DD-950022-011

SALD-Library Drawings DD-950022-012


SALD-Library Drawings DD-950025-001

SALD-Library Drawings DD-950025-002


SALD-Library Drawings DD-950053-001

Saudi Aramco: Company General Use


SALD-Library Drawings DD-950056-001
SALD-Library Drawings DD-950058-001
SALD-Library Drawings DD-950079-001

SALD-Library Drawings DD-950107-001

SALD-Library Drawings DD-950114-001

SALD-Library Drawings DD-950114-002

SALD-Library Drawings DD-950114-003

SALD-Library Drawings DD-950114-004

SALD-Library Drawings DD-950114-005

SALD-Library Drawings DD-950114-006

SALD-Library Drawings DD-950114-007

SALD-Library Drawings DD-950114-008

SALD-Library Drawings DD-950114-009

SALD-Library Drawings DD-950114-010

SALD-Library Drawings DD-950114-011

SALD-Library Drawings DD-950114-012

SALD-Library Drawings DD-950114-013

SALD-Library Drawings DD-950114-014

SALD-Library Drawings DD-950114-015

SALD-Library Drawings DD-950114-016

SALD-Library Drawings DD-950114-017

SALD-Library Drawings DD-950114-018


SALD-Library Drawings DD-950114-019

Saudi Aramco: Company General Use


SALD-Library Drawings DD-950114-020

SALD-Library Drawings DD-950114-021

SALD-Library Drawings DD-950114-022

SALD-Library Drawings DD-950114-023


SALD-Library Drawings DD-950114-024

SALD-Library Drawings DD-950114-025

SALD-Library Drawings DD-950114-026

SALD-Library Drawings DD-950114-027

SALD-Library Drawings DD-950114-028

SALD-Library Drawings DD-950114-029

SALD-Library Drawings DD-950114-030

SALD-Library Drawings DD-950114-031

SALD-Library Drawings DD-950114-032

SALD-Library Drawings DD-950114-033

SALD-Library Drawings DD-950114-034

SALD-Library Drawings DD-950114-035

SALD-Library Drawings DD-950114-036

SALD-Library Drawings DD-950114-037

SALD-Library Drawings DD-950114-038

SALD-Library Drawings DD-950115-001

SALD-Library Drawings DD-950116-001

SALD-Library Drawings DD-950121-001

Saudi Aramco: Company General Use


SALD-Library Drawings DD-950122-001

SALD-Library Drawings DD-950135-001


SALD-Library Drawings DD-950302-001

SALD-Library Drawings DD-950683-001


SALD-Library Drawings DE-950001-001

SALD-Library Drawings DE-950010-001

SALD-Library Drawings DE-950015-001

SALD-Library Drawings DE-950019-001

SALD-Library Drawings DE-950019-002

SALD-Library Drawings DE-950021-001


SALD-Library Drawings DE-950026-001
SALD-Library Drawings DE-950064-001
SALD-Library Drawings DE-950066-001

SALD-Library Drawings DE-950086-001

SALD-Library Drawings DE-950086-002

SALD-Library Drawings DE-950086-003

SALD-Library Drawings DE-950086-004

SALD-Library Drawings DE-950086-005

SALD-Library Drawings DE-950086-006

SALD-Library Drawings DE-950086-007

SALD-Library Drawings DE-950086-008

SALD-Library Drawings DE-950086-009

SALD-Library Drawings DE-950086-010

SALD-Library Drawings DE-950086-011

SALD-Library Drawings DE-950086-012

Saudi Aramco: Company General Use


SALD-Library Drawings DE-950086-013

SALD-Library Drawings DE-950086-014

SALD-Library Drawings DE-950086-015

SALD-Library Drawings DE-950086-016

SALD-Library Drawings DE-950086-017

SALD-Library Drawings DE-950086-018

SALD-Library Drawings DE-950086-019

SALD-Library Drawings DE-950086-020

SALD-Library Drawings DE-950086-021

SALD-Library Drawings DE-950086-022

SALD-Library Drawings DE-950086-023

SALD-Library Drawings DE-950086-024

SALD-Library Drawings DE-950086-025

SALD-Library Drawings DE-950086-026

SALD-Library Drawings DE-950086-027

SALD-Library Drawings DE-950086-028

SALD-Library Drawings DE-950086-029


SALD-Library Drawings DE-950087-001
SALD-Library Drawings DE-950087-002

SALD-Library Drawings DE-950087-003

SALD-Library Drawings DE-950088-001

SALD-Library Drawings DE-950089-001

SALD-Library Drawings DE-950090-001


SALD-Library Drawings DE-950091-002

Saudi Aramco: Company General Use


SALD-Library Drawings DE-950091-003

SALD-Library Drawings DE-950101-001

SALD-Library Drawings DE-950149-001


SALD-Library Drawings DE-950311-001

SALD-Library Drawings DE-950470-001

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
Manuals ENVIRONMENTAL HEALTH CODE

Saudi Aramco: Company General Use


Manuals INSPECTION MANUAL (EDITION-1)

Forms-Life Cycle Cost LCC-001

Forms-Life Cycle Cost LCC-002

Forms-Life Cycle Cost LCC-006

Forms-Life Cycle Cost LCC-007

Forms-Life Cycle Cost LCC-008

Forms-Life Cycle Cost LCC-010

Forms-Life Cycle Cost LCC-015

Forms-Life Cycle Cost LCC-019

Forms-Life Cycle Cost LCC-020

Forms-Life Cycle Cost LCC-021

Saudi Aramco: Company General Use


Forms-Life Cycle Cost LCC-023

Forms-Life Cycle Cost LCC-024

Forms-Life Cycle Cost LCC-024A

Forms-Life Cycle Cost LCC-025

Forms-Life Cycle Cost LCC-025A

Manuals MANUAL
Manuals MANUAL-CUSTODY MEASUREMENT-1
Manuals MANUAL-CUSTODY MEASUREMENT-2
Manuals MANUAL-CUSTODY MEASUREMENT-3

Manuals MANUAL-ENERGY CONSERVATION


Manuals MANUAL-FRONT END LOADING
Manuals MANUAL-INTEGRATED PROJECT TEAM
Manuals MANUAL-LUBRICATION

Manuals MANUAL-MATERIALS LABORATORY

Manuals MANUAL-OVERLAY WELDING

Manuals MANUAL-PERFORMING PNS SECURITY

Manuals MANUAL-PROJECT SPONSOR A AND B PROJECTS

Manuals MANUAL-PROJECT SPONSOR C AND C1 PROJECTS

Manuals MANUAL-STANDARD WELDING

Manuals MANUAL-STRUCTURAL WELDING

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Forms-Data Sheets SA-0375

Forms-Data Sheets SA-2318

Forms-Data Sheets SA-2504

Forms-Data Sheets SA-2505

Forms-Data Sheets SA-2505-M


Forms-Data Sheets SA-2507-M

Forms-Data Sheets SA-2514

Forms-Data Sheets SA-2514-M

Forms-Data Sheets SA-2517

Forms-Data Sheets SA-2519


Forms-Data Sheets SA-2527
Forms-Data Sheets SA-2527-1

Forms-Data Sheets SA-2546

Forms-Data Sheets SA-2605

Forms-Data Sheets SA-2615

Forms-Data Sheets SA-2615-1

Forms-Data Sheets SA-2616

Forms-Data Sheets SA-2616-1


Forms-Data Sheets SA-2616-W
Forms-Data Sheets SA-2617

Forms-Data Sheets SA-2634

Saudi Aramco: Company General Use


Forms-Data Sheets SA-2634-1

Forms-Data Sheets SA-2635

Forms-Data Sheets SA-2635-1

Forms-Data Sheets SA-2636

Forms-Data Sheets SA-2636-1


Forms-Data Sheets SA-2693

Forms-Data Sheets SA-2694


Forms-Data Sheets SA-2696
Forms-Data Sheets SA-2696-1
Forms-Data Sheets SA-2696-2

Forms-Data Sheets SA-2699

Forms-Data Sheets SA-2713

Forms-Data Sheets SA-2713-M

Forms-Data Sheets SA-2714


Forms-Data Sheets SA-2716
Forms-Data Sheets SA-2731
Forms-Data Sheets SA-2731-M

Forms-Data Sheets SA-2741

Forms-Data Sheets SA-2741-M


Forms-Data Sheets SA-2742

Forms-Data Sheets SA-2742-M

Forms-Data Sheets SA-2745

Forms-Data Sheets SA-2745-M

Forms-Data Sheets SA-2748

Saudi Aramco: Company General Use


Forms-Data Sheets SA-2748-M

Forms-Data Sheets SA-2773

Forms-Data Sheets SA-2773-M

Forms-Data Sheets SA-2775

Forms-Data Sheets SA-2775-M

Forms-Data Sheets SA-2777

Forms-Data Sheets SA-2777-M

Forms-Data Sheets SA-2778

Forms-Data Sheets SA-2778-M

Forms-Data Sheets SA-2780

Forms-Data Sheets SA-2780-M

Forms-Data Sheets SA-2781A

Forms-Data Sheets SA-2781B

Forms-Data Sheets SA-2781C

Forms-Data Sheets SA-2781D

Forms-Data Sheets SA-2781E

Forms-Data Sheets SA-2786-M

Forms-Data Sheets SA-2787

Forms-Data Sheets SA-2787-M

Forms-Data Sheets SA-2788

Forms-Data Sheets SA-2788-M

Saudi Aramco: Company General Use


Forms-Data Sheets SA-2790

Forms-Data Sheets SA-2790-M

Forms-Data Sheets SA-2793-M

Forms-Data Sheets SA-2794

Forms-Data Sheets SA-2794-M

Forms-Data Sheets SA-2799

Forms-Data Sheets SA-2811

Forms-Data Sheets SA-2811-M


Forms-Data Sheets SA-2812

Forms-Data Sheets SA-2812-M

Forms-Data Sheets SA-2821


Forms-Data Sheets SA-2824
Forms-Data Sheets SA-2825
Forms-Data Sheets SA-2825-1
Forms-Data Sheets SA-2825-2
Forms-Data Sheets SA-2829
Forms-Data Sheets SA-2860
Forms-Data Sheets SA-2864
Forms-Data Sheets SA-2871
Forms-Data Sheets SA-2871-M
Forms-Data Sheets SA-3060
Forms-Data Sheets SA-3063-M
Forms-Data Sheets SA-3099A
Forms-Data Sheets SA-3175
Forms-Data Sheets SA-3176
Forms-Data Sheets SA-3176-M
Forms-Data Sheets SA-3176A
Forms-Data Sheets SA-3177

Forms-Data Sheets SA-3185


Forms-Data Sheets SA-3185-A

Forms-Data Sheets SA-3186

Forms-Data Sheets SA-3186-M

Saudi Aramco: Company General Use


Forms-Data Sheets SA-3188
Forms-Data Sheets SA-3188-M

Forms-Data Sheets SA-3195

Forms-Data Sheets SA-3195-M


Forms-Data Sheets SA-373
Forms-Data Sheets SA-3730
Forms-Data Sheets SA-3750
Forms-Data Sheets SA-4719-A

Forms-Data Sheets SA-5645-1

Forms-Data Sheets SA-5645-2

Forms-Data Sheets SA-5645-3

Forms-Data Sheets SA-5645-4


Forms-Data Sheets SA-5994
Forms-Data Sheets SA-5994-1
Forms-Data Sheets SA-6039

Forms-Data Sheets SA-6078

Forms-Data Sheets SA-6078-M

Forms-Data Sheets SA-6079

Forms-Data Sheets SA-6079-M

Forms-Data Sheets SA-6080

Forms-Data Sheets SA-6080-M

Forms-Data Sheets SA-6081

Forms-Data Sheets SA-6081-M


Forms-Data Sheets SA-6225
Forms-Data Sheets SA-6228

Forms-Data Sheets SA-6232


Forms-Data Sheets SA-6233-1

Forms-Data Sheets SA-6236

Saudi Aramco: Company General Use


Forms-Data Sheets SA-6236-M
Forms-Data Sheets SA-6237
Forms-Data Sheets SA-6237-M

Forms-Data Sheets SA-6238

Forms-Data Sheets SA-6238-M


Forms-Data Sheets SA-6239
Forms-Data Sheets SA-6285

Forms-Data Sheets SA-6286

Forms-Data Sheets SA-6286-M


Forms-Data Sheets SA-6320-1
Forms-Data Sheets SA-6320-2
Forms-Data Sheets SA-6320-3
Forms-Data Sheets SA-6717
Forms-Data Sheets SA-6736
Forms-Data Sheets SA-6801
Forms-Data Sheets SA-6880
Forms-Data Sheets SA-6880-M

Forms-Data Sheets SA-7076

Forms-Data Sheets SA-7175


Forms-Data Sheets SA-7235
Forms-Data Sheets SA-7305
Forms-Data Sheets SA-7460
Forms-Data Sheets SA-7460-1
Forms-Data Sheets SA-7460-2
Forms-Data Sheets SA-7460A

Forms-Data Sheets SA-7627


Forms-Data Sheets SA-7683

Forms-Data Sheets SA-7746

Forms-Data Sheets SA-7823


Forms-Data Sheets SA-7898

Forms-Nonmaterial Requirements SA-7900

Saudi Aramco: Company General Use


Forms-Nonmaterial Requirements SA-7901
Forms-Nonmaterial Requirements SA-7902

Forms-Nonmaterial Requirements SA-7903

Forms-Nonmaterial Requirements SA-7904

Forms-Nonmaterial Requirements SA-7905

Forms-Nonmaterial Requirements SA-7906

Forms-Nonmaterial Requirements SA-7907

Forms-Nonmaterial Requirements SA-7908

Forms-Nonmaterial Requirements SA-7909

Forms-Nonmaterial Requirements SA-7910

Forms-Nonmaterial Requirements SA-7911

Forms-Nonmaterial Requirements SA-7912

Forms-Nonmaterial Requirements SA-7913

Forms-Nonmaterial Requirements SA-7914

Forms-Nonmaterial Requirements SA-7915

Forms-Nonmaterial Requirements SA-7916

Forms-Nonmaterial Requirements SA-7917

Forms-Nonmaterial Requirements SA-7918

Forms-Nonmaterial Requirements SA-7918-1

Forms-Nonmaterial Requirements SA-7918-2

Forms-Nonmaterial Requirements SA-7919

Saudi Aramco: Company General Use


Forms-Nonmaterial Requirements SA-7919-1

Forms-Nonmaterial Requirements SA-7919-2

Forms-Nonmaterial Requirements SA-7920

Forms-Nonmaterial Requirements SA-7921

Forms-Nonmaterial Requirements SA-7922

Forms-Nonmaterial Requirements SA-7922-1

Forms-Nonmaterial Requirements SA-7922-2

Forms-Nonmaterial Requirements SA-7922-3

Forms-Nonmaterial Requirements SA-7922-4

Forms-Nonmaterial Requirements SA-7922-5

Forms-Nonmaterial Requirements SA-7923

Forms-Nonmaterial Requirements SA-7924

Forms-Nonmaterial Requirements SA-7924-1

Forms-Nonmaterial Requirements SA-7925

Forms-Nonmaterial Requirements SA-7926

Forms-Nonmaterial Requirements SA-7927

Forms-Nonmaterial Requirements SA-7928

Forms-Nonmaterial Requirements SA-7929


Forms-Nonmaterial Requirements SA-7930

Forms-Data Sheets SA-8001

Forms-Data Sheets SA-8001-M


Forms-Data Sheets SA-8002-1

Saudi Aramco: Company General Use


Forms-Data Sheets SA-8002-2
Forms-Data Sheets SA-8002-3
Forms-Data Sheets SA-8002-4
Forms-Data Sheets SA-8002-5
Forms-Data Sheets SA-8002-6
Forms-Data Sheets SA-8002-7
Forms-Data Sheets SA-8002-8
Forms-Data Sheets SA-8002-9

Forms-Data Sheets SA-8002-M-1

Forms-Data Sheets SA-8002-M-2

Forms-Data Sheets SA-8002-M-3

Forms-Data Sheets SA-8002-M-4

Forms-Data Sheets SA-8002-M-5

Forms-Data Sheets SA-8002-M-6

Forms-Data Sheets SA-8002-M-7

Forms-Data Sheets SA-8002-M-8

Forms-Data Sheets SA-8002-M-9

Forms-Data Sheets SA-8003

Forms-Data Sheets SA-8003-M

Forms-Data Sheets SA-8004-1

Forms-Data Sheets SA-8004-2

Forms-Data Sheets SA-8004-3

Forms-Data Sheets SA-8004-4

Forms-Data Sheets SA-8004-M-1

Forms-Data Sheets SA-8004-M-2

Forms-Data Sheets SA-8004-M-3

Saudi Aramco: Company General Use


Forms-Data Sheets SA-8004-M-4
Forms-Data Sheets SA-8009-1
Forms-Data Sheets SA-8009-2
Forms-Data Sheets SA-8009-3
Forms-Data Sheets SA-8009-4
Forms-Data Sheets SA-8009-5
Forms-Data Sheets SA-8009-6
Forms-Data Sheets SA-8009-M-1
Forms-Data Sheets SA-8009-M-2
Forms-Data Sheets SA-8009-M-3
Forms-Data Sheets SA-8009-M-4
Forms-Data Sheets SA-8009-M-5
Forms-Data Sheets SA-8009-M-6
Forms-Data Sheets SA-8010

Forms-Data Sheets SA-8010-M


Forms-Data Sheets SA-8012

Forms-Data Sheets SA-8014

Forms-Data Sheets SA-8014-M

Forms-Data Sheets SA-8020-100

Forms-Data Sheets SA-8020-112

Forms-Data Sheets SA-8020-113

Forms-Data Sheets SA-8020-114

Forms-Data Sheets SA-8020-115

Forms-Data Sheets SA-8020-115-M

Forms-Data Sheets SA-8020-116

Forms-Data Sheets SA-8020-116-M

Forms-Data Sheets SA-8020-117

Forms-Data Sheets SA-8020-117-M

Saudi Aramco: Company General Use


Forms-Data Sheets SA-8020-118

Forms-Data Sheets SA-8020-119

Forms-Data Sheets SA-8020-120

Forms-Data Sheets SA-8020-121

Forms-Data Sheets SA-8020-122

Forms-Data Sheets SA-8020-124

Forms-Data Sheets SA-8020-124-M

Forms-Data Sheets SA-8020-151

Forms-Data Sheets SA-8020-153

Forms-Data Sheets SA-8020-167

Forms-Data Sheets SA-8020-168

Forms-Data Sheets SA-8020-200

Forms-Data Sheets SA-8020-212

Forms-Data Sheets SA-8020-213

Forms-Data Sheets SA-8020-312

Forms-Data Sheets SA-8020-314

Forms-Data Sheets SA-8020-318

Forms-Data Sheets SA-8020-319

Forms-Data Sheets SA-8020-320

Forms-Data Sheets SA-8020-321


Forms-Data Sheets SA-8020-3540

Saudi Aramco: Company General Use


Forms-Data Sheets SA-8020-400

Forms-Data Sheets SA-8020-413

Forms-Data Sheets SA-8020-415

Forms-Data Sheets SA-8020-415-M

Forms-Data Sheets SA-8020-416

Forms-Data Sheets SA-8020-418

Forms-Data Sheets SA-8020-418-M

Forms-Data Sheets SA-8020-419

Forms-Data Sheets SA-8020-419-M

Forms-Data Sheets SA-8020-511

Forms-Data Sheets SA-8020-512

Forms-Data Sheets SA-8020-514

Forms-Data Sheets SA-8020-515

Forms-Data Sheets SA-8020-517

Forms-Data Sheets SA-8020-525

Forms-Data Sheets SA-8020-605

Forms-Data Sheets SA-8020-611

Forms-Data Sheets SA-8020-611-M

Forms-Data Sheets SA-8020-612

Forms-Data Sheets SA-8020-613-1

Forms-Data Sheets SA-8020-613-2

Saudi Aramco: Company General Use


Forms-Data Sheets SA-8020-614

Forms-Data Sheets SA-8020-617

Forms-Data Sheets SA-8020-623

Forms-Data Sheets SA-8020-625

Forms-Data Sheets SA-8020-634

Forms-Data Sheets SA-8020-711

Forms-Data Sheets SA-8020-712

Forms-Data Sheets SA-8020-713

Forms-Data Sheets SA-8020-716

Forms-Data Sheets SA-8020-717

Forms-Data Sheets SA-8020-718

Forms-Data Sheets SA-8020-815

Forms-Data Sheets SA-8020-825

Forms-Data Sheets SA-8020-827

Forms-Data Sheets SA-8020-828

Forms-Data Sheets SA-8020-830

Forms-Data Sheets SA-8020-831

Forms-Data Sheets SA-8020-841

Forms-Data Sheets SA-8020-846

Forms-Data Sheets SA-8020-847

Saudi Aramco: Company General Use


Forms-Data Sheets SA-8020-913
Forms-Data Sheets SA-8110
Forms-Data Sheets SA-8110-1
Forms-Data Sheets SA-8110-2

Forms-Data Sheets SA-8111

Forms-Data Sheets SA-8111-1

Forms-Data Sheets SA-8111-2

Forms-Data Sheets SA-8114

Forms-Data Sheets SA-8117-M

Forms-Data Sheets SA-8118


Forms-Data Sheets SA-8130-1
Forms-Data Sheets SA-8130-2
Forms-Data Sheets SA-8130-M-1
Forms-Data Sheets SA-8130-M-2

Forms-Data Sheets SA-8150

Forms-Data Sheets SA-8150-M

Forms-Data Sheets SA-8172

Forms-Data Sheets SA-8173


Forms-Data Sheets SA-8213
Forms-Data Sheets SA-8213-1A

Forms-Data Sheets SA-8213-2

Forms-Data Sheets SA-8213-3


Forms-Data Sheets SA-9247
Forms-Data Sheets SA-9524

Forms-Data Sheets SA-9524-1


Forms-Data Sheets SA-9524-2
Forms-Data Sheets SA-9527
Forms-Data Sheets SA-9541

Forms-Data Sheets SA-9543


Forms-Data Sheets SA-9544

Saudi Aramco: Company General Use


Forms-Data Sheets SA-9547
Forms-Data Sheets SA-9548
Forms-Data Sheets SA-9549
Forms-Data Sheets SA-9561
Forms-Data Sheets SA-9562

Forms-Data Sheets SA-9570


Forms-Data Sheets SA-9580
Forms-Data Sheets SA-9594

Forms-Nonmaterial Requirements SA-9597

Forms-Nonmaterial Requirements SA-9597-1


Forms-Data Sheets SA-9601
Forms-Data Sheets SA-9872
Forms-Precommissioning SA-D-001
Forms-Precommissioning SA-D-002
Forms-Precommissioning SA-E-001A
Forms-Precommissioning SA-E-001B
Forms-Precommissioning SA-E-002
Forms-Precommissioning SA-F-001
Forms-Precommissioning SA-F-002
Forms-Precommissioning SA-G-005

Forms-Precommissioning SA-G-006
Forms-Precommissioning SA-G-007
Forms-Precommissioning SA-G-110
Forms-Precommissioning SA-J-001
Forms-Precommissioning SA-J-002
Forms-Precommissioning SA-J-003
Forms-Precommissioning SA-J-004

Forms-Precommissioning SA-J-005
Forms-Precommissioning SA-J-006
Forms-Precommissioning SA-J-007

Forms-Precommissioning SA-J-008
Forms-Precommissioning SA-J-009

Forms-Precommissioning SA-J-010

Forms-Precommissioning SA-J-011

Forms-Precommissioning SA-J-012

Saudi Aramco: Company General Use


Forms-Precommissioning SA-J-013

Forms-Precommissioning SA-J-014

Forms-Precommissioning SA-J-015
Forms-Precommissioning SA-J-016
Forms-Precommissioning SA-J-017

Forms-Precommissioning SA-J-018

Forms-Precommissioning SA-J-019
Forms-Precommissioning SA-K-001

Forms-Precommissioning SA-K-402

Forms-Precommissioning SA-K-403
Forms-Precommissioning SA-K-501

Forms-Precommissioning SA-K-502
Forms-Precommissioning SA-K-511
Forms-Precommissioning SA-K-600
Forms-Precommissioning SA-L-001

Forms-Precommissioning SA-L-002
Forms-Precommissioning SA-L-003

Forms-Precommissioning SA-L-004
Forms-Precommissioning SA-P-000
Forms-Precommissioning SA-P-001

Forms-Precommissioning SA-P-002
Forms-Precommissioning SA-P-010

Forms-Precommissioning SA-P-011
Forms-Precommissioning SA-P-012
Forms-Precommissioning SA-P-020

Forms-Precommissioning SA-P-021

Forms-Precommissioning SA-P-022

Forms-Precommissioning SA-P-023

Forms-Precommissioning SA-P-024

Saudi Aramco: Company General Use


Forms-Precommissioning SA-P-030
Forms-Precommissioning SA-P-031
Forms-Precommissioning SA-P-032
Forms-Precommissioning SA-P-033
Forms-Precommissioning SA-P-040
Forms-Precommissioning SA-P-041
Forms-Precommissioning SA-P-042
Forms-Precommissioning SA-P-050
Forms-Precommissioning SA-P-051
Forms-Precommissioning SA-P-052
Forms-Precommissioning SA-P-060
Forms-Precommissioning SA-P-061
Forms-Precommissioning SA-P-062
Forms-Precommissioning SA-P-063
Forms-Precommissioning SA-P-070
Forms-Precommissioning SA-P-071

Forms-Precommissioning SA-P-072
Forms-Precommissioning SA-P-080
Forms-Precommissioning SA-P-081
Forms-Precommissioning SA-P-082

Forms-Precommissioning SA-X-001

Forms-Precommissioning SA-X-002

Forms-Precommissioning SA-X-003

Forms-Precommissioning SA-X-004

Forms-Precommissioning SA-X-005

Forms-Precommissioning SA-X-006

Forms-Precommissioning SA-X-007

Forms-Precommissioning SA-X-008

Forms-Precommissioning SA-X-009

Forms-Precommissioning SA-X-010

Forms-Precommissioning SA-X-011

Saudi Aramco: Company General Use


SABP-Best Practices SABP-A-001

SABP-Best Practices SABP-A-002

SABP-Best Practices SABP-A-003


SABP-Best Practices SABP-A-004

SABP-Best Practices SABP-A-005

SABP-Best Practices SABP-A-007

SABP-Best Practices SABP-A-008

SABP-Best Practices SABP-A-009

SABP-Best Practices SABP-A-011

SABP-Best Practices SABP-A-012


SABP-Best Practices SABP-A-013

SABP-Best Practices SABP-A-014


SABP-Best Practices SABP-A-015
SABP-Best Practices SABP-A-016
SABP-Best Practices SABP-A-018
SABP-Best Practices SABP-A-019

Supplement Pages SABP-A-019A

SABP-Best Practices SABP-A-020


SABP-Best Practices SABP-A-021

SABP-Best Practices SABP-A-022

SABP-Best Practices SABP-A-023


SABP-Best Practices SABP-A-024

SABP-Best Practices SABP-A-025


SABP-Best Practices SABP-A-026

SABP-Best Practices SABP-A-028


SABP-Best Practices SABP-A-029

Saudi Aramco: Company General Use


SABP-Best Practices SABP-A-030
SABP-Best Practices SABP-A-032

SABP-Best Practices SABP-A-033

Supplement Pages SABP-A-033A

Supplement Pages SABP-A-033B

Supplement Pages SABP-A-033C

Supplement Pages SABP-A-033D

Supplement Pages SABP-A-033E

SABP-Best Practices SABP-A-034


SABP-Best Practices SABP-A-036

SABP-Best Practices SABP-A-038


SABP-Best Practices SABP-A-039

SABP-Best Practices SABP-A-040


SABP-Best Practices SABP-A-041
SABP-Best Practices SABP-A-042
SABP-Best Practices SABP-A-043

SABP-Best Practices SABP-A-044

SABP-Best Practices SABP-A-045

SABP-Best Practices SABP-A-046

SABP-Best Practices SABP-A-047

SABP-Best Practices SABP-A-048

SABP-Best Practices SABP-A-049

SABP-Best Practices SABP-A-051

SABP-Best Practices SABP-A-052

Saudi Aramco: Company General Use


SABP-Best Practices SABP-A-053

SABP-Best Practices SABP-A-055

SABP-Best Practices SABP-A-056


SABP-Best Practices SABP-A-057

SABP-Best Practices SABP-A-058


SABP-Best Practices SABP-A-059

SABP-Best Practices SABP-A-060


SABP-Best Practices SABP-A-062

SABP-Best Practices SABP-A-064


Supplement Pages SABP-A-064A

SABP-Best Practices SABP-A-065


SABP-Best Practices SABP-A-066

SABP-Best Practices SABP-A-068

SABP-Best Practices SABP-A-071

SABP-Best Practices SABP-A-072

SABP-Best Practices SABP-A-073

SABP-Best Practices SABP-A-074

SABP-Best Practices SABP-A-075

SABP-Best Practices SABP-A-077

SABP-Best Practices SABP-C-001

SABP-Best Practices SABP-C-002

SABP-Best Practices SABP-D-001

Saudi Aramco: Company General Use


SABP-Best Practices SABP-D-002
SABP-Best Practices SABP-E-002

SABP-Best Practices SABP-E-003


SABP-Best Practices SABP-F-001

SABP-Best Practices SABP-F-002

SABP-Best Practices SABP-F-004


SABP-Best Practices SABP-F-005

SABP-Best Practices SABP-G-001

SABP-Best Practices SABP-G-002

SABP-Best Practices SABP-G-003

SABP-Best Practices SABP-G-005

SABP-Best Practices SABP-G-006

SABP-Best Practices SABP-G-007

SABP-Best Practices SABP-G-008

SABP-Best Practices SABP-G-009

Supplement Pages SABP-G-009A

SABP-Best Practices SABP-G-010

SABP-Best Practices SABP-G-011

SABP-Best Practices SABP-G-012

SABP-Best Practices SABP-G-013

SABP-Best Practices SABP-G-014


SABP-Best Practices SABP-G-015

SABP-Best Practices SABP-G-016

Saudi Aramco: Company General Use


SABP-Best Practices SABP-G-017

SABP-Best Practices SABP-G-018

SABP-Best Practices SABP-G-019

SABP-Best Practices SABP-G-020

SABP-Best Practices SABP-G-021

SABP-Best Practices SABP-G-022

SABP-Best Practices SABP-G-023


SABP-Best Practices SABP-G-024

SABP-Best Practices SABP-G-026

SABP-Best Practices SABP-G-028

SABP-Best Practices SABP-H-001

SABP-Best Practices SABP-H-003

SABP-Best Practices SABP-H-004

SABP-Best Practices SABP-J-100

SABP-Best Practices SABP-J-500

SABP-Best Practices SABP-J-510


SABP-Best Practices SABP-J-511
SABP-Best Practices SABP-J-600

SABP-Best Practices SABP-J-701

SABP-Best Practices SABP-J-711

SABP-Best Practices SABP-J-900

SABP-Best Practices SABP-J-902


SABP-Best Practices SABP-K-001

Saudi Aramco: Company General Use


SABP-Best Practices SABP-K-002

SABP-Best Practices SABP-K-003

SABP-Best Practices SABP-K-004

SABP-Best Practices SABP-K-006


SABP-Best Practices SABP-K-100

SABP-Best Practices SABP-K-401

SABP-Best Practices SABP-L-001


SABP-Best Practices SABP-L-002
SABP-Best Practices SABP-L-003

SABP-Best Practices SABP-L-004

SABP-Best Practices SABP-L-005


SABP-Best Practices SABP-L-006

SABP-Best Practices SABP-L-007

SABP-Best Practices SABP-L-008

SABP-Best Practices SABP-L-009


SABP-Best Practices SABP-L-010

SABP-Best Practices SABP-L-011

SABP-Best Practices SABP-L-012

SABP-Best Practices SABP-L-013

SABP-Best Practices SABP-L-014

SABP-Best Practices SABP-M-001

SABP-Best Practices SABP-M-006


SABP-Best Practices SABP-M-007
SABP-Best Practices SABP-M-008

Saudi Aramco: Company General Use


SABP-Best Practices SABP-M-009

SABP-Best Practices SABP-M-010

SABP-Best Practices SABP-P-001

SABP-Best Practices SABP-P-002

SABP-Best Practices SABP-P-003

SABP-Best Practices SABP-P-004


SABP-Best Practices SABP-P-005

SABP-Best Practices SABP-P-006

SABP-Best Practices SABP-P-008


SABP-Best Practices SABP-P-009

SABP-Best Practices SABP-P-010

SABP-Best Practices SABP-P-011

SABP-Best Practices SABP-P-012

SABP-Best Practices SABP-P-013

SABP-Best Practices SABP-P-014

SABP-Best Practices SABP-P-015


SABP-Best Practices SABP-P-016

SABP-Best Practices SABP-P-017

SABP-Best Practices SABP-P-018

SABP-Best Practices SABP-P-019


SABP-Best Practices SABP-P-020

SABP-Best Practices SABP-P-021


SABP-Best Practices SABP-P-022

SABP-Best Practices SABP-P-023

Saudi Aramco: Company General Use


SABP-Best Practices SABP-P-024

Supplement Pages SABP-P-024A

Supplement Pages SABP-P-024B


Supplement Pages SABP-P-024C

SABP-Best Practices SABP-P-035

SABP-Best Practices SABP-P-036


SABP-Best Practices SABP-P-037

SABP-Best Practices SABP-P-038

SABP-Best Practices SABP-P-039

SABP-Best Practices SABP-P-040

SABP-Best Practices SABP-P-041

SABP-Best Practices SABP-P-045

SABP-Best Practices SABP-P-047

SABP-Best Practices SABP-P-049

SABP-Best Practices SABP-P-050

SABP-Best Practices SABP-P-051

SABP-Best Practices SABP-P-052


SABP-Best Practices SABP-P-053

SABP-Best Practices SABP-P-059

SABP-Best Practices SABP-P-060

SABP-Best Practices SABP-P-061


SABP-Best Practices SABP-Q-001
SABP-Best Practices SABP-Q-002
SABP-Best Practices SABP-Q-003

SABP-Best Practices SABP-Q-004


SABP-Best Practices SABP-Q-005

Saudi Aramco: Company General Use


SABP-Best Practices SABP-Q-006
SABP-Best Practices SABP-Q-007

SABP-Best Practices SABP-Q-008

SABP-Best Practices SABP-Q-010

SABP-Best Practices SABP-Q-011

SABP-Best Practices SABP-Q-012


SABP-Best Practices SABP-Q-014

SABP-Best Practices SABP-R-001


SABP-Best Practices SABP-S-001

SABP-Best Practices SABP-S-002

SABP-Best Practices SABP-T-001


SABP-Best Practices SABP-T-002
SABP-Best Practices SABP-T-007

SABP-Best Practices SABP-T-008

SABP-Best Practices SABP-T-010


SABP-Best Practices SABP-W-001

SABP-Best Practices SABP-W-002


SABP-Best Practices SABP-W-003

SABP-Best Practices SABP-X-001

SABP-Best Practices SABP-X-002

SABP-Best Practices SABP-X-003

SABP-Best Practices SABP-X-004

SABP-Best Practices SABP-Y-067

SABP-Best Practices SABP-Y-069

Saudi Aramco: Company General Use


SABP-Best Practices SABP-Y-101

SABP-Best Practices SABP-Y-851

SABP-Best Practices SABP-Y-856

SABP-Best Practices SABP-Z-001

SABP-Best Practices SABP-Z-002

Supplement Pages SABP-Z-002A

Supplement Pages SABP-Z-002B

Supplement Pages SABP-Z-002C

Supplement Pages SABP-Z-002D

Supplement Pages SABP-Z-002E

Supplement Pages SABP-Z-002F

Supplement Pages SABP-Z-002G

Supplement Pages SABP-Z-002H

Supplement Pages SABP-Z-002I

Supplement Pages SABP-Z-002J

Supplement Pages SABP-Z-002K

Supplement Pages SABP-Z-002L

Supplement Pages SABP-Z-002M

Supplement Pages SABP-Z-002N

Supplement Pages SABP-Z-002S

Saudi Aramco: Company General Use


Supplement Pages SABP-Z-002T

Supplement Pages SABP-Z-002U

Supplement Pages SABP-Z-002V


SABP-Best Practices SABP-Z-017
SABP-Best Practices SABP-Z-018

SABP-Best Practices SABP-Z-019


SABP-Best Practices SABP-Z-020

SABP-Best Practices SABP-Z-030

SABP-Best Practices SABP-Z-031


SABP-Best Practices SABP-Z-032
SABP-Best Practices SABP-Z-033

SABP-Best Practices SABP-Z-034


SABP-Best Practices SABP-Z-046

SABP-Best Practices SABP-Z-047

SABP-Best Practices SABP-Z-050

SABP-Best Practices SABP-Z-051

SABP-Best Practices SABP-Z-052

SABP-Best Practices SABP-Z-053

SABP-Best Practices SABP-Z-054

SABP-Best Practices SABP-Z-055

SABP-Best Practices SABP-Z-056

SABP-Best Practices SABP-Z-057

SABP-Best Practices SABP-Z-058

SABP-Best Practices SABP-Z-059

SABP-Best Practices SABP-Z-060

Saudi Aramco: Company General Use


SABP-Best Practices SABP-Z-061

SABP-Best Practices SABP-Z-062

SABP-Best Practices SABP-Z-063

SABP-Best Practices SABP-Z-064

SABP-Best Practices SABP-Z-065

SABP-Best Practices SABP-Z-066

SABP-Best Practices SABP-Z-069


Supplement Pages SABP-Z-069A

SABP-Best Practices SABP-Z-070

SABP-Best Practices SABP-Z-071

SABP-Best Practices SABP-Z-072

SABP-Best Practices SABP-Z-073

SABP-Best Practices SABP-Z-074


SABP-Best Practices SABP-Z-075

SABP-Best Practices SABP-Z-076

SABP-Best Practices SABP-Z-077


SABP-Best Practices SABP-Z-078

SABP-Best Practices SABP-Z-079

SABP-Best Practices SABP-Z-080

SABP-Best Practices SABP-Z-081

SABP-Best Practices SABP-Z-082

SABP-Best Practices SABP-Z-083

SABP-Best Practices SABP-Z-084

Saudi Aramco: Company General Use


SABP-Best Practices SABP-Z-085

SABP-Best Practices SABP-Z-086

SABP-Best Practices SABP-Z-087

SABP-Best Practices SABP-Z-088


SAEP-Procedures SAEP-100

SAEP-Procedures SAEP-1021
SAEP-Procedures SAEP-1025

SAEP-Procedures SAEP-1026

SAEP-Procedures SAEP-1027

SAEP-Procedures SAEP-1028
SAEP-Procedures SAEP-103
SAEP-Procedures SAEP-110

SAEP-Procedures SAEP-1101
SAEP-Procedures SAEP-1135

SAEP-Procedures SAEP-1140

SAEP-Procedures SAEP-1141

SAEP-Procedures SAEP-1142
SAEP-Procedures SAEP-1143
SAEP-Procedures SAEP-1144
SAEP-Procedures SAEP-1145
SAEP-Procedures SAEP-1146
SAEP-Procedures SAEP-1150

SAEP-Procedures SAEP-1151

SAEP-Procedures SAEP-1152
SAEP-Procedures SAEP-1154

SAEP-Procedures SAEP-1160

SAEP-Procedures SAEP-1161

Saudi Aramco: Company General Use


SAEP-Procedures SAEP-119
SAEP-Procedures SAEP-12

SAEP-Procedures SAEP-120

SAEP-Procedures SAEP-1200
SAEP-Procedures SAEP-121
SAEP-Procedures SAEP-122

SAEP-Procedures SAEP-125

SAEP-Procedures SAEP-127

SAEP-Procedures SAEP-13

SAEP-Procedures SAEP-133

SAEP-Procedures SAEP-134

SAEP-Procedures SAEP-1350

SAEP-Procedures SAEP-136

SAEP-Procedures SAEP-137
Supplement Pages SAEP-137A

SAEP-Procedures SAEP-138
SAEP-Procedures SAEP-14
SAEP-Procedures SAEP-140

SAEP-Procedures SAEP-142
Supplement Pages SAEP-142A

SAEP-Procedures SAEP-144

SAEP-Procedures SAEP-145

SAEP-Procedures SAEP-146

SAEP-Procedures SAEP-147

Saudi Aramco: Company General Use


SAEP-Procedures SAEP-148
Supplement Pages SAEP-148A

SAEP-Procedures SAEP-149
Supplement Pages SAEP-14E

SAEP-Procedures SAEP-15

SAEP-Procedures SAEP-150

SAEP-Procedures SAEP-16

SAEP-Procedures SAEP-1610

SAEP-Procedures SAEP-1622
SAEP-Procedures SAEP-1624
SAEP-Procedures SAEP-1626

SAEP-Procedures SAEP-1628
SAEP-Procedures SAEP-1636
SAEP-Procedures SAEP-1650
SAEP-Procedures SAEP-1661
SAEP-Procedures SAEP-1662
SAEP-Procedures SAEP-20
SAEP-Procedures SAEP-201

SAEP-Procedures SAEP-206

SAEP-Procedures SAEP-21
SAEP-Procedures SAEP-22
SAEP-Procedures SAEP-25

SAEP-Procedures SAEP-250
SAEP-Procedures SAEP-26

SAEP-Procedures SAEP-27

SAEP-Procedures SAEP-28

SAEP-Procedures SAEP-29

Saudi Aramco: Company General Use


SAEP-Procedures SAEP-301

SAEP-Procedures SAEP-302
Supplement Pages SAEP-302A
Supplement Pages SAEP-302B
Supplement Pages SAEP-302C

SAEP-Procedures SAEP-303
SAEP-Procedures SAEP-305
SAEP-Procedures SAEP-306
SAEP-Procedures SAEP-308

SAEP-Procedures SAEP-309

SAEP-Procedures SAEP-31
SAEP-Procedures SAEP-310

SAEP-Procedures SAEP-3101
Supplement Pages SAEP-3101A

Supplement Pages SAEP-3101B

Supplement Pages SAEP-3101C

Supplement Pages SAEP-3101D


Supplement Pages SAEP-3101E

SAEP-Procedures SAEP-3102
Supplement Pages SAEP-3102A

Supplement Pages SAEP-3102B

Supplement Pages SAEP-3102C

Supplement Pages SAEP-3102D


Supplement Pages SAEP-3102E

Saudi Aramco: Company General Use


SAEP-Procedures SAEP-3103
Supplement Pages SAEP-3103A

Supplement Pages SAEP-3103B

Supplement Pages SAEP-3103C

Supplement Pages SAEP-3103D


Supplement Pages SAEP-3103E

SAEP-Procedures SAEP-311

SAEP-Procedures SAEP-316

SAEP-Procedures SAEP-317

SAEP-Procedures SAEP-319

SAEP-Procedures SAEP-32

SAEP-Procedures SAEP-321

SAEP-Procedures SAEP-322

SAEP-Procedures SAEP-323

SAEP-Procedures SAEP-324

SAEP-Procedures SAEP-325

SAEP-Procedures SAEP-327
SAEP-Procedures SAEP-329

Supplement Pages SAEP-329A2

Supplement Pages SAEP-329A3

Supplement Pages SAEP-329A4


SAEP-Procedures SAEP-332
Supplement Pages SAEP-332A

Saudi Aramco: Company General Use


SAEP-Procedures SAEP-333
Supplement Pages SAEP-333A

SAEP-Procedures SAEP-334
SAEP-Procedures SAEP-335

SAEP-Procedures SAEP-339

SAEP-Procedures SAEP-340
SAEP-Procedures SAEP-341

SAEP-Procedures SAEP-342

SAEP-Procedures SAEP-343

SAEP-Procedures SAEP-345
SAEP-Procedures SAEP-347

SAEP-Procedures SAEP-348
SAEP-Procedures SAEP-349

SAEP-Procedures SAEP-35

SAEP-Procedures SAEP-350
SAEP-Procedures SAEP-351
SAEP-Procedures SAEP-352

SAEP-Procedures SAEP-354
SAEP-Procedures SAEP-355

SAEP-Procedures SAEP-358

SAEP-Procedures SAEP-359

SAEP-Procedures SAEP-36
SAEP-Procedures SAEP-360

SAEP-Procedures SAEP-363

SAEP-Procedures SAEP-364
SAEP-Procedures SAEP-365

Saudi Aramco: Company General Use


SAEP-Procedures SAEP-366
SAEP-Procedures SAEP-367
SAEP-Procedures SAEP-368
SAEP-Procedures SAEP-37
SAEP-Procedures SAEP-370
SAEP-Procedures SAEP-371
SAEP-Procedures SAEP-372

SAEP-Procedures SAEP-373
SAEP-Procedures SAEP-378
SAEP-Procedures SAEP-380
SAEP-Procedures SAEP-381

SAEP-Procedures SAEP-383

SAEP-Procedures SAEP-384

SAEP-Procedures SAEP-387
SAEP-Procedures SAEP-388

SAEP-Procedures SAEP-390

SAEP-Procedures SAEP-391

SAEP-Procedures SAEP-393

SAEP-Procedures SAEP-394
SAEP-Procedures SAEP-396
SAEP-Procedures SAEP-397
SAEP-Procedures SAEP-399
SAEP-Procedures SAEP-40

SAEP-Procedures SAEP-400

Supplement Pages SAEP-400A


SAEP-Procedures SAEP-405

SAEP-Procedures SAEP-407

Saudi Aramco: Company General Use


SAEP-Procedures SAEP-414

SAEP-Procedures SAEP-415

SAEP-Procedures SAEP-42

SAEP-Procedures SAEP-44
SAEP-Procedures SAEP-46

SAEP-Procedures SAEP-50

SAEP-Procedures SAEP-500
SAEP-Procedures SAEP-501

SAEP-Procedures SAEP-503

SAEP-Procedures SAEP-55
SAEP-Procedures SAEP-60

SAEP-Procedures SAEP-600
SAEP-Procedures SAEP-601

SAEP-Procedures SAEP-602
SAEP-Procedures SAEP-603

SAEP-Procedures SAEP-604

SAEP-Procedures SAEP-605

SAEP-Procedures SAEP-606

SAEP-Procedures SAEP-61

SAEP-Procedures SAEP-64
SAEP-Procedures SAEP-68
SAEP-Procedures SAEP-701

SAEP-Procedures SAEP-702

SAEP-Procedures SAEP-707
SAEP-Procedures SAEP-71

Saudi Aramco: Company General Use


SAEP-Procedures SAEP-717

SAEP-Procedures SAEP-72

SAEP-Procedures SAEP-74

SAEP-Procedures SAEP-744

SAEP-Procedures SAEP-746
SAEP-Procedures SAEP-747

SAEP-Procedures SAEP-750
SAEP-Procedures SAEP-76
SAEP-Procedures SAEP-77
SAEP-Procedures SAEP-79

SAEP-Procedures SAEP-80
SAEP-Procedures SAEP-81
SAEP-Procedures SAEP-83

SAEP-Procedures SAEP-98

SAEP-Procedures SAEP-99

Saudi Aramco: Company General Use


Supplement Pages SAER-6143A1
Supplement Pages SAER-6143A2
Supplement Pages SAER-6143A3
Supplement Pages SAER-6143B
Supplement Pages SAER-6143C

Supplement Pages SAER-6168A

Saudi Aramco: Company General Use


Supplement Pages SAER-6572A

Supplement Pages SAER-6572B

SAES-Standards SAES-A-004
SAES-Standards SAES-A-005

SAES-Standards SAES-A-007
SAES-Standards SAES-A-010
SAES-Standards SAES-A-011

SAES-Standards SAES-A-012

SAES-Standards SAES-A-014

SAES-Standards SAES-A-016

SAES-Standards SAES-A-020

SAES-Standards SAES-A-030

Supplement Pages SAES-A-030A

SAES-Standards SAES-A-100

SAES-Standards SAES-A-102

Saudi Aramco: Company General Use


SAES-Standards SAES-A-103

SAES-Standards SAES-A-104
SAES-Standards SAES-A-105
SAES-Standards SAES-A-111
SAES-Standards SAES-A-112
SAES-Standards SAES-A-113
SAES-Standards SAES-A-114

SAES-Standards SAES-A-115
SAES-Standards SAES-A-135

SAES-Standards SAES-A-202
SAES-Standards SAES-A-204
SAES-Standards SAES-A-205

Supplement Pages SAES-A-205B

Supplement Pages SAES-A-205C

Supplement Pages SAES-A-205D


SAES-Standards SAES-A-206
SAES-Standards SAES-A-207
SAES-Standards SAES-A-208
SAES-Standards SAES-A-210

SAES-Standards SAES-A-302
SAES-Standards SAES-A-400
SAES-Standards SAES-A-401
SAES-Standards SAES-A-403

SAES-Standards SAES-A-502

SAES-Standards SAES-A-503

SAES-Standards SAES-A-504
SAES-Standards SAES-A-506

SAES-Standards SAES-B-005
SAES-Standards SAES-B-006

SAES-Standards SAES-B-008

SAES-Standards SAES-B-009

Saudi Aramco: Company General Use


SAES-Standards SAES-B-014
SAES-Standards SAES-B-017
SAES-Standards SAES-B-018

SAES-Standards SAES-B-019
SAES-Standards SAES-B-053

SAES-Standards SAES-B-054
SAES-Standards SAES-B-055

SAES-Standards SAES-B-057

SAES-Standards SAES-B-058

SAES-Standards SAES-B-060
SAES-Standards SAES-B-062
SAES-Standards SAES-B-063
SAES-Standards SAES-B-064
SAES-Standards SAES-B-067
SAES-Standards SAES-B-068
SAES-Standards SAES-B-069

SAES-Standards SAES-B-070

SAES-Standards SAES-B-071
SAES-Standards SAES-C-001
SAES-Standards SAES-D-001

SAES-Standards SAES-D-008

SAES-Standards SAES-D-100

SAES-Standards SAES-D-108

SAES-Standards SAES-D-109

SAES-Standards SAES-D-110
SAES-Standards SAES-D-116

SAES-Standards SAES-E-004

SAES-Standards SAES-E-006

Saudi Aramco: Company General Use


SAES-Standards SAES-E-007

SAES-Standards SAES-E-014

SAES-Standards SAES-E-015
SAES-Standards SAES-F-001
SAES-Standards SAES-F-007
SAES-Standards SAES-G-005

SAES-Standards SAES-G-006

SAES-Standards SAES-G-007

SAES-Standards SAES-G-115

SAES-Standards SAES-G-116

SAES-Standards SAES-G-117

SAES-Standards SAES-H-001

SAES-Standards SAES-H-002

SAES-Standards SAES-H-002V

SAES-Standards SAES-H-003

SAES-Standards SAES-H-004

SAES-Standards SAES-H-005

SAES-Standards SAES-H-101V

SAES-Standards SAES-H-102

SAES-Standards SAES-H-200

SAES-Standards SAES-H-201
SAES-Standards SAES-I-001
SAES-Standards SAES-I-002

Saudi Aramco: Company General Use


SAES-Standards SAES-I-003

SAES-Standards SAES-J-003
SAES-Standards SAES-J-100

SAES-Standards SAES-J-505
SAES-Standards SAES-J-510
SAES-Standards SAES-J-600

SAES-Standards SAES-J-601

SAES-Standards SAES-J-602

SAES-Standards SAES-J-603
SAES-Standards SAES-J-605

SAES-Standards SAES-J-607
SAES-Standards SAES-J-700
SAES-Standards SAES-J-901
SAES-Standards SAES-J-902
SAES-Standards SAES-J-903
SAES-Standards SAES-J-904

SAES-Standards SAES-K-001

SAES-Standards SAES-K-002

SAES-Standards SAES-K-003
SAES-Standards SAES-K-011
SAES-Standards SAES-K-100
SAES-Standards SAES-K-400
SAES-Standards SAES-K-402
SAES-Standards SAES-K-403
SAES-Standards SAES-K-501
SAES-Standards SAES-K-502
SAES-Standards SAES-K-511
SAES-Standards SAES-K-600

SAES-Standards SAES-L-100
SAES-Standards SAES-L-105
SAES-Standards SAES-L-108

SAES-Standards SAES-L-109

Saudi Aramco: Company General Use


SAES-Standards SAES-L-110
SAES-Standards SAES-L-120

SAES-Standards SAES-L-125
SAES-Standards SAES-L-131

SAES-Standards SAES-L-132

SAES-Standards SAES-L-133

SAES-Standards SAES-L-136
SAES-Standards SAES-L-140

SAES-Standards SAES-L-150
SAES-Standards SAES-L-310
SAES-Standards SAES-L-350
SAES-Standards SAES-L-410
SAES-Standards SAES-L-420
SAES-Standards SAES-L-440

SAES-Standards SAES-L-450

SAES-Standards SAES-L-460

SAES-Standards SAES-L-488
SAES-Standards SAES-L-610

SAES-Standards SAES-L-620

SAES-Standards SAES-L-650
SAES-Standards SAES-L-810
SAES-Standards SAES-L-850

SAES-Standards SAES-M-001

SAES-Standards SAES-M-005
SAES-Standards SAES-M-006

SAES-Standards SAES-M-009
SAES-Standards SAES-M-010

SAES-Standards SAES-M-011

Saudi Aramco: Company General Use


SAES-Standards SAES-M-012

SAES-Standards SAES-M-013
SAES-Standards SAES-M-100
SAES-Standards SAES-N-001

SAES-Standards SAES-N-004
SAES-Standards SAES-N-100

SAES-Standards SAES-N-110

SAES-Standards SAES-N-130

SAES-Standards SAES-N-140

SAES-Standards SAES-O-201
SAES-Standards SAES-O-202
SAES-Standards SAES-O-203
SAES-Standards SAES-O-204
SAES-Standards SAES-O-205
SAES-Standards SAES-O-206
SAES-Standards SAES-O-207

SAES-Standards SAES-O-208

SAES-Standards SAES-O-209
SAES-Standards SAES-O-211

SAES-Standards SAES-O-310

SAES-Standards SAES-O-313

SAES-Standards SAES-O-317
SAES-Standards SAES-O-318

SAES-Standards SAES-O-319

SAES-Standards SAES-P-100
SAES-Standards SAES-P-103

SAES-Standards SAES-P-104

SAES-Standards SAES-P-107

Saudi Aramco: Company General Use


SAES-Standards SAES-P-111
SAES-Standards SAES-P-113

SAES-Standards SAES-P-114
SAES-Standards SAES-P-116
SAES-Standards SAES-P-119
SAES-Standards SAES-P-121

SAES-Standards SAES-P-123

SAES-Standards SAES-P-126

SAES-Standards SAES-P-127

SAES-Standards SAES-Q-001

SAES-Standards SAES-Q-004
SAES-Standards SAES-Q-005

SAES-Standards SAES-Q-006

SAES-Standards SAES-Q-007
SAES-Standards SAES-Q-009

SAES-Standards SAES-Q-010
SAES-Standards SAES-Q-011

SAES-Standards SAES-Q-012

SAES-Standards SAES-Q-014

SAES-Standards SAES-R-004
Supplement Pages SAES-R-004A1
SAES-Standards SAES-S-007
SAES-Standards SAES-S-010
SAES-Standards SAES-S-020
SAES-Standards SAES-S-030
SAES-Standards SAES-S-040

SAES-Standards SAES-S-050
SAES-Standards SAES-S-060
SAES-Standards SAES-S-070

Saudi Aramco: Company General Use


SAES-Standards SAES-T-018
SAES-Standards SAES-T-151
SAES-Standards SAES-T-481
SAES-Standards SAES-T-493

SAES-Standards SAES-T-494
SAES-Standards SAES-T-555

SAES-Standards SAES-T-566

SAES-Standards SAES-T-570

SAES-Standards SAES-T-624

SAES-Standards SAES-T-629

SAES-Standards SAES-T-632

SAES-Standards SAES-T-634

SAES-Standards SAES-T-744

SAES-Standards SAES-T-795

SAES-Standards SAES-T-830

SAES-Standards SAES-T-883

SAES-Standards SAES-T-911
SAES-Standards SAES-T-916
SAES-Standards SAES-T-919
SAES-Standards SAES-T-920
SAES-Standards SAES-T-928

SAES-Standards SAES-W-010
SAES-Standards SAES-W-011
SAES-Standards SAES-W-012

SAES-Standards SAES-W-013

Saudi Aramco: Company General Use


SAES-Standards SAES-W-014
SAES-Standards SAES-W-015

SAES-Standards SAES-W-016
SAES-Standards SAES-W-017

SAES-Standards SAES-W-019
SAES-Standards SAES-X-300
SAES-Standards SAES-X-400

SAES-Standards SAES-X-500
SAES-Standards SAES-X-600

SAES-Standards SAES-X-700

SAES-Standards SAES-X-800
SAES-Standards SAES-Y-101

SAES-Standards SAES-Y-103

SAES-Standards SAES-Y-301
SAES-Standards SAES-Z-001
SAES-Standards SAES-Z-003

SAES-Standards SAES-Z-004
SAES-Standards SAES-Z-008
SAES-Standards SAES-Z-010

SAES-Standards SAES-Z-020

Saudi Aramco: Company General Use


Forms-Smart Data Sheets SDS-EE-14531

Forms-Smart Data Sheets SDS-EE-14536

Forms-Smart Data Sheets SDS-EE-16502

Forms-Smart Data Sheets SDS-EE-16503

Forms-Smart Data Sheets SDS-EE-16504

Forms-Smart Data Sheets SDS-EE-16506

Forms-Smart Data Sheets SDS-EE-16508

Forms-Smart Data Sheets SDS-EE-16512

Forms-Smart Data Sheets SDS-EE-16518

Forms-Smart Data Sheets SDS-EE-16520

Forms-Smart Data Sheets SDS-EE-16521


Forms-Smart Data Sheets SDS-EE-17502

Forms-Smart Data Sheets SDS-EE-17503

Forms-Smart Data Sheets SDS-EE-17511

Forms-Smart Data Sheets SDS-EE-17514


Forms-Smart Data Sheets SDS-EE-17516

Forms-Smart Data Sheets SDS-EE-17518


Forms-Smart Data Sheets SDS-EE-17520
Forms-Smart Data Sheets SDS-L-100

Saudi Aramco: Company General Use


Forms-Smart Data Sheets SDS-ME-04001
Forms-Smart Data Sheets SDS-ME-04002

Forms-Smart Data Sheets SDS-ME-04051


Forms-Smart Data Sheets SDS-ME-09527

Forms-Smart Data Sheets SDS-ME-09528


Forms-Smart Data Sheets SDS-ME-09550

Forms-Smart Data Sheets SDS-RE-13001


Forms-Smart Data Sheets SDS-RE-31001

Forms-Smart Data Sheets SDS-RE-31003

Forms-Smart Data Sheets SDS-RE-31006

Forms-Smart Data Sheets SDS-RE-32009

Forms-Smart Data Sheets SDS-RE-32010

Forms-Smart Data Sheets SDS-RE-32100

Forms-Smart Data Sheets SDS-SE-M009

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
Committee Name Document Name
Inspection Engineering Road Crossings Inspection Requirements
Inspection Engineering In-Service Inspection Requirements of Subsea Assets
Inspection Engineering Inspection Involvement in Management of Change
Inspection Engineering Inspection Manning Determination Guidelines
Inspection of Corrosion under Insulation and
Inspection Engineering Fireproofing
Inspection Engineering External Visual Inspection Procedure
Inspection Engineering Worksheet Control and Tracking Program
Inspection Engineering Technical Alert Implementation and Tracking Program
Inspection Engineering Inspection Records/Filing Procedure
Inspection Engineering Guidelines for Process Equipment Inspection
External Inspection of Industrail Assets using Unmanned
Inspection Engineering Aerial Vehicles
Inspection Engineering Small Nipple Inspection Program
Inspection Engineering Retirement Thickness of In-Plant Piping
Inspection Engineering Injection Point Inspection Program
Inspection Engineering Inspection of SSSP Underground Storage Caverns
Brazed Aluminum Heat Exchanger Inspection
Inspection Engineering Requirements
Shop Applied, Internal Cement Mortar Lining of Steel
Civil Pipe
Materials Engineering Fabricated Steel Piping
Offshore Structures Submarine Pipe Weight Coating

Qualification of Plates for Storage Tanks and Pressured


Materials Engineering Equipment for Resistance to Hydrogen Induced Cracking
Corrosion Control Intrusive Online Corrosion Monitoring
Specification for Heavy Duty Polytetrafluoroethylene
(PTFE) and Perfluoroalkoxy (PFA) Lined Carbon Steel
Non-Metallic Pipe and Fittings
Non-Metallic RTR (Fiberglass) Pipe and Fittings for Gravity Flow
Non-Metallic RTR (Fiberglass) Pressure Pipe and Fittings
Materials Engineering API Line Pipe
Materials Engineering Induction and Furnace Hot Pipe Bends
Non-Metallic Lining of Tanks and Vessels with Elastomeric Materials
Reinforced Thermoset Resin Pipe and Fittings in Water
Non-Metallic and Hydrocarbon Services
Materials Engineering Carbon Steel Pipes for On-Plot Piping
Materials Engineering CRA Clad Pipe Spools

Qualification Requirements for Composite Materials


Non-Metallic used in Lined Carbon Steel Downhole Tubing and Casing
Materials Engineering Stainless Steel Pipe
Materials Engineering Manufacturing of Stainless Steel Tubes

Saudi Aramco: Company General Use


Materials Engineering CRA Clad or Lined Steel Pipe

Reinforced Thermoset Resin (RTR) Pipe, Fittings and


Non-Metallic Adhesive Packing, Handling, Transportation and Storage
Thermoplastic Tight Fit Grooved or Perforated Liners for
Non-Metallic New and Existing Pipelines
Non-Metallic High Density Polyethylene (HDPE) Pipe and Fittings
Offshore Structures Deepwater Floating Production Installations
Offshore Structures Deepwater Pipeline Systems
Offshore Structures Deepwater Subsea Production Systems
Materials Engineering High Frequency Welded Line Pipe
Materials Engineering Butt Welding Pipe Fittings
Materials Engineering Hot Tap and Stopple Fittings
Piping Design and Fabrication of Scraper Traps

Piping Flanged Insulating Joints/Spools for Cathodic Protection


Materials Engineering Forged Steel and Alloy Flanges
Materials Engineering Weld Overlayed Fittings, Flanges and Spool Pieces
Stainless Steel and Nickel Alloy Butt Welding Pipe
Materials Engineering Fittings
Valves Gate Valves
Valves Steel Globe Valves - Flanged and Butt-welding Ends
Valves Additional Requirements for Low Temperature Valves
Valves Check Valves, Swing Type
Valves General Requirements for Valves
Valves Expanding Plug Valve
Valves 4-Way Diverter Valve
Steel High Performance Butterfly Valves (Including
Valves Triple-Offset)
Valves Valve Inspection and Testing Requirements
Valves Gate Valves, Through Conduit Type, API SPEC 6D
Valves Ball Valves, API SPEC 6D
Valves Steel Lubricated Plug Valves - Flanged and Welding End
Valves Valves and Chokes, ISO 10423
Plumbing and Utilities Automatic Electric Water Heaters
Qualification Requirements of Elastomeric Materials and
Non-Metallic Manufacturers
Pressure Preservative Treatment for Wood Piles,
Onshore Structures Timbers and Ties
Qualification Requirements for Alkyd Coating Systems
Paints and Coatings (APCS-4 and APCS-6)
Paints and Coatings Packaging Requirements for Coatings
Qualification Requirements for Coating Systems Used in
Paints and Coatings Immersion Services

Saudi Aramco: Company General Use


Qualification Requirements for Epoxy Coatings for
Paints and Coatings Atmospheric Service
Qualification Requirements of Epoxy Coating Systems
Paints and Coatings for Splash Zone (APCS-19C)
Qualification Requirements for Inorganic Zinc Primer
Paints and Coatings (APCS-17A) and (APCS-17B)
Onshore Structures Caulking Compound (Joint Sealant)
Qualification Requirements for Epoxy Coatings Applied
Paints and Coatings on Damp Steel Surfaces
Civil Aggregates for Concrete
Shop-Applied External Fusion Bonded Epoxy Coating for
Paints and Coatings Steel Line Pipes
Qualification Requirements for Shop-Applied Internal
Paints and Coatings FBE Coatings
Onshore Structures Scaffold Plank
Civil Ready-Mixed Concrete
Civil Precast Concrete Fence Posts
Qualification Requirements for Stand Alone Self-Priming
Epoxy Mastic Coatings including Top Coating with
Paints and Coatings Aliphatic Polyurethane
Qualification Requirements for High Temperature
External Coatings in Atmospheric Services (APCS-11A)
Paints and Coatings and (APCS-11B)
Paints and Coatings Epoxy Coating of Steel Reinforcing Bars
Qualification and Application Requirements of
Paints and Coatings Fluoropolymer/Ceramic Coatings on Fasteners
The Requirements of External Liquid Coatings for Buried
Paints and Coatings Pipelines and Piping (APCS-113A)
Materials Engineering Marking of Metal Products
Onshore Structures Fabrication of Structural and Miscellaneous Steel
Onshore Structures Erection of Structural and Miscellaneous Steel
Onshore Structures Blast Resistant Doors and Frames
Onshore Structures Pre-Engineered Metal Buildings
Structural Plates Rolled Shapes and Tubulars
Materials Engineering Specification for Fixed Offshore Platforms
Fiber-Reinforced Plastic (FRP) Grating and FRP
Non-Metallic Components
Fiber-Reinforced Plastic (FRP) Manhole and Access
Non-Metallic Covers with Frame
Compressors, Gears and Steam
Turbines Special Purpose Gear Units
Compressors, Gears and Steam
Turbines General Purpose Gear Units
Electrical Substations Equipment Power Transformers
Electrical Substations Equipment Three-Phase Dry-Type Power Transformers

Saudi Aramco: Company General Use


Electrical Substations Equipment Overhead-Type Distribution Transformers
Electrical Substations Equipment Pad-Mounted, Three-Phase Distribution Transformers
Electrical Systems Designs and Material, Manufacture and Preservative Treatment of
Automation Wood Poles
Electrical Systems Designs and Material, Manufacture and Preservative Treatment of
Automation Wood Crossarms
Electrical Systems Designs and
Automation Octagonal Steel Poles for Overhead Distribution Systems
Electrical Systems Designs and
Automation Medium Voltage Power Cable 5 kV through 35 kV
Electrical Systems Designs and
Automation Submarine Power Cable 5 kV through 35 kV
Electrical Systems Designs and
Automation Submarine Power Cable 69 kV through 230 kV
Metal-Enclosed, Metal-Clad Low-Voltage Switchgear
Electrical Substations Equipment Assemblies
Electrical Substations Equipment Indoor Controlgear - Low Voltage
Electrical Substations Equipment Indoor Metal-Clad Switchgear: 1 to 38 kV
Electrical Substations Equipment Indoor Controlgear - High Voltage
Electrical Substations Equipment High Voltage Motor Controller - Outdoor
SF6 Gas Insulated Circuit Breakers, Outdoor - 34.5 kV
Electrical Substations Equipment through 230 kV
Manually Operated Pad Mounted SF6 Switchgear: 1 kV
Electrical Substations Equipment to 36 kV
Electrical Substations Equipment Outdoor Switchrack - Low Voltage
Electrical Systems Designs and
Automation Power System Automation Components
Electrical Systems Designs and
Automation Control and Protective Relay Panel - Indoor
Motors and Generators Adjustable Frequency Drive System 1 kV and Above
Electrical Substations Equipment Low Voltage Panelboards
Electrical Substations Equipment Indoor Switchboard - Low Voltage
Electrical Systems Designs and
Automation Cablebus
Electrical Substations Equipment Indoor Automatic Transfer Switch - Low Voltage
Retrofit Replacement Vacuum Circuit Breakers Applied
Electrical Substations Equipment in Indoor Metal Clad Switchgear 1 to 38 kV

Electrical Substations Equipment Metal Enclosed Isolated Phase Bus - Indoor and Outdoor
Conventional (Tap Adjustable) Transformer/Rectifiers
Cathodic Protection for Cathodic Protection
Cathodic Protection Cathodic Protection Phase Controlled Rectifiers
Cathodic Protection Galvanic Anodes for Cathodic Protection
Cathodic Protection Impressed Current Anodes for Cathodic Protection
Cathodic Protection Junction Boxes for Cathodic Protection

Saudi Aramco: Company General Use


Cathodic Protection Photovoltaic Power Supply for Cathodic Protection
Cathodic Protection Impressed Current Cathodic Protection Cables
Remote Monitoring System (RMS) for Cathodic
Cathodic Protection Protection Applications
Motors and Generators Form-Wound Induction Motors 500 HP and Above
Severe-Duty, Totally Enclosed, Squirrel Cage Induction
Motors and Generators Motors to 500 HP
Motors and Generators Form-Wound Synchronous Turbine Generators

UPS, DC Systems and Power Electronics Stationary Storage Batteries

UPS, DC Systems and Power Electronics Rectifier/Charger

Electrical Substations Equipment Auxiliary Electrical Systems for Skid-Mounted Equipment

UPS, DC Systems and Power Electronics Uninterruptible Power Supply (UPS) System
Motors and Generators Diesel Generator Sets
Motors and Generators Form-Wound Brushless Synchronous Motors
Motors and Generators Form-Wound Brushless Synchronous Motors
Project Quality Blank A175 Form
Detailed Instructions of Inspection and Testing
Project Quality Requirements
Project Quality General Template for Special Inspection Form
General Inspection plan exclusively for Pipe and fittings
of new materials or materials where there are no SAMSS
Materials Engineering exist
HIC Testing: Qualification of Plates for Storage Tanks,
Fittings and Pressured Equipment for Resistance to
Materials Engineering Hydrogen Induced Cracking
Materials Engineering HIC Testing: ANSI/ASTM/API 5L Line Pipe
PIPE: High Frequency Welded Line Pipe, Class B, NPS 4
Materials Engineering and Larger
PIPE: Beveled End, Seamless or Submerged Arc Welded,
Materials Engineering Straight or Spiral Seam Carbon Steel Pipe
PIPE: ASTM, Carbon Steel for On-Plot Piping, Seamless
Materials Engineering or Welded, Straight Seam
PIPE: Beveled End, Seamless or Welded, Straight Seam,
Materials Engineering Stainless Steel Pipe
Materials Engineering PIPES: Nickel Alloy Pipes
Materials Engineering PIPE: Seamless or Welded Clad and Lined Pipe
Materials Engineering CRA Clad Pipe Spools
PIPE & FITTINGS: Fiberglass: RTRP (glass-fiber-reinforced
thermosetting resin) & RPMP (glass-fiber-reinforced
Materials Engineering plastic-mortar)

Saudi Aramco: Company General Use


Specification for Heavy Duty Polytetrafluoroethylene
(PTFE) and Perfluoroalkoxy (PFA) Lined carbon Steel Pipe
Non-Metallic and Fittings
Non-Metallic RTR PIPES & FITTINGS: For Water and Hydrocarbons
Non-Metallic RTR (Fiberglass) Pipes and Fittings for Gravity Flow
Non-Metallic RTP Pipes and Fittings: For Water and Hydrocarbons
CONCRETE MORTAR LINING: For Internal Surfaces of
Paints and Coatings Line Pipe and Fittings
CONCRETE WEIGHT COATING: For Line Pipe Used
Paints and Coatings Underwater
PIPE: Fabrication of Spools; Carbon, Alloy, High Strength
Piping Special, Low and High Temperature Steels
Materials Engineering Induction Pipe Bends
TUBES: for Condensers, Heat-Exchangers and Boiler and
Materials Engineering Super Heaters
Materials Engineering TUBES: Stainless Steel and Nickel Alloy Tubes
Condenser Tubes: Seamless Tube and Ferrule Stock of
Materials Engineering Copper and Various Copper Alloys
PIPE: Seamless 1" and Larger; and Straight Seam
Submerged Arc Welded 16" and Larger; for Low
Piping Temperature Service
High Density Polyetheline (HDPE) Pipe , Spool, and
Non-Metallic Fittings
PIPE: Seamless ; Carbon or Alloy Steel; A335; A376; A430
Piping or A524
Piping PIPING: AUXILIARY - For Mechanical Equipment
Piping HOSE: Corrugated Metal Hoses and Hose Assemblies
Materials Engineering General Inspection for Tubing, Fittings, and Flanges
Materials Engineering Spectacle Plates, Spacers, Blanks
FLANGES - WELDNECK, BLIND FLANGES, FORGED STEEL
Materials Engineering & ALLOY
Materials Engineering FLANGES: Nickel Alloy
FLANGES: Socket Weld and Threaded, All Materials
Piping Covered by ASME B16.5
Materials Engineering FITTINGS: Saddle; Pipe; Steel; Full Encirclement
PIPE COMPONENTS: Low Temperature Service, Wrought
Carbon Steel and Alloy Steel: Seamless & Welded
Materials Engineering Construction
INTEGRAL INSULATING JOINTS / SPOOLS and FLANGES:
For Cathodically Protection; ASME B16.5 Service
Piping Pressure Ratings of
Materials Engineering FITTINGS Pipe Butt Welding Wrought Carbon Steel
FITTINGS: For Use In HOT TAP and/or Stopple
Operations: Wet & Sweet Sour Services: Include - Split
Materials Engineering Tees, Stopple Fittings, Full

Saudi Aramco: Company General Use


FITTINGS: Alloy Steel, Applicable to Low Alloy, Stainless
Materials Engineering Steel and Nickel Alloy
Materials Engineering Fittings and Connector (Olets): Copper Nickel Alloy
FITTINGS: Hub, Clamps and Seal Rings API-6A or
Piping Proprietary Design
Materials Engineering Weld Overlayed Flanges, Fittings and Spool Pieces.

TRAP, SCRAPER: Permanent Scraper Traps for Line Sizes


above 4", for Pressure Ratings of Class 150 to 1500.
Applies to Water or Hydrocarbon Services, Onshore and
Piping Offshore
Project Quality Stockist Supplied Inspectable Materials
Valve Materials Certification Requirements: for SA-175
Valves Forms 043600, 043601, 045600 and 341900
VALVES: Metallic; Includes Gate, Globe, Angle, Check,
Valves Needle, Ball, Plug, Piston, Butterfly, and Choke
VALVE: Low Severity, Utilities Service in Cast Iron or
Valves Ductile Iron and Non-Ferrous Material
VALVES & CHOKES: ISO 10423 ; For Use Downstream of
the Wellhead and Tree Assembly. (See Note 2 for
Valves Exclusions)
Civil WIRE or WIRE ROPE
SLINGS: Using Chain, Wire Rope, Manila, Nylon,
Civil Polyester, Polypropyleneor Synthetic Webbing
Non-Metallic HOSES - Marine Oil, Offshore Tanker Loading
HOSES: Oil Suction and Discharge Services; for Dock
Non-Metallic Tanker Loading
Onshore Structures DOORS: Wood Flush, Solid Core, Fire Rated
Paints and Coatings COATING: Shop Applied, Internal or External
Paints and Coatings COATING: Shop Applied; for Drilling Tubulars

Coating: Shop Applied; for Wellhead Equipment that


includes: Casing Heads, Spools (Casing and Tubing),
Bonnets, Valves, Flanges and all Related Wellhead
Drilling Workover Wellhead and Valves Components, Onshore and/or Offshore
COATING: SHOP APPLIED; For Tanks, Piping, Pipelines
(and Associated Appurtenances & Fittings), Structures,
Paints and Coatings Process Equipment;
COATING: Shop Applied, Application of Composite
Paints and Coatings Fluropolymer/Ceramic Coatings to Fasteners

Fasteners, Alloy and Stainless Steel Nuts & Bolting


Materials: Bars, Bolts, Screws, Studs, Stud Bolts, & Wire;
for Use in High or Low Temperature Services, and
Civil Structural Connections
STEEL STRUCTURES: (Excludes Offshore Structures and
Onshore Structures Pre-engineering Metal Buildings)
Onshore Structures Spreader Beam

Saudi Aramco: Company General Use


Onshore Structures BUILDING: Metal; One Story, Pre-engineered
Onshore Structures Tower: Transmission

Onshore Structures DOORS AND FRAMES: Steel, Fire Rated or Blast Resistant
Onshore Structures TOWER: Communication
STRUCTURAL PLATES, ROLLED SHAPES, TUBULARS:
Carbon Steel or Carbon Manganese Steel, For Fixed
Materials Engineering Offshore Platforms
FIBER REINFORCED PLASTICS (FRP): Grating and FRP
Non-Metallic Components
Onshore Structures BUILDING: Portable; Pre-fabricated
Compressors, Gears and Steam
Turbines GEAR UNITS: Special Purpose
Compressors, Gears and Steam COUPLING: Shaft, Special Purpose (Applicable only to
Turbines couplings transferring 2000 HP and above)
Compressors, Gears and Steam
Turbines GEAR UNITS: General Purpose
Transformer: Distribution; Pad-Mounted,
Electrical Substations Equipment Compartmental-Type, Self-cooled, Three-Phase
Transformers: Power; 3 Phase, Dry Type, 501 kVA and
Electrical Substations Equipment Larger
Electrical Substations Equipment Transformers: Power, Oil Filled, 60 Hz
Mobile Substation 50 MVA 230-115/34.5-13.8 kV and 30
Electrical Substations Equipment MVA 115-69/13.8-4.16 kV
Electrical Substations Equipment Unit, Package Substations, and Ring Main Unit (RMU)
Electrical Substations Equipment Capacitor Bank
Electrical Systems Designs and
Automation WOOD: Utility Pole
Electrical Systems Designs and
Automation WOOD: Cross Arm or Cross Braces
Electrical Systems Designs and Submarine Power Cable 5 kV through 115 kV: Designed
Automation to AEIC. IEC and ICEA Specifications

Electrical Systems Designs and Medium Voltage Power Cable: Solid Dielectric Insulated
Automation Cables for Rated Voltages of 5 kV through 35 kV
Electrical Systems Designs and High Voltage Power Cable - Solid Dielectric Insulated
Automation Cables for Rated Voltages of 69 kV through 138 kV
POWER CIRCUIT BREAKER SWITCHGEAR and DRAWOUT
POWER CIRCUIT BREAKERS: Metal-Enclosed, Low
Electrical Substations Equipment Voltage
INDOOR CONTROLGEAR; High Voltage, Built to Either IEC
Electrical Substations Equipment or NA, 50 or 60 Hz, 3 Phase up to 4160 Volts
Electrical Substations Equipment Outdoor Controlgear: High Voltage
Electrical Systems Designs and
Automation Control and Protective Relay Panel - Indoor

Saudi Aramco: Company General Use


SWITCHGEAR: Metal-Clad, Air Insulated, Indoor, 1 to 38
Electrical Substations Equipment kV
SF6 Gas Insulated Circuit Breakers Outdoor - 34.5 kV
Electrical Substations Equipment through 230 kV
Electrical Substations Equipment SF6 Gas Insulated Metal Enclosed HV Switchgear (GIS)
INDOOR CONTROLGEAR; Low Voltage, Built to Either IEC
Electrical Substations Equipment or NA
SWITCHGEAR: Load Interrupting, Manually-Operated,
Electrical Substations Equipment Pad Mounted SF6 Switchgear, up to 36 kV
OUTDOOR SWITCHRACK: Low Voltage, Built to Either IEC
Electrical Substations Equipment or NA
Electrical Systems Designs and
Automation Power System Automation
Motors and Generators Adjustable Frequency Drive System - 1 kV and Above
Motors, Electric: Severe Duty Totally Enclosed Squirrel
Cage Induction Motors to 500 HP, 4000 V or Below, and
Motors and Generators Explosion Proof Motors
MOTORS: Form-Wound, Squirrel-cage Induction 500 HP
Motors and Generators and above, or Brushless Synchronous
GENERATORS: Synchronus, Continuous Duty, 13.8 kV, 3
Phase, 60 Hertz, 10 MVA and Larger, Built to 17-SAMSS-
Motors and Generators 510
DIESEL ENGINE GENERATOR SETS: Stationary or Potable,
Motors and Generators Rated from 35 kW up to and Including 10 MW
RECTIFIERS: Conventional (Tap Adjustable) or Phase
Cathodic Protection Controlled
Cathodic Protection GALVANIC ANODES: For Cathodic Protection

Cathodic Protection IMPRESSED CURRENT ANODES: For Cathodic Protection


Cathodic Protection CABLE: 600 Volts Maximum, for Cathodic Protection

UPS, DC Systems and Power Electronics BATTERY CHARGER / RECTIFIER: Rated output > 100 ADC
BATTERY CHARGER / RECTIFIER with Rating less than or
UPS, DC Systems and Power Electronics equal to 100 ADC
POWER SUPPLY, PHOTOVOLTAIC (PV): For Cathodic
Cathodic Protection Protection
Uninteruptable Power Supply (UPS) Systems: Rated
UPS, DC Systems and Power Electronics Output Power > 10 kVA
AUXILIARY ELECTRICAL SYSTEMS: As Provided on
Custom-Engineered,Factory-Assembled, and Pre-Wired
Electrical Substations Equipment Equipment Skids

UPS, DC Systems and Power Electronics BATTERIES: Stationary


Communications Fiber Optic Cable
Communications Composite Overhead Fiber Optic Ground Wire (OPGW)

Saudi Aramco: Company General Use


Communications Submarine Fiber Optic Cable

Non-Metallic FLOAT: For Submarine Oil Hose, 12 in. to 24 in. Diameter


Aviation Fuel Quality CHAIN, ANCHOR CHAIN, SHACKLES or SWIVELS
Process Control Distributed Control System (DCS)
Supervisory Control and Data Acquisition (SCADA)
Process Control System
Terminal Management Systems (TMS) Equipment and
Process Control Associated Software
Process Control Remote Terminal Unit
Packaged Water-Cooled Cetrifugal Chillers for Utility
HVAC Service
Direct Expansion Air Conditioning Systems: For Offshore
HVAC Facilities
Direct Expansion Air Conditioning Systems for Offshore
HVAC Facilities
COOLING TOWERS: Induced Draft, Field Erected, Open
HVAC Type
HVAC Fire, Smoke, and Combination Fire-Smoke Dampers
AIR CONDITIONING UNIT: Direct Expansion, Split Type
HVAC and Air Cooled Chiller
COIL: Refrigeration, Hot or Chilled Water, for HVAC
HVAC Application
HVAC Sound Attenuator
HVAC Air Damper, Air Louver, Spiral Duct
Compressors, Gears and Steam
Turbines Chiller: Water Cooled Scroll Compressor
Gas Turbines and Diesel Engines DIESEL ENGINES: Reciprocating, Compression-Ignition
Rotary Multiphase Pump (Twin-Screw and Progressive
Pumps, Seals and Mixers Cavity type): API 676
Pumps, Seals and Mixers Mechanical Seals for Pumps
Pumps, Seals and Mixers PUMPS: Rotary Per API 676
Pumps, Seals and Mixers PUMPS: Positive Displacement Reciprocating
PUMPS: Centrifugal, Horizontal, End Suction Single
Pumps, Seals and Mixers Stage, or Vertical In-line
MOLTEN SULFUR PUMPS: Centrifugal, Horizontal and
Pumps, Seals and Mixers Vertical
Pumps, Seals and Mixers PUMPS: Sealless
Pumps, Seals and Mixers Turbine, Hydraulic Recovery, MFR STD
Pumps, Seals and Mixers PUMP: API, Centrifugal
Pumps, Seals and Mixers Turbine, Hydraulic Recovery, API STD
Pumps, Seals and Mixers PUMP: API, Sealless Pump
MAIN FIREWATER PUMPS: Centrifugal, Horizontal and
Pumps, Seals and Mixers Vertical
Pumps, Seals and Mixers HELICO-AXIAL MULTIPHASE PUMP: API 610

Saudi Aramco: Company General Use


PUMPS: Submersible, Bowl Type, with or without
Pumps, Seals and Mixers Electric Motors
PUMPS: Positive Displacement, Controlled Volume,
Pumps, Seals and Mixers Diaphragm & Packed Plunger Types
Compressors, Gears and Steam COMPRESSOR: Reciprocating, for Process Air or Gas
Turbines Service
Compressors, Gears and Steam
Turbines COMPRESSOR: Centrifugal
Compressors, Gears and Steam AAIR COMPRESSOR: Centrifugal, Constant Speed,
Turbines Packaged, Integrally Geared, Including Accessories
Compressors, Gears and Steam ROTORS: Separately Ordered for Centrifugal Process Gas
Turbines Compressor
COMPRESSOR: Screw, Packaged Air Compressors. This
Compressors, Gears and Steam Does Not Apply To Compressors With Rated Flow Less
Turbines Than 250 SCFM
Compressors, Gears and Steam
Turbines COMPRESSOR: Rotary, for General Refinery Service
Compressors, Gears and Steam
Turbines Process Gas Ejector (Compressor)
Compressors, Gears and Steam
Turbines Dry Gas Seals for Gas Compressors
HOISTS or OVERHEAD CRANES: Lifting Capacity Over
Inspection Engineering 5000 kg
Onshore Structures Tower Cranes
Offshore Structures Offshore Pedestal Crane (Lattice Boom)
General Inspection plan exclusively for 32 class new
Materials Engineering materials or materials where there are no SAMSS exist
Compressors, Gears and Steam
Turbines TURBINE: Steam, General Purpose or Special Purpose

Positive Material Identification (PMI): For Pressure-


retaining Alloy Material Components, Flange Bolting,
Welds, Weld Overlays, and Cladding or Equipment
Materials Engineering where Specified in the SAMSS or Purchase Order
Heat Transfer Equipment Boiler: Power; Water Tube.
High Intensity Burner for Sulfur Recovery Unit
Welding Combustion Chamber
Vessels Pressure Vessel
Vessels SMALL PRESSURE VESSEL; 32-SAMSS-036
Heat Transfer Equipment HEAT EXCHANGERS: Shell and Tubes
Heat Transfer Equipment HEAT EXCHANGERS: PLATE AND FRAME
Heat Transfer Equipment HEAT EXCHANGERS: Electrical, Immersion-type
Heat Transfer Equipment TUBE BUNDLES, Separately Ordered
Heat Transfer Equipment AIR-COOLED HEAT EXCHANGERS
Heat Transfer Equipment Heater: Direct Fired

Saudi Aramco: Company General Use


Manufacture of Skid-Mounted Process Packaged
Vessels Equipment Units
TANKS: Atmospheric, Steel, within the Scope of API 650;
Except for Tanks According to Appendix F of the Same
Vessels Standard
TANKS: Low Pressure, Steel, within the Scope of API 620.
Except for Tanks according to Appendix Q and Double
Vessels Wall Tanks according
TANKS ROOF: Aluminum Roof with the Scope of API 650
Vessels Appendix (G)
TANKS ROOF: Internal Floating Roof as per API 650
Vessels Appendix (H) and 32-SAMSS-005
Trays and Packing Process Design COLUMN TRAYS AND PACKING
TANKS: Steel; Aboveground or Underground to API-12F,
Vessels API-650 Appendix-J, UL-58, and UL-142
Vessels TANK: FRP Storage Tanks, ASME RTP-1
Environmental Reverse Osmosis Systems

Inlet Air Filtration Systems for; Centrifugal Air


Compressors to 32-SAMSS-016 for Use in Both Onshore
Compressors, Gears and Steam and Offshore Environments. Systems are limited to the
Turbines automatic pulse-jet
Combustion Gas Turbine Package: Battery
Gas Turbines and Diesel Engines Charger/Rectifier
Combustion Gas Turbine Package: Uninterruptible
Power Supply Systems (UPS); For Auxiliary and Control
Gas Turbines and Diesel Engines Systems

COMBUSTION GAS TURBINE PACKAGE: COATING; Shop


Gas Turbines and Diesel Engines Applied for inlet filtration system Internal & External
Gas Turbines and Diesel Engines Combustion Gas Turbine Package: Control System
Combustion Gas Turbine Package: Coupling; Shaft, for:
1) Load Coupling [Power Generation Units Only] 2)
Gas Turbines and Diesel Engines Auxiliary Gearbox Coupl
Combustion Gas Turbine Package: Gear Unit for: 1.
Auxiliary Gearbox (Power Generation and Mechanical
Gas Turbines and Diesel Engines Drive Units) 2. Load Gearbox
Combustion Gas Turbine Package: Heat Exchangers;
Gas Turbines and Diesel Engines Auxiliary Systems
Combustion Gas Turbine Package: Inlet Air Filtration
Gas Turbines and Diesel Engines Systems: For use in both on and offshore environments
Combustion Gas Turbine Package: Instrumentation; (not
Gas Turbines and Diesel Engines applicable to inlet filtration)
Combustion Gas Turbine Package: Monitoring Systems;
Gas Turbines and Diesel Engines Vibration, Axial Position, and Bearing Temperature

Saudi Aramco: Company General Use


Combustion Gas Turbine Package: Electric Motors; for
Gas Turbines and Diesel Engines Auxiliary Systems
Gas Turbines and Diesel Engines Combustion Gas Turbine Package: Starter Motor
Combustion Gas Turbine Package: Piping & Valves; On-
Gas Turbines and Diesel Engines Skid Auxiliary Equipment
Combustion Gas Turbine Package: Pumps; For Auxiliary
Gas Turbines and Diesel Engines Systems
Combustion Gas Turbine Package: Steel Structures; For
Gas Turbines and Diesel Engines CGT Air Filtration & Heat Exchanger Structures
COMBUSTION GAS TURBINE PACKAGE: ATMOSPHERIC
Gas Turbines and Diesel Engines TANKS; For Auxiliary System
Combustion Gas Turbine Package: Turbine; Industrial
Gas Turbines and Diesel Engines and Aero-derivative
Combustion Gas Turbine Package: Indoor Control Gear;
Gas Turbines and Diesel Engines Control Gear; MCC, AC & DC Control Panels
Combustion Gas Turbine Package: Batteries; For
Gas Turbines and Diesel Engines Auxiliary and Control Systems
Gas Engine: Dual Fuel, Reciprocating, Internal
Gas Turbines and Diesel Engines Combustion Engine, Industrial
LUBRICATION, SHAFT SEALING and CONTROL OIL
Vibration and Lubrication SYSTEMS
FLARE SYSTEMS: Including Flare Stacks, Flare Tips, Dry
Flare Systems Design Gas Seals, and Knockout & Liquid-Seal Drums
Pumps, Seals and Mixers Mixers : Side Entry
Refractories: Hydraulic-Setting, Castable Systems; To be
used on Pressure Vessles, Boilers, Process Heaters,
Heat Transfer Equipment HEX's, Piping, and Flare Tips
Heat Transfer Equipment Heat Recovery Steam Generator (HRSG)
General Inspection plan exclusively for Instrumentation
related new materials or materials where there are no
Materials Engineering SAMSS exist
VALVES: Control, Steel, General Service, Pneumatic
Valves Operated, Up to and Including Class 2500 Ratings
Valves VALVES: Control, Non-General Service
Custody Measurement Truck Loading Metering Systems
Custody Measurement Truck Unloading Metering Systems
Instrumentation Instrumentation for Packaged Units
ACTUATORS, VALVE: a) Pneumatic Actuators ON-OFF
Service to 34-SAMSS-716. b) Electric Motor Operated
Instrumentation Valve Actuators to 34-SAMSS-718

Actuator, Valve, Hydraulic: With Integral or Remote


Power Unit for Rising Stem and Quarter Turn Valves.
Excluded are Actuators for Offshore Well Platforms and
Instrumentation Wellhead Valves
Custody Measurement Atmospheric Portable Tank Prover

Saudi Aramco: Company General Use


Custody Measurement Small Volume Prover
Instrumentation Pressure Retaining Instruments
Instrumentation VALVE: Safety Relief Conventional and Balanced Type
Custody Measurement Bi-Directional Meter Prover
Custody Measurement Uni-Directional Meter Prover
Instrumentation METER: Flow, Turbine
Instrument Control Panels: Indoor and Outdoor; To 34-
SAMSSS-820 for Panels, Cabinets, Marshalling Cabinets
Instrumentation in Electrically Unclassified Air-Conditioned Buildings
Process Analyzers CHROMATOGRAPHS: Process Gas
Process Control PIPELINES LEAK DETECTION SYSTEMS (LDS)
Instrumentation PROGRAMMABLE LOGIC CONTROLLERS
ESD System: Hard Wired, Solid State (Non-
Instrumentation Programmable)
Instrumentation ESD SYSTEM: Electromagnetic Relay
PROGRAMMABLE CONTROLLER BASED ESD SYSTEMS:
Instrumentation Fail - Safe, Fault - Tolerant
Self Contained Wellhead High Integrity Protection
Instrumentation System Skid
Self-Contained Wellhead High Integrity Protection
High Integrity Protection Systems System Skid - Gas
Offshore; Wellhead High Integrity Protection System
High Integrity Protection Systems Skid - Gas Service
MONITORS: Combustible Gas or Hydrogen Sulfide,
Instrumentation Stationary
Monitoring Systems: Vibration, Axial Position, and
Instrumentation Bearing Temperature
Process Analyzers DENSITY METERS
Automatic Sampling Systems for Crude Oil and Refined
Custody Measurement Products
Instrumentation and Thermocouple Extension Cable: For
Signaling and Control Purposes (Excluding Data Highway
Instrumentation Cable)
Communications TETRA Devices Operating in Hazardous Area
Instrumentation Wellhead Control, Monitoring and Shutdown Systems

Drilling Workover Wellhead and Valves Casing and Tubing

Drilling Workover Wellhead and Valves Drill Pipe


Non-Heat Treated Green Tubes (Pipes and Coupling
Drilling Workover Wellhead and Valves Stock) for Casing and Tubing

Drilling Workover Wellhead and Valves Casing: API 5L Grades X42 through X70
Coating: Shop Applied, External FBE; for Drilling
Paints and Coatings Tubulars, Cathodically Protected OCTG

Saudi Aramco: Company General Use


Wire Rope: Includes Drill Line, Raising Line and Cable,
Drilling Workover Wellhead and Valves and Wireline (Well Measuring)

Drilling Workover Wellhead and Valves Blowout Preventers (BOP) Hoses


Annular and RAM Type BOP Units and Diverters: All
Drilling Workover Wellhead and Valves Working Pressure Ranges

Drilling Workover Wellhead and Valves Rotary or Vibrator Hose


Rotary Swivel, Drilling Hook, Traveling Block or Hook-
Drilling Workover Wellhead and Valves Block Combination

Drilling Workover Wellhead and Valves Rotary Table

Drilling Workover Wellhead and Valves Drill Collars: With Integral Connectors and Kellys

Drilling Workover Wellhead and Valves Top Drive Drilling System


Wellhead Components: Back Pressure Valves and Two
Drilling Workover Wellhead and Valves Way Check Valves

Drilling Workover Wellhead and Valves Wellhead Equipment; API 6A, PSL 1 and 2, Sour Service
Wellhead Equipment: API 6A, PSL 3 and 4, Sour Wet
Drilling Workover Wellhead and Valves Service
Subsea Wellhead Drilling System (API 6A, 17D, Sour, PSL-
Drilling Workover Wellhead and Valves 2 and 3)
Safety Valves; Well Control, Kelly Cock Stab-In Type 5K -
Drilling Workover Wellhead and Valves 15K. Not for H2S Service
Valves Actuator Assembly: Hydraulic; SSV

Drilling Workover Wellhead and Valves Valve Assembly: Safety, Subsurface

Drilling Workover Wellhead and Valves Mud Valve and Low Torque Valves
Pumps, Seals and Mixers Mud Pumps
Motors and Generators Motors, Drilling: A/C
DRILLING EQUIPMENT SPARE PARTS: Ordered directly
from the Original Equipment Manufacturers (OEM) or
Drilling Workover Wellhead and Valves through Distributors
Piping Hydraulic Power Pack System & Piping
Compressors, Gears and Steam
Turbines Rotors: Separately Ordered for Turbines
PANTOGRAPH (OUTBOARD) CABLES: For Marine Loading
Arms, Galvanized &Non-Galvanized, Size 7/8 inch to 1-
Offshore Structures 3/4 inch Nominal
Compressors, Gears and Steam
Turbines CENTAC ROTORS: All Stages (Spares)

Saudi Aramco: Company General Use


IMPELLER: Separately Ordered for API Pumps with Rated
Pumps, Seals and Mixers Power Equal to or Greater than 300 HP per Stage
Re-Engineered Pump Spare Parts other than Impeller
Pumps, Seals and Mixers and Casing Parts for API and Non-API Pumps
Re-Engineered Pump Casing Parts for API and Non-API
Pumps, Seals and Mixers Pumps
RRe-Engineered Pump Impeller for API and Non-API
Pumps, Seals and Mixers Pumps
Composite Overhead Fiber Optic Ground Wire (OPGW)
Communications Specifications
Specifications of Standalone Submarine Fiber Optic
Communications Cable
Specifications of Fiber Optic Cable for Composite
Communications Submarine Cable
Communications Two Part Polyurethane Duct Sealant
Outside Plant - Fiber Optic Cable Specifications (Single-
Communications Mode and Multi-Mode)
Procurement Guidelines for Consumables - Welding and
Welding Allied Processes
Fire Protection AFFF Liquid Concentrate
Fire Protection High Expansion Foam Concentrate
Fireproofing for Repair or Replacement of Valve
Loss Prevention Actuator - Box and Blanket System Enclosures
Fluroprotein Foam Concentrate for MTBE Hydrocarbon
Fire Protection Fires
Fire Protection Fire Protection Department Protective Clothing
Loss Prevention Intumescent Fireproofing for Valve Actuators

Non-Metallic Oil Suction and Discharge Hoses for Dock Tanker Loading
Non-Metallic Oil Hose for Offshore Tanker Loading
Process Optimization Solutions Operator Training Simulator
Process Control Distributed Control Systems
Supervisory Control and Data Acquisition (SCADA)
Process Control Systems
Process Control Remote Terminal Unit
Process Control Terminal Management Systems
Process Optimization Solutions Laboratory Information Management System (LIMS)
Process Optimization Solutions Data Validation and Reconciliation Software
Process Optimization Solutions Data Acquisition and Historization System (DAHS)
Process Optimization Solutions 3D Asset Virtualization Tool
Plants Networks Industrial Ethernet Switch Specifications
Vibration and Lubrication Turbine Oils 32, 46, 68 and 100
Vibration and Lubrication Machinery Oils 150, 220, 320 and 460
Vibration and Lubrication Automotive Gear Lube 85W-140

Saudi Aramco: Company General Use


Gear Lubes EP 100, EP 150, EP 220, EP320, EP 460 and
Vibration and Lubrication EP 1000
Vibration and Lubrication Automatic Transmission Fluid III
Vibration and Lubrication Hydraulic Oils AW 32 and 68
Vibration and Lubrication All Purpose Grease EP 1
Vibration and Lubrication All Purpose Grease EP 3
Vibration and Lubrication Ball Bearing Grease 2
Vibration and Lubrication Gear Coupling Grease 1
Vibration and Lubrication Diesel Engine Oils
Vibration and Lubrication Gas Turbine Oil 32
Vibration and Lubrication Insulating Oil
Vibration and Lubrication Refrigeration Oil - WF68
Vibration and Lubrication Penetrating Oil
Vibration and Lubrication Rust Preventive
Vibration and Lubrication Open Gear and Wire Rope Lubricant
Vibration and Lubrication General Purpose Cutting Oil
Vibration and Lubrication Heavy Duty Cutting Oil
Vibration and Lubrication Soluble Oil
Vibration and Lubrication Honing Oil
Vibration and Lubrication Synthetic Grinding Fluid
Vibration and Lubrication Way Lubricant
Vibration and Lubrication Synthetic Gas Turbine Oil 5
Vibration and Lubrication Rack and Pinion Grease
Vibration and Lubrication Turbine Oil Vapor Space Inhibitor
Vibration and Lubrication Refrigeration Oil HFC-134a Synthetic
Vibration and Lubrication Automotive Gear Lube 90
Vibration and Lubrication High Temperature Grease
Vibration and Lubrication Turbo-Compressor Oils 46
Flow Assurance Kinetic Hydrate Inhibitors
Packaged Water Cooled Centrifugal Chillers for Utility
HVAC Services
Direct Expansion Air Conditioning Systems for Offshore
HVAC Facilities
HVAC Field Erected Cooling Towers
HVAC Water Chilling Units for Industrial/Process Services
HVAC Through the Wall (Window Type) Air Conditioning Units
Fire Protection Fire Protection Department Uniform Shirts (White)
Fire Protection Fire Protection Department Uniform Badges
Security Industrial Security Male Short Sleeve Shirt
Security Industrial Security Male Long Sleeve Shirt
Security Industrial Security Waist Length Outer Wear-Jacket
Security Industrial Security Dark Brown Pants
Fire Protection Fire Protection Department Hip Length Jacket
Fire Protection Department Uniform Trousers (Navy
Fire Protection Blue)

Saudi Aramco: Company General Use


Gas Turbines and Diesel Engines Diesel Engines
Compressors, Gears and Steam Axial and Centrifugal Compressors and Expander-
Turbines Compressors
Compressors, Gears and Steam
Turbines Packaged Screw Plant and Instrument Air Compressors
Compressors, Gears and Steam Reciprocating Compressors for Process Air or Gas
Turbines Service
Pumps, Seals and Mixers Centrifugal Pumps
Compressors, Gears and Steam
Turbines Packaged, Integrally Geared Centrifugal Air Compressors
Pumps, Seals and Mixers Positive Displacement Pumps - Controlled Volume
Submersible Pumps and Motors for Water Well and
Pumps, Seals and Mixers Offshore Service

Pumps, Seals and Mixers Shaft Sealing Systems for Centrifugal and Rotary Pumps
Pumps, Seals and Mixers Sealless Centrifugal Pumps
Inspection Engineering Inspection of Air-Cooled Heat Exchangers
Compressors, Gears and Steam
Turbines Steam Turbines for Power Generation
Vessels Manufacture of FRP Storage Tanks
Vessels Manufacture of Pressure Vessels
Vessels Manufacture of Atmospheric Tanks
Vessels Manufacture of Low Pressure Tanks
Heat Transfer Equipment Manufacture of Shell and Tube Heat Exchangers

Gas Turbines and Diesel Engines Inlet Air Filtration Systems for Combustion Gas Turbines
Compressors, Gears and Steam
Turbines General Purpose Steam Turbines
Compressors, Gears and Steam
Turbines Special Purpose Steam Turbines
Heat Transfer Equipment Manufacture of Air-Cooled Heat Exchangers
Lubrication, Shaft Sealing and Control Oil Systems and
Vibration and Lubrication Auxiliaries
Compressors, Gears and Steam
Turbines Inlet Air Filtration Systems for Air Compressors
Pumps, Seals and Mixers Side-Entry Mixers
Heat Transfer Equipment Manufacture of Plate and Frame Heat Exchangers
Trays and Packing Process Design Manufacture of Distillation Trays and Packing
Heat Transfer Equipment Manufacture of Industrial Boilers
Flare Systems Design Manufacture of Components for Flare Systems
Heat Transfer Equipment Manufacture of Electric Heat Exchangers
Heat Transfer Equipment Manufacture of Double Pipe Heat Exchangers
Heat Transfer Equipment Manufacture of Fired Heaters
Manufacture of Small Metallic Atmospheric Storage
Vessels Tanks

Saudi Aramco: Company General Use


Vessels Manufacture of Clad Vessels and Heat Exchangers
Environmental Reverse Osmosis Systems
Environmental Granular Filtering Materials
Heat Transfer Equipment Manufacture of Heat Recovery Steam Generator
Vessels Manufacture of Small Pressure Vessels
Manufacture of Skid-Mounted Process Packaged
Oil and Gas Process Engineering Equipment Units
Gas Turbines and Diesel Engines Combustion Gas Turbines
Multi-Phase Flow Meters (MPFM) Multi-Phase Flow Meters
Quality Requirements for Pressure Retaining
Instrumentation Instruments
Custody Measurement Flow Meters for Gas Custody Measurement
Custody Measurement Flow Meter for Liquid Custody/Royalty Measurement
Custody Measurement Bi-Directional Meter Prover
Custody Measurement Atmospheric Portable Tank Prover
Custody Measurement Truck Loading and Unloading Metering Systems
Custody Measurement Truck Weigh Scale System
Instrumentation Radar Tank Gauging Equipment
Radar Tank Gauging Systems for Royalty/Custody
Custody Measurement Measurement of Hydrocarbon Liquids
Process Analyzers Online Analyzers
Instrumentation Combustible Gas and Hydrogen Sulfide Monitors
Custody Measurement Automatic Sampling Systems for Hydrocarbon Liquids
Instrumentation Safety Relief Devices
Instrumentation Flame Monitoring Systems
ESD Systems - Hard-Wired - Solid-State
High Integrity Protection Systems (Nonprogrammable)
High Integrity Protection Systems ESD Systems - Electromagnetic Relay
Process Control Programmable Controller Based ESD Systems
High Integrity Protection Systems Wellhead Control, Monitoring and Shutdown Systems
Instrumentation Machinery Protection Systems

High Integrity Protection Systems Onshore Gas Wellhead Over-Pressure Protection System
Wellhead High Integrity Protection System - Offshore
High Integrity Protection Systems Gas Service
Self-Contained Wellhead High Integrity Protection
High Integrity Protection Systems System - Onshore Oil Service
Wellhead High Integrity Protection System - Offshore Oil
High Integrity Protection Systems (ESP) Service
Instrumentation Local ZV Control Systems
Instrumentation Control Valves
Instrumentation Pneumatic Actuators On-Off Service
Instrumentation Hydraulic Valve Actuators Systems
Instrumentation Electric Motor Operated Valve Actuators
Instrumentation Instrument Control Cabinets

Saudi Aramco: Company General Use


Instrumentation Programmable Logic Controller
Instrumentation Instrumentation for Packaged Units
Flow Computer for Custody Transfer Measurement of
Custody Measurement Hydrocarbon Liquids
Flow Computers for Custody Transfer Measurement of
Custody Measurement Hydrocarbon Gases
Preset Controller for Truck Loading and unloading
Custody Measurement Systems
Metering Supervisory Computer for Custody Transfer
Custody Measurement Measurement of Hydrocarbon Liquids
Instrumentation Instrumentation and Thermocouple Cable
Valves and Wellhead Equipment Requirements per API
Drilling Workover Wellhead and Valves SPEC 6A
Casing and Tubing Requirements per API SPEC 5CT and
Drilling Workover Wellhead and Valves API SPEC 5B
Casing and Tubing - Pup Joints Requirements per API
Drilling Workover Wellhead and Valves SPEC 5CT and API SPEC 5B
Casing, Tubing and Conductor - Crossover Per API SPEC
Drilling Workover Wellhead and Valves 5CT, API SPEC 5B and API SPEC 5L
Casing and Tubing - Couplings Requirements per API
Drilling Workover Wellhead and Valves SPEC 5CT and API SPEC 5B
Electric Submersible Pump ESP Controller Skid - Outdoors
Electric Submersible Pump ESP Controllers
Electric Submersible Pump ESP Transformers - Outdoors
Offshore Structures Pantograph Cables for Marine Loading Arms

Saudi Aramco: Company General Use


Typical Schematic Fuel Treatment Facilities for
Gas Turbines and Diesel Engines Combustion Gas Turbine
Piping Flowline Removeable Anchor 6 - 12
Piping Flowline Removeable Anchor 6 - 12
Electrical Systems Designs and Armless Construction, Double Dead End Structure 2.4,
Automation 4.16, 13.8 and 34.5kv
Security Security Sunshade Type I, 22x38M
Security Security Sunshade Type II, 22x46M
Electrical Systems Designs and
Automation Four-Way Manhole (Electrical) Details
Electrical Systems Designs and
Automation Four-Way Manhole (Electrical) Reinforcement Bar List
Security Security Decorative Gate, Elevation

Saudi Aramco: Company General Use


Security Security Decorative Gate, Foundation
Security Security Decorative Gate, Details
Security Security Site Layout , Main Gate 6Lanes
Security Security Site Layout, Main Gale 4Lanes
Security Security Site Layout, Security Gate 4Lanes

Security Security Gatehouse (2-3 men) 4x6M Floor Roof


Elevations and Sections, Gatehouse Building 4 x 6
Security meters
Security Security Gatehouse, Typical Details

Security Security Gatehouse (4-6 men) 5x7M Floor Roof

Security Security Galehouse (4-6 men) 5x7M Elev Secl

Security Security Gatehouse (7-11 men) 5x11M Floor Roof

Security Security Gatehouse (7-11 men) 5x11M Elev Sect


Security Security Support Bldg, Floor Roof
Security Security Support Bldg, Elev Sec
Security Security Support Bldg, Enlarge Details

Cathodic Protection Test Station-ER Soil Corrosion Probe for Buried Pipelines
Cathodic Protection, Installation Details Galvanic Anodes
Cathodic Protection At Thrust Anchor
Cathodic Protection Installation Details - Cable
Cathodic Protection Connection to Wellhead

Cathodic Protection Installation Details Cable Connection To Wellhead


Security Security Female Inspection Bldg
Security Security Visitor & ID Office, Floor
Security Security Visitor & ID Office, Sectn
Security Security X-Ray Bldg, Floor Roof
Security Security X-Ray Bldg, Elev Sectn

Cathodic Protection Offshore Negative Terminal Junction Box C.P.


Security Security Generator Bldg, Floor Roof
Security Security Generator Bldg, Elevalion
Security Security Generator Bldg, Section
Electrical Systems Designs and
Automation Dead-End Riser Pole With Fuse Disconnect
Electrical Systems Designs and
Automation Tap-Off Tangent Pole With Cable Riser

Piping Piping & Instrument Diagram Truck Loading Facility

Saudi Aramco: Company General Use


Piping & Instrument Diagram Truck Unloading Metering
Piping System

Standard Communications Maintenance Hole - Service


Communications Maintenance Hole (40 Tons) Plan and Section

Standard Communications Maintenance Hole -


Communications Maintenance Hole Type I (40 Tons) Plan and Section

Standard Communications Maintenance Hole -


Communications Maintenance Hole Type 2 (40 Tons) Plan and Section
Standard Communications Maintenance Hole - Bar
Communications Bending Schedule 2 (40 Tons)
Electrical Systems Designs and
Automation 13.8 kV - 34.5 kV Overhead Power Line (List of Drawings)
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line [Armless Tangent
Automation Pole (0 - 2 Deg)]
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line [Armless Angle
Automation Pole (5° - 30°)]
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line [Armless Angle
Automation Pole (30° - 60°)]
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line [Armless Angle
Automation Pole (60° - 90°)]
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line [Double Dead
Automation End Pole)
Electrical Systems Designs and 3.8 kV - 34.5 kV Overhead Power Line (Tap-Off Pole from
Automation Armless Pole)
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line (Dead-End Riser
Automation Pole with Fuse)
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line (Dead-End Riser
Automation Pole)
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line (Terminal Pole
Automation with 3-Phase Transformer)
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line (Terminal Pole
Automation with 1-Phase Transformer)
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line (Fuse Disconnect
Automation Switch Pole)
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line (Load Break
Automation Switch Pole)
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line (Guy and
Automation Anchor)
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line (Installation
Automation Detail-Steel Pole Footing)
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line (Tap-Off from
Automation Cross-Arm Pole)

Saudi Aramco: Company General Use


Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line (Cross-Arm
Automation Tangent Pole)
Electrical Systems Designs and 13.8 kV - 34.5 kV Overhead Power Line (Overhead Shield
Automation / Ground Wire)
Electrical Systems Designs and
Automation 13.8 kV - 34.5 kV Overhead Power Line (Dead-End Pole)

Cathodic Protection Cathodic Protection Junction Box - Cable Splice


Piping & Instrument Diagram - Two Product Truck
Custody Measurement Loading
Cathodic Protection Cathodic Protection 3-Pin Test Station

Custody Measurement Small Royalty/Custody Metering System - Liquid


Straight Pipe Requirements For Orifices, Flow Nozzles
Instrumentation and Venturi Tubes

Piping Aircraft Refuelling Facility Jet A-1 Plan and Details


Work Platforms Corrosion Monitoring Station Plans,
Onshore Structures Sections and Details

Onshore Structures Plan and Detail Sunshade For Fire Protection Units

Civil Plan, Sections and Details - Onshore Helipad

Offshore Structures Offshore Helideck Types 1 & 2 - Plans and Elevation

Offshore Structures Offshore Helideck Type 3 - Plan and Marking Detail


Offshore Structures Offshore Helidecks Warning Signs

Gen'l Assembly Of Radar, Temp. And Manual Gauging


Vessels For External Floating Roofing Tanks

Civil Permanent AirStrip Plan, Sections and Details


Electrical Systems Designs and Lighting, Emergency, Flares and Markers Airstrips Types
Automation 1, 2 and 3 Layout

Cathodic Protection Cathodic Protection Junction Box - Multi Purpose

Cathodic Protection Cathodic Protection Bond Box - 5 Terminal

Cathodic Protection Cathodic Protection, Scrap Steel Anode Bed

Cathodic Protection Cathodic Protection, Photovoltaic Power System

Pumps, Seals and Mixers Double Mechanical Seals Of Centrifucal Pumps-Type

Saudi Aramco: Company General Use


Cathodic Protection Pile Mounted Anodes for Offshore Cathodic Protection

12 Well Platform Location Plan Anchoring Scheme and


Onshore Structures Flowline/Cable Routing Ofshore Drilling Equipment
Lettering For Covers and Backs Of Photostat Books,
Equipment Manuals and Inspection Record Books All
Plants Networks Plants

Lettering For Covers and Backs Of Photostat Books,


Equipment Manuals and Inspection Record Books All
Plants Networks Plants - Metric

Onshore Structures Anchor Bolt Details - Inch and Metric Sizes


Cathodic Protection, Half Shell Bracelet Type Anode For
Cathodic Protection Pipe Size 4
Cathodic Protection, Surface Anode Bed Details,
Cathodic Protection Horizontal and Vertical Anodes
Cathodic Protection, Surface Anode Bed Details,
Cathodic Protection Horizontal and Vertical Anodes

Cathodic Protection Cathodic Protection Junction Box - 20, Terminal


Cathodic Protection, Galvanic and Impressed Anodes On
Cathodic Protection Offshore Structures

Cathodic Protection Cathodic Protection Bond Box - 3 Terminals

Cathodic Protection Cathodic Protection Bond Box - 2 Terminal

Cathodic Protection Galvanic Anodes For Roads and Camel Pipeline Crossing

Cathodic Protection Galvanic Anodes For Roads and Camel Pipeline Crossing

Cathodic Protection Water Storage Tanks Impressed Current - Internal

Cathodic Protection Water Storage Tanks Interior Galvanic Anode Install


Impressed Current Tank Bottom - Cathodic Protection
Cathodic Protection Details
Impressed Current Tank Bottom - Cathodic Protection
Cathodic Protection Details

Cathodic Protection Aquifer Penetrating Anode Ground


Cathodic Protection Bed and Junctn Box Assembly

Communications VHF/UHF Antenna Installation On Self Supporting Tower

Saudi Aramco: Company General Use


Communications VHF/UHF Antenna Installation On Wood Pole

Civil Underground Pull Box Non Hazardous Areas


Jackfield Arrangements For 46A and 36A Multiplex
Communications Applications
PolyVInyl Chloride (P.V.C.) Plastic Direct Buried/Encased
Communications Conduit In Concrete
PolyVInyl Chloride (P.V.C.) Plastic Direct Buried/Encased
Communications Conduit In Concrete
Communication Special Manholes, Construction Notes
Communications and List Of Material

Communication Special Manholes, Reinforced Concrete


Communications Details Floor and Wall Construction

Communication Special Manholes, Reinforced Concrete


Communications Details Roof Construction

Communications Communication Special Manholes, Racking Details

Cathodic Protection Cathodic Protection Offshore Anode Junction Box


Cathodic Protection Cathodic Protection Deep Anode Bed
Cathodic Protection Internal Galvanic Anodes
Cathodic Protection Installation Detail for Vessels
Cathodic Protection Galvanic Anodes Details
Electrical Systems Designs and Dead-End Tap-Off Pole With Transformer Installation,
Automation 13.8Kv and Below
Electrical Systems Designs and
Automation Dead-End Tap-Off Pole With Transformer Installation
Communications Equipment Grounding for
Communications Telecommunication Facilities
Piping Wellhead Piping For Hawtah Field
Onshore Structures Remote Controls for Onshore Wells

Civil English Type Letters and Numerals For Aerial Marker


Piping Wellhead Piping Gas Lift Water Supply
Offshore Structures Small Boat Pier Fender Details
Offshore Structures Small Boat Pier Fender Details - Metric
Civil Size Of Lettering - Road Sign Facilities
Assembly and Details Of Gage Well and Guide Pole For
Vessels Floating Roof Tanks

Civil Layout and Details Standard Fire Hose House

Saudi Aramco: Company General Use


Royalty/Custody Metering System (Liquid), Typical
Custody Measurement Schematic
Bi-Directional Meter Prover -Skid Mounted-Typical
Custody Measurement Schematic
Uni-Directional Meter Prover (Liquid)-Skid Mounted-
Custody Measurement Typical Schematic
Valve Boxes, Concrete, Block; For Pipeline Block Valve
Piping and Drains
Valve Boxes, Concrete, Block; For Pipeline Block Valve
Piping and Drains
6x2 Single Well Completion Wellhead Piping For
Piping Onshore Wells
Civil Anchors Unrestrained Pipelines
Compressors, Gears and Steam Piping and Instrument Diagram Dry Gas Seal Piping
Turbines System
2", 3" or 4" Single Tubing Connection Wellhead Piping
Piping for Onshore Wells

Electrical Systems Designs and Grounding Arrangement For 115kv Disconnect Switch
Automation Structure 115kv Powerlines
Civil Concrete Masonry
Detail of Riser to Hydrant and Headers from Plastic or
Cathodic Protection RTRP Water Main
Detail of Riser to Hydrant and Headers from Plastic or
Cathodic Protection RTRP Water Main
Flush Mounted Bond Box Details for Manholes Cathodic
Cathodic Protection Protection
Compressors, Gears and Steam Piping & Instrument Diagram - Plant Instrument Air
Turbines
Compressors, Gears and Steam Compressor
Turbines Plant Instrument Air Compressor
Marker Piles and Marine Lantern Supports For
Piping Underwater Pipelines

Warning Sign For Attachment To Underwater Pipelines


Loss Prevention Marker Piles Offshore
Cathodic Protection, Bonding Details For On-Shore
Cathodic Protection Pipelines and Flowlines

Cathodic Protection Direct Buried Cable Installation Det. C. Prot.


Saudi Aramco Security and General Purpose Fencing -
Security Post and Fabric Details

Civil Standard Sand and Oil (Grease) Separators


Civil Valve Boxes Construction Details

Saudi Aramco: Company General Use


Buried Telephone Cable Distribution Wire Installation
Communications Details
Buried Telephone Cable Distribution Wire Installation
Communications Details
Buried Telephone Cable Distribution Wire Installation
Communications Details

Communications Standard Installation Telephone Pole Lines


SSD\1 Security Fencing (SAES-O-101), Plan, Elevation
Security and Foundations
SSD\1 Security Fencing (SAES-O-101), Concrete Post
Security Details
SSD\1 Security Fencing (SAES-O-101), Miscellaneous
Security Details
Details Drive Gate and Walk Gate Security Fencing
Security (SSD\5, SAES-O-105)
Details Gates Locking DeVIce and Drop Bolt Security
Security Fencing (SSD\5, SAES-O-105)

Floor Plan, Roof Plan and Elevation, Gate House (1 and 2


Security Man) (SSD\17, SAES-O-117)

Elevation, Sections and Details Gate House (1 and 2, 3


Security and 4 Man) (SSD\17, SAES-O-117)

Gate House Floor Plan, Roof Plan and Elevation (3 and 4


Security Man) (SSD\17, SAES-O-117)

Schedule and Details Windows, Door and Security Mesh


Security Gate House (SSD\17, SAES-O-117)
Foundation and Reinforcing Details, Gate House
Security (SSD\17, SAES-O-117)

Security Gate House and Vehicle Lock (SSD\17, SAES-O-117)


Security Hammam Near Gate House

Cathodic Protection, Crude and Product Tank Bottom


Cathodic Protection Internal Galvanic Anode Installation

Communications Grounding For Remote Communication Sites

Pumps, Seals and Mixers Pump Seal Flush Plan 53B with Makeup Unit
Cathodic Protection, Tension Spring and Rope Impressed
Cathodic Protection Current Offshore Anode

Saudi Aramco: Company General Use


Temporary Airstrips Types 1 and 2 - Plans, Sections &
Civil Details

Civil Airplane Ramp and Taxiway - Plan, Section and Details

Piping Flange and Ring Details Swivel Ring Flanges

Piping Flange and Ring Details Swivel Ring Flanges


Airstrip Marking Details - Runway, Clearway, Taxiway
Civil and Ramp

Standard Communications Maintenance Hole - Service


Communications Maintenance Hole (20 Tons) Plan and Section

Standard Communications Maintenance Hole -


Communications Maintenance Hole Type 1 (20 Tons) Plan and Section

Standard Communications Maintenance Hole -


Communications Maintenance Hole Type 2 (20 Tons) Plan and Section
Standard Communications Maintenance Hole - Bar
Communications Bending Schedule (20 Tons)
Maintenance Hole Grounding Layout, Service and
Maintenance Hole, Standard Communication
Communications Maintenance Hole

General Design Requirements Blast Resistant Control


Security Building (SSD\26, SAES-O-126)
Forced Feed Lubrication System - Piping & Instrument
Vibration and Lubrication Diagram
Lube Oil Circulation System Piping and Instrument
Vibration and Lubrication Diagram (PandID)
Cathodic Protection, Electrical Insulating/Isolating
Cathodic Protection Assemblies
Piping Pipeline Vents Assembly and Details

Piping Pipeline Vents Assembly and Details - Metric


Onshore Structures Spreader Beams H - Beams
Onshore Structures Spreader Beams H - Beams
Piping Pipeline Drains Detail

Details of Installation of New Bottoms and Cathodic


Cathodic Protection Protection for Existing Welded and Riveted Tanks
Heat Transfer Equipment Insulation Details For Hot Piping
Heat Transfer Equipment Insulation Details For Hot Vessels
Heat Transfer Equipment Insulation Details For Cold Piping

Saudi Aramco: Company General Use


Heat Transfer Equipment Insulation Details For Cold Vessels

Civil Standard Details Standard Steel Casement Windows In 8

Standard Details Standard Steel Casement Windows In


Civil 200mm and 300mm Exterior Concrete Block Walls
Details Standard Steel Projecting and Fixed Windows In
Civil 8

Details Standard Steel Projecting and Fixed Windows In


Civil 200mm and 300mm Exterior Concrete Block Walls

Onshore Structures Round Man Basket 500 kg Capacity Details

Onshore Structures Round Man Basket 500 kg Capacity Details

Onshore Structures Square Man Basket 500 kg capacity Details

Onshore Structures Square Man Basket 500 kg Capacity Details


Lifting Frames - 2 and 5 Metric Tons Safe Working Load
Onshore Structures A-Frame
Vessels Manways and Vents for Tanks

Cathodic Protection Anode, Metal Oxide For Offshore Pile Mounting


Cast Iron Catch Basin for 8 Inches Sewer Connection for
Plumbing and Utilities Refinery Use
Instrumentation Thermowell Assembly and Detail
Typical Pipelines Repair Sleeves Installation (Non-
Piping Pressure Containing)
Pipelines Repair Sleeves Fabrication (Non-Pressure
Piping Containing)
Packing Details Of Pipeline Repair Sleeves (Non-Pressure
Piping Containing)
Plumbing and Utilities Sample Cooler Assembly and Detail

Plumbing and Utilities Oily Water Sewer Manholes Miscellaneous Details


Piping Joints For Welding Cement Lined Pipe
Instrumentation Standard Orifice Plates
Instrumentation Standard Orifice Plates

Piping Ring Girders For Bolting To Supports For 16


Loss Prevention Assembly and Details Of Type
Loss Prevention Assembly and Details Of Type
Plumbing and Utilities Supports For Plastic Piping

Saudi Aramco: Company General Use


Piping and Instrumentation Diagram - Small Metering
Custody Measurement Skid (Gas) - Field Mounted FC

Piping and Instrumentation Diagram - Small Metering


Custody Measurement Skid (Gas) - Panel Mounted FC

Piping and Instrumentation Diagram - Small Metering


Custody Measurement Skid (Gas) - Coriolis Flow Meter Based

Piping and Instrumentation Diagram - Medium Metering


Custody Measurement Skid (Gas) - Orifice Based

Piping and Instrumentation Diagram - Medium Metering


Custody Measurement Skid (Gas) - Ultrasonic Flow Meter Based

Piping and Instrumentation Diagram - Medium Metering


Custody Measurement Skid (Gas) - Coriolis Flow Meter Based

Piping and Instrumentation Diagram - Large Metering


Custody Measurement Skid (Gas) - Ultrasonic Flow Meter Based
Piping Letter Designation for Lines Numbers
Piping Pipe Spacings

Piping Standard Symbol For Piping Orthographic Drawings

Civil Plan and Detail Concrete Slabs For Road Crossing

Civil Sidewalk and Curb and Gutter Plan and Section


Installation Of Pipeline Repair Sleeves (Pressure
Piping Containing)
Pipeline Repair Sleeves Packing Det. (Pressure
Piping Containing)
Packing Details For Pipeline Repair Sleeves (Pressure
Piping Containing)
Electrical Systems Designs and
Automation Surface Marker Underground Electric Cable

Cathodic Protection Cathodic Protection Junction Box - 5 Terminal

Cathodic Protection Cathodic Protection Junction Box -12 Terminal


Instrumentation Standard Equipment Symbols

Loss Prevention Standard Sign, Danger High Voltage Keep Away


Loss Prevention Standard Sign, Underground Electric Cable

Saudi Aramco: Company General Use


Cathodic Protection Cathodic Protection Marker Plate Details

Joint Preparation and Welding Details Alloy and Clad


Welding Pressure Vessels and Heat Exchangers
Cathodic Protection Onshore Rectifier Installation
Cathodic Protection Details
Cathodic Protection Onshore Rectifier Installation
Cathodic Protection Details
Sanitary Sewer Manhole Precase Concrete Plan, Section
Plumbing and Utilities and Detail
Cathodic Protection Cable Connections to Pipelines and
Cathodic Protection Structures

Welding Hardness Testing For Welding Procedure Qualifications


Electrical Systems Designs and
Automation Tank Grounding

Heat Transfer Equipment Installation Details Of Refractory Ceramic Fiber Modules


Heat Transfer Equipment Hexsteel Details
Electrical Systems Designs and
Automation Street Lighting Details
Refractory Ceramic Fiber Layered Blanket and Blanket
Heat Transfer Equipment Board Installation Details
Exposed Valves For Buried Cross Country Pipelines Side
Piping Views and Sections
Details Cast Iron Catch Basin with Side Inlets for Non-
Plumbing and Utilities Traffic Areas

Process Analyzers Salt-In Crude Analyzer Arrangement of Safety Feature


Instrumentation Ring Joint Orifice Flange Assembly

Instrumentation Ring Joint Orifice Flange Assembly - Metric

Civil Well Head Pipe Supports and Anchor At Well Head

Standard Water Supply Well Manifold For 600HP


Piping Submersible Pumps and Natural Flow

Civil Design Load On Pipelines In Road Crossing

Magnesium Anode Installation At Pipeline Repair


Cathodic Protection Locations Layout, Sections and Details
Local Instrument Symbols (Pneumatic and Electrical) For
Instrumentation Instrument Loop Diagrams

Saudi Aramco: Company General Use


Local Instrument Symbols (Miscellaneous) For
Instrumentation Instrument Loop Diagrams

Instrumentation Instrument Loop Diagrams, Panel Instrument Symbols

Instrumentation Instrument Loop Diagrams, Panel Instrument Symbols

Piping Riser Column and Adapters For Submersible Pumps

Bridge Weld and Typical Brace Seal Welded and Socket


Welding Welded Valves On Process Lines

Piping Weld Over Sleeve For Repair Of Leaking Sleeves On 30


Welding End Bells For Weld Over Sleeve 30
On Shore Wellhead Completion For Powered Water
Piping Injection

Piping Offshore Oil Well Manifold Single Well Platform


Cathodic Protection Junction Box Mounting Support
Cathodic Protection Details

Onshore Structures Detail Of Foundation For 115kv Disconnect Structure

Electrical and Gas Water Heater Installation, Residential


Plumbing and Utilities and Industrial Area

Valves Locations For Radiographic Examination Valve Castings

Pile Foundation, Cap, Splice Details, Protective Coating


Civil and Uplift Connections For H-Piles

Pile Foundation, Cap, Splice Details, Protective Coating


Civil and Uplift Connections For H-Piles
Electrical Systems Designs and Tell - Tales For Overhead Powerline and Pipeway
Automation Crossings - Details
An Overview Saudi Aramco Security and General
Security Purpose Fencing
Saudi Aramco Security and General Purpose Fencing -
Security Gate Details
Onshore Structures Well Head Guard Barrier

Piping Reinforcement Of Welded Branch Connections


Piping Aerial Pipeline Marker Details

Saudi Aramco: Company General Use


Electrical Systems Designs and Lighting Pole, Tapered Seamless Aluminum 3 Meter For
Automation Security Fence (SSD\13, SAES-O-113)

Communications Standard Installation Overhead Telephone Drop Wire

Security Steel Bending Details Gate House (SSD\17, SAES-O-117)

SSD\1 Security Fencing (SAES-O-101), Steel Bending


Security Details Security Fencing (SSD\1, SAES-O-101)

Electrical Systems Designs and Perimeter and Area Lighting, Typical Layout, Part Of
Automation Plant Area (SSD\13, SAES-O-113)

Electrical Systems Designs and Elementary Diagram Of Power and Control Circuits For
Automation Security Lighting Per SSD\13, SAES-O-113

Piping Temporary Suction Screen Gas Compressors


Electrical Systems Designs and
Automation Standard Electrical Symbols One Line Diagram (Power)
Electrical Systems Designs and
Automation Standard Electrical Symbols One Line Diagram (Power)
Electrical Systems Designs and
Automation Standard Electrical Symbols One Line Diagram (Power)
Electrical Systems Designs and
Automation Standard Electrical Symbols - Plan Layout

Piping Piping Ring Girder Details For Welding To Support For 16


Cathodic Protection Cathodic Protection At Road Crossing

Civil Steel Bending Details, Sand and Oil (Grease) Separators


Steel Bending Details, Sand and Oil (Grease) Separators -
Civil Metric
Piping Sleeved Crossing For Restrained Pipelines

Communications Buried/Underground Cable Route Marker Post and Signs

Cathodic Protection Cathodic Protection, Test Stations For Buried Pipelines


Support Details At Nozzles and Manways For Castable
Heat Transfer Equipment Refractories
Details Of Pipe DaVIt Top Mounting On Process Columns
Onshore Structures 2000#Max. Load
Details Of Pipe DaVIt Top Mounting On Process Columns
Onshore Structures 2000#Max. Load

Saudi Aramco: Company General Use


Plumbing and Utilities Standard Details Cast Iron Catch Basin For 6
Piping Fabricated Girder For Pipeline Repair

Electrical Systems Designs and Armless Construction, Angle Structure, 15 To 30 Deg.,


Automation 2.4, 4.16, 13.8 and 34.5kv
Electrical Systems Designs and Armless Construction, Angle Structure, 60 To 90 Deg.,
Automation 2.4, 4.16, 13.8 and 34.5kv

Piping Detail Vent, Drain and Sample Connections


Details Cast Iron Catch Basin without Side Inlets for Non-
Plumbing and Utilities Traffic Areas
Electrical Systems Designs and Armless Construction, Tangent Structure, 0-2 Degrees
Automation 2.4, 4.16, 13.8 and 34.5 Kv
Electrical Systems Designs and Armless Construction, Angle Structure, 0 To 15 Deg., 2.4,
Automation 4.16, 13.8 and 34.5kv
Electrical Systems Designs and Armless Construction, Angle Structure, 30 To 60 Deg.,
Automation 2.4, 4.16, 13.8 and 34.5kv
Electrical Systems Designs and Armless Construction, Full Deadend Structure, 2.4, 4.16,
Automation 13.8 and 34.5 Kv
Electrical Systems Designs and Armless Construction, Three Phase Tap Structure, 2.4,
Automation 4.16, 13.8 and 34.5 Kv
Loss Prevention Assembly and Details Of Type 'B' Stairs

Civil Standard Manway and Saddle Detail For 21


Piping Pipeline Corrosion Barrier Patch
Weld Metal Build-Up For The Repair Of Pipeline Surface
Piping Defects

Footing Details Perimeter Fencing For On-Shore


Security Helipads 1.2 M (4 Foot) Fence Height
Piping Corrugated Weldrepair Sleeve, Pipe Size 6

Heat Transfer Equipment Anchoring Details For Castable Refractories

Loss Prevention Flame Impingement Shield For Flangeless Valves

Loss Prevention Flame Impingement Shield For Flangeless Valve


Instrumentation Raised Face Orifice Flange Assembly

Instrumentation Raised Face Orifice Flange Assembly - Metric


Weld Neck Flanges and Blind Flanges Large Size Class
Piping 300 Ring Joint

Saudi Aramco: Company General Use


Weld Neck Flanges and Blind Flanges Large Size Class
Piping 600 Ring Joint
Lap Joint Flanges and Stub Ends Large Size Class 600
Piping Ring Joint

Instrumentation Burner Safety System Natural Draft Furnaces


Marine Lantern Support For Underwater Pipelines In
Piping Shallow Water

Onshore Structures Helipad Marking Details - Onshore Helipad Plan


Weld Neck Flanges and Blind Flanges Large Size Class
Piping 300 Ring Joint

Piping Lap Joint Flanges and Stub Ends Large Size 300 Ring Joint
Civil Traffic Control Devices
Piping and Instrument Diagram For Pipeline Scraper
Piping Trap Stations
Piping and Instrument Diagram For Pipeline Scraper
Piping Trap Station
Guide Bar Details For Tees and Branches In Pipelines
Piping With Scraping Facilities
Heat Transfer Equipment Chart For Rolling Furnace Tubes In Header

Piping Installation of Jack Screws for Flanged Joints

Piping Tie Rod Arrangement For Weld and Ends Coupling


Piping Road Crossings For Pipelines
Piping Road Crossings For Unrestrained Pipelines
Piping Road Crossings For Pipelines
Piping Road Crossings For Pipelines
Saudi Aramco Security and General Purpose Fencing -
Security Footing Details
Perimeter Fencing For On Shore Helipads - Footing
Security Details Type VI Fence
Conical Pump Suction Screen For Class 150 and 300
Piping Flanges Pipe Sizes 16
Maximum Spans For Above Ground Unrestrained
Piping Pipelines 14

Loss Prevention Details Fireproofing For Column and Vessel Skirts


Instrumentation Instrument Symbols
Assembly of Davits for Side Mounting on Pressure
Vessels Vessels
Instrumentation Orientation For Orifice Flanges
Plumbing and Utilities Water Line Valve Direct Buried

Saudi Aramco: Company General Use


Onshore Structures Wellhead Guard Posts Plan and Details
Electrical Systems Designs and Bonding Details Armless Construction Angle Structure 60
Automation To 90 Degrees
Electrical Systems Designs and
Automation Guy and Anchors 8k Down Guys
Electrical Systems Designs and
Automation Guy and Anchors 10.8k Down Guys
Electrical Systems Designs and
Automation Guy and Anchors 12.5 or 18.8k Down Guys
Vessels Roof Center Vent for Cone Roof Tanks
Electrical Systems Designs and
Automation Guy and Anchors, 10.8k Sidewalk Guy Installation
Electrical Systems Designs and
Automation Guy and Anchors, Power Installed Screw
Electrical Systems Designs and
Automation Guy and Anchors, 8k Overhead Guy
Electrical Systems Designs and
Automation Guy and Anchors, 10.8k Overhead Guy
Electrical Systems Designs and Guy and Anchors, 12.5k, 14.5k, 18k Or 18.8k Overhead
Automation Guy
Electrical Systems Designs and
Automation Rock Anchor Installation
Conical Pump Suction Screen For Raised Face Flanges
Piping Pipe Sizes 2, 3 and 4
Cathodic Protection Cable Identification Termination
Cathodic Protection Detail
Electrical Systems Designs and
Automation Pole Top Switch Grounding Detail
Electrical Systems Designs and
Automation Bonding Details, Post Insulators
Electrical Systems Designs and Bonding Details, Armless Construction, Angle Structure,
Automation 30 To 6o Degree
Piping Letter Designation for Line Numbers
Details Of Moulded Bricks For Baffles (SAMS 32-158-
Heat Transfer Equipment 585) Refractory Bricks
Details Of Moulded Bricks For Baffles (SAMS 32-158-
Heat Transfer Equipment 583) Refractory Bricks

Details Of Moulded Bricks For For Pipe Dia 76mm (SAMS


Heat Transfer Equipment 32-158-596) Refractory Bricks
Details Of Moulded Bricks For Drum Lining, Refractory
Heat Transfer Equipment Bricks
Details Of Moulded Bricks For Arches (SAMS 32-158-
Heat Transfer Equipment 753) Refractory Bricks

Saudi Aramco: Company General Use


Details Of Moulded Bricks For For Pipe Dia 76mm (SAMS
Heat Transfer Equipment 32-158-760) Refractory Bricks
Details Of Moulded Bricks For Arches (SAMS 32-158-
Heat Transfer Equipment 734) Refractory Bricks
Details Of Moulded Bricks For Arches (SAMS 32-158-
Heat Transfer Equipment 737) Refractory Bricks

Details Of Moulded Bricks For Drum Lining (SAMS 32-


Heat Transfer Equipment 158-626) Refractory Bricks

Details Of Moulded Bricks For For Pipe Dia 76mm (SAMS


Heat Transfer Equipment 32-158-700) Refractory Bricks

Details Of Moulded Bricks For For Pipe Dia 76mm (SAMS


Heat Transfer Equipment 32-158-766) Refractory Bricks
Details Of Moulded Angle Bricks (SAMS 32-158-799)
Heat Transfer Equipment Refractory Bricks
Details Of Moulded Angle Bricks (SAMS 32-158-802)
Heat Transfer Equipment Refractory Bricks
Details Of Moulded Bricks For Arches (SAMS 32-158-
Heat Transfer Equipment 747) Refractory Bricks
Details Of Moulded Bricks (SAMS 32-158-703)
Heat Transfer Equipment Refractory Bricks
Details Of Moulded Bricks (SAMS 32-158-706)
Heat Transfer Equipment Refractory Bricks
Details Of Moulded Angle Bricks (SAMS 32-158-808)
Heat Transfer Equipment Refractory Bricks

Details Of Moulded Bricks For Upper Lining (SAMS 32-


Heat Transfer Equipment 158-778) Refractory Bricks

Details Of Moulded Bricks For Upper Lining (SAMS 32-


Heat Transfer Equipment 158-781) Refractory Bricks

Details Of Moulded Bricks For For Pipe Dia 76mm (SAMS


Heat Transfer Equipment 32-158-763) Refractory Bricks

Details Of Moulded Bricks For For Pipe Dia 76mm (SAMS


Heat Transfer Equipment 32-158-805) Refractory Bricks

Details Of Moulded Bricks For Upper Lining (SAMS 32-


Heat Transfer Equipment 158-775) Refractory Bricks
Details Of Moulded Bricks For Arches (SAMS 32-158-
Heat Transfer Equipment 722) Refractory Bricks

Saudi Aramco: Company General Use


Details Of Tile For Drum Protection (SAMS 32-158-630)
Heat Transfer Equipment Refractory Bricks
Details Of Moulded Bricks For Arches (SAMS 32-158-
Heat Transfer Equipment 731) Refractory Bricks
Details Of Tile For Drum Protection (SAMS 32-158-634)
Heat Transfer Equipment Refractory Bricks
Details Of Moulded Bricks For Arches (SAMS 32-158-
Heat Transfer Equipment 740) Refractory Bricks
Details Of Moulded Bricks (SAMS 32-152-498)
Heat Transfer Equipment Refractory Bricks

Piping Spectacle Plates, Blinds and Spacers For 54

Security Sand Fence Installation and Fabrication Details


Piping Blinds For API-3000 PSI Ring Joint Flanges
In-Line Instrument Symbols For Instrument Loop
Instrumentation Diagrams

Conical Pump Suction Screen For Raised Faced Flanges


Piping Pipe Sizes 6, 8, 10, 12 and 12

Piping Standard Wear Pads For Unrestrained Pipelines


Construction Notes and Welding Details For Isometric
Piping Piping Detail Sheet
Spectacle Plates, Blinds and Spacers For Class 125 Cast
Piping Iron Flanges
Spectacle Plates, Blinds and Spacers For Class 150 Raised
Piping Face Flanges

Piping Weld Neck and Blind Flanges Large Size Class 150 R.F.
Spectacle Plates, Blinds and Spacers For Class 600 Raise
Piping Face Flanges

Piping Detail Of Heavy Welding Boss Socket Weld Connections

Piping W.N. and Blind Flanges Large Size Class 600 R.F.
Piping Detail Of 54

Piping W.N. and Blind Flanges Large Size Class 400 R.F.

Onshore Structures Concrete Fire Proofing For Structural Members

Onshore Structures Grade Hydrographic and Tidal Data Ras Tanura

Onshore Structures Grade Hydrographic and Tidal Data Ras Tanura - Metric

Saudi Aramco: Company General Use


Spectacle Plates, Blinds and Spacers For Class 250
Piping R.F.C.I. and Class 300 Raised Face Flanges
Spectacle Plates, Blinds and Spacers For Class 600 Oct.
Piping Ring Joint Flanges
Spectacle Plates, Blinds and Spacers For Class 900 Oct.
Piping Ring Joint Flanges
Spectacle Plates, Blinds and Spacers For Class 1500 Oct.
Piping Ring Joint Flanges

Cathodic Protection Cathodic Protection, Anode For Offshore Plidco Sleeve


Detail and Design Criteria Concrete Block Retaining
Civil Walls
Detail and Design Criteria Concrete Block Retaining
Civil Walls and Planting Boxes
Cathodic Protection Symbols Cathodic Protection
Material Guide for Centrifugal Pumps - Horizontal and
Pumps, Seals and Mixers Vertical In-Line (Sheet 1)
Material Guide for Centrifugal Pumps - Horizontal and
Pumps, Seals and Mixers Vertical In-Line (Sheet 2)
Electrical Systems Designs and
Automation Installation Of Direct Buried Electric Cable And Conduit
Heat Transfer Equipment Refractory Repairs and Terminations

Onshore Structures Marker Plates For Pipeline Kilometer Marker


Saddle Details For Large Diameters Unrestrained
Piping Pipelines

Piping W.N. and Blind Flanges Large Size Class 300 R.F.

Gas Turbines and Diesel Engines Air Filter Test Dust Particle Size Distribution
Electrical Systems Designs and
Automation Pole Setting

Saudi Aramco: Company General Use


Electrical Systems Designs and
Automation Pole Setting With Fine Sand Or Marsh
Electrical Systems Designs and
Automation Pole Footing Increased Bearing Area
Electrical Systems Designs and
Automation Pole Rake
Electrical Systems Designs and
Automation Pole Protection Guard
Piping Funnel With 1/2
Piping Detail of 1/2" Standard Sample Tube
Plumbing and Utilities Detail Of Ring (High Type) For 600mm (24
Plumbing and Utilities Manhole Cover For Sewers
Manhole Covers For Sewers (Manufactured Locally ) 600
Plumbing and Utilities mm, Opening
Piping Pump Suction Screen Flat
Techical Specification Truck Bottom Loading Truck Truck
Security Loading Facility

Custody Measurement Truck Loading or Unloading - General Arrangement

Piping Boss Welding for Thrd. Conn. To Vessels and Lins


Post Weld Heat Treatment Requirements For Caustic
Welding Solutions
Heat Transfer Equipment Ferrules For 3/4
Heat Transfer Equipment Ferrules For 3/4
Civil Parking Bumpers Precast Concrete Block
Pipeline Repair Patch for Minimum Wall Thickness
Piping Violations
Civil Precast Circular Storm Water Catch Basin
Precast or Cast in Place Rectangular or Square Storm
Civil Water Catch Basin
Piping Detail Of Pipe U-Bolts
Plan and Section Reaction Furnace Combustion
Heat Transfer Equipment Chamber
Engineering Data and Drawing Systems Drawing and Equipment Index Key
Engineering Data and Drawing Systems Drawing and Equipment Index Key

Engineering Data and Drawing Systems Drawing and Equipment Index Key - Standard Drawing
Security Guard Post and Guardrail Details

Cable-Exposed Building Entrance(189B1) 300 Pair,


Protected Entrance Cable 600 Pair, Expandable To 1200
Communications Pair, Distribution

Saudi Aramco: Company General Use


Cable-Exposed Building Entrance(189B1) 200 Pair,
Communications Expandable To 400 Pair, Protected Ent.

Cable-Exposed Building Entrance(189B1) 400 Pair


Protected Entrance Cable 800 Pair, Expandable To 1600
Communications Pair, Distribution

Cable-Exposed Building Entrance(189B1) 600 Pair,


Protected Entrance Cable 1200 Pair, Expandable To
Communications 1400 Pair, Distribution
Piping Details Of 54

Cable-Exposed Building Entrance (134A1A) 50 Pair,


Communications Ultimate Requirement Mechanical Protection Required

Cable-Exposed Building Entrance (134A1A) 25 Pair,


Communications Ultimate Requirement Mechanical Protection Required
Welding Preheat Levels For Welding Carbon Steels
Preheat Levels For Welding Carbon Steels (Including Low
Welding Hydrogen Processes)
Preheat Levels For Welding Carbon Steels (Including Low
Welding Hydrogen Processes)
Preheat Levels For Welding Carbon Steels (Including Low
Welding Hydrogen Processes)
Preheat Levels For Welding Carbon Steels (Including Low
Welding Hydrogen Processes)
Preheat Levels For Welding Carbon Steels (Including Low
Welding Hydrogen Processes)
Preheat Levels For Welding Carbon Steels (Including Low
Welding Hydrogen Processes)
Preheat Levels For Welding Carbon Steels (Including Low
Welding Hydrogen Processes)

Vessels Minimum Instrumentations For Separator Vessels


Piping Branch Connections To Flare Headers
Project Management Office Engineering Drawing Forms Layouts

Piping Drip Pans For Steam Relief Valve Discharge Lines


List Of Material For Saudi Aramco Security Fencing
Security (SSD\1,SAES-O-101)
List Of Material For Saudi Aramco Security Fencing
Security (SSD\1,SAES-O-101)
List Of Material For Saudi Aramco Security Fencing
Security (SSD\1,SAES-O-101)

Saudi Aramco: Company General Use


List Of Material For Saudi Aramco Security Fencing
Security (SSD\1,SAES-O-101)
Piping External Welding Sleeves For Cement Pipe

Security List Of Materials For Gate Houses SSD\17, SAES-O-117

Security List Of Materials For Gate Houses SSD\17, SAES-O-117

Security List Of Materials For Gate Houses SSD\17, SAES-O-117

Security List Of Materials For Gate Houses SSD\17, SAES-O-117

Security List Of Materials For Gate Houses SSD\17, SAES-O-117


Piping Detail Of Standard Pipe Repair Plug
Piping Standarded Threaded Pipe Adapter

Security List Of Material For Saudi Aramco Security Fencing

Security List Of Material For Saudi Aramco Security Fencing

Security List Of Material For Saudi Aramco Security Fencing

Security List Of Material For Saudi Aramco Security Fencing

Security List Of Material For Saudi Aramco Security Fencing

Security List Of Material For Saudi Aramco Security Fencing

Security List Of Material For Saudi Aramco Security Fencing

Security List Of Material For Saudi Aramco Security Fencing

Security List Of Material For Saudi Aramco Security Fencing

Security List Of Material For Saudi Aramco Type II Fencing

Security List Of Material For Saudi Aramco Type II Fencing

Security List Of Material For Saudi Aramco Type II Fencing

Security List Of Material For Saudi Aramco Type II Fencing

Security List Of Material For Saudi Aramco Type II Fencing

Security List Of Material For Saudi Aramco Type II Fencing

Saudi Aramco: Company General Use


Security List Of Material For Saudi Aramco Type II Fencing

Security List Of Material For Saudi Aramco Type II Fencing

Security List Of Material For Saudi Aramco Type II Fencing

Security List Of Material For Saudi Aramco Type III Fencing

Security List Of Material For Saudi Aramco Type III Fencing

Security List Of Material For Saudi Aramco Type III Fencing

Security List Of Material For Saudi Aramco Type III Fencing

Security List Of Material For Saudi Aramco Type III Fencing

Security List Of Material For Saudi Aramco Type III Fencing

Security List Of Material For Saudi Aramco Type III Fencing

Security List Of Material For Saudi Aramco Type III Fencing

Security List Of Material For Saudi Aramco Type IV Fencing

Security List Of Material For Saudi Aramco Type IV Fencing

Security List Of Material For Saudi Aramco Type IV Fencing

Security List Of Material For Saudi Aramco Type IV Fencing

Security List Of Material For Saudi Aramco Type IV Fencing

Security List Of Material For Saudi Aramco Type IV Fencing

Security List Of Material For Saudi Aramco Type IV Fencing

Security List Of Material For Saudi Aramco Type IV Fencing

Security List Of Material For Saudi Aramco Type V Fencing

Security List Of Material For Saudi Aramco Type V Fencing

Security List Of Material For Saudi Aramco Type V Fencing

Saudi Aramco: Company General Use


Security List Of Material For Saudi Aramco Type V Fencing

Security List Of Material For Saudi Aramco Type V Fencing

Security List Of Material For Saudi Aramco Type V Fencing

Security List Of Material For Saudi Aramco Type V Fencing

Security List Of Material For Saudi Aramco Type V Fencing

Civil Standard Detail For Wall Anchor Clips For Steel Windows

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
Standards Management Corporate Technical Alert SAP System User Guide

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
Vessels 24 Inch Standpipe and Diffuser Baffle For Spheroid Tanks

Water Injection Well Head Flow and Pressure Recorder


Instrumentation Instrument Piping and Installation Details

Instrumentation Logic Diagram Motor Operated Valve Control


Corrosion Control 2
Local Shut-Down Cabinet with Partial Stroke Test Double
Instrumentation Acting Actuator

Local Shut-Down Cabinet with Partial Stroke Test Single


Instrumentation Acting - Spring Return Actuator

Cathodic Protection Bonding For Offshore Structures Installation Details

Cathodic Protection Junction Box Mounting Det. Ofsh. Installation Details

Cathodic Protection Rectifier Ofsh. Installation Details Non-Classified Area


Plumbing Installation, Hammam, 4, 8, 12 and 16 Stall,
Plumbing and Utilities Plan, Section and Details
Onshore Structures Lighting and Power Plans

Cathodic Protection Galvanic Anodes Replacement On Ofsh. Structures

Cathodic Protection Galvanic Anodes Replacement For Submarine Pipelines


Platform and Davit at Relief Valves on Separators for
Loss Prevention GOSPs

Cathodic Protection Cathodic Protection Scrap Steel Anode Bed

Electrical Systems Designs and Plan and Details 115 kV Powerlines Arrangement of
Automation Tapping for Spur Line 4/0 AWAC TEE 4/0 AWAC Run
Electrical Systems Designs and Power, Grounding and Lighting Layout Gate House
Automation (SSD/117; SAES-O-117)
Electrical Systems Designs and
Automation Standard Details Electrical Manholes and Handholes

Saudi Aramco: Company General Use


Windsock Pole Onshore Helipad or Air Strip Details -
Civil Structural & Electrical
Valve Boxes, Poured Concrete for Pipeline Block Valve &
Civil Drains
Onshore Structures General Notes and Instructions
Onshore Structures Substation Basis and Limitations

Onshore Structures Floor Plan - Standard Substation 10 m Wide

Onshore Structures Floor Plan - Standard Substation 15 m Wide

Onshore Structures Elevation - Standard Substation 10 m Wide

Onshore Structures Elevation - Standard Substation 15 m Wide


Onshore Structures Section - Standard Substation 10 m Wide
Onshore Structures Section - Standard Substation 15 m Wide
Roof Plan and Finish Schedule - Standard Substation 10
Onshore Structures m Wide
Roof Plan and Finish Schedule - Standard Substation 15
Onshore Structures m Wide

Onshore Structures Door Schedule - Standard Substation 10 m Wide

Onshore Structures Door Schedule - Standard Substation 15 m Wide

Onshore Structures Typical Precast Insulated Panel (Plain Panel) - Type 1


Typical Precast Insulated Panel (Standard Penetration) -
Onshore Structures Type 2
Typical Precast Insulated Panel (Personnel Door) - Type
Onshore Structures 3
Typical Precast Insulated Panel (Double Door
Onshore Structures W/Transom) - Type 4
Typical Precast Insulated Panel (Double Door
Onshore Structures W/Transom) - Type 5

Onshore Structures Typical Precast Insulated Panel (Double Door) - Type 6

Onshore Structures Typical Precast Insulated Panel (Double Door) - Type 7

Onshore Structures Typical Precast Insulated Panel (Corner Door) - Type 8


Typical Precast Insulated Panel (Corner Panel) - Type 9
Onshore Structures and 9a (Handed)
Typical Precast Insulated Panel (Plain Corner Panel) -
Onshore Structures Type 10

Saudi Aramco: Company General Use


Typical Precast Internal Panel (Internal Plain Panel) -
Onshore Structures Type 11
Typical Precast Internal Panel (Standard Penetration
Onshore Structures Internal) - Type 12

Onshore Structures Typical Precast Insulated Panel (Plain Panel) - Type 13


Typical Connection Details-Standard Substation 10 m
Onshore Structures Wide
Typical Connection Details-Standard Substation 15 m
Onshore Structures Wide
Onshore Structures Typical Connection Details
Onshore Structures Typical Steel Plate Enbeds Details
Onshore Structures Typical Steel Plate Accessories Details
Roof Double Tee Slab Layout - Standard Substation 10 m
Onshore Structures Wide
Roof Double Tee Slab Layout - Standard Substation 15 m
Onshore Structures Wide
Foundation Plan/Section - Standard Substation 10 m
Onshore Structures Wide
Foundation Plan/Section - Standard Substation 15 m
Onshore Structures Wide

Onshore Structures Foundation Layout - Standard Substation 15 m Wide


Onshore Structures Typical Precast Structural Detail
Onshore Structures Typical Precast Structural Detail
Onshore Structures Typical Precast Structural Detail
Onshore Structures Typical Precast Structural Detail
Onshore Structures Typical Precast Structural Detail
Onshore Structures Typical Precast Structural Detail

Process Engineering Single Stage Centrifugal Compressor ESPT Drawings 101

Process Engineering Multi-Stage Reciprocating Comp. ESPT Drawing-102


Process Engineering Screw Compressor ESPT Drawing-103

Process Engineering One-Stage Centrifugal Refri Compr - ESPT Drawing-104

Process Engineering Two-Stage Centri Refrigerant Compr - ESPT Drawing-105

Process Engineering Three-Stage Centrifugal Refri Compr - ESPT Drawing-106

Process Engineering Lube Oil System for Compressors - ESPT Drawing-107

Process Engineering Centrifugal Pump-Below 300HP - ESPT Drawing-201

Saudi Aramco: Company General Use


Process Engineering Desanding Stripper Pump - ESPT Drawing-202
Hor. Centrifugal Pump Above 1000HP - ESPT Drawing-
Process Engineering 203

Process Engineering Lube Oil System for Pumps - ESPT Drawing-204

Process Engineering Oily Water Lift Station - ESPT Drawing-205

Process Engineering Reciprocating Pumps Up To 250 HP - ESPT Drawing-206


Vertical Canned Pump 300 to 1000 HP - ESPT Drawing-
Process Engineering 207
Process Engineering Gas Expander - ESPT Drawing-301
Gen Purpose Steam Turbine <2500 HP - ESPT Drawing-
Process Engineering 302

Process Engineering Single Train CGT Fuel Gas System - ESPT Drawing-303
Back Pressure Steam Turbine >2500 HP - ESPT Drawing-
Process Engineering 304

Process Engineering Turbo-Expander/Compressor - ESPT Drawing-305


Process Engineering Dual Gas Outlet Drum - ESPT Drawing-401

Process Engineering Ethane Refrigerant Accumulator - ESPT Drawing-402


Process Engineering Gas Filter/Separator - ESPT Drawing-403
Process Engineering Flare K.O. Drum - ESPT Drawing-404

Process Engineering Gas Compressor Suction Drum - ESPT Drawing-405


Process Engineering GOSP Desalter - ESPT Drawing-406

Process Engineering GOSP Three-Phase Drum - ESPT Drawing-407

Process Engineering GOSP Two-Phase Drum - ESPT Drawing-408

Process Engineering Horizontal Coalescer Drum - ESPT Drawing-409

Process Engineering Horizontal Two-Phase Drum - ESPT Drawing-410

Process Engineering Mercury Removal Bed - ESPT Drawing-411

Process Engineering Molecular Sieve Dehydrator - ESPT Drawing-412

Process Engineering Propane Refrigerant Accumulator - ESPT Drawing-413


Process Engineering Reflux Drum - ESPT Drawing-414

Saudi Aramco: Company General Use


Refrigerant Compressor Suction Drum - ESPT Drawing-
Process Engineering 415

Process Engineering Refrigerant Economizer - ESPT Drawing-416


Process Engineering Slug Catcher - ESPT Drawing-417

Process Engineering Split Flow Inlet Horizontal Drum - ESPT Drawing-418

Process Engineering Three Phase Horizontal Drum - ESPT Drawing-419

Process Engineering Two-Phase Vertical Drum - ESPT Drawing-420

Process Engineering Vertical Coalescer Drum - ESPT Drawing-421

Process Engineering Wet Crude Dehydrator - ESPT Drawing-422

Process Engineering Water Oil Separator (WOSEP) - ESPT Drawing-423

Process Engineering Emergency Water Disposal Tank - ESPT Drawing-501

Process Engineering Field Roof Product Tank - ESPT Drawing-502

Process Engineering Floating Roof Product Tank - ESPT Drawing-503

Process Engineering Low Pressure Degassing Tank - ESPT Drawing-504

Process Engineering Product Storage Sphere - ESPT Drawing-505

Process Engineering Product Storage Spheroid - ESPT Drawing-506


Process Engineering Water Storage Tank - ESPT Drawing-507

Process Engineering Packed Absorber Column - ESPT Drawing-601

Process Engineering Packed Distillation Column - ESPT Drawing-602

Process Engineering Packed Rectifier Column - ESPT Drawing-603

Process Engineering Packed Stripper Column - ESPT Drawing-604

Process Engineering Trayed Absorber Column - ESPT Drawing-605

Process Engineering Trayed Distillation Column - ESPT Drawing-606

Process Engineering Trayed Rectifier Column - ESPT Drawing-607

Saudi Aramco: Company General Use


Process Engineering Trayed Stripper Column - ESPT Drawing-608

Process Engineering Steam Stripper Column - ESPT Drawing-609

Process Engineering Air Cooled Heat Exchanger - ESPT Drawing-701

Process Engineering Air Cooled Refrigerant Condenser - ESPT Drawing-702

Process Engineering BAHE Cross-Exchanger - ESPT Drawing-703

Process Engineering BAHE Refrigerant Chiller - ESPT Drawing-704

Process Engineering Deethanizer Overhead Condenser - ESPT Drawing-705

Process Engineering Electric Heat Exchanger - ESPT Drawing-706

Process Engineering Evaporated Humidified Cooling Sys - ESPT Drawing-707

Process Engineering Horizontal Thermosyphon Reboiler - ESPT Drawing-708


Process Engineering Kettle Reboiler - ESPT Drawing-709

Process Engineering Kettle Refrigerant Chiller - ESPT Drawing-710

Process Engineering Kettle Steam Generator - ESPT Drawing-711

Process Engineering Plate & Frame Heat Exchanger - ESPT Drawing-712

Process Engineering Shell & Tube Heat Exchanger - ESPT Drawing-713


Steam Heated Thermosyphon Reboiler - ESPT Drawing-
Process Engineering 714

Process Engineering Vertical Thermosyphon Reboiler - ESPT Drawing-715

Process Engineering Water Cooled Heat Exchanger - ESPT Drawing-716


Water Cooled Refrigerant Condenser - ESPT Drawing-
Process Engineering 717
Once-Thru Thermosyp Reboiler Steam - ESPT Drawing-
Process Engineering 718
Process Engineering Crude Oil Furnace - ESPT Drawing-801
Process Engineering Vacuum Furnace - ESPT Drawing-802

Process Engineering Distillation Column System - ESPT Drawing-901

Process Engineering Single-Stage Refrigeration Cycle - ESPT Drawing-902

Saudi Aramco: Company General Use


Process Engineering Two-Stage Refrigeration Cycle - ESPT Drawing-903

Process Engineering Three-Stage Refrigeration Cycle - ESPT Drawing-904

Process Engineering Crude Stabilizer System - ESPT Drawing-905

Process Engineering Condensate Stabilizer System - ESPT Drawing-906


Process Engineering Absorber System - ESPT Drawing-907

Process Engineering Stripper Column System - ESPT Drawing-908

Process Engineering TEG Dehydration System - ESPT Drawing-909

Process Engineering Amine Sweetening System - ESPT Drawing-910


Molecular Sieve Dehydration System - ESPT Drawing-
Process Engineering 911
Molecular Sieve Regeneration System - ESPT Drawing-
Process Engineering 912

Process Engineering Single Stage Gas Compressor System - ESPT Drawing-913

Process Engineering Two-Stage Gas Compressor System - ESPT Drawing-914


Three-Stage Gas Compression System - ESPT Drawing-
Process Engineering 915

Process Engineering Product Shipping & Custody Meas. - ESPT Drawing-916

Process Engineering Product NGL Fractionation System - ESPT Drawing-917


GOSP Crude Dehy. & Desalter System - ESPT Drawing-
Process Engineering 918

Process Engineering GOSP HPPT/LPPT System - ESPT Drawing-19

Process Engineering Cryogenic Turbo-Expander Process - ESPT Drawing-920

Process Engineering Enhanced Absorption System - ESPT Drawing-921

Process Engineering Evaporative Cooling Tower System - ESPT Drawing-922

Process Engineering Once-Thru Thermosyp Reboiler Sys - ESPT Drawings-923


Onshore Structures Typical Parking Sunshade

Onshore Structures Typical Parking Sunshade - Sections and Details

Saudi Aramco: Company General Use


Typical Parking Sunshade - Foundation Plan, Section and
Onshore Structures Detail
Onshore Structures Typical Parking Sunshade - General Notes
Electrical Systems Designs and
Automation Protection Legend Library Drawings

Electrical Systems Designs and Protection Logic Diagram Breaker and a Half Substation
Automation Feeder (Radial or Inter-tie)
Electrical Systems Designs and Protection Logic Diagram Breaker and a Half Substation
Automation Feeder (Sec Incomer)
Electrical Systems Designs and Protection Logic Diagram Breaker and a Half Substation
Automation Auto Transformer
Electrical Systems Designs and Protection Logic Diagram Breaker and a Half Substation
Automation Two Winding Transformer

Electrical Systems Designs and Protection Logic Diagram Double Bus Single Breaker
Automation Substation Feeder (Radial or Inter-Tie)

Electrical Systems Designs and Protection Logic Diagram Double Bus Single Breaker
Automation Substation Feeder (Sec Incomer)

Electrical Systems Designs and Protection Logic Diagram Double Bus Single Breaker
Automation Substation Bus Coupler and Bus Section

Electrical Systems Designs and Protection Logic Diagram Double Bus Single Breaker
Automation Substation Auto Transformer

Electrical Systems Designs and Protection Logic Diagram Double Bus Single Breaker
Automation Substation Two Winding Transformer
Electrical Systems Designs and Protection Logic Diagram Inverted PI Substation
Automation Protection Line Diagram
Electrical Systems Designs and Protection Logic Diagram Inverted PI Substation Library
Automation Drawings

Electrical Systems Designs and Protection Logic Diagram Inverted PI Substation Prot.
Automation Line Diagram (Sec Incomer)

Electrical Systems Designs and Protection Logic Diagram Inverted PI Substation Prot.
Automation Logic Diagram (Sec Incomer)
Electrical Systems Designs and Protection Logic Diagram Ring Bus Substation One Line
Automation Diagram
Electrical Systems Designs and Protection Logic Diagram Ring Bus Substation Library
Automation Drawings

Saudi Aramco: Company General Use


Electrical Systems Designs and Protection Logic Diagram Generator Feeder Protection
Automation Unit Transformer Connected with GCB

Electrical Systems Designs and Protection Logic Diagram Generator Feeder Protection
Automation Unit Trans. Connected without GCB

Electrical Systems Designs and Protection Logic Diagram Generator Protection Unit
Automation Trans. Connected without GCB

Electrical Systems Designs and Protection Logic Diagram Generator Protection Unit
Automation Trans. Connected with GCB

Electrical Systems Designs and Protection Logic Diagram Breaker and Half Substation
Automation High Impedance Bus Protection

Electrical Systems Designs and Protection Logic Diagram Double Bus Single Breaker
Automation Substation Low Impedance Bus Protection
Electrical Systems Designs and Protection Logic Diagram 115 kV and below Shunt
Automation Reactor
Electrical Systems Designs and Protection Logic Diagram 230 kV and above Shunt
Automation Reactor
Electrical Systems Designs and Protection Logic Diagram Transformer Ended Feeder
Automation Library Drawings
Electrical Systems Designs and Protection Logic Diagram Two Winding Transformer 69
Automation kV and above
Electrical Systems Designs and Protection and Metering MV Double Ended Switchgear
Automation Library Drawings

Electrical Systems Designs and Protection and Metering MV Double Ended Switchgear-
Automation Switchgear Library Drawings
Electrical Systems Designs and Protection and Metering MV Direct Connected Library
Automation Drawings
Electrical Systems Designs and Protection and Metering Captive Transformer Library
Automation Drawings
Electrical Systems Designs and Protection and Metering 4.16 kV Motor Control Center
Automation Library Drawings
Electrical Systems Designs and Protection and Metering MV Emergency Library
Automation Drawings
Electrical Systems Designs and Protection and Metering MV Renewable Energy
Automation Generation Library Drawings
Electrical Systems Designs and Logic Diagram MV Double Ended Switchgear Library
Automation Drawings
Electrical Systems Designs and Logic Diagram MV Double Ended Switchgear Library
Automation Drawings

Saudi Aramco: Company General Use


Electrical Systems Designs and Logic Diagram MV Double Ended Switchgear Library
Automation Drawings
Electrical Systems Designs and Logic Diagram MV Double Ended Switchgear Library
Automation Drawings
Electrical Systems Designs and
Automation Logic Diagram Tripping Logic Library Drawings
Electrical Systems Designs and Protection and Metering LV Double Ended Switchgear
Automation Library Drawings
Electrical Systems Designs and Protection and Metering LV Controlgear Library
Automation Drawings
Electrical Systems Designs and Protection and Metering Low Voltage Diesel Generator
Automation Set Library Drawings
Electrical Systems Designs and Logic Diagram LV Double Ended Switchgear Library
Automation Drawings
Electrical Systems Designs and Logic Diagram LV Double Ended Switchgear Library
Automation Drawings
Electrical Systems Designs and Logic Diagram LV Double Ended Switchgear Library
Automation Drawings
Electrical Systems Designs and Logic Diagram LV Double Ended Switchgear Library
Automation Drawings

Process Engineering Piping and Instrument Diagram - Liquid Sampling System

Process Engineering Piping and Instrument Diagram - Liquid Sampling System

Process Engineering Piping and Instrument Diagram - Liquid Sampling System


Civil Man Hammam 4, 8, 12 and 16 Stall
Typ Wood Frame for Interior and Exterior Door Concrete
Civil Wall

Civil Typ Access Panels Concrete Block, Wood Metal Walls


Civil Typ Wood Doors, 1-3/8" and 1-1/8" Thick
Civil Typ Wood Doors 1-3/4" and 1-1/2" Thick
Piping Steam Trap Layout
Welds, Lugs, Skirt, Vents, Supports Pressure Vessels and
Vessels Columns
Vertical K.O. Drums Arrangement and Design Detail
Vessels Model
Piping Submarine Pipeline Flange Guard 30
Corrosometer Corrosion Probe Extension Cable
Instrumentation Installation

Instrumentation Liquid Level Gauge Glasses Instrument Piping Detail


Standard Instrument Piping Details for Pneumatic Level
Instrumentation Instruments

Saudi Aramco: Company General Use


Standard Instrument Piping Details for Electric Level
Instrumentation Instrument (up to Class 600 ANSI Rating)
Local Shut-Down Cabinet Arrangement Drawing (All
Instrumentation Pneumatic)
Thermocouple Well Assembly Horizontal Process Lines
Instrumentation Detail
Straightening Vane and Pipe Spool Piece, Flow Meter
Instrumentation Orifice Runs
Straightening Vane and Pipe Spool Piece, Flow Meter
Instrumentation Orifice Runs
Cathodic Protection Plant Road Crossings In Plastic
Cathodic Protection Envelope
Forced Feed Lubrication System Piping and Instrument
Vibration and Lubrication Diagram (PandID)
Plumbing and Utilities Cleanout For Sewers (All Materials)

Plumbing and Utilities Plumbing Installation Water Cooler (Heavy Duty)

Plumbing and Utilities Concrete Thrust Block Details For Utility Pipelines

Onshore Structures Offset and Portable Pipe Supp. Unrestrained Pipelines

Onshore Structures Breakaway Roadside Sign Support Install & Mtng Det

Onshore Structures Metal Beam Guardrail Wire Rope Safety Fence

Onshore Structures Metal Beam Guardrail Wire Rope Safety Fence

Onshore Structures Metal Beam Guardrail Wire Rope Safety Fence

Onshore Structures Metal Beam Guardrail Wire Rope Safety Fence

Onshore Structures Metal Beam Guardrail Wire Rope Safety Fence

Onshore Structures Metal Beam Guardrail Wire Rope Safety Fence

Onshore Structures Metal Beam Guardrail Wire Rope Safety Fence

Onshore Structures Metal Beam Guardrail Wire Rope Safety Fence

Onshore Structures Metal Beam Guardrail Wire Rope Safety Fence

Onshore Structures Metal Beam Guardrail Wire Rope Safety Fence

Saudi Aramco: Company General Use


Onshore Structures Metal Beam Guardrail Wire Rope Safety Fence

Onshore Structures Metal Beam Guardrail Wire Rope Safety Fence


Onshore Structures Terminal Section Wire Rope Safety Fence

Onshore Structures Cable Guardrail Type 1 Wire Rope Safety Fence

Onshore Structures Cable Guardrail Type 1 Wire Rope Safety Fence

Onshore Structures Cable Guardrail Type 1 Wire Rope Safety Fence

Onshore Structures Median Application Wire Rope Safety Fence

Onshore Structures Median Application Wire Rope Safety Fence

Onshore Structures Shoulder Application Wire Rope Safety Fence

Onshore Structures Shoulder Application Wire Rope Safety Fence


Median and Shoulder Application Wire Rope Safety
Onshore Structures Fence
Median and Shoulder Application Wire Rope Safety
Onshore Structures Fence
Instrumentation Smart ZV - Single Acting Actuators
Instrumentation Smart ZV - Double Acting Actuators

Electrical Systems Designs and Three Phase Transformer Installation Platform Mounting
Automation Step-Up or Step-Down Voltage Application

Electrical Systems Designs and Switched Capacitor Installation Armless Construction


Automation Three Phase Tangent Structure
Electrical Systems Designs and Single Phase Transformer Installation Pole Mounting
Automation Details
Reinforced Concrete Water Draw Basins for Tanks
Civil Details
Reinforced Concrete Water Draw Basins for Tanks
Civil Details
Electrical Systems Designs and Electrical Grounding and Bonding at Shipping Wharves
Automation and Loading Racks
Electrical Systems Designs and
Automation Crossarm Hardware Bonding Details
Local Shut-Down Cabinet Conventional-Double Acting
Instrumentation Actuator

Instrumentation Local Shutdown Cabinet Conventional - Spring Return

Saudi Aramco: Company General Use


Electrical Systems Designs and
Automation Safety Ground Mat Plan and Details

Electrical Systems Designs and Straight Two Way Joints for I/C Rubber Insulated,
Automation Shielded, Neoprene Jacketed Cable, 5 kV Ungrounded

Electrical Systems Designs and Straight Two Way Joint for 3/C Rubber Insulated,
Automation Shielded Neoprene Jacketed Cable, 5 kV, Underground

Civil Concrete Box for 24" x 16" Tank Bottom Outlet


Concrete Boxes for Corrosion Monitoring Station Plan,
Civil Section and Details
Concrete Anchors and Thrust Blocks for Asbestos
Civil Cement Pipe

Piping Piping Detail - Antifoulant Injection System

Piping Piping Detail - Water Wash Injection System


Piping Piping Detail - Caustic Injection System

Piping Piping Detail - Neutralizing Amine Injection System

Piping Piping Detail - Filming Amine Injection System


Geotechnical Geogrid Sand Fence (Sheet 1)
Geotechnical Geogrid Sand Fence (Sheet 2)

Civil Typ Damp Proofing Membrane Application Details

Civil Typ Damp Proofing Membrane Application Details

Civil Typ Wood Frame for Interior Doors, Steell/Wood Walls

Civil Typ Moldings for Window and Door Frames


Civil Standard Shop Wall Bench
Combination Cleanout and Water Draw-Off Detail For
Vessels Tank
Vessels Beveling Details for API-650 Tanks
Electrical Systems Designs and Three Phase Alley Arm Single Circuit Horizontal Primary
Automation 2.4, 4.16 and 13.8 Kv
Electrical Systems Designs and Wood Pole Line Construction, 0 To 30 Degree Vertical
Automation Angle Pole, 13.8kv
Electrical Systems Designs and Wood Pole Line Construction, 30 To 90 Degree Vertical
Automation Angle Pole, 13.8kv
Electrical Systems Designs and Three Phase Transformer Installation Single Pole
Automation Mounting

Saudi Aramco: Company General Use


Electrical Systems Designs and Three Phase Fused Disconnect Switch Structure, Armless
Automation Construction, 2.4, 4.16, 13.8 and 34.5kv
Pressure Indicators and Switches Locally Mounting
Instrumentation Instrument Piping Details
Pressure Indicators and Switches Panel or Wall Mounted
Instrumentation Instrument Piping Details
Instruments Piping Details Pressure Instruments Blind
Instrumentation and Indicating Type

Instrumentation Electrical Connections For Field-Mounted Instruments


Instrumentation Instrument Standpipes
Instrumentation Level Instruments Piping Detail
Royalty and Custody Transfer Metering Installation For
Instrumentation Wet Gas

Instrument Piping Details Flow Meter Installations Liquid


Instrumentation Service (Non-Corrosive)
Instrument Piping Details Flow Meter Installations Liquid
Instrumentation Service (Corrosive)

Instrument Piping Details Flow Meter Installations Gas


Instrumentation and Vapor Service (Non-Corrosive)

Instrument Piping Details Flow Meter Installations Gas


Instrumentation and Vapor Service (Corrosive)

Instrument Piping Details Flow Meter Installations


Instrumentation Steam Service (up to ANSI Class 1500 Rating)

Piping Main Dimensions Of Bi-Directional Scraper Traps

Main Dimensions Of Bi-Directional Scraper Traps ANSI


Piping Class 900 Through 1500
Main Dimensions Of Scraper Traps For Instrumented
Piping Scraper

Main Dimensions Of Scraper Trap Of Vertical Launcher


Piping For Cleaning Or Batching Scraper
Welding Repair Sleeves Fabrication Details, East West
Piping NGL Pipelines
Electrical Systems Designs and
Automation Armless Constr. Double Circuit Angle Structure 0-2 Deg.
Electrical Systems Designs and
Automation Armless Constr. Double Circuit Angle Structure 0-15 Deg.

Saudi Aramco: Company General Use


Electrical Systems Designs and Armless Constr. Double Circuit Angle Structure 15-30
Automation Deg.
Electrical Systems Designs and Armless Constr. Double Circuit Angle Structure 30-60
Automation Deg.
Electrical Systems Designs and Armless Constr. Double Circuit Angle Structure 60-90
Automation Deg.
Electrical Systems Designs and
Automation Single Phase Termination O/H Armless to Underground
Standard Details of Circumferential Stairway for Cone
Loss Prevention Roof Tanks
Standard Circumferential Stairway for Floating Roof
Loss Prevention Tanks
Electrical Systems Designs and
Automation Sectionalizing Fuse Installation 2.4, 4.16 and 13.8 kV
Electrical Systems Designs and
Automation Armless Brackets Overhead Distribution
Electrical Systems Designs and Lashed Multiplex Secondary Connections and
Automation Attachments
Electrical Systems Designs and Armless Construction Single Phase Tap Structure 2.4,
Automation 4.16, 13.8 and 34.5 kV
Electrical Systems Designs and
Automation Metal Clad Cable Termination Details
Electrical Systems Designs and Jacketed Aluminum Sheathed (MC) Cable Termination
Automation Details
Electrical Systems Designs and Buckarm Sectionalizing Fuse Installation 2.4, 4.16 and
Automation 13.8 kV
Electrical Systems Designs and
Automation Load Break Switch Installation 2.4, 4.16 and 13.8 kV
Electrical Systems Designs and
Automation Straight Line Pole Wood Pole Line Construction 13.8 kV
Electrical Systems Designs and
Automation Small Angle Pole Wood Pole Line Construction 13.8 kV
Electrical Systems Designs and
Automation Large Angle Pole Wood Pole Line Construction 13.8 kV
Electrical Systems Designs and 90 Degrees Angle Pole Wood Pole Line Construction
Automation 13.8 kV
Electrical Systems Designs and Horizontal Dead-End Pole Wood Pole Line Construction
Automation 13.8 kV
Electrical Systems Designs and
Automation Tap Off Pole - Wood Pole Line Construction - 13.8 kV
Electrical Systems Designs and
Automation Four-Way Junction Wood Pole Line Construction 13.8 kV

Civil Slip Base Plate for Break-Away Sign Post Details

Saudi Aramco: Company General Use


Recommended Grounding Scheme for Process
Instrumentation Automation System
Plan & Profile/Pipeline Alignment Atmospheric Portable
Custody Measurement Tank Prover
Manway Cover Details For Pressure Vessels and
Vessels Columns

Vessels Demister Supports For Pressure Vessels and Columns

Vessels Vortex Breakers Details for Columns and Vessels


Vessels Anti-Swirl Baffles
Slide Bearing Details For Support Of Horizontal Vessels -
Vessels Metric
Electrical Systems Designs and
Automation Pole Butt Ground
Electrical Systems Designs and
Automation Ground Connections Details Ground Rod To Ground Grid
Electrical Systems Designs and Ground Connections Detaills Ground Grid Conn. Using
Automation Compression Connector
Electrical Systems Designs and Ground Connections Details Ground Plate To Ground
Automation Grid Using Comp. Conn.
Electrical Systems Designs and Ground Connections Details Fence Post And Gates To
Automation Ground Grid
Electrical Systems Designs and Ground Connections Details Lightning Conductor
Automation Systems For Buildings

Electrical Systems Designs and Ground Conn. Details Switchboard/Control Panel


Automation Ground Bus To Ground Grid
Electrical Systems Designs and
Automation Ground Connections Metal Cable Tray To Ground Grid
Electrical Systems Designs and Ground Connections Details Structural Steel To Ground
Automation Grid
Electrical Systems Designs and Ground Connections Details Ground Grid Connections
Automation Using Thermit Welding
Electrical Systems Designs and Ground Connections Details Ground Plate Assembly
Automation Using Thermit Welding
Electrical Systems Designs and Ground Connections Details Transformer To Ground
Automation Grid
Electrical Systems Designs and Ground Connections Details Horizontal And Vertical
Automation Motors To Ground Grid
Instrumentation Nameplate Details For Instrument Boards

Instrumentation Nameplate Details For Instrument Boards - Metric


Instrumentation Field Mounting Details For Instruments

Saudi Aramco: Company General Use


Thermocouple Installation Details Of Heater Tube
Instrumentation Skinpoint
Instrumentation Condensate Or Seal Pot Detail
Plumbing and Utilities Valve Support For Plastic Pipelines

Onshore Structures Parking Stall Layout and Wheel Stop Detail

Motors and Generators Generator Protection Large Direct-Connected Generator

Motors and Generators Generator Protection Large Direct-Connected Generator


Generator Protection Medium Direct-Connected
Electrical Substations Equipment Generator
Transformer Protection Delta/WYE, Normally-Open Bus
Electrical Substations Equipment Tie
Transformer Protection Wye/Delta, Normally-Open Bus
Electrical Substations Equipment Tie
Transformer Protection Delta/Delta, Normally-Open Bus
Electrical Substations Equipment Tie

Transformer Protection Delta/Delta, Grounding


Electrical Substations Equipment Transformer Normally-Open Bus Tie
Transformer Protection Delta/Wye, N.C. Bus Tie Greater
Electrical Substations Equipment than 600 V LV
Transformer Protection Delta/Wye, N.C. Bus Tie 480V LV
Electrical Substations Equipment Bus
Transformer Protection Wye/Delta, Grounding
Electrical Substations Equipment Transformer N.C. Bus Tie
Transformer Protection Multi-Winding, Normally-Closed
Electrical Substations Equipment Bus Tie
Transformer Protection Intertie Autotransformer
Electrical Substations Equipment W/Tertiary Winding
Transformer Protection HV Circuit Switcher Normally-
Electrical Substations Equipment Open Bus Tie
Transformer Protection HV Circuit Switcher Blocking
Electrical Substations Equipment Scheme

Electrical Substations Equipment Transformer Protection Zero Sequence Current Shunts


Transformer Protection Directional Ground Scheme
Electrical Substations Equipment Device 67TG
Transformer Protection Differential Ground Scheme
Electrical Substations Equipment Device 87N
Transformer Protection Captive or Dedicated Delta/Wye
Electrical Substations Equipment Xfmr F/Mot
Electrical Substations Equipment Bus Protection, Bus Differential Scheme

Saudi Aramco: Company General Use


Bus Protection Partial Differential Scheme Greater than
Electrical Substations Equipment 600V

Electrical Substations Equipment Bus Protection Single-Bus Overcurrent Scheme

Electrical Substations Equipment Bus Protection Double-Ended Bus Overcurrent Scheme

Electrical Substations Equipment Bus Protection Bus Differential Three Line Diagram
Electrical Substations Equipment Bus Protection Test Switch Connections
Automatic Transfer Scheme Secondary Selec-Greater
Electrical Substations Equipment than 600V
Automatic Transfer Scheme Circ. Brks 52-1 and 52-3
Electrical Substations Equipment Cont. Schm.
Automatic Transfer Scheme Circ. Brks 52-2 and 52-4
Electrical Substations Equipment Cont. Schm.

Electrical Substations Equipment Automatic Transfer Scheme AC Control Power


Automatic Transfer Scheme Prim Selec Schm. Sng-Throw
Electrical Substations Equipment Tranf SW.
Automatic Transfer Scheme Prim Selec Schm. Dbl-Throw
Electrical Substations Equipment Tranf SW.

Electrical Substations Equipment Automatic Transfer Scheme AC to DC Supply Transfer


Automatic Transfer Scheme AC-AC Instantaneous
Electrical Substations Equipment Transfer
Automatic Transfer Scheme AC-AC Time Delayed
Electrical Substations Equipment Transfer
AC Schematic Diag Directional Overcurrent Scheme Ln
Electrical Substations Equipment and Circuit Prot.
Line and Circuit Prot Non-Selective Gnd Detctn Schm 'A'
Electrical Substations Equipment U/G Sys.
Line and Circuit Prot Non-Selective Gnd Detctn Schm 'B'
Electrical Substations Equipment U/G Sys.
Breaker Failure Prot. HV Circuit Breakers (69kV or
Electrical Substations Equipment above)

Electrical Substations Equipment Breaker Failure Prot. MV Circuit Breakers (2.4 to 34.5 kV)
Electrical Systems Designs and
Automation Lashed Multiplex-Double Deadend
Electrical Systems Designs and
Automation Lashed Multiplex Angle Attachment

Electrical Systems Designs and Armless Construction-Single Phase Angle Structure 60


Automation deg - 90 deg 13.8 and 34.5 kV

Saudi Aramco: Company General Use


Electrical Systems Designs and
Automation Armless Construction Angle Structure, 15 deg - 30 deg.
Electrical Systems Designs and
Automation Cross Arm Details
Civil Typ Frameless Wall Mirror Detail

Geotechnical Roads and Earthen Dikes in Tank Forms Details


Piping Burner Pit Typical

Vessels Insulation Support Details For Vertical Pressure Vessels

Heat Transfer Equipment Pulling Baseplug Details For Clad Tube Sheets
Electrical Systems Designs and
Automation Framing and Drilling Instructions
Electrical Systems Designs and
Automation Crossarm Framing and Drilling Instructions

Piping Wear Supports For Insulated Hot Pipelines


Instrumentation Detail Of Siphon Instrument Service
Heat Transfer Equipment Heat Exchanger Gasket Types
Piping Corrosion Bar Wear Support

Heat Transfer Equipment Heat Exchanger Head Gasket Shape Code - NAR

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NARC1

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAE1

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAE2

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAF1

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAG1

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAG2

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAG3

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAG4

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAG7

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAH1

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAH5

Saudi Aramco: Company General Use


Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAH12

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAI1

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAI2

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAI5

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAI6

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAJ2

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAK1

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAK2

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAJ1

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAI8

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAJ3

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAR2

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAI7

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAH6

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAH6

Heat Transfer Equipment Heat Exchanger Head Gasket Shapre Code - NAH6

Heat Transfer Equipment Heat Exchanger Head Gasket Special Shape


Onshore Structures 40-Musalla Floor, Roof Plan and Sections
Onshore Structures 40-Man Musalla Elevations

Onshore Structures 40-Man Musalla Door and Windows Schedule

Onshore Structures 40-Man Musalla Roof Framing Plan and Details

Onshore Structures 40-Man Musalla Foundation Plan and Details

Onshore Structures 40-Man Musalla HVAC Layout and Schedule


Onshore Structures Electrical Miscellaneous Details

Saudi Aramco: Company General Use


Onshore Structures Electrical Miscellaneous Details

Loss Prevention Safety Guards For Ladders, Assembly and Details

Civil Concrete Slab for Covering Underground Electric Cable


Civil Typ Door Frame Strike Provisions

Geotechnical Drainage Channel and Slope Protection Detail

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
Environmental Saudi Aramco Environmental Health Code

Saudi Aramco: Company General Use


Saudi Aramco In-Service Static Process Equipment
Inspection Engineering Inspection Manual

Pumps, Seals and Mixers Life Cycle Cost Spread Sheet for Centrifugal Pumps
Life Cycle Cost Spread Sheet for Centrifugal
Pumps, Seals and Mixers Pump/Motor Trains
Compressors, Gears and Steam Life Cycle Cost Spread Sheet for Centrifugal
Turbines Compressor/Motor Trains

Compressors, Gears and Steam Life Cycle Cost Spread Sheet for Compressor or Pump
Turbines driven by Steam Turbine
Compressors, Gears and Steam Life Cycle Cost Spread Sheet for Steam Turbine driving
Turbines Generator (STG)

Compressors, Gears and Steam Life Cycle Cost Spread Sheet for Integrally Geared
Turbines Centrifugal Air Compressor/Motor Trains

Gas Turbines and Diesel Engines Life Cycle Cost Spread Sheet for Gas Turbines

Motors and Generators Life Cycle Cost Spread Sheet for Induction Motors

Motors and Generators Life Cycle Cost Spread Sheet for Synchronous Motors
Life Cycle Cost Spread Sheet for Synchronous
Motors and Generators Generators

Saudi Aramco: Company General Use


Electrical Substations Equipment Life Cycle Cost Spread Sheet for Power Transformers

Heat Transfer Equipment Life Cycle Cost Spread Sheet for Single Fuel Boilers

Heat Transfer Equipment Life Cycle Cost Spread Sheet for Dual Fuel Boilers
Life Cycle Cost Spread Sheet for Single Fuel Process
Heat Transfer Equipment Heaters
Life Cycle Cost Spread Sheet for Dual Fuel Process
Heat Transfer Equipment Heaters

Asset Management Asset Integrity Management System (AIMS)


Custody Measurement Section 1 (Dynamic Measurement)
Custody Measurement Section 2 (Static Measurement)
Custody Measurement Section 3 - Gas Measurement Manual

Energy Systems Optimization Saudi Aramco Energy Conservation Manual


Capital Program Efficiency Front End Loading (FEL) Manual
Capital Program Efficiency Integrated Project Team (IPT) Manual
Vibration and Lubrication Saudi Aramco Lubrication Manual

Consulting Services Consulting Services Materials Laboratory Manual

Welding Saudi Aramco Overlay Welding Procedure Specifications


Performing PN&S Security Compliance Assessment
Plants Networks Manual

Capital Program Efficiency Project Sponsor (PS) Guide for Type A and B Projects

Capital Program Efficiency Project Sponsor (PS) Guide for Type C and C1 Projects
Saudi Aramco Standard Welding Procedure
Welding Specifications

Welding Prequalified Structural Welding Procedure Specifications

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Instrumentation Valve Data for Mounting Motor Operators

Welding Welder and Welding Operator Qualification Record


List of Nameplates for Instruments, Local Mounted
Instrumentation Instruments

Pumps, Seals and Mixers Power Driven Reciprocating Pump Data Sheet

Pumps, Seals and Mixers Power Driven Reciprocating Pump Data Sheet (Metric)
Pumps, Seals and Mixers Direct Acting Steam Pump (Metric)

Pumps, Seals and Mixers Rotary Positive Displacement Pump Data Sheet

Pumps, Seals and Mixers Rotary Positive Displacement Pump Data Sheet (Metric)

Instrumentation Fluid, Meter, Pipe and Pittot Tube Data Sheet


Piping Detail Sheet - Total List of Material for All Spools
Piping Required
Heat Transfer Equipment Equipment Assembly and Details (Size
Heat Transfer Equipment Equipment Assembly and Details (Size

Civil Road and Highway Vertical Design Calculation Sheet

Facilities Planning Engineering Study Approval-Change Request


Electrical Systems Designs and
Automation Standard Drawing Sheet Size "A"
Electrical Systems Designs and
Automation Face Sheet - Standard Drawing Sheet (Size "A")
Electrical Systems Designs and
Automation Standard Drawing Sheet "E" Size
Electrical Systems Designs and
Automation Face Sheet -Standard Drawing Sheet 'E' Size
Engineering Data and Drawing Systems Standard Drawing Sheet (E) Size
Engineering Data and Drawing Systems Drawing Control Sheet
Electrical Systems Designs and
Automation Standard Drawing Sheet Size "B"

Saudi Aramco: Company General Use


Electrical Systems Designs and
Automation Face Sheet - Standard Drawing Sheet (Size "B")
Electrical Systems Designs and
Automation Standard Drawing Sheet Size "C"
Electrical Systems Designs and
Automation Face Sheet - Standard Drawing Sheet (Size "C")
Electrical Systems Designs and
Automation Standard Drawing Sheet Size "D"
Electrical Systems Designs and
Automation Face Sheet - Standard Drawing Sheet (Size "D")
Vessels Safety Instruction Sheet - Tanks

Vessels Safety Instruction Sheet for Pressure Vessels


Vessels Layout of Appurtenances - Size "B"
Vessels Layout of Appurtenances - Size
Vessels Layout of Appurtenances - Size

Vessels Unfired Pressure Vessel External Inspection Report


Data and Operating Limits - Shell and Tube Heat
Heat Transfer Equipment Exchangers
Safety Instruction Sheet for Shell and Tube Exchanger
Heat Transfer Equipment (Metric)

Heat Transfer Equipment Shell and Tube Heat Exchanger Specification


Heat Transfer Equipment Data Sheet - Air Cooled Heat Exchangers
Heat Transfer Equipment Data and Operating Limits - Fired Heaters
Heat Transfer Equipment Data and Operating Limits - Fired Heaters

Centrifugal Pump Data Sheet for Horizontal Pumps and


Pumps, Seals and Mixers Vertical In-Line Pumps

Centrifugal Pump Data Sheet for Horizontal Pumps and


Pumps, Seals and Mixers Vertical In-Line Pumps (Metric)
Pumps, Seals and Mixers Data and Operating Limits - Pumps

Pumps, Seals and Mixers Data and Operating Limits - Pumps (Metric)

Sealless Centrifugal Pump Data Sheet for Horizontal


Pumps, Seals and Mixers Pumps and Vertical In-line Pumps

Sealless Centrifugal Pump Data Sheet for Horizontal


Pumps, Seals and Mixers Pumps and Vertical In-line Pumps
Centrifugal Pump Data Sheet for Vertical Line Shaft
Pumps, Seals and Mixers Pumps

Saudi Aramco: Company General Use


Centrifugal Pump Data Sheet for Vertical Line Shaft
Pumps, Seals and Mixers Pumps (Metric)

Instrumentation Instrument Specification Sheet - Pressure Instruments


Instrument Specification Sheet - Pressure Instruments
Instrumentation (Metric)
Instrument Specification Sheet - Bulb Type Temperature
Instrumentation Instruments
Instrument Specification Sheet - Bulb Type Temperature
Instrumentation Instruments (Metric)

Instrumentation Instrument Specification Sheet - Receiving Instruments


Instrument Specification Sheet - Receiving Instruments
Instrumentation (Metric)

Instrumentation Instrument Specification Sheet - Local Flow Instruments


Instrument Specification Sheet - Local Flow Instruments
Instrumentation (Metric)
Instrument Specification Sheet - Balanced Bridge Type
Instrumentation Temperature Instruments

Instrument Specification Sheet - Balanced Bridge Type


Instrumentation Temperature Instruments (Metric)

Instrumentation Instrument Installation Schedule - Pressure Instrument


Instrument Installation Schedule - Temperature
Instrumentation Instruments

Instrumentation Instrument Installation Schedule - Flow Instruments

Instrumentation Instrument Installation Schedule - Level Instruments


Instrument Installation Schedule - Miscellaneous
Instrumentation Instruments
Instrument Specification Sheet - Traps and Drainers
Instrumentation (Metric)

Instrumentation Instrument Specification Sheet - Pressure Regulators


Instrument Specification Sheet - Pressure Regulators
Instrumentation (Metric)
Instrument Specification Sheet - Differential Type Level
Instrumentation Instruments

Instrument Specification Sheet - Differential Type Level


Instrumentation Instruments (Metric)

Saudi Aramco: Company General Use


Instrument Specification Sheet - Variable Area Flow
Instrumentation Meters
Instrument Specification Sheet - Variable Area Flow
Instrumentation Meters (Metric)

Instrumentation Instrument Specification Sheet - Draft Gauges (Metric)

Instrumentation Instrument Specification Sheet - Snap Acting Valves


Instrument Specification Sheet - Snap Acting Valves
Instrumentation (Metric)

Instrumentation Instrument Installation Sheet - Relief Valves

Gas Turbines and Diesel Engines Data Sheet - Steam Turbine / Gas Expansion Turbine
Data Sheet - Steam Turbine / Gas Expansion Turbine -
Gas Turbines and
Compressors, Diesel
Gears and Engines
Steam (Metric)
Turbines Data Sheet - Centrifugal Compressors
Compressors, Gears and Steam
Turbines Data Sheet - Centrifugal Compressors (Metric)

Piping Safety Instruction Sheet - Critical Plant Piping


Piping Line Designation Table
Piping Isometric Piping Detail - Size "B"
Piping Isometric Piping Detail - Size
Piping Isometric Piping Detail - Size
Piping Piping Arrangement, Proportioning Pump
Motors and Generators Inspection Record - Motors
Engineering Data and Drawing Systems Cable and Conduit Schedule
Civil Steel Bending Details - Size "B"
Civil Steel Bending Detail
Inspection Engineering T&I Acceptance Report
Geotechnical Pile Driving Record (Metric)
Valves Relief Valve Authorization
Instrumentation Orifice Plate Detail for RF Flanges
Instrumentation Orifice Plate Detail - Segmental
Instrumentation Orifice Plate Detail - Segmental (Metric)
Instrumentation Orifice Plate Detail - Restriction
Instrumentation Orifice Plate Detail - Quadrant Edge

Instrumentation Instrument Material Summary Sheet - Item 001 to 196


Instrumentation Instrument Material Summary Sheet

Instrumentation Instrument Specification Sheet - Vibration Switches


Instrument Specification Sheet - Vibration Switches
Instrumentation (Metric)

Saudi Aramco: Company General Use


Instrumentation Meter Reading Tables
Instrumentation Meter Reading Tables (Metric)

Instrumentation Instrument Specification Sheet - Piston Operated Valves


Instrument Specification Sheet - Piston Operated Valves
Instrumentation (Metric)
Inspection Engineering HIPS Authorization Form
Inspection Engineering HIPS Maintenance Report
Instrumentation Relief Valve Maintenance Report
Environmental Radiography Request and Report Sheet
Safety Instruction Sheet for Cross Country Pipelines -
Piping Main Line Pipe
Safety Instruction Sheet for Cross Country Pipelines -
Piping Critical Piping

Piping Safety Instruction Sheet - Terminal and Bulk Plant Piping

Piping Safety Instructions Sheet for Nonmetallic Flowlines


Instrumentation Piping & Instrument Diagram - Size "A"
Instrumentation Piping & Instrument Diagram - Size
Vibration and Lubrication Lubrication Schedule

Instrumentation Instrument Specification Sheet - Flow Instruments


Instrument Specification Sheet - Flow Instruments
Instrumentation (Metric)

Instrumentation Instrumentation Specification Sheet - Level Switches

Instrumentation Instrument Specification Sheet - Level Switches (Metric)


Instrument Specification Sheet - Filled System Type
Instrumentation Temperature Switches

Instrument Specification Sheet - Filled System Type


Instrumentation Temperature Switches (Metric)
Instrument Specification Sheet - Thermocouple / RTD
Instrumentation Switches
Instrument Specification Sheet - Thermocouple / RTD
Instrumentation Switches (Metric)
Engineering Data and Drawing Systems Face Sheet for (D) Size Drawings
Engineering Data and Drawing Systems Material Take-Off List
Electrical Systems Designs and
Automation Lighting Panel Schedule - Size "C"
Valves Valve Data Sheet
Electrical Systems Designs and
Automation Motor Control Center No. for Substation No.

Saudi Aramco: Company General Use


Electrical Systems Designs and
Automation Motor Control Center No. for Substation No. (Metric)
Gas Turbines and Diesel Engines Data Sheet for Diesel Engine(s)
Gas Turbines and Diesel Engines Data Sheet for Diesel Engines (Metric)

Heat Transfer Equipment Data and Operating Limits - Air-Cooled Heat Exchangers
Data and Operating Limits - Air-Cooled Heat Exchanger
Heat Transfer Equipment (Metric)
Instrumentation Instrument Specification Sheet - General
Engineering Data and Drawing Systems Plan and Profile - Size
Compressors, Gears and Steam Reciprocating Compressor Data Sheet - Plant and
Turbines Instrument Air Service
Compressors, Gears and Steam
Turbines Reciprocating Compressor Data Sheet (Metric)
Pumps, Seals and
Compressors, Mixers
Gears and Steam Centrifugal Pumps - Check Sheet
Turbines Centrifugal Compressors - Check Sheet
Gas Turbines and Diesel Engines Combustion Gas Turbine - Check Sheet
Project Quality Request for Inspection
Project Management Office Data Sheet for Offshore Platform
Inspection Engineering Crane Inspection Report
Pumps, Seals and Mixers Submersible Pumps Data Sheet
Pumps, Seals and Mixers Submersible Pumps Data Sheet (Metric)

Instrumentation Instrument Installation Schedule - MOV/AOV/HOV/GOV

Storage of Radioactive Material in Saudi Aramco


Materials Engineering Radioactive Equipment Storage in Dhahran
Piping Hot Tap Data and Check List
Environmental Equipment Noise Data Sheet
Instrumentation Instrument Loop Diagram - Size "B"
Instrumentation Instrument Loop Diagram - Size
Instrumentation Instrument Loop Diagram - Size
Instrumentation Instrument Segment Diagram - Size

Piping Hot Tap/Stopple and Reinforcement Calculation Request


Facilities Planning Quarterly Accountability Report

Design Contractor Weekly Report of Expended Manhour


Project Management Office (includes Continuation Sheet 7746-1)
Electrical Systems Designs and
Automation Medium Voltage Cable Test Record
Project Quality Inspection Request

Heat Transfer Equipment Nonmaterial Requirements for Fired Heaters

Saudi Aramco: Company General Use


Compressors, Gears and Steam Nonmaterial Requirements for Reciprocating Gas
Turbines Compressors
Pumps, Seals and Mixers Nonmaterial Requirements for Pumps
Electrical Systems Designs and Nonmaterial Requirements for High Voltage SF6 Dead
Automation Tank Circuit Breakers
Electrical Systems Designs and Nonmaterial Requirements for Metal-Clad Switch Gear -
Automation High Voltage
Nonmaterial Requirements for General-Purpose Steam
Gas Turbines and Diesel Engines Turbines

Electrical Systems Designs and Nonmaterial Requirements for Transformers: Small,


Automation Medium and Large, Power Distribution
Nonmaterial Requirements for Instrumentation
Instrumentation (General)

Gas Turbines and Diesel Engines Nonmaterial Requirements for Diesel Engines
Compressors, Gears and Steam Nonmaterial Requirements for Reciprocating Air
Turbines Compressors

Electrical Systems Designs and Nonmaterial Requirements for Metal Enclosed Switch
Automation Gear - Low-Voltage and Motor Control Centers
Compressors, Gears and Steam
Turbines Nonmaterial Requirements for Centrifugal Compressors
Electrical Systems Designs and Nonmaterial Requirements for Electric Rotating
Automation Machinery

Heat Transfer Equipment Nonmaterial Requirements Industrial Watertube Boilers

Offshore Structures Nonmaterial Requirements for Loading Arm

Pumps, Seals and Mixers Nonmaterial Requirements for Lube Oil Systems
Nonmaterial Requirements Concentrated Firefighting
Fire Protection Foam
Compressors, Gears and Steam Nonmaterial Requirements for Special Purpose Steam
Turbines Turbines

Nonmaterial Requirements for Safety Relief Valves


Instrumentation Conventional and Balanced Types
Nonmaterial Requirements for Shop and Field Erected
Vessels Tanks
Nonmaterial Requirements - Floating and Internal
Vessels Floating Roofs
Nonmaterial Requirements for Fabricated Pipe Bends
Piping Per 01-SAMSS-010

Saudi Aramco: Company General Use


Vessels Nonmaterial Requirements for Pressure Vessels

Trays and Packing Process Design Nonmaterial Requirements for Column Trays
Electrical Systems Designs and
Automation Nonmaterial Requirements for Disconnect Switches
Electrical Systems Designs and
Automation Nonmaterial Requirements for Insulators

Electrical Systems Designs and Nonmaterial Requirements for Vibration, Axial Position,
Automation and Bearing Temperature Monitoring System
Nonmaterial Requirements for Shell and Tube and
Heat Transfer Equipment Double-Pipe Heat Exchangers
Nonmaterial Requirements for Air-Cooled Heat
Heat Transfer Equipment Exchangers

Heat Transfer Equipment Nonmaterial Requirements for Electric Heat Exchangers


Nonmaterial Requirements for Plate and Frame Heat
Heat Transfer Equipment Exchangers

HVAC Nonmaterial Requirements for Cooling Towers


Nonmaterial Requirements for Control Panels Per 34-
Instrumentation SAMSS-820/821 (3/4)
Nonmaterial Requirements for Solid State ESD Systems
Instrumentation (per 34-SAMSS-621)
Nonmaterial Requirements for Solid State ESD Systems
Instrumentation (per 34-SAMSS-621)

Nonmaterial Requirements for Valves - All Types (Special


Valves Service Size/Rating Only)

Electrical Systems Designs and Nonmaterial Requirements for Insulated Cable - Single
Automation Conductor or Multiconductor
Nonmaterial Requirements for Fabricated Structural
Onshore Structures Steel
Nonmaterial Requirements for Pneumatic-Powered
Valves Valve Actuators
Nonmaterial Requirements for Communications
Communications Equipment
Engineering Data and Drawing Systems Nonmaterial Requirements for
Compressors, Gears and Steam Data Sheet - Reciprocating Compressor, Process Air and
Turbines Gas Service
Compressors, Gears and Steam Data Sheet - Reciprocating Compressor, Process Air and
Turbines Gas Service (Metric)
Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet

Saudi Aramco: Company General Use


Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet
Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet
Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet
Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet
Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet
Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet
Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet
Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet

Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet (Metric)

Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet (Metric)

Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet (Metric)

Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet (Metric)

Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet (Metric)

Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet (Metric)

Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet (Metric)

Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet (Metric)

Gas Turbines and Diesel Engines Combustion Gas Turbines Data Sheet (Metric)
Compressors, Gears and Steam Data Sheet - Gear Unit (For Increasers and Reducers of
Turbines Parallel Shaft Design)

Compressors, Gears and Steam Data Sheet - Gear Unit (For Increasers and Reducers of
Turbines Parallel Shaft Design) (Metric)
Lubrication, Shaft Sealing and Control Oil Systems Data
Vibration and Lubrication Sheet
Lubrication, Shaft Sealing and Control Oil Systems Data
Vibration and Lubrication Sheet
Lubrication, Shaft Sealing and Control Oil Systems Data
Vibration and Lubrication Sheet
Lubrication, Shaft Sealing and Control Oil Systems Data
Vibration and Lubrication Sheet
Lubrication, Shaft Sealing and Control Oil Systems Data
Vibration and Lubrication Sheet
Lubrication, Shaft Sealing and Control Oil Systems Data
Vibration and Lubrication Sheet
Lubrication, Shaft Sealing and Control Oil Systems Data
Vibration and Lubrication Sheet

Saudi Aramco: Company General Use


Lubrication, Shaft Sealing and Control Oil Systems Data
Vibration and Lubrication Sheet
Heat Transfer Equipment Data Sheet - Fired Heater
Heat Transfer Equipment Fired Heater - Data Sheet
Heat Transfer Equipment Fired Heater - Data Sheet
Heat Transfer Equipment Fired Heater - Data Sheet
Heat Transfer Equipment Fired Heater - Data Sheet
Heat Transfer Equipment Fired Heater - Data Sheet
Heat Transfer Equipment Fired Heater - Data Sheet (Metric)
Heat Transfer Equipment Fired Heater - Data Sheet (Metric)
Heat Transfer Equipment Fired Heater - Data Sheet (Metric)
Heat Transfer Equipment Fired Heater - Data Sheet (Metric)
Heat Transfer Equipment Fired Heater - Data Sheet (Metric)
Heat Transfer Equipment Fired Heater - Data Sheet (Metric)
Pumps, Seals and Mixers Data Sheet - Positive Displacement Pump

Pumps, Seals and


Compressors, Mixers
Gears and Steam Data Sheet - Positive Displacement Pump (Metric)
Turbines Specification for Compressed Air Dryer

Onshore Structures Data Sheet - Foundation Design (Dynamic Design)


Data Sheet - Foundation Design (Dynamic Design)
Onshore Structures (Metric)

Instrument Specification Sheet -Coriolis Flow Meter for


Custody Measurement Gas Custody Transfer Measurement
Instrument Specification Sheet - Orifice Meter for Gas
Custody Measurement Custody Measurement
Instrument Specification Sheet - Flow Transmitters-
Instrumentation Smart (Differential Pressure)

Instrument Specification Sheet - Ultrasonic Flow Meter


Custody Measurement for Gas Custody Transfer Measurement
Instrument Specification Sheet - Metering Orifice
Instrumentation Calculation Conventional Units
Instrument Specification Sheet - Metering Orifice
Instrumentation Calculation SI Units
Instrument Specification Sheet - Venturi Tube
Instrumentation Specification and Calculation

Instrument Specification Sheet - Venturi Tube


Instrumentation Specification and Calculation (Metric)

Instrumentation Instrument Specification Sheet - Turbine Meters

Instrumentation Instrument Specification Sheet - Turbine Meters (Metric)

Saudi Aramco: Company General Use


Instrument Specification Sheet - Liquid Positive
Instrumentation Displacement Meters
Instrument Specification Sheet - Bi-Directional Meter
Custody Measurement Prover
Instrument Specification Sheet - Uni-Directional Meter
Custody Measurement Prover

Custody Measurement Instrument Specification Sheet - Small Volume Prover


Instrument Specification Sheet - Atmospheric Portable
Custody Measurement Tank Prover

Instrument Specification Sheet - Restriction Orifice


Instrumentation Calculation and Specification

Instrument Specification Sheet - Restriction Orifice


Instrumentation Calculation and Specification (Metric)
Instrument Specification Sheet - Small Gas Metering
Custody Measurement System

Instrument Specification Sheet - Medium Gas Metering


Custody Measurement System with Ultrasonic Flow Meter (UFM)

Custody Measurement Instrument Specification Sheet ¿ Truck Loading Systems


Instrument Specification Sheet ¿ Truck Unloading
Custody Measurement Systems
Instrument Specification Sheet - Pressure Transmitters -
Instrumentation Smart (ABS, GAGE, and DP)
Instrument Specification Sheet - Pressure and
Instrumentation Differential Pressure Gauges
Instrument Specification Sheet - Pressure and D/P
Instrumentation Switch

Instrumentation Instrument Specification Sheet - Level Gauge Glasses

Instrumentation Instrument Specification Sheet - Level Instruments


Instrument Specification Sheet - Automatic Tank
Instrumentation Gauging Equipment
Instrument Specification Sheet - Automatic Tank Gauge -
Instrumentation Radar
Instrument Specification Sheet - Level Device: Time
Instrumentation Domain Reflectometer
Instrument Specification Sheet Radar Tank Gauging
Custody Measurement Equipment
High Integrity Protection Systems Safety Requirement Specifications

Saudi Aramco: Company General Use


Instrument Specification Sheet - Temperature
Instrumentation Transmitters - Smart
Instrument Specification Sheet - Mechanical
Instrumentation Temperature Switches
Instrument Specification Sheet - Thermocouple (T/C)
Instrumentation Assembly
Instrument Specification Sheet - Thermocouple (T/C)
Instrumentation Assembly (Metric)
Instrument Specification Sheet - Resistance
Instrumentation Temperature Detector (RTD)

Instrumentation Instrument Specification Sheet - Thermowell

Instrumentation Instrument Specification Sheet - Thermowell (Metric)

Instrumentation Instrument Specification Sheet - Temperature Monitor


Instrument Specification Sheet - Temperature Monitor
Instrumentation (Metric)

Process Analyzers Instrument Specification Sheet - Chromatographs

Process Analyzers Instrument Specification Sheet - Oxygen Analyzer

Instrument Specification Sheet - Combustible Gas and


Instrumentation Hydrogen Sulfide Monitors

Process Analyzers Instrument Specification Sheet - Moisture Analyzers


Instrument Specification Sheet - Density Meter for Gas
Process Analyzers and Liquid Service
Instrument Specification Sheet - Hydrocarbon Liquid
Custody Measurement Sampling Systems

Instrumentation Instrument Specification Sheet - Surge Relief Valves

Instrument Specification Sheet - Pressure Relief Valves


Instrumentation Conventional and Balanced Types
Instrument Specification Sheet - Safety Relief Valves
Instrumentation (Metric)
Instrument Specification Sheet - Safety Relief Valves
Instrumentation Pilot Operated
Instrument Specification Sheet - Pressure / Vacuum
Instrumentation Relief Valves
Instrument Specification Sheet - Pressure / Vacuum
Instrumentation Relief Valves

Saudi Aramco: Company General Use


Instrumentation Instrument Specification Sheet - Rupture Disks
Instrument Specification Sheet - Flame Monitoring
Instrumentation Systems

Instrument Specification Sheet - Programmable


Instrumentation Controller Based ESD Systems
Instrument Specification Sheet - Machinery Protection
Instrumentation Systems

Instrumentation Instrument Specification Sheet - Local ZV Controls


Instrument Specification Sheet - Globe / Angle Control
Instrumentation Valves

Instrumentation Instrument Specification Sheet - Ball Control Valves


Instrument Specification Sheet - Butterfly / Rotary Plug
Instrumentation Control Valves
Instrument Specification Sheet - Pneumatic Actuators
Instrumentation (On-Off Service)
Instrument Specification Sheet - Hydraulic Valve
Instrumentation Actuators
Instrument Specification Sheet - Electric Motor
Instrumentation Operated Valve Actuators

Instrumentation Instrument Specification Sheet - Annunciators

Instrumentation Instrument Specification Sheet - Electromagnetic Relays


Instrument Specification Sheet - Solenoid Operated
Instrumentation Valves
Instrument Specification Sheet - Transducers (Signal
Instrumentation Conversion)
Instrument Specification Sheet - Programmable
Instrumentation Controller
Instrument Specification Sheet - Instrumentation for
Instrumentation Packaged Units

Instrument Specification Sheet - Flow Computer for


Custody Measurement Custody Transfer Measurement of Hydrocarbon Liquids

Instrument Specification Sheet - Flow Computer for


Custody Measurement Custody Transfer Measurement of Hydrocarbon Gases

Instrument Specification Sheet - Preset Controller for


Custody Measurement Truck Loading and Unloading Systems

Saudi Aramco: Company General Use


Instrument Specification Sheet - Instrumentation and
Instrumentation Thermcouple Cable
Instrumentation Logic Diagram - Size "A"
Instrumentation Logic Diagram - Size
Instrumentation Logic Diagram - Size

Instrumentation Index Sheet - Instrument Loop Diagram (I.L.D.) - Size "B"

Instrumentation Index Sheet - Instrument Loop Diagram (I.L.D.) - Size

Instrumentation Index Sheet - Instrument Loop Diagram (I.L.D.) - Size


Electrical Systems Designs and
Automation Electrical Load Tabulation - Size "A"
Data Sheet - Centrifugal Fluorocarbon Refrigeration
Vessels Units
Data Sheet for Hydrostatic Test Report - Submarine
Piping Pipelines
Pumps, Seals and Mixers Side Entry Mixer - Data Sheet
Pumps, Seals and Mixers Side Entry Mixer - Data Sheet
Pumps, Seals and Mixers Side Entry Mixer - Data Sheet (Metric)
Pumps, Seals and Mixers Side Entry Mixer - Data Sheet

HVAC Packaged Integrally Geared Centrifugal Air Compressor


Packaged Integrally Geared Centrifugal Air Compressor
HVAC (Metric)

Heat Transfer Equipment Data Sheet - Plate and Frame Type Heat Exchanger
Data and Operating Limits - Plate and Frame Type Heat
Heat Transfer Equipment Exchanger
Project Quality Projects Inspection Report
Project Quality Project Inspection Worksheet

Project Quality Project Inspection Worksheet Clearance Form


Saudi Aramco Inspection Department Non-Conformance
Project Quality Report
Project Quality Certificate of Inspection
Trays and Packing Process Design Process Design Data Sheet - Packing

Trays and Packing Process Design Process Design Data Sheet - Stream Composition
Trays and Packing Process Design Process Design Data Sheet - Trays
Vessels Pressure Vessel - Data Sheet (Size "D")
Heat Transfer Equipment Data Sheet - Electric Heat Exchanger
Data Sheet - Pressure Relief Device-Process Selection
Flare Systems Design Basis for Flare Systems
Flare Systems Design Flare Load Summary

Saudi Aramco: Company General Use


Flare Systems Design Data Sheet - Flare Tip
Flare Systems Design Specification Sheet - Flares
Flare Systems Design Data Sheet - Flare Knockout / Seal Drum
Flare Systems Design Flare Process Conditions
Flare Systems Design Data Sheet - Flare Utilities

Heat Transfer Equipment Data and Operating Limits - Watertube Boilers


Vessels API 620 Storage Tank Data Sheet
Engineering Data and Drawing Systems Drawing Completion Certificate (DCC)
Non-material Requirements for Uninterruptible Power
UPS, DC Systems and Power Electronics Supply (UPS)
Nonmaterial Requirements for Rectifiers/Battery
UPS, DC Systems and Power Electronics Chargers
Engineering Data and Drawing Systems Engineering Drawing Access Request
Inspection Engineering On-Stream Inspection (OSI)
Vessels Precommissioning - Pressure Vessels
Vessels Precommissioning - Storage Tanks
Heat Transfer Equipment Precommissioning - Heat Exchangers
Heat Transfer Equipment Precommissioning - Fin Fan
Heat Transfer Equipment Precommissioning - Blowers
Heat Transfer Equipment Precommissioning - Furnaces And Heaters
Heat Transfer Equipment Precommissioning - Boilers
Pumps, Seals and Mixers Precommissioning - Centrifugal Pumps
Precommissioning - Positive Displacement Pumps
Pumps, Seals and Mixers (Reciprocating)
Pumps, Seals and
Compressors, Mixers
Gears and Steam Precommissioning - Submersible Pumps
Turbines Precommissioning - Gears
Instrumentation Precommissioning - Transmitters
Instrumentation Precommissioning - Transducers
Instrumentation Precommissioning - Switches
Instrumentation Precommissioning - Indicators
Precommissioning - Orifice Plates, Venturis And Lo-Loss
Instrumentation Tubes
Instrumentation Precommissioning - Control Valve
Instrumentation Precommissioning - Thermocouples

Instrumentation Precommissioning - Resistance Temperature Detectors


Instrumentation Precommissioning - Controllers

Instrumentation Precommissioning - Instrument Air Line Pressure Test


Precommissioning - Turbine, Positive Displacement, and
Instrumentation Magnetic Flow Meters

Instrumentation Precommissioning - Pitot Tubes/Annubars Flow Meters

Saudi Aramco: Company General Use


Instrumentation Precommissioning - Installation Inspection

Instrumentation Precommissioning - Loop Check Cover Sheet

Instrumentation Precommissioning - Instrument and Control Cables


Instrumentation Precommissioning - Vibration
Instrumentation Precommissioning - Temperature Monitor

Instrumentation Precommissioning - H2S Monitoring System


Precommissioning - Combusatble Gas Monitoring
Instrumentation System
HVAC Precommissioning - HVAC

HVAC Precommissioning - Centrifugal Compressors


Precommissioning - Positive Displacement Compressor
HVAC
Compressors, Gears and Steam (Reciprocating)
Turbines Precommissioning - Steam Turbines

Gas Turbines and Diesel Engines Precommissioning - Combustion Gas Turbines


Gas Turbines and Diesel Engines Precommissioning - Diesel Engine
Pumps, Seals and Mixers Precommissioning - Mixers
Piping Precommissioning - Piping, General

Piping Precommissioning - Piping, Special Purpose


Piping Precommissioning - Valves

Piping Precommissioning - Plumbing and Non-Electric Utilities


Electrical Substations Equipment Precommissioning - Testing Guide Lines
Electrical Substations Equipment Precommissioning - Battery System
Precommissioning - Uninterruptible Power Supply
UPS, DC Systems and Power Electronics System
Electrical Substations Equipment Precommissioning - Protective Relays

Electrical Substations Equipment Precommissioning - Instrument Transformers


Electrical Substations Equipment Precommissioning - Metering
Electrical Substations Equipment Precommissioning - Switchgear-General

Electrical Substations Equipment Precommissioning - Low Voltage Motor Controlgear

Electrical Substations Equipment Precommissioning - High Voltage Motor Controlgear

Electrical Substations Equipment Precommissioning - Automatic Transfer Switches

Electrical Substations Equipment Precommissioning - SF-6 Pad-Mounted Switchgear

Saudi Aramco: Company General Use


Electrical Substations Equipment Molded Case Circuit Breakers
Electrical Substations Equipment LV Power Circuit Breakers
Electrical Substations Equipment HV Power Circuit Breakers
Electrical Substations Equipment HV Dead Tank SF6 Circuit Breakers
Electrical Substations Equipment LV Cables
Electrical Substations Equipment HV Cables 5-15-36 kV
Electrical Substations Equipment HV Cables 69-115 kV
Electrical Substations Equipment Dry Type Power Transformers
Electrical Substations Equipment Oil Filled Power Transformers
Electrical Substations Equipment Dehydrator -Desalter Transformers
Electrical Substations Equipment Outdoor Bus
Electrical Substations Equipment Outdoor Substation Equipment
Electrical Substations Equipment Surge Arrestors
Electrical Substations Equipment Metal Enclosed Bus
Electrical Substations Equipment Diesel Electric Generators
Electrical Substations Equipment VFD's For NEMA Frame Motors
Nema Frame, Form Wound Induction and Synchronous
Motors and Generators Motors
Electrical Substations Equipment Grounding
Electrical Substations Equipment Lighting
Electrical Substations Equipment Heat Tracing

Cathodic Protection Precommissioning - Cathodic Protection Rectifier


Precommissioning - Cathodic Protection Photovoltic
Cathodic Protection Power System
Precommissioning - Cathodic Protection Plant Potential
Cathodic Protection Survey
Precommissioning - Cathodic Protection External Tank
Cathodic Protection Bottom Potential Survey
Precommissioning - Cathodic Protection Tank Internal
Cathodic Protection Potential Survey
Precommissioning - Cathodic Protection Well
Cathodic Protection Casing/Flowline Potential Survey
Precommissioning - Cathodic Protection Pipeline
Cathodic Protection Potential Survey
Precommissioning - Cathodic Protection Submarine
Cathodic Protection Pipeline Potential Survey

Precommissioning - Cathodic Protection Offshore


Cathodic Protection Platform/Well Casing Potential Survey
Precommissioning - Onshore Anode Bed Commissioning
Cathodic Protection Data Sheet
Precommissioning - Offshore Anode Bed Commissioning
Cathodic Protection Data Sheet

Saudi Aramco: Company General Use


Polythionic Acid SCC Mitigation - Materials Selection and
Effective Protection of Austenitic Stainless Steels and
Corrosion Control other Austenitic Alloys
Load Management for Energy Efficiency: Pumps and
Energy Systems Optimization Compressors

Environmental Unconventional Gas Development in Saudi Aramco


Energy Systems Optimization Energy Performance Indices
Quick Energy Assessment Methodology for Energy
Energy Systems Optimization Efficiency Optimization

Energy Systems Optimization Steam Trap Management for Energy Efficiency


Load Management for Energy Efficiency: Heat Transfer
Energy Systems Optimization Equipment

Energy Systems Optimization Pinch Technology for Energy Efficiency Optimization


Energy Conservation Requirements in Saudi Aramco
Engineering Standards and Materials System
Energy Systems Optimization Specifications
New Projects Energy Efficiency Optimization Review
Energy Systems Optimization Methodology
Corrosion Control Corrosion Control in Amine Units
Atmospheric Oil Degassing, Spheroids and Stabilizers
Corrosion Control Corrosion Control
Corrosion Control Chemical Injection Systems
Corrosion Control Crude Unit Corrosion Control
Corrosion Control GOSP Corrosion Control
Corrosion Control Pipeline Corrosion Control

Corrosion Control List of Sour and Non-Sour Crude Service Pipelines

Corrosion Control Corrosion Control in Sulfur Recovery Units


Corrosion Control Corrosion Control in Desalination Plants

Materials Engineering Stainless Steel Fabrication, Testing and Installation


Overview of In-House Combined Heat and Power
Energy Systems Optimization Optimization Model
Geotechnical Sand Control Methods

Corrosion Control Corrosion Control in Vacuum Distillation Units


Corrosion Control Cooling Systems Corrosion Control
Optimizing Design and Operation of Reverse Osmosis
Environmental Plants
Corrosion Control Corrosion Control in Boilers

Saudi Aramco: Company General Use


Energy Systems Optimization Energy Assessment for Efficiency Optimization in GOSP
Consulting Services Assets Repair History SAP Input

Corrosion Control Corrosion Management Program (CMP) Manual

Corrosion Control Attachment 1 - Manage Corrosion at Design


Attachment 2 - Manage Corrosion at Procurement and
Corrosion Control Construction
Attachment 3 - Manage Corrosion at Operate and
Corrosion Control Maintain

Consulting Services Attachment 4 - Manage Corrosion at Decommissioning

Corrosion Control Attachment 5 - Damage Mechanism Narratives


Plant Performance and Capacity Testing Procedure for
Oil and Gas Process Engineering Upstream Crude Processing
Corrosion Control Corrosion Monitoring Best Practice

Process Control LPG MEROX RSH Extraction Units Best Practice


Process Control Proactive Process Monitoring Programs

Guidelines for Conducting Value Engineering on


Consulting Services Mandatory Saudi Aramco Engineering Requirements
Facilities Planning Project Synergy Planning Guidelines
Facilities Planning Business Case Development Guidelines
Facilities Planning Master Plan Development Guidelines

Energy Systems Optimization Plant Energy Management Program Guidelines

Process Engineering Operating Window for Hydrocracking Units

Other Novel Process for Reaction Furnace Cold Startup

Qualification Criteria and Approved Service Providers for


Asset Management Reliability, Availability and Maintainability (RAM) Study

Energy Systems Optimization Energy Management Program Assessment Guidelines

Flow Assurance Multiphase Flow Guidelines for In-Plant Piping

Corrosion Control Supplement to Chemical Cleaning Procedures

Energy Systems Optimization Non-Industrial Energy Use Intensities (EUIs)

Saudi Aramco: Company General Use


Qualification of Service Providers for Corrosion
Management Program (CMP) Deployment for Existing
Corrosion Control Facilities

Grid Connected Solar Photovoltaic (PV) System Design,


Energy Systems Optimization Installation, Commissioning and Maintenance

Oil and Gas Process Engineering Gas Processing Technology Selection Guidelines
Geotechnical Controlled Low-Strength Material (CLSM)

Recommended Consultants for Industrial/Non-Industrial


Energy Systems Optimization Energy Assessment Studies
Oil and Gas Process Engineering Sampling Crude Oil for BS&W and Salt
Combined Heat and Power Advisory tool for Operational
Energy Systems Optimization Energy Efficiency
Energy Systems Optimization Definitive Energy Assessment Guidelines

Energy Systems Optimization Bin Weather Data Tool for Energy Calculation
Energy Systems Optimization Appendix A - (Electronic Weather Data)

Process Engineering Process Guidelines for Selecting Organic Rankine Cycle


Energy Systems Optimization Energy Intensity KPI Guidelines

Process Engineering Design Guidelines: Gas and Liquid


Oil and Gas Process Engineering Hydrocarbon Filtration Systems

Asset Management Reliability Terms, Definitions and Abbreviations


Materials Selection and Cleanliness of Piping Systems in
Corrosion Control Oxygen Service

Geotechnical Dynamic Compaction Design and Quality Control

Geotechnical Dynamic Replacement Design and Quality Control


Drilling & Workover Downhole Material Selection Process for Downhole Completion
Equipment Equipment
Cleaning of Plate Heat Exchanger Used in Diesel
Process Engineering Hydrotreating Units
Guidelines for Technical Assessment of Manufacturers
Trays and Packing Process Design of Trays and Packing

Trays and Packing Process Design Guidelines for Distillation Column Internals Inspection

Guidelines for Technical Assessment of Manufacturers


Vessels of Pressure Vessels and Storage Tanks

Saudi Aramco: Company General Use


Qualification Criteria for Cr-Mo Pressure Vessel
Vessels Manufacturers
Heat Transfer Equipment Guidelines for Retubing Heat Exchangers
Performance Enhancement to Existing Air-Cooled Heat
Heat Transfer Equipment Exchangers
Consulting Services Process Heaters Optimizations

Guidelines for Conducting Heat Transfer Equipment


Heat Transfer Equipment Manufacturing Facility Technical Survey
Sootblowers Operation, Inspection, and Maintenance
Heat Transfer Equipment Guidelines
Heat Transfer Equipment Burners Inspection and Maintenance
Centrifugal Pumps Dynamic Analysis Factory Acceptance
Pumps, Seals and Mixers Test
General Purpose Steam Turbines Dynamic Analysis
Consulting Services Factory Acceptance Test
Special Purpose Steam Turbines Dynamic Analysis
Consulting Services Factory Acceptance Test
Synchronous Motors Dynamic Analysis Factory
Consulting Services Acceptance Test
Induction Motors Dynamic Analysis Factory Acceptance
Consulting Services Test

Packaged, Integrally Geared Centrifugal Air Compressor


Consulting Services Dynamic Analysis Factory Acceptance Test

Asset Management Field Reliability Unit Guidelines and Procedures


Preventive Maintenance Optimization Guidelines and
Asset Management Procedures
Preventive Maintenance Optimization Guidelines and
Asset Management Procedures
Guidelines for Surveying Manufacturing Facilities of
Gas Turbines and Diesel Engines Rotating Equipment
Air Cooled Heat Exchangers (Fin-Fans) Reliability
Vibration and Lubrication Document
A User Guide to Root Cause Analysis Guidelines and
Asset Management Procedures

Pumps, Seals and Mixers Rotating Equipment Piping Strain Diagnosis

Procedure for Assessing the Accuracy of Field Data-


Consulting Services Collectors and Allied Equipment
Pumps, Seals and Mixers Guidelines for Holset Coupling Setup
Guidelines for Identifying and Eliminating The Root
Pumps, Seals and Mixers Cause of Rotor Partial Rub

Saudi Aramco: Company General Use


Asset Management Equipment Criticality Assessment

Compressors, Gears and Steam Torsional Analysis Requirements for Synchronous Motor
Turbines Driven Compressor Train

Consulting Services Rotordynamic Design Review - Lateral Analysis


Guidelines for Vibration Offline Condition Monitoring
Consulting Services Program

Pumps, Seals and Mixers Pumps Retrofit with Non-Metallic Components

Vibration and Lubrication Compatibility Check of Turbine Oil of Different Brand

Recommended Setup for Existing Online Condition


Consulting Services Monitoring System for Rotating Machinery
Vibration and Lubrication Oil Condition Monitoring Process
Piping and Structural Vibration Measurements and
Vibration and Lubrication Evaluations
Prevention of Rotating Equipment Trips on Low-Low
Vibration and Lubrication Lube-Seal Oil Pressure

Selection and Application of Reinforced Fiber Glass Lay


Paints and Coatings up System for Repair of Storage Tank and Vessels

Guidelines for Surveying Carbon Steel Pipe Coating


Paints and Coatings Applicators and Coating Manufacturers
Robotic Coating Application on Internal Girth Welds of
Paints and Coatings Pipe Strings

Instrumentation Process Flowmeter Calibration and Validation


Calibration of Combustible Gas and Hydrogen Sulfide
Instrumentation Detectors
PROACTIVE Analyzer Systems Maintenance and
Instrumentation Inspection Practices
Instrumentation Validation of Process Analyzer
Instrumentation In-Place Testing of Safety Valves

Instrumentation Troubleshooting Control Valve Seat Leakage


Selection of Recycle Valves for Salt Water Disposal
Instrumentation Pumps
FOUNDATIONâ„¢ fieldbus (FF) Physical Layer
Instrumentation Commissioning
Installation Guidelines for Instrumentation Wiring &
Instrumentation Terminal Blocks
HVAC Energy-Efficient Buildings

Saudi Aramco: Company General Use


Introduction to Industrial Refrigeration Systems
Consulting Services Targeting
Guidelines for Technical Assessment of HVAC Equipment
HVAC Manufacturing Facilities

Energy Systems Optimization Non-Residential Buildings Energy Audit Procedures

Energy Systems Optimization Residential Buildings Energy Audit Procedures


Gas Turbines and Diesel Engines Heavy Duty Gas Turbines Inspections
Compressors, Gears and Steam
Turbines Site Performance Testing of Centrifugal Compressors

Piping Wall Thickness Selection of Transportation Pipelines


Piping Design of Submarine Pipelines
Materials Engineering Guidelines for Conducting Pipe Mill Survey

Guidelines for Surveying Manufacturing Facilities of


Non-Metallic Reinforced Thermoset Resin Piping

Piping Piping Vibration Measurements and Assessment


Piping Piping Stress Analysis Review

Guidelines for Conducting Flanges Manufacturing


Materials Engineering Facility Technical Assessment

Guidelines for Conducting Technical Assessment of


Materials Engineering Fitting Manufacturing Facilities

Piping Spring Supports Design, Construction, Inspection


Piping and Maintenance Guidelines
Piping Guidelines for Evaluating Pipe Movement
Guidelines for Conducting a Valve Manufacturing Facility
Valves Technical Survey

Piping Guidelines for On-Stream Scraping of Pipelines


Guidelines for Surveying Steel Mills Manufacturing HIC
Materials Engineering Resistant Materials
Guidelines for Surveying Manufacturing Facilities of
Piping Scraper Traps

Offshore Structures Inspection Guidelines of Offshore Structures

Onshore Structures Wind Loads on Piperacks and Open Frame Structures


Onshore Structures Steel Piperack Design
Onshore Structures Seismic Design of New Buildings

Saudi Aramco: Company General Use


Onshore Structures Plant Survey

Onshore Structures Dynamic Analysis of Above Ground Structures


Guidelines for the Condition Assessment of Large
Consulting Services Electrical Generators

UPS, DC Systems and Power Electronics Selection and Design of Battery Monitoring System

Consulting Services Adjustable Frequency Drives - Selection and Application

Electrical Substations Equipment New Electrical Equipment Plant Assessment


Consulting Services Transformer Factory Acceptance Tests

Synchronous Generators and Associated Control


Equipment Datasheets Required for Power System
Consulting Services Transient Stability Studies

Consulting Services Inspection and Maintenance for Wooden Poles


Electrical Substations Equipment Power Transformer Diagnostics
Motor Partial Discharge Monitors - Selection and
Motors and Generators Application

Electrical Substations Equipment Captive Motor-Transformers: Design and Selection


Electrical Systems Designs and Preparation & Application Procedure for High Voltage
Automation Insulators Coating

Electrical Substations Equipment Electrical Design in Hazardous (Classified) Areas

Motors and Generators Guidelines for Designing Excitation Systems


Troubleshooting, Repair Procedures, and Up-rating of
Motors and Generators Large Electrical Generators
Electrical Substations Equipment Power Transformer Maintenance
Grassroots Project Energy Assessment Study Scope of
Energy Systems Optimization Work
Guide on Induction Motors Factory Acceptance Test
Motors and Generators Procedures
Guide on Synchronous Motors Factory Acceptance Test
Motors and Generators Procedures
Electrical Substations Equipment Transformers Condition Assessment
Electrical Systems Designs and Investigation Process for Power Cable, Joint and
Automation Termination Failures
Electrical Substations Equipment Paralleling Mismatched Transformers

Electrical Substations Equipment Guide on Safe Handling of Metal Clad Switchgear

Saudi Aramco: Company General Use


Guidelines for Minor and Major Preventive Maintenance
UPS, DC Systems and Power Electronics of UPS Systems
Appendix A: Minor PM quarterly UPS system in
UPS, DC Systems and Power Electronics operation

UPS, DC Systems and Power Electronics Appendix B: Major PM - annual UPS system shutdown
UPS, DC Systems and Power Electronics Appendix C
Guidelines for Motors and Generators Condition
Electrical Substations Equipment Assessment
Switchgear and Controlgear Condition Assessment
Electrical Substations Equipment Guidelines
UPS, DC Systems and Power Electronics Battery Condition Assessment
Guidelines for the Condition Assessment of
UPS, DC Systems and Power Electronics Uninterruptable Power Supply
Guidelines for the Condition Assessment of Rectifiers
UPS, DC Systems and Power Electronics Battery Chargers
Adjustable Frequency Drive, Application Qualification
Motors and Generators Procedure
Electrical Systems Designs and
Automation Guidelines for Conducting Arc Flash Hazard Analysis
Electrical Systems Designs and
Automation Ground Grid Design Guidelines
Electrical Systems Designs and Guidelines for Advanced Metering Infrastructure: Design
Automation and Specifications
Procedure for Conducting Harmonic Measurements and
Consulting Services Studies

UPS, DC Systems and Power Electronics Photovoltaic Panels Qualification Guidelines


Electrical Systems Designs and Arc Flash Hazard Analysis Procedure Using ETAP
Automation Software

Motors and Generators Adjustable Frequency Drive Troubleshooting


UPS, DC Systems and Power Electronics Solar Inverter Qualification Guidelines
Electrical Systems Designs and Procedure for Conducting Time Domain Motor
Automation Acceleration Studies

Motors and Generators Condition Assessment of Critical Large Motors


Electrical Systems Designs and
Automation Engineering Solutions to Reduce Arc Flash Hazard
Onshore Structures Anchor Bolt Design and Installation
Onshore Structures Spread Footings Design
Onshore Structures Vertical Vessel Foundation Design
Heat Exchanger and Horizontal Vessel Foundation
Onshore Structures Design
Onshore Structures Storage Tank Ringwall Foundation Design

Saudi Aramco: Company General Use


Consulting Services Wind Loads on Pressure Vessels
Geotechnical Deadman Anchor Design Guide

Onshore Structures Design of Concrete Masonry Walls/Buildings


Mix Design and Construction of Sulfur Extended Asphalt
Civil Concrete

Geotechnical Vibro Compaction Design and Quality Control

Geotechnical Vibro Stone Column Design and Quality Control


Geotechnical Rapid Impact Compaction (RIC)
Design Information Requirements in Architectural
Civil Submissions
Environmental Hydrocarbon Tank Cleaning Methods

Qualification Criteria and Approved Consultants for


Environmental Impact Assessments and Construction
Environmental Environmental Monitoring
Proactive Monitoring and Alerting Solution for Plant
Plants Networks Networks and Systems
Plants Networks Plant Systems Antivirus Protection
Communications VoIP Security Best Practices

Plants Networks Whitelisting in Plant Servers and Workstations

Centralized Account Management Architecture for


Plants Networks Plants Networks and Systems (PN&S)
Welding Best Practice for the Welding of Cast Iron
Repair of Tube to Tubesheet Welds and Retubing of
Welding Sulfur Condensers
Welding Welding of Duplex Stainless Steels

Cathodic Protection Cathodic Protection Design Package Preparation


Cathodic Protection Rectifier (Tap Adjustable) Factory
Cathodic Protection Acceptance Tests

Cathodic Protection Cathodic Protection Installation Requirements

Plants Survey and Technical Assessment of Cathodic


Cathodic Protection Protection Equipment and Materials Manufacturers

Factory and Site Acceptance Testing for Truck Bottom


Custody Measurement Loading and Unloading Metering Systems
Flow Meter Calibration - Royalty/Custody Liquid
Custody Measurement Transfer Applications

Saudi Aramco: Company General Use


Factory and Site Acceptance Testing Requirements for
Custody Measurement Gas Metering Systems

Metering Supervisory Computer for Custody Transfer


Custody Measurement Measurement of Hydrocarbon Liquids

Metering Supervisory Computer for Custody Transfer


Custody Measurement Measurement of Hydrocarbon Gases

Process Optimization Solutions Plant Information System Data Compression

Process Control Functional Specifications for Process Control Systems

Process Control Project Specification for PCS Scope of Work


Functional Specification for Process Control Systems
Process Control (PCS) and Integration
Functional Specification for Distributed Control Systems
Process Control (DCS)
Functional Specification for Emergency Shutdown
Process Control Systems (ESD)
Functional Specification for Compressor Control Systems
Process Control (CCS)

Functional Specification for Data Acquisition and


Process Optimization Solutions Historization Systems (DAHS)
Functional Specification for Alarm Management Systems
Process Control (ALMS)
Functional Specification for System Design Document
Process Control (SDD)
Functional Specification for Maintenance Training
Process Control System (MTS)
Project Specification for Operator Training Simulator
Process Optimization Solutions (OTS)

Functional Specification for Supervisory Control and


Process Control Data Acquisition Systems (SCADA)

Process Control Functional Specification for Remote Terminal Unit (RTU)


Functional Specification for Leak Detection Systems
Process Control (LDS)
Functional Specification for Terminal Management
Process Control System (TMS)
Functional Specification for Production Operation
Process Optimization Solutions Management (POM)

Saudi Aramco: Company General Use


Functional Specification for Maintenance Operation
Process Optimization Solutions Management (MnOM)
Functional Specification for Quality Operation
Process Optimization Solutions Management (QOM)
Functional Specification for Inventory Operation
Process Optimization Solutions Management (IOM)
Process Optimization Solutions Control Layer Performance Monitoring
Process Optimization Solutions Steady State Process Modeling
Process Automation System Condition Assessment
Process Control Survey
Process Optimization Solutions Modeling Hydrocracker Units in RefSys
Wireless Process Remote Monitoring and Control Using
Plants Networks SMS
Wash Water Injection Facilities for Hydroprocessing
Process Engineering Units
Process Optimization Solutions Dynamic Process Modeling Best Practice
Flow Assurance Flow Assurance
Industrial Facilities Initial Energy Assessment Study
Energy Systems Optimization (IEAS) Guidelines
Energy Systems Optimization Optimization Solutions Development
Data Backup and Restore for Plants Networks and
Plants Networks Systems (PN&S)

Plants Networks Network Devices Hardening Guide – Alcatel Switches


Network Devices Hardening Guide – Allied Telesis
Plants Networks Switches

Plants Networks Network Devices Hardening Guide – Cisco Switches

Plants Networks Network Devices Hardening Guide – Dell Switches


Network Devices Hardening Guide – Emerson DeltaV
Plants Networks Smart Switches
Network Devices Hardening Guide – Enterasys
Plants Networks Switches
Network Devices Hardening Guide – Hewlett Packard
Plants Networks Switches

Plants Networks Network Devices Hardening Guide – 3COM Switches


Network Devices Hardening Guide – Juniper SRX
Plants Networks Service Gateway
Network Devices Hardening Guide – RuggedCom
Plants Networks Switches

Plants Networks Operating Systems Hardening Guide – Windows 7

Saudi Aramco: Company General Use


Plants Networks Operating Systems Hardening Guide – Windows 8

Plants Networks Operating Systems Hardening Guide – Windows 2003


Operating Systems Hardening Guide – Windows
Plants Networks Server 2008
Operating Systems Hardening Guide – Windows
Plants Networks Server 2000

Plants Networks Operating Systems Hardening Guide – Windows Vista

Plants Networks Operating Systems Hardening Guide – Windows XP

Flare Systems Design Design Guidelines for Flare Gas Recovery Systems
Flare Systems Design Flare Gas Recovery
Process Automation Systems Cybersecurity
Plants Networks Obsolescence Management
Implementing Security Controls for Removable Media
Plants Networks Devices

Functional Specification for Process Automation System


Plants Networks (PAS) Cybersecurity Requirement

Guidelines for Disaster Recovery Plan Development for


Process Control Process Automation Systems (PAS)
Guidelines for Virtual Servers and Thin Clients for
Process Control Process Automation Systems
Flow Assurance Production Management System
Guideline for Development of Safety Requirement
Process Control Specification (SRS)

Process Optimization Solutions Advanced Process Control (APC) System Design


Process Optimization Solutions Inferential Properties for APC Systems

Flare Systems Design Equipment Overpressure Scenario Identification


Network Devices Hardening Guide- Siemens Scalance X-
Plants Networks 200 Series
Network Devices Hardening Guide -GE Lantronix DSTni
Plants Networks Xpress
Network Devices Hardening Guide -Hirschmann
Plants Networks Switches

Plants Networks Network Devices Hardening Guide -Moxa Switches


Operating Systems Hardening Guide -Windows Server
Plants Networks 2012

Saudi Aramco: Company General Use


Juniper SRX Intrusion Detection Signatures Offline
Plants Networks Update

Plants Networks RDP Security Controls and Mitigations Guidelines

Implementing Secure Shell (SSH) File Transfer Protocol


Plants Networks (SFTP) on Process Automation Systems
Performing Offline Update to PAN WSUS Server (Import
Plants Networks and Export)
Plants Networks Plant's Cyber Security Incident Response

Project Management Office Surveying Services Division Project Control


Corrosion Control Chemical Cleaning of Boilers

Corrosion Control Lay-Up and Preservation of Steam Generation Systems

Instrumentation Pressure Relief Valve Conventional and Balanced Types


Chemical Cleaning and Flushing of Lube/Seal Oil and
Corrosion Control Fluid Power Systems
Standards Management Metric Units of Weights and Measures
Engineering Data and Drawing Systems Saudi Aramco Standard Drawings

Inspection Engineering Test Supplements for Welder Performance Qualification


Inspection Engineering On-Stream Inspection Administration

Non-Destructive Testing Qualification of Saudi Aramco NDT Personnel

Environmental Radiation Protection for Industrial Radiography

Non-Destructive Testing Qualification of Non-Saudi Aramco NDT Personnel


Non-Destructive Testing Radiographic Examination
Non-Destructive Testing Magnetic Particle Examination
Non-Destructive Testing Liquid Penetrant Examination
Non-Destructive Testing Manual Ultrasonic Thickness Testing
Project Quality Inspection Coverage on Projects
Inspection Requirements for Contractor Procured
Project Quality Materials and Equipment
Approval Procedure for Ready-Mixed Concrete Mix
Project Quality Design
Project Quality Guidelines for Contractor's Quality Plan
Tracking and Reporting of Welding, NDT, and Pressure
Project Quality Testing for Capital Projects

Inspection Engineering Testing and Inspection (T&I) Reporting Procedure

Saudi Aramco: Company General Use


Preparation of Saudi Aramco Materials System
Standards Management Specifications
Project Management Office Project Execution Plan

Security Execution Requirements for Security Projects


Qualification Procedures for Protective Coatings and
Paints and Coatings Abrasive Blasting Materials
Project Management Office Operating Instructions for New Facilities
Project Management Office Project Records

Standards Management Preparation of Saudi Aramco Engineering Standards

Engineering Data and Drawing Systems Security and Control of Saudi Aramco Engineering Data

Environmental Project Environmental Impact Assessments

Instructions for the Development and Maintenance of


Vessels "Inspectable Commodities" Engineering Standards

Standards Management Preparation of Saudi Aramco Engineering Procedures


Design Basis Scoping Paper (DBSP) Preparation and
Facilities Planning Revision Procedure
Saudi Aramco Management of Electric Equipment
Electrical Substations Equipment Obsolescence Program

Electrical Substations Equipment Saudi Aramco Management of Power Transformers


Electrical Substations Equipment Transformer Scoring Procedure

Safety Requirements for Temporary Tents, Canopies and


Loss Prevention Membrane Structures
Project Management Office Project Proposal
Training and Development Project Training Impact Assessment
Saudi Aramco Management of HVAC Equipment
HVAC Replacement Program
HVAC HVAC Equipment Smart Matrix

Multi-Phase Flow Meters Radioactive Sources Handling


Multi-Phase Flow Meters (MPFM) and Management Procedure
Flow Loop Test Performance Evaluation for Multi-Phase
Multi-Phase Flow Meters (MPFM) Flow Meters
Performance Verification Field Test of Multi-Phase Flow
Multi-Phase Flow Meters (MPFM) Meters
Determining Rupture Exposure Radius of Onshore Oil
Loss Prevention and Gas Wells

Saudi Aramco: Company General Use


Mandatory Engineering Standards and Codes for Non-
Onshore Structures Industrial, Public and Government Facilities
Consulting Services Appendix to SAEP-148
Risk Assessment Requirements for High Integrity
Loss Prevention Protection Systems
Project Management Office SCDRs Approval Form
Preparation of Restricted Vendor Lists for Process
Process Control Automation Systems
Vibration Spectrum Analyzer and Sensors Accuracy
Vibration and Lubrication Assessment
Project Execution Guide for Process Automation
Process Control Systems

Process Control Preparation of Functional Specification Documents

Preparation of technical Bid Evaluation Plan Document


Process Control for Process Automation Systems
Process Control Preparation of System Design Documents
Process Control Configuration and Graphics Guidelines

Process Control Preparation of PAS Integration Specifications Document


Process Control Installation and Checkout Plan
Process Control Main Automation Contractor
Environmental Waste Minimization Assessments
Corrosion Control Cleaning of Plant Equipment and Piping
Inspection Engineering Equipment Inspection Schedule
Knowledge Management Saudi Aramco Engineering Reports
Instructions for Establishing and Maintaining Corporate
Knowledge Management Technical Alert

Project Execution Requirements for Saudi Aramco


Custody Measurement Royalty Custody Metering Systems
Custody Measurement Tank Calibration Requirements
Project Management Office Estimate Preparation Guidelines

Process Hazard Analysis Safety Integrity Level Assignment and Verification


Project Management Office Capital Project Benchmarking Guidelines

Flow Assurance Pipeline Surge Analysis and Flow Assurance

Custody Measurement Radar Tank Gauging System Verification Requirements


General Instructions and Guidelines for Online Valve
Valves Preventive Maintenance

Saudi Aramco: Company General Use


Instructions for Establishing and Maintaining Mandatory
Standards Management Saudi Aramco Engineering Requirements

Instructions for Obtaining a Waiver of a Mandatory


Standards Management Saudi Aramco Engineering Requirement
Standards Management Attachment A of SAEP-302
Standards Management Attachment B of SAEP-302
Standards Management Mandatory and Recommended Standards
Electrical Systems Designs and
Automation Engineering Reviews of Project Documentation
Engineering Data and Drawing Systems Saudi Aramco Library Drawings
Piping Assessment of Pipeline Defects
Inspection Engineering Operations Inspection Unit Reviews
Inspection of Community and Operations Support
Inspection Engineering Facilities
Corporate Equipment and Spare Parts Data
Projects Procurement Requirements
Piping Piping and Pipeline Repair

Equipment and Spare Parts Data Requirements for


Projects Procurement Contractor Procured Equipment
Projects Procurement Appendix A - Glossary of Terms
Appendix B - Spare Parts Data Package Status Report
Projects Procurement (SPDPSR) Required Format

Appendix C - Instructions to Suppliers for Providing


Spare Parts and Operating Materials Data for New
Projects Procurement Equipment Purchased

Projects Procurement Appendix D - Spare Parts Data Package (SPDP) Checklists


Projects Procurement Appendix E - SPDP Waiver Procedure

Equipment and Spare Parts Data Requirements for


Projects Procurement SAPMT Originated Requisitions
Projects Procurement Appendix A - Glossary of Terms
Appendix B - Spare Parts Data Package Status Report
Projects Procurement (SPDPSR) Required Form

Appendix C - Instructions to Suppliers for Providing


Spare Parts and Operating Materials Data for New
Projects Procurement Equipment Purchased

Projects Procurement Appendix D - Spare Parts Data Package (SPDP) Checklists


Projects Procurement Appendix E - SPDP Waiver Procedure

Saudi Aramco: Company General Use


Projects Procurement Equipment and Spare Parts Data Requirements
Projects Procurement Appendix A - Glossary of Terms
Appendix B - Spare Parts Data Package Status Report
Projects Procurement (SPDPSR) Required Form

Appendix C - Instructions to Suppliers for Providing


Spare Parts and Operating Materials Data for New
Projects Procurement Equipment Purchased

Projects Procurement Appendix D - Spare Parts Data Package (SPDP) Checklists


Projects Procurement Appendix E - SPDP Waiver Procedure

Piping Installation of Hot Tapped and Stopple Connections


Performance Qualification Requirements of Coating
Project Quality Personnel
Testing and Inspection (T&I) of Shell and Tube Heat
Inspection Engineering Exchangers
Pressure Relief Devices - Testing and Inspection
Inspection Engineering Requirements

Environmental Environmental Performance Assessment (EPA) Program


Performance Qualification Testing and Certification of
Inspection Engineering Saudi Aramco Welders
Saudi Aramco Brazers Performance Qualification and
Inspection Engineering Tracking Requirements

Contract Welders and Brazers Performance Qualification


Inspection Engineering Testing and Tracking Requirements

Project Quality Certification Review and Registration of Project Welders

Inspection Engineering Inspection Requirements for Pressurized Equipment

Disposal of Wastewater from Cleaning, Flushing and


Environmental Dewatering Pipelines and Vessels
Project Management Office Project Close-Out Report

Project Management Office Project Closeout Reports (Exhibit II - Checklist)


Project Closeout Reports (Exhibit III - Design Deficiency
Project Management Office Matrix)

Project Management Office Project Closeout Reports (Exhibit IV - Quantity Metrics)


Cathodic Protection Cathodic Protection Commissioning
Cathodic Protection Cathodic Protection Commissioning

Saudi Aramco: Company General Use


Cathodic Protection Cathodic Protection Monitoring
Cathodic Protection Cathodic Protection Monitoring

Retrieval, Certification and Submittal of Saudi Aramco


Engineering Data and Drawing Systems Engineering and Vendor Drawings
Heat Transfer Equipment Boiler Condition Assessment
Marine Dredging and Landfilling Approval and
Environmental Permitting
Air Dispersion Modeling, Emission Inventory, and Leak
Environmental Detection and Repair
Pumps, Seals and Mixers Equipment Life Cycle Cost Procedure

Engineering Data and Drawing Systems Engineering Drawings Emergency Delivery Plan

Inspection Engineering Risk-Based Inspection (RBI) for Saudi Aramco Facilities


Composite Non-Metallic Repair Systems for Pipelines
Non-Metallic and Pipework
Project Quality Supplying Material from Stockists

Chemical Cleaning, Disinfection, Post Treatment, and


Environmental Storage of Reverse Osmosis Membranes
Process Optimization Solutions Advanced Process Control (APC) Systems

Valves Valves Handling, Hauling, Receipt Tests, and Storage


Regular Maintenance and Testing for Industrial
UPS, DC Systems and Power Electronics Stationary Batteries
Piping Bolted Flange Joints Assembly
Welding Welding Procedures Review and Approval

High Integrity Protection Systems High Integrity Protection Systems Design Requirements
Materials Engineering Field Metallography and Hardness Testing

Management of Technologically Enhanced Naturally


Environmental Occurring Radioactive Material (NORM)
Biodiversity Protection Areas (Designation and
Environmental Management)

Custody Measurement Proving Systems Calibration Requirements


Facilities Planning Project Planning Guidelines

Flow Assurance Pipeline Simulation Model Development and Support

Process Optimization Solutions Process Simulation Model Development and Support


Pumps, Seals and Mixers Pump Spare Parts Reverse Engineering

Saudi Aramco: Company General Use


Roles and Responsibilities of Company Organizations for
Seismic Risk Assessment and Management Program
Onshore Structures (SRA&MP)
Project Management Office Value Improving Practices Requirements
Process Control Alarm System Management
Welding Pipelines Residual Magnetism Removal
Environmental Transportation of Radioactive Material
Environmental Hearing Conservation Program (HCP)
Inspection Engineering Plant Inspection Performance Index (PIPI)

Inspection Engineering High Integrity Protection Systems - Tracking Program


Inspection Engineering Electrical Inspection Requirements
Project Quality Equipment Deficiency Report
Project Quality Project Quality Issues Escalation Process

Approving Third Party Testing Laboratories,


Project Quality Geotechnical Engineering Offices, and Batch Plants

Inspection Engineering In-Service Inspection Requirements for RTR Pipe

Design of Thermoplastic Tight Fit Grooved and


Non-Metallic Perforated Liners for New and Existing Pipelines
Corrosion Control Cleaning of Pipelines

Environmental Radiation Protection Assessment (RPA) Program

Environmental Environmental Monitoring of Groundwater

Asset Management Integrity Operating Windows (IOWs) Procedure


Field Butt Fusion Welding and Qualification of
Polyethylene Pipe and Fittings for Water and Gas
Non-Metallic Services
Environmental Terrestrial Ecology Surveys
Project Quality Vendor Performance Escalation
Environmental Ship Ballast Water Sampling
Capital Program Efficiency Value Assurance Process

Flare Systems Design Guidelines for Facility Flaring Minimization Plan

Flare Systems Design Appendix 10 - Real-Time Flare Monitoring System (FMS)


Flare Systems Design Flare System Purge Gas Optimization
Qualification of Nonmetallic Pipe Installers, Supervisors,
Non-Metallic and Inspectors

Saudi Aramco: Company General Use


Configuration of Online Condition Monitoring Systems
Vibration and Lubrication for Rotating Machinery
Vibration Limits for Existing Rotating Machinery, Piping
Vibration and Lubrication and Structures

Energy Systems Optimization Capital Projects Energy Efficiency Optimization

Projects Procurement Instructions for Commodity Material Management


Environmental Chemical Hygiene Plan
Project Execution Requirements for Third Party
Custody Measurement Royalty/Custody Metering Systems

Guidelines for Screening and Qualifying Compatible


Flow Assurance Hydrate and Corrosion Inhibitors
Flow Assurance Drag Reducing Agent (DRA) Chemicals

Asset Management Assets’ Sparing Requirements and Guidelines


Gas Custody Measurement Claims Handling
Custody Measurement Requirements
Facilities Planning Master Plan Development Procedure
Process Design Guidelines - Crude and Vacuum
Process Engineering Distillation
Process Engineering Process Design Guidelines - Hydrocracking

Oil and Gas Process Engineering Process Design Guidelines - Sulfur Recovery
Process Engineering Process Design Guidelines- Hydrotreating

Process Engineering Process Design Guidelines - CCR Reforming

Process Engineering Process Design Guidelines - Naphtha Hydrotreating


Process Design and Operating Guidelines - Mercury
Oil and Gas Process Engineering Removal Unit

Geotechnical Geotechnical Engineering Procedures - Onshore

Environmental Comprehensive Environmental Health Assessment


Project Quality Inspection Coverage on C1 Projects
Plants Networks Plant Ethernet Networks Test Procedure

Plants Networks Managing PN&S Security Compliance Process


Risk Assessment Procedure for Plants Networks and
Plants Networks Systems
Capital Program Efficiency Portfolio Execution Planning (PXP)

Saudi Aramco: Company General Use


Saudi Aramco Information Technology System
Communications Obsolescence Program
Plot Plan Development and Control for Onshore
Facilities Planning Facilities

Technology Management Engineering Services Technology Deployment


Preventive Maintenance and Condition Assessment for
Communications Communication Towers
Lifecycle Management Procedures for Process
Process Control Automation Systems
Process Control Pipelines Leak Detection Systems
Testing Procedures for Process Automation Systems
Process Control (PAS)
Offshore Structures Decommissioning of Offshore Pipelines
Offshore Structures Decommissioning of Offshore Structures
Offshore Structures Subsea Pipeline Repair
Safety Procedure for Mini-copter UAV Operations at
UAV and Robotics Saudi Aramco
Process Engineering Project Process Design Development
Process Engineering Mass Balance Guidelines
Removable Media Usage for Process Automation
Plants Networks Systems

Plants Networks Saudi Aramco Industrial Control System Security

Saudi Aramco: Company General Use


Fire Protection Fire Training Ground Evolutions Plan
Fire Protection Fire Training Building Floor Plan
Fire Protection Evolutions Definitions
Fire Protection Class B Fire Station Scope of Work
Fire Protection Class C Fire Station Scope of Work

Oily Water Lift Stations (OWLS) Survey Appendices (A -


Inspection Engineering G)

Saudi Aramco: Company General Use


Corrosion Control Monthly Corrosion Report Template

Corrosion Control Corrosion Monitoring and Chemical Treatment Template

Project Quality General Requirements for Pressure Testing


Vessels Safety Instruction Sheet

Corrosion Control Hydrostatic Testing Fluids and Lay-Up Requirements


Oil and Gas Process Engineering Gas Oil Separation Plants (GOSPs)
Oil and Gas Process Engineering Crude Oil Stabilization
Process Design Criteria for Produced Water Treatment
Oil and Gas Process Engineering and Disposal

Oil and Gas Process Engineering Design of Hydrate Inhibition and Dehydration Systems
Process Design Guidelines Sour Water Stripper (SWS)
Process Engineering System

Oil and Gas Process Engineering Equipment Specific P&ID Templates (ESPT)
Reliability, Availability, and Maintainability (RAM) Study
Asset Management Execution

Asset Management Appendix A - Reliability and Maintenance (R&M) Data

Project Management Office Survey Coordinates, Datum's and Data Formats

Environmental Ambient Air Quality and Source Emissions Standards

Saudi Aramco: Company General Use


Environmental Protection of the Marine Environment

Environmental Wastewater Treatment, Reuse, and Disposal


Environmental Noise Control
Environmental Borrow Pit Requirements
Environmental Meteorological and Seismic Design Data
Geotechnical Geotechnical Engineering Requirements
Geotechnical Excavation and Backfill
Groundwater Monitoring Well Design, Installation, and
Environmental Decommissioning
Inspection Engineering On Stream Inspection Requirements

Engineering Data and Drawing Systems Saudi Aramco Engineering Drawing Preparation
Onshore Structures Preparation of Structural Calculations
Corrosion Control Oilfield Chemicals
Request for Technical Evaluation of New Chemical
Corrosion Control Product
Request for Technical Evaluation of Approved Chemical
Corrosion Control Product

Corrosion Control Field Technical Data for Corrosion Inhibitor Evaluation


Materials Engineering Positive Material Identification
Process Engineering Catalyst and Desiccant Selection
Environmental Water Treatment Chemicals
Environmental Management of Pyrophoric Wastes

Aviation Fuel Quality Aviation Fuel Quality Assurance Design Requirement


Industrial Drainage Industrial Drainage Systems
Industrial Drainage Closed Drain Systems (CDS)
Industrial Drainage Offshore Platform Drainage Systems

Energy Systems Optimization Combined Heat and Power Systems Optimum Design

Energy Efficiency for Non-Industrial Buildings Except


Energy Systems Optimization Low-Rise Residential Buildings

Energy Systems Optimization Energy Efficiency for Low Rise Residential Buildings
Energy Systems Optimization Energy Efficiency in Existing Buildings
Spacing and Diking for Atmospheric and Low-Pressure
Loss Prevention Tanks.
Loss Prevention Fireproofing for Plants

Loss Prevention Restrictions to Use of Cellars, Pits, and Trenches


Fire Protection and Safety Requirements for Offshore
Loss Prevention Production Facilities

Saudi Aramco: Company General Use


Safety Requirements for Plant and Operations Support
Loss Prevention Buildings
Loss Prevention Fire Water System Design
Loss Prevention Foam Systems
Portable, Mobile, and Special Fixed Firefighting
Loss Prevention Equipment
Loss Prevention Equipment and Piping Protective Guarding
Access, Egress, and Materials Handling for Plant
Loss Prevention Facilities
Loss Prevention Plant Layout
Safety Requirements: Refrigerated and Pressure Storage
Loss Prevention Tanks and Vessels

Loss Prevention Emergency Shutdown, Isolation, and Depressuring

Loss Prevention Fire Protection for Piers, Wharves and Sea Islands
Loss Prevention Onshore Wellsite Safety
Loss Prevention Aviation Obstruction Marking and Lighting
Loss Prevention Onshore and Nearshore Pipeline Safety
Loss Prevention Safety Identification and Safety Colors
Loss Prevention Electrical Area Classification
Loss Prevention Emergency Eyewashes and Showers

Fire and Safety Requirements for Bulk Plants, Air Fueling


Loss Prevention Terminals and Sulfur Handling Facilities

Loss Prevention Community and Facility Audible General Alarms


Trays and Packing Process Design Process Design of Trays and Packing
Vessels Design Criteria for Pressure Vessels

Vessels Repairs, Alterations, and Re-rating of Process Equipment

Vessels Design Criteria of Atmospheric and Low-Pressure Tanks

Vessels Repair, Alteration and Reconstruction of Storage Tanks

Vessels Design of Small Metallic Atmospheric Storage Tanks


Design of Fiberglass-Reinforced Plastic (FRP) Storage
Vessels Tanks
Environmental Underground Storage Tank System

Heat Transfer Equipment Design Criteria of Shell and Tube Heat Exchangers

Heat Transfer Equipment Design Criteria of Double Pipe Heat Exchangers

Saudi Aramco: Company General Use


Heat Transfer Equipment Design Criteria of Air-Cooled Heat Exchangers

Heat Transfer Equipment Design Criteria of Plate and Frame Heat Exchangers

Heat Transfer Equipment Design Criteria of Electric Heat Exchangers


Heat Transfer Equipment Design Criteria of Fired Heaters
Flare Systems Design System Design Criteria of Flares
Pumps, Seals and Mixers Centrifugal Pumps

Pumps, Seals and Mixers Positive Displacement Pumps - Controlled Volume


Submersible Pumps and Motors for Water Well and
Pumps, Seals and Mixers Offshore Service
Lubrication, Shaft Sealing and Oil Control Systems and
Vibration and Lubrication Auxiliaries
Cleanliness Standard for Lube/Seal Oil and Fluid Power
Vibration and Lubrication Systems
Requirements for Rotating Machinery Online Condition
Vibration and Lubrication Monitoring Systems

Coating Selection and Application Requirements for


Paints and Coatings Industrial Plants and Equipment
Internal and External Coatings for Steel Pipelines and
Paints and Coatings Piping
Approved Saudi Aramco Data Sheets for Pipeline and
Paints and Coatings Piping Coatings

Paints and Coatings Protective Coatings for Industrial Concrete Structures

Protective Coating Selection and Application


Paints and Coatings Requirements for Offshore Structures and Facilities
Thermal Spray Aluminum Coating by Arc Spray Process
for Structure Materials Against Atmospheric
Paints and Coatings Environment
Approved Saudi Aramco Data Sheets - Paints and
Paints and Coatings Coatings

Paints and Coatings Safety Requirements for Coating Applications


Storage, Handling, and Installation of Externally Coated
Paints and Coatings Pipe

General Specifications for External and Internal FBE


Paints and Coatings Coatings of Pipeline Field Girth Welds
Electric Submersible Pump ESP System - Design and Procurement
Electric Submersible Pump ESP System - Supplier Integration

Saudi Aramco: Company General Use


Electric Submersible Pump Electric Submersible Pump for Crude Oil Service
Instrumentation and Control Buildings - Basic Design
Instrumentation Criteria
Instrumentation Process Measurement
Combustible Gas and Hydrogen Sulfide in Air Detection
Instrumentation Systems
Process Analyzers Process Analyzer Systems
Instrumentation Pressure Relief Devices

Process Control Emergency Shutdown and Isolation Systems


Boiler and Combustion Systems Hazards Management
Instrumentation and Waterside Control
Process Heaters Instrumentation, Control and Safety
Instrumentation Systems
Instrumentation Surge Relief Protection Systems

Instrumentation Burner Management Systems for SRU Trains


Instrumentation Control Valves
Instrumentation Instrument and Plant Air Supply Systems
Instrumentation Electrical Systems for Instrumentation
Instrumentation Intrinsically Safe Systems
Instrumentation FOUNDATION¿ fieldbus (FF) Systems
Design and Installation of Heating, Ventilating and Air
HVAC Conditioning Systems
Air Conditioning Systems for Essential Operating
HVAC Facilities
HVAC Systems for Communications Facilities and Data
HVAC Centers
HVAC Building Management System
HVAC
Compressors, Gears and Steam Saudi Aramco Mechanical (HVAC) Code
Turbines
Compressors, Gears and Steam Basic Selection of Compressors
Turbines
Compressors, Gears and Steam Centrifugal Compressors
Turbines
Compressors, Gears and Steam Reciprocating Compressors
Turbines Steam Turbines
Gas Turbines and Diesel Engines Combustion Gas Turbines
Gas Turbines and Diesel Engines Diesel Engines
Pumps, Seals and Mixers Side-Entry Mixers
Applicable Codes and Standards for Pressure Piping
Piping Systems
Piping Piping Line Classes
Valves Selection of Valves

Piping Selection of Flanges, Stud Bolts and Gaskets

Saudi Aramco: Company General Use


Piping Limitations on Pipe Joints and Components
Piping Piping Flexibility Analysis

Piping Safety Instruction Sheet for Piping and Pipelines


Materials Engineering Fracture Control of Line Pipe
Materials Selection for Pipelines, Piping and Process
Materials Engineering Equipment
Corrosion Protection Requirements for Pipelines, Piping
Corrosion Control and Process Equipment

Materials Engineering Pipe, Flange, and Fitting Material Requirements


Piping Thermal Expansion Relief in Piping

Piping Pressure Testing of Plant Piping and Pipelines


Piping Design of Plant Piping
Piping Construction of Plant Piping
Piping Design of Pipelines
Piping Scraper Trap Station and Appurtenances
Geotechnical Anchors for Buried Pipelines

Piping Construction of On-Land and Near-Shore Pipelines

Piping Pipeline Crossings under Roads and Railroads


Pipelines Cleanliness Requirements for Hydrocarbon
Corrosion Control Services
Piping Nonmetallic Piping for In-Plant

Design of Reinforced Thermosetting Resins (RTR) Piping


Piping in Hydrocarbon and Water Injection Systems

Construction of Nonmetallic Piping in Hydrocarbon and


Piping Water Injection Systems
Piping Design of Piping on Offshore Structures
Offshore Structures Design of Submarine Pipelines and Risers

Onshore Structures Structural Design Criteria for Non-Building Structures

Offshore Structures Design and Construction of Fixed Offshore Platforms


Civil Saudi Aramco General Purpose Fencing

Onshore Structures Design Criteria for Blast Resistant Buildings


Offshore Structures Design of Deepwater Pipeline Systems

Offshore Structures Design of Deepwater Floating Production Installations

Saudi Aramco: Company General Use


Offshore Structures Design of Deepwater Subsea Production Systems
Operations, Inspection and Maintenance of Deepwater
Offshore Structures Production Systems
Onshore Structures Saudi Aramco Building Code
Heat Transfer Equipment Basic Criteria, Industrial Insulation

HVAC Design and Installation of Building Thermal Envelop


Heat Transfer Equipment Refractory Systems

Heat Transfer Equipment Installation Requirements - Monolithic Refractories

Heat Transfer Equipment Installation Requirements - Refractory Bricks

Heat Transfer Equipment Installation Requirements - Refractory Ceramic Fiber

Security General Requirements of Security Directives


Security Security Fencing Systems
Security Security Gates
Security Security Lighting
Security Security Systems for Industrial Facilities
Security Security Devices
Security Power Supply for Security Systems
Wired and Wireless Communications for Security
Security Application

Security Security Doors, Locks, and Ballistic Structures


Security Identification Cards

Security Security Requirements for Railway Facilities

Security Security Requirements for Marine and Offshore Facilities

Security Security Requirements for Electrical Power Substations


Security Security Requirements for Industrial Cities

Security Security Requirements for Residential Compounds


Electrical Systems Designs and
Automation Basic Power System Design Criteria
UPS, DC Systems and Power Electronics UPS and DC Systems
Electrical Systems Designs and
Automation Wiring Methods and Materials
Electrical Systems Designs and
Automation Overhead Distribution Systems

Saudi Aramco: Company General Use


Electrical Systems Designs and
Automation Grounding
Motors and Generators Motors and Generators
Electrical Systems Designs and
Automation Power System Protection and Control
Electrical Substations Equipment Switchgear and Control Equipment
Electrical Substations Equipment Substations
Electrical Substations Equipment Transformers and Reactors
Electrical Systems Designs and
Automation Lighting
Electrical Systems Designs and
Automation Power System Automation

UPS, DC Systems and Power Electronics High Voltage Direct Current (HVDC) Systems
Criteria for Design and Construction of Concrete
Civil Structures
Installation of Piles and Conductors for Offshore
Offshore Structures Structures
Onshore Structures Concrete Foundations

Civil Asphalt and Sulfur Extended Asphalt Concrete Paving


Foundations and Supporting Structures for Heavy
Onshore Structures Machinery
Geotechnical Concrete Retaining Walls
Cement Based, Non-Shrink Grout for Structural and
Civil Equipment Grouting
Civil Epoxy Grout for Machinery Support

Criteria for Design and Construction of Precast and


Civil Prestressed Concrete Structures

Offshore Structures Offshore Geotechnical Investigation Requirements

Civil Building Architectural Design and Finishes Requirements


Civil Building Design & Finishing Guidelines
Environmental Solid Waste Landfill Requirements
Plumbing and Utilities Sanitary Sewers
Plumbing and Utilities Oily Water Drainage Systems
Civil Storm Water Drainage Systems
Plumbing and Utilities Saudi Aramco Water Systems

Plumbing and Utilities Sprinkler and Standpipe Systems in Buildings


Plumbing and Utilities Saudi Aramco Plumbing Code
Plumbing and Utilities Installation of Utility Piping Systems

Saudi Aramco: Company General Use


Telecommunications - Symbols, Abbreviations and
Communications Definitions
Communications D.C. Power Systems
Plants Networks In-Plant Voice Paging System
Communications Mobile and Fixed Radio Systems

Communications Very Small Aperture Terminal (VSAT) Network Design


Communications IP Based Closed-Circuit Television (CCTV)

Plants Networks Plants Demilitarized Zone (DMZ) Architecture

Communications Design Residential Telecommunications Infrastructure

Telecommunications: Fiber Optic Cables for Outside


Communications Plant (OSP) and Inter/Intra Building Applications

Communications Telecommunications Outside Plant - Copper Cable

Telecommunications: Splicing Copper Cables, Fiber Optic


Communications Cables and Types of Splice Closure

Communications Telecommunications - Cable Testing and Acceptance


Design Criteria and Installation of Communication
Onshore Structures Towers

Grounding, Bonding, and Electrical Protection for


Communications Telecommunications Facilities

Communications Voice Frequency Loop Transmission Objectives

Communications Telecommunications - Inductive Coordination

Communications Telecommunication Conduit System Design


Communications Communications Building Cable
Communications Submarine Fiber Optic Cable
Communications Telecommunications Cable Information
Communications Telecommunications-OSP Buried Cable

Welding Welding Requirements for Pressure Vessels


Welding Welding Requirements for On-Plot Piping
Welding Welding Requirements for Pipelines

Welding Welding Requirements for Offshore Structures

Saudi Aramco: Company General Use


Welding Weld Overlays and Welding of Clad Materials
Welding Strip Lining Application

Welding Welding of Special Corrosion-Resistant Materials


Welding Welding Requirements for API Tanks

Welding Girth Welding Requirements for Clad Pipelines


Cathodic Protection Cathodic Protection of Marine Structures
Cathodic Protection Cathodic Protection of Buried Pipelines

Cathodic Protection Cathodic Protection of Vessel and Tank Internals


Cathodic Protection Cathodic Protection of Plant Facilities

Cathodic Protection Cathodic Protection of Onshore Well Casings


Cathodic Protection for Existing Reinforced Concrete
Cathodic Protection Structures
Custody Measurement Custody Metering of Hydrocarbon Gases

Custody Measurement Royalty/Custody Metering of Hydrocarbon Liquids


Royalty/Custody Radar Tank Gauging of Hydrocarbon
Custody Measurement Liquids
Process Control Process Control Systems
Process Control Pipelines Leak Detection Systems
Supervisory Control and Data Acquisition (SCADA)
Process Control System
Process Control Terminal Management Systems
Plants Networks Process Automation Networks

Design and Installation of Fiber Optic Cable Systems for


Plants Networks Process Control Networks

Saudi Aramco: Company General Use


Electrical Systems Designs and
Automation Data Schedule 1 - 14-SAMSS-531, Power Transformers

Electrical Systems Designs and Data Schedule - Attachment to 14-SAMSS-536, Pad


Automation Mounted Distribution Transformers
Metal-Enclosed Low Voltage Switchgear Assemblies 16-
Electrical Substations Equipment SAMSS-502
Data Schedule 16-SAMSS-503 : Indoor Controlgear - Low
Electrical Substations Equipment Voltage
Indoor Metal-Clad Switchgear 1 to 38 kV - 16-SAMSS-
Electrical Substations Equipment 504
Data Schedule 16-SAMSS-506 : Indoor Control Gear -
Electrical Substations Equipment High Voltage

Data Schedule - 16-SAMSS-508 : SF6 Gas Insulated


Electrical Substations Equipment Circuit Breakers Outdoor 34.5 kV through 230 kV

Electrical Substations Equipment Data Schedule 16-SAMSS-512 : Switchrack - Outdoor


Data Schedule for 16-SAMSS-518 : Low Voltage
Electrical Substations Equipment Panelboards
Electrical Systems Designs and
Automation Cable Bus - 16-SAMSS-520
Data Schedule: 16-SAMSS-521 : Indoor Transfer Switch -
Electrical Substations Equipment Low Voltage
Motors and Generators Purchaser's Induction Motor

Motors and Generators Severe Duty Enclosed Squirrel Cage Induction Motors

Data Schedule 17-SAMSS-511 : Stationary Storage


UPS, DC Systems and Power Electronics Batteries Information Supplied by the Buyer
Date Schedule - 17-SAMSS-514: Battery
UPS, DC Systems and Power Electronics Charger/Rectifier
UPS, DC Systems and Power Electronics Uninterruptible Power Supply System

Motors and Generators Data Schedule - 17-SAMSS-518, Diesel Generator Sets


Motors and Generators Wound Synchronous Motors
Materials Engineering Carbon Steel Line Pipe Requisition

Saudi Aramco: Company General Use


Valves Valve Data Sheet
Valves Valve Data Sheet
API 599 Flanged & Welding-End Steel Lubricated Plug
Valves Valves
Vessels Pressure Vessel Data Sheet

Vessels Storage Tank Datasheet (API 650 Storage Tank)


Heat Transfer Equipment Water-Tube Boiler
Compressors, Gears and Steam
Turbines
Compressors, Gears and Steam Special Purpose Gear Units - 13-SAMSS-001
Turbines Centrifugal Compressor - 31-SAMSS-001
Compressors, Gears and Steam Reciprocating Compressor for Process Air or Gas Service
Turbines - 31-SAMSS-003
Compressors, Gears and Steam Integrally Geared Centrifugal Air Compressor - 31-
Turbines SAMSS-006
Compressors, Gears and Steam
Turbines General Purpose Steam Turbine - 32-SAMSS-009
Compressors, Gears and Steam
Turbines Special Purpose Steam Turbine - 32-SAMSS-010

Gas Turbines and Diesel Engines Combustion Gas Turbine Smart Data Sheet

Onshore Structures Blast Design Requirements (BDR) - SAES-M-009

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
Revision Type Issue Date Planned Update On Status
3/14/2016 Active
3/24/2016 Active
6/10/2009 Active
1/17/2011 Active

8/1/2009 Active
7/25/2009 Active
6/10/2009 Active
6/10/2009 Active
7/25/2009 Active
11/26/2007 Active

7/23/2017 Active
8/19/2009 Active
6/10/2009 Active
7/25/2009 Active
8/18/2009 Active

9/14/2014 Active

11/1/2015 8/5/2018 Active


7/9/2014 7/9/2018 Active
5/4/2014 5/4/2019 Active

12/25/2013 11/4/2018 Active


6/18/2015 7/14/2019 Active

1/30/2013 1/30/2018 Active


2/1/2015 2/1/2020 Active
3/19/2013 9/15/2017 Active
3/3/2014 6/5/2018 Active
Major 12/18/2016 12/18/2019 Active
1/29/2015 1/29/2020 Active

12/30/2013 12/30/2018 Active


10/6/2015 10/6/2018 Active
Major 11/14/2016 11/14/2019 Active

1/16/2014 1/16/2019 Active


10/30/2013 10/30/2018 Active
Major 12/18/2016 12/18/2019 Active

Saudi Aramco: Company General Use


10/6/2015 10/6/2018 Active

Major 9/21/2017 9/21/2020 Active

12/15/2012 12/15/2017 Active


5/5/2016 5/5/2019 Active
New 1/24/2017 1/24/2020 Active
New 1/19/2017 1/19/2020 Active
New 1/19/2017 1/19/2020 Active
4/20/2014 4/20/2019 Active
Major 12/31/2016 12/31/2019 Active
Major 9/26/2016 9/26/2019 Active
9/1/2015 9/1/2018 Active

11/28/2012 11/28/2017 Active


6/15/2013 1/9/2018 Active
Major 11/14/2016 11/14/2019 Active

New 8/20/2017 8/20/2020 Active


12/31/2015 12/31/2018 Active
3/8/2016 3/8/2019 Active
12/31/2015 12/31/2018 Active
4/17/2016 4/17/2019 Active
Major 3/27/2017 3/27/2020 Active
2/15/2016 2/15/2019 Active
3/1/2016 3/1/2019 Active

1/16/2014 1/16/2019 Active


3/1/2016 3/1/2019 Active
3/1/2016 3/1/2019 Active
4/17/2016 4/17/2019 Active
Major 5/4/2017 5/4/2020 Active
Major 4/12/2017 4/12/2020 Active
Major 12/13/2016 12/13/2019 Active

Major 2/22/2017 2/22/2020 Active

5/25/2014 5/25/2019 Active

Major 7/11/2017 7/11/2020 Active


10/24/2012 10/24/2017 Active

11/9/2015 11/9/2018 Active

Saudi Aramco: Company General Use


Major 3/25/2017 3/25/2020 Active

Major 9/7/2016 9/7/2019 Active

Major 9/7/2016 9/7/2019 Active


5/25/2014 5/25/2019 Active

Major 2/7/2017 2/7/2020 Active


1/28/2016 1/28/2019 Active

Major 2/7/2017 2/7/2020 Active

Major 2/6/2017 2/6/2020 Active


6/2/2016 6/2/2019 Active
9/16/2015 9/16/2018 Active
3/26/2015 3/26/2020 Active

6/30/2014 6/30/2019 Active

5/31/2016 5/31/2019 Active


Major 3/25/2017 3/25/2020 Active

6/20/2016 6/20/2019 Active

Major 9/7/2016 9/7/2019 Active


6/30/2014 6/30/2019 Active
Major 9/26/2016 9/26/2019 Active
12/25/2014 12/25/2019 Active
Major 7/17/2017 7/17/2020 Active
1/16/2014 1/16/2019 Active

10/8/2013 10/8/2018 Active

Major 11/1/2016 11/1/2019 Active

3/3/2013 9/8/2017 Active

12/22/2012 12/22/2017 Active

12/24/2012 12/24/2017 Active


2/2/2016 2/2/2019 Active
Major 9/27/2016 9/27/2019 Active

Saudi Aramco: Company General Use


Major 9/27/2016 9/27/2019 Active
Major 9/7/2016 9/7/2019 Active

6/1/2014 6/1/2019 Active

6/1/2014 6/1/2019 Active

9/16/2015 6/1/2019 Active

12/4/2012 12/4/2017 Active

Major 3/20/2017 3/20/2020 Active

Major 3/20/2017 3/20/2020 Active

Major 1/2/2017 1/2/2020 Active


Major 1/2/2017 1/2/2020 Active
Major 1/10/2017 1/10/2020 Active
Major 1/11/2017 1/11/2020 Active
5/22/2016 5/22/2019 Active

2/12/2015 2/12/2020 Active

Major 5/22/2017 5/22/2020 Active


Major 1/10/2017 1/10/2020 Active

5/15/2016 5/15/2019 Active

Major 7/4/2017 7/4/2020 Active


Major 6/12/2017 6/12/2020 Active
Major 8/24/2016 8/24/2019 Active
Major 8/24/2016 8/24/2019 Active

6/4/2014 6/4/2019 Active


Major 9/7/2016 9/7/2019 Active

11/28/2013 11/28/2018 Active

Major 9/7/2016 9/7/2019 Active

Major 8/6/2017 8/6/2020 Active


Major 1/25/2017 1/25/2020 Active
6/1/2014 6/1/2019 Active
Major 1/25/2017 1/25/2020 Active
Major 3/25/2017 3/25/2020 Active

Saudi Aramco: Company General Use


Major 3/25/2017 3/25/2020 Active
Major 1/25/2017 1/25/2020 Active

4/28/2013 4/28/2018 Active


Major 11/1/2016 11/1/2019 Active

3/8/2016 10/26/2018 Active


Major 7/9/2017 7/9/2020 Active

Major 6/7/2017 6/7/2020 Active

Major 6/7/2017 6/7/2020 Active

10/6/2013 10/6/2018 Active

Major 6/11/2017 6/11/2020 Active


Major 1/10/2017 7/2/2018 Active
10/26/2015 4/7/2020 Active
9/28/2005 Active
10/31/2016 Active

9/20/2015 Active
4/10/2017 Active

10/31/2016 Active

4/27/2017 11/4/2018 Active


4/27/2017 6/5/2018 Active

4/27/2017 4/20/2018 Active

7/12/2017 Active

4/27/2017 10/6/2018 Active

12/22/2015 Active
10/31/2016 Active
7/12/2017 Active
4/5/2017 Active

10/31/2016 Active

Saudi Aramco: Company General Use


10/31/2016 Active
10/31/2016 Active
11/2/2016 Active
11/2/2016 Active

10/31/2016 Active

10/31/2016 Active

7/12/2017 Active
4/5/2017 Active

12/7/2015 Active
4/5/2017 Active

5/26/2016 Active

10/31/2016 Active

11/1/2016 Active

10/31/2016 Active
11/1/2016 Active
10/31/2016 Active
12/10/2015 Active
11/3/2015 Active

7/12/2017 Active
11/2/2016 Active

4/24/2016 Active
12/10/2015 Active

6/16/2016 Active

6/16/2016 Active
7/12/2017 Active

4/5/2017 Active

Saudi Aramco: Company General Use


10/27/2016 Active
11/1/2016 Active

6/16/2016 Active
4/5/2017 4/5/2020 Active

2/26/2017 Active
11/1/2016 Active

12/1/2016 Active

7/12/2017 Active

5/19/2016 Active

7/12/2017 Active
4/24/2016 Active

11/29/2015 Active
12/1/2016 Active

12/1/2016 Active
6/16/2016 Active
7/12/2017 Active
6/16/2016 Active

11/10/2016 Active

6/16/2016 Active

10/31/2016 Active

12/7/2015 Active

10/31/2016 Active
1/18/2016 Active

Saudi Aramco: Company General Use


11/30/2015 Active
1/18/2016 Active

6/14/2016 Active
6/14/2016 Active

6/14/2016 Active

4/10/2017 Active
11/30/2015 Active

6/16/2016 Active

4/24/2016 Active

12/1/2016 Active

7/12/2017 Active

7/12/2017 Active
7/12/2017 Active

6/23/2016 Active
2/29/2016 Active
2/29/2016 Active

10/31/2016 Active

10/31/2016 Active

4/10/2017 4/10/2020 Active

10/31/2016 Active

12/1/2016 Active

7/6/2017 Active

3/12/2017 Active
1/25/2016 Active

12/3/2015 Active

Saudi Aramco: Company General Use


7/6/2017 Active

4/24/2016 Active
6/23/2016 Active

3/12/2017 Active

9/17/2017 9/17/2020 Active

3/12/2017 Active

2/6/2017 Active
12/1/2016 Active

10/31/2016 Active

6/23/2016 Active

6/23/2016 Active

3/12/2017 Active

4/10/2017 4/10/2020 Active


11/30/2015 Active

4/10/2017 4/10/2020 Active


4/10/2017 4/10/2020 Active

9/17/2017 9/17/2020 Active

12/3/2015 Active

12/1/2016 Active

9/17/2017 9/17/2020 Active

10/31/2016 Active

9/17/2017 9/17/2020 Active


5/26/2016 Active
5/26/2016 Active

Saudi Aramco: Company General Use


6/23/2016 Active

6/16/2016 Active
12/1/2016 Active
4/10/2017 Active

4/10/2017 4/10/2020 Active

6/26/2016 Active
4/10/2017 Active

6/19/2016 Active

6/19/2016 Active

11/29/2015 Active

11/7/2015 Active
4/24/2016 Active

4/24/2016 Active

6/19/2016 Active
6/19/2016 Active
6/19/2016 Active

11/29/2015 Active
10/31/2016 Active

6/12/2016 Active
4/17/2017 4/17/2020 Active
4/24/2016 Active
7/6/2017 Active

4/24/2016 Active

12/1/2016 Active
4/24/2016 Active
12/1/2016 Active
7/6/2017 Active
6/12/2016 Active
10/31/2016 Active

6/12/2016 Active
6/12/2016 Active

Saudi Aramco: Company General Use


10/31/2016 Active

4/24/2016 Active

6/12/2016 Active

6/12/2016 Active

4/5/2017 4/5/2020 Active

12/22/2016 Active

6/12/2016 Active

6/12/2016 Active

11/17/2016 Active

6/12/2016 Active

6/12/2016 Active
1/18/2016 Active
1/18/2016 Active

1/18/2017 Active

4/5/2017 4/5/2020 Active

10/31/2016 Active
2/26/2017 Active

12/22/2015 Active
7/6/2017 Active
7/6/2017 Active
7/6/2017 Active
7/12/2017 Active
7/12/2017 Active
6/23/2016 Active
7/6/2017 Active
2/26/2017 Active

Saudi Aramco: Company General Use


7/6/2017 Active

7/12/2017 Active

9/17/2017 9/17/2020 Active

11/30/2015 Active

11/30/2015 Active
4/27/2017 Active

7/12/2017 Active
2/26/2017 Active
6/23/2016 Active

10/31/2016 Active

10/31/2016 Active

10/31/2016 Active

6/23/2016 Active
10/31/2016 Active

10/31/2016 Active

10/31/2016 Active

10/31/2016 Active

2/26/2017 Active

10/31/2016 Active

10/31/2016 Active

Saudi Aramco: Company General Use


10/31/2016 Active
10/31/2016 Active

10/31/2016 Active

10/31/2016 Active

10/31/2016 Active

12/1/2016 Active

10/31/2016 Active

10/31/2016 Active

10/31/2016 Active

2/25/2016 Active

2/26/2017 Active

2/26/2017 Active
2/26/2017 Active

10/31/2016 Active
2/26/2017 Active

6/26/2016 Active

11/16/2015 Active
6/26/2016 Active
6/28/2016 Active
6/28/2016 Active
10/31/2016 Active

3/12/2017 Active

10/31/2016 Active
10/31/2016 Active

Saudi Aramco: Company General Use


6/28/2016 Active
3/12/2017 Active
6/26/2016 Active
7/6/2017 Active
6/26/2016 Active
10/31/2016 Active

3/22/2017 Active
9/17/2017 9/17/2020 Active
6/26/2016 Active
6/26/2016 Active

12/22/2015 Active
6/26/2016 Active

6/26/2016 Active

6/26/2016 Active

9/17/2017 9/17/2020 Active

8/10/2016 Active

4/24/2016 Active

6/26/2016 Active
4/24/2016 Active

6/26/2016 Active

4/24/2016 Active
12/1/2016 Active
6/26/2016 Active

11/10/2016 Active

11/10/2016 Active

11/10/2016 Active

7/6/2017 Active

11/10/2016 Active

Saudi Aramco: Company General Use


11/10/2016 Active

11/10/2016 Active

11/10/2016 Active

11/10/2016 Active

11/10/2016 Active

11/10/2016 Active

11/10/2016 Active

11/10/2016 Active

11/10/2016 Active

12/1/2016 Active

12/1/2016 Active

11/10/2016 Active

11/10/2016 Active
11/10/2016 Active

11/10/2016 Active

11/10/2016 Active
11/10/2016 Active
12/22/2015 Active

12/1/2016 Active
12/1/2016 Active

10/31/2016 Active

10/31/2016 Active

12/1/2016 Active

Saudi Aramco: Company General Use


12/1/2016 Active

10/21/2016 Active

10/21/2016 Active

10/21/2016 Active

7/22/2012 7/22/2017 Active

8/15/2012 8/15/2017 Active

9/11/2012 9/11/2017 Active


7/18/2012 11/6/2015 Active

9/9/2013 9/9/2018 Active

Major 2/2/2017 2/2/2020 Active


11/21/2011 11/21/2016 Active
11/28/2011 11/28/2016 Active

8/19/2014 8/19/2019 Active

11/28/2011 11/28/2016 Active


4/16/2012 4/16/2017 Active
8/19/2014 8/19/2019 Active

2/7/2017 2/7/2020 Active


Major 2/7/2017 2/7/2020 Active
12/3/2014 11/14/2017 Active
Major 3/14/2017 7/22/2017 Active

Major 3/14/2017 1/16/2019 Active


Major 3/14/2017 1/21/2018 Active
7/7/2015 7/7/2018 Active
12/3/2014 12/4/2017 Active
12/3/2014 8/7/2017 Active
12/3/2014 9/17/2018 Active
2/11/2015 2/11/2020 Active
5/17/2015 5/17/2018 Active
5/27/2014 5/27/2019 Active
6/4/2014 6/4/2019 Active
5/28/2014 5/28/2019 Active

Saudi Aramco: Company General Use


6/18/2013 6/18/2018 Active
5/28/2014 5/28/2019 Active
6/1/2014 6/1/2019 Active
6/4/2014 6/4/2019 Active
6/4/2014 6/4/2019 Active
6/1/2014 6/1/2019 Active
6/1/2014 6/1/2019 Active
6/4/2014 6/4/2019 Active
10/30/2012 10/30/2017 Active
5/27/2014 5/27/2019 Active
5/27/2014 5/27/2019 Active
5/27/2014 5/27/2019 Active
5/27/2014 5/27/2019 Active
5/27/2014 5/27/2019 Active
5/27/2014 5/27/2019 Active
6/1/2014 6/1/2019 Active
6/1/2014 6/1/2019 Active
6/10/2014 6/10/2019 Active
6/10/2014 6/10/2019 Active
6/10/2014 6/10/2019 Active
6/10/2014 6/10/2019 Active
6/30/2014 6/30/2019 Active
6/10/2014 6/10/2019 Active
6/10/2014 6/10/2019 Active
6/30/2014 6/30/2019 Active
6/30/2014 6/30/2019 Active
8/27/2015 5/27/2019 Active
7/13/2015 7/13/2018 Active

Major 8/7/2017 8/7/2020 Active

12/5/2012 10/31/2017 Active


Major 6/18/2017 6/18/2020 Active
5/5/2016 5/5/2019 Active
2/20/2013 10/31/2017 Active
4/3/2013 11/28/2016 Active
4/16/2012 4/16/2017 Active
2/18/2015 2/18/2020 Active
2/22/2015 2/22/2020 Active
Major 9/20/2017 9/20/2020 Active
Major 9/20/2017 9/20/2020 Active
11/28/2011 11/28/2016 Active

4/3/2013 11/28/2016 Active

Saudi Aramco: Company General Use


6/15/2016 6/15/2019 Active

Major 8/23/2017 8/23/2020 Active

1/12/2015 1/11/2020 Active

Major 3/20/2017 3/20/2020 Active


Major 1/1/2017 1/1/2020 Active

6/15/2016 6/15/2019 Active


2/11/2016 2/11/2019 Active

11/12/2013 11/12/2018 Active

Major 2/5/2017 2/5/2020 Active


3/1/2016 3/1/2019 Active
9/15/2014 Active

8/6/2013 8/6/2018 Active


Major 12/25/2016 12/25/2019 Active
Major 8/20/2017 8/20/2020 Active
Major 6/26/2017 6/26/2020 Active
Major 6/26/2017 6/26/2020 Active
Major 6/26/2017 6/26/2020 Active

6/15/2013 6/15/2018 Active

7/24/2014 7/24/2019 Active

Major 2/9/2017 2/9/2020 Active


Major 7/2/2017 7/2/2020 Active

9/16/2015 1/28/2020 Active

6/15/2016 6/15/2019 Active


7/13/2015 7/13/2018 Active
11/7/2013 11/7/2017 Active
6/21/2015 6/21/2018 Active
7/4/2016 7/4/2019 Active
2/18/2012 2/18/2017 Active
1/30/2014 1/30/2019 Active
1/30/2014 1/30/2019 Active
7/4/2016 7/4/2019 Active

Major 12/31/2016 12/31/2019 Active

Saudi Aramco: Company General Use


4/18/2016 4/18/2019 Active
3/9/2016 11/28/2018 Active
3/9/2016 7/14/2019 Active
Major 9/26/2016 9/26/2019 Active
8/31/2014 8/31/2019 Active

Major 9/7/2016 9/7/2019 Active


7/17/2014 7/17/2019 Active
Major 9/7/2016 9/7/2019 Active

Major 9/15/2016 9/15/2019 Active


Major 10/18/2016 10/18/2019 Active
Major 8/1/2016 8/1/2019 Active
Major 8/7/2016 8/7/2019 Active
Major 7/4/2016 7/4/2019 Active
6/7/2016 6/7/2019 Active
Major 8/16/2017 8/16/2020 Active
4/24/2012 4/24/2017 Active

Major 8/3/2016 8/3/2019 Active


5/1/2017 5/1/2019 Active
5/17/2015 12/26/2018 Active
5/26/2016 5/26/2019 Active
5/31/2016 5/31/2019 Active
9/9/2013 9/9/2018 Active

11/29/2015 11/29/2018 Active


2/20/2013 2/20/2018 Active
12/26/2013 12/26/2018 Active
7/16/2012 7/16/2017 Active
Major 8/6/2017 8/6/2020 Active

Major 4/25/2017 4/25/2020 Active

2/15/2016 2/15/2019 Active

8/10/2015 8/10/2018 Active

2/15/2016 2/15/2019 Active


10/2/2012 10/2/2017 Active
8/15/2012 10/10/2016 Active
Major 9/21/2016 9/21/2019 Active
11/4/2015 6/29/2018 Active
2/12/2015 2/12/2020 Active
7/13/2016 7/13/2019 Active

Saudi Aramco: Company General Use


3/20/2013 3/20/2018 Active
Major 8/6/2017 8/6/2020 Active

5/19/2016 5/19/2019 Active

1/22/2015 1/22/2020 Active

11/3/2013 11/3/2018 Active

2/26/2015 2/26/2020 Active


Major 8/2/2017 8/2/2020 Active

12/31/2012 1/29/2016 Active

1/23/2012 1/23/2017 Active

1/23/2012 1/23/2017 Active

1/23/2012 1/23/2017 Active

1/23/2012 1/23/2017 Active


Major 5/9/2017 5/9/2020 Active
Major 5/9/2017 5/9/2020 Active
Major 5/9/2017 5/9/2020 Active
9/15/2014 9/15/2019 Active

Saudi Aramco: Company General Use


8/31/2005 Active
4/30/1995 Active
4/30/1995 Active

1/31/1996 Active
6/2/2010 Active
6/2/2010 Active

12/31/1996 Active

12/31/1996 Active
6/2/2010 Active

Saudi Aramco: Company General Use


6/2/2010 Active
6/2/2010 Active
6/2/2010 Active
6/2/2010 Active
6/2/2010 Active

6/2/2010 Active

6/2/2010 Active
6/2/2010 Active

6/2/2010 Active

6/2/2010 Active

6/2/2010 Active

6/2/2010 Active
6/2/2010 Active
6/2/2010 Active
6/2/2010 Active

7/9/2007 Active

5/31/1998 Active

6/23/2013 Active

10/1/1999 Active
6/2/2010 Active
6/2/2010 Active
6/2/2010 Active
6/2/2010 Active
6/2/2010 Active

4/1/1999 Active
6/2/2010 Active
6/2/2010 Active
6/2/2010 Active

2/1/1996 Active

2/1/1996 Active

6/29/2010 Active

Saudi Aramco: Company General Use


6/29/2010 Active

11/8/2009 Active

11/14/2009 Active

11/8/2009 Active

11/8/2009 Active

9/8/2015 Active

9/9/2015 Active

9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

Saudi Aramco: Company General Use


9/8/2015 Active

9/8/2015 Active

9/8/2015 Active

9/30/2003 Active

11/27/2010 Active
9/30/2003 Active

3/24/2015 Active

6/30/2002 Active

2/3/1987 Active

11/3/1983 Active

5/31/1992 Active

3/31/2008 Active

12/13/2016 Active

10/13/2016 Active
12/31/2003 Active

6/1/1996 Active

11/23/2005 Active

11/23/2005 Active

9/30/2003 Active

9/30/2003 Active

6/1/1994 Active

5/1/1992 Active

10/15/1992 Active

Saudi Aramco: Company General Use


9/1/1995 Active

6/1/1992 Active

2/1/1994 Active

2/1/1994 Active

1/1/2009 Active

12/1/1999 Active

8/1/1995 Active

8/1/1997 Active

9/30/2003 Active

12/1/1999 Active

9/30/2003 Active

9/30/2003 Active

11/1/1994 Active

4/1/2000 Active

5/31/2004 Active

5/31/2004 Active

7/30/2003 Active

7/30/2003 Active

9/1/1995 Active

5/1/1990 Active

Saudi Aramco: Company General Use


5/1/1990 Active

11/1/1985 Active

9/1/1987 Active

5/1/1985 Active

5/1/1985 Active

5/20/1985 Active

6/1/1985 Active

6/1/1985 Active

6/1/1985 Active

3/31/1998 Active
3/14/2012 Active

6/30/2004 Active
1/14/2016 Active

1/31/1996 Active

1/31/1996 Active

9/24/1995 Active
10/23/1993 Active
2/14/2017 Active

1/31/1996 Active
2/16/1987 Active
6/1/1992 Active
6/1/1992 Active
2/1/1996 Active

6/1/1996 Active

6/1/1992 Active

Saudi Aramco: Company General Use


11/20/2013 Active

5/14/2017 Active

5/14/2017 Active

5/31/1992 Active

5/31/1992 Active

9/22/1986 Active
6/21/1994 Active

12/28/2016 Active

1/31/1995 Active

5/30/2001 Active
1/31/1996 Active

1/30/2002 Active

1/30/2002 Active

1/1/1999 Active

11/30/2002 Active
11/30/2002 Active

2/28/1992 Active

11/1/1995 Active

12/1/1999 Active

5/1/1999 Active

5/1/1990 Active

12/28/1986 Active
8/23/1986 Active

Saudi Aramco: Company General Use


8/31/1990 Active

10/31/1992 Active

8/31/1990 Active

5/31/1992 Active

10/31/1992 Active

3/31/1994 Active

7/31/1992 Active

5/31/1992 Active

5/31/1992 Active

11/30/1993 Active

4/4/1988 Active

11/30/1993 Active

4/17/1988 Active

11/30/1993 Active

3/24/1988 Active
9/10/1988 Active

7/31/1999 Active

3/26/1990 Active

5/2/2012 Active

11/30/1999 Active

Saudi Aramco: Company General Use


9/15/1995 Active

11/23/2005 Active

5/22/2017 Active

5/2/1995 Active

11/23/2005 Active

11/8/2009 Active

11/8/2009 Active

11/8/2009 Active

11/8/2009 Active

7/18/2013 Active

6/30/1990 Active

2/15/2017 Active

2/15/2017 Active

12/31/1994 Active
12/31/1989 Active

12/19/1989 Active
11/30/2002 Active
11/30/2002 Active
6/12/1986 Active

2/1/2007 Active
8/1/1996 Active
8/1/1996 Active
4/1/1996 Active

Saudi Aramco: Company General Use


8/1/1996 Active

7/1/1992 Active

6/30/1992 Active

6/30/1992 Active

6/30/1992 Active

5/22/2017 Active

5/22/2017 Active

5/22/2017 Active

5/22/2017 Active

11/30/2002 Active
10/31/2004 Active

8/31/1995 Active

3/25/2008 Active
9/30/2002 Active

2/17/1998 Active

11/29/2011 Active

4/1/1990 Active
11/1/1986 Active

11/30/2003 Active
1/1/1998 Active
9/30/2002 Active
1/30/2002 Active

7/1/1986 Active
11/1/1992 Active
11/1/1992 Active
1/18/1987 Active

Saudi Aramco: Company General Use


3/14/2017 Active

3/14/2017 Active

3/14/2017 Active

3/14/2017 Active

3/14/2017 Active

3/14/2017 Active

3/14/2017 Active
1/11/2017 Active
12/1/1996 Active

10/31/1992 Active

11/1/1993 Active

6/1/1994 Active

10/1/1995 Active

3/1/1998 Active

11/1/1995 Active

11/1/2001 Active

9/30/2003 Active

10/31/1998 Active
6/1/1992 Active

3/31/1994 Active
5/31/1996 Active

Saudi Aramco: Company General Use


9/30/2003 Active

6/1/1992 Active

4/28/2004 Active

4/28/2004 Active

11/3/1985 Active

9/24/2013 Active

1/31/1990 Active

10/30/2002 Active

1/31/1996 Active
1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

9/30/1990 Active

2/2/2015 Active

2/17/1987 Active
11/18/1996 Active

11/2/1996 Active

5/4/1988 Active

7/1/1999 Active

11/1/1992 Active

12/1/1999 Active

9/30/2002 Active

Saudi Aramco: Company General Use


12/1/1996 Active

12/1/1996 Active

5/17/1987 Active

6/1/1986 Active

5/31/2006 Active

6/11/1986 Active
6/11/1986 Active

12/31/1994 Active

7/2/1986 Active

6/30/2004 Active

8/19/1986 Active

3/1/1987 Active

3/1/1992 Active

11/1/1982 Active

11/1/1982 Active

4/1/1982 Active

4/1/1990 Active

5/1/1990 Active
1/11/2017 Active

7/1/1999 Active
7/1/1999 Active

Saudi Aramco: Company General Use


3/31/1996 Active

5/11/1983 Active

11/30/1993 Active

10/31/1992 Active

12/31/1995 Active

12/31/1995 Active

7/8/2006 Active

12/31/1987 Active

12/31/1987 Active

12/31/1987 Active

3/31/1988 Active

6/30/1997 Active
7/31/1995 Active

7/31/1992 Active

7/31/1992 Active
5/31/1992 Active

3/25/2009 Active

9/1/1999 Active

2/1/1996 Active

9/30/1992 Active

9/30/1992 Active

Saudi Aramco: Company General Use


6/30/1992 Active
2/7/1987 Active

12/31/1995 Active

12/31/1995 Active

12/31/1992 Active

2/2/2015 Active

12/31/1995 Active

1/1/1996 Active

1/1/1996 Active

1/1/1996 Active

12/1/1986 Active
7/6/1985 Active

5/31/1992 Active
7/1/1992 Active

7/1/1992 Active

6/1/1992 Active
9/1/1986 Active

1/31/1996 Active

12/31/1994 Active

10/31/1992 Active
4/1/1996 Active

4/1/1996 Active

12/31/1999 Active

Saudi Aramco: Company General Use


12/31/1999 Active

6/11/1997 Active

12/26/2010 Active

5/31/1992 Active

12/31/1995 Active

12/31/1999 Active

7/1/1998 Active
6/1/1994 Active

1/11/2017 Active

1/11/2017 Active

2/28/1998 Active
4/30/1993 Active

4/6/2009 Active

9/12/1988 Active
4/1/1993 Active
4/1/1993 Active
4/1/1993 Active
11/1/1996 Active

4/1/1997 Active

7/1/1992 Active

11/20/2006 Active

7/1/1999 Active

3/1/1999 Active
9/30/2002 Active

4/30/1996 Active
12/1/1996 Active
5/31/1995 Active

Saudi Aramco: Company General Use


1/11/2017 Active

8/17/1994 Active

12/31/1995 Active

12/31/1995 Active

12/31/1995 Active
10/31/2004 Active

12/31/1995 Active

12/31/1995 Active

12/31/1995 Active

11/10/1987 Active

12/31/1995 Active

12/31/1995 Active

6/21/1994 Active

1/29/2004 Active

6/1/1998 Active

6/1/1998 Active

6/1/1998 Active
12/15/2012 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

Saudi Aramco: Company General Use


1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

Saudi Aramco: Company General Use


1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

1/31/1996 Active

10/31/2011 Active

5/31/1994 Active
7/1/1998 Active

12/1/1996 Active

7/1/1994 Active

11/30/1998 Active

6/13/1987 Active

11/12/2011 Active

11/12/2011 Active

5/31/2006 Active

11/12/2011 Active

4/30/2001 Active

1/1/2000 Active
10/1/1999 Active

2/1/2000 Active

9/1/2000 Active

7/1/1999 Active

7/1/1999 Active

Saudi Aramco: Company General Use


11/12/2011 Active

11/12/2011 Active

11/12/2011 Active

11/12/2011 Active

8/28/1989 Active

6/30/1992 Active

6/30/1992 Active
9/30/2003 Active

4/10/2016 Active

4/10/2016 Active

5/31/1996 Active
2/1/1996 Active

1/11/2017 Active

6/11/1997 Active

12/31/1999 Active

1/1/1986 Active

12/31/1995 Active

Saudi Aramco: Company General Use


12/31/1995 Active

6/1/1987 Active

3/1/1987 Active

3/1/1987 Active
6/30/1986 Active
5/20/1986 Active
4/30/1992 Active
4/30/1992 Active

4/30/1992 Active
9/1/1986 Active

12/8/2010 Active

8/9/2010 Active

5/31/1991 Active

5/13/1990 Active
7/21/1975 Active
7/1/1983 Active
1/4/2011 Active

10/1/1992 Active
6/29/2015 Active

6/29/2015 Active
10/1/1988 Active

11/1/1992 Active
7/1/2008 Active
2/15/2016 Active

8/23/2011 Active
6/17/1999 Active

11/18/1986 Active

Saudi Aramco: Company General Use


11/18/1986 Active

11/18/1986 Active

11/18/1986 Active
6/11/1997 Active

11/18/1986 Active

11/18/1986 Active
12/31/1995 Active

6/30/1992 Active

6/30/1992 Active

6/30/1992 Active

12/31/1995 Active

6/30/1992 Active

6/30/1992 Active

6/30/1992 Active

6/5/1995 Active
6/5/1995 Active
2/27/2000 Active

7/1/1999 Active

12/31/1993 Active

12/31/1993 Active

12/31/1993 Active

Saudi Aramco: Company General Use


12/31/1993 Active
6/4/1986 Active

12/31/1983 Active

12/31/1983 Active

12/31/1983 Active

12/31/1983 Active

12/31/1985 Active
6/1/1986 Active
6/11/1992 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

1/1/1994 Active

1/1/1994 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

1/1/1994 Active

11/1/1993 Active

11/1/1993 Active

Saudi Aramco: Company General Use


11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

1/1/1994 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

1/1/1994 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

11/1/1993 Active

12/1/1990 Active

12/1/1990 Active

12/1/1990 Active

Saudi Aramco: Company General Use


12/1/1990 Active

12/1/1990 Active

12/1/1990 Active

12/1/1990 Active

12/1/1990 Active

12/1/1990 Active

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
12/7/2016 Active

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
7/1/1999 Active

7/1/1999 Active

10/1/1999 Active
10/19/2005 Active

1/3/1999 Active

1/3/1999 Active

3/7/1999 Active

2/7/1999 Active

3/2/1999 Active

7/1/1998 Active
2/1/1999 Active

3/1/1999 Active

3/1/1999 Active

4/30/2000 Active

6/30/2004 Active

6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

Saudi Aramco: Company General Use


12/14/2005 Active

9/29/2004 Active
2/18/2006 Active
2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active
2/18/2006 Active
2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

Saudi Aramco: Company General Use


2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active
6/1/2012 Active
2/18/2006 Active
2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active

2/18/2006 Active
2/18/2006 Active
2/18/2006 Active
2/18/2006 Active
2/18/2006 Active
2/18/2006 Active
2/18/2006 Active

1/29/2008 Active

1/29/2008 Active
1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

Saudi Aramco: Company General Use


1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active
1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active
1/29/2008 Active

1/29/2008 Active
1/29/2008 Active
1/29/2008 Active

1/29/2008 Active
1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active
1/29/2008 Active

Saudi Aramco: Company General Use


1/29/2008 Active

1/29/2008 Active
1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active
1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

Saudi Aramco: Company General Use


1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active
1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active
1/29/2008 Active
1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

Saudi Aramco: Company General Use


1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active
1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active

1/29/2008 Active
11/1/2011 Active

11/1/2011 Active

Saudi Aramco: Company General Use


11/1/2011 Active
11/1/2011 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

Saudi Aramco: Company General Use


7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

Saudi Aramco: Company General Use


7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

7/23/2017 Active

10/14/2012 Active

10/14/2012 Active

10/14/2012 Active
3/17/2015 Active

3/17/2015 Active

3/17/2015 Active
3/17/2015 Active
3/17/2015 Active
7/1/1999 Active

7/1/1999 Active

7/1/1999 Active
12/31/1999 Active

9/30/2002 Active

9/30/2002 Active

9/30/2002 Active

Saudi Aramco: Company General Use


9/30/2002 Active

11/30/1996 Active

11/30/1996 Active

11/30/1996 Active

11/30/1996 Active

1/30/2002 Active

7/1/1999 Active
7/1/1998 Active

7/1/1998 Active

6/17/1998 Active

4/1/1999 Active

8/1/1999 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

Saudi Aramco: Company General Use


4/30/2000 Active

4/30/2000 Active
4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active

4/30/2000 Active
9/30/2002 Active
9/30/2002 Active

6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

9/29/2004 Active

9/29/2004 Active

6/30/2002 Active

6/30/2002 Active

9/30/2002 Active

9/30/2002 Active

Saudi Aramco: Company General Use


6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

9/29/2004 Active

9/29/2004 Active

6/29/2015 Active

8/29/2007 Active

8/29/2007 Active
8/29/2007 Active

8/29/2007 Active

8/29/2007 Active
2/13/2011 Active
11/30/2008 Active

3/17/2015 Active

3/17/2015 Active

3/17/2015 Active

3/17/2015 Active
3/17/2015 Active

7/1/1999 Active
7/1/1999 Active

4/1/1991 Active

7/1/1999 Active

7/1/1999 Active

4/1/1991 Active

Saudi Aramco: Company General Use


4/1/1991 Active

9/30/2002 Active

9/30/2002 Active

9/30/2002 Active

5/30/2001 Active
11/30/1996 Active
12/1/1996 Active

11/30/1996 Active

9/30/2002 Active

9/30/2002 Active

9/30/2002 Active

9/30/2002 Active

9/30/2002 Active

2/8/1999 Active

3/1/1999 Active

3/1/1999 Active

7/1/1999 Active

5/1/1998 Active

7/1/1998 Active

7/1/1998 Active

Saudi Aramco: Company General Use


7/1/1998 Active

7/1/1998 Active

7/1/1998 Active

7/1/1998 Active

4/30/2000 Active

4/30/2000 Active

6/30/2002 Active

8/31/2002 Active

6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

8/31/2002 Active

6/30/2002 Active

9/29/2004 Active

Saudi Aramco: Company General Use


8/31/2005 Active

7/10/2016 Active

7/1/1999 Active

7/1/1999 Active

5/31/1985 Active
7/1/1999 Active

7/1/1999 Active

3/1/1991 Active

7/1/1999 Active

7/1/1999 Active

7/1/1999 Active

7/1/1999 Active

7/1/1999 Active

7/1/1999 Active

7/1/1999 Active

7/1/1999 Active

7/1/1999 Active

7/1/1999 Active

7/1/1999 Active

7/1/1999 Active
7/1/1999 Active

7/1/1999 Active
11/30/1996 Active

Saudi Aramco: Company General Use


11/30/1996 Active
7/1/1999 Active
6/18/1998 Active

4/30/2000 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active
11/1/1999 Active

Saudi Aramco: Company General Use


11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active
11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

11/1/1999 Active

6/30/2002 Active

6/30/2002 Active

6/30/2002 Active

Saudi Aramco: Company General Use


6/30/2002 Active

6/30/2002 Active
3/17/2015 Active

2/18/2015 Active
7/1/1995 Active

7/1/1999 Active

7/1/1999 Active

4/1/1991 Active

4/1/1991 Active

10/1/1998 Active
7/1/1999 Active
7/1/1999 Active
11/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

Saudi Aramco: Company General Use


9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

9/1/1998 Active

10/1/1998 Active

10/1/1998 Active

10/1/1998 Active

10/1/1998 Active

10/1/1998 Active

10/1/1998 Active

9/1/1998 Active

9/1/1998 Active

2/29/2004 Active
2/1/1999 Active
2/1/1999 Active

2/1/1999 Active

3/1/1999 Active

3/1/1999 Active

2/1/1999 Active
2/1/1999 Active

Saudi Aramco: Company General Use


2/1/1999 Active

4/30/2000 Active

9/29/2004 Active
3/17/2015 Active

2/17/2015 Active

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
2/1/2015 Active

Saudi Aramco: Company General Use


5/1/2010 Active

5/11/2015 Active

5/11/2015 Active

4/11/2016 Active

4/11/2016 Active

4/11/2016 Active

6/23/2015 Active

4/11/2016 Active

5/11/2015 Active

5/11/2015 Active

5/11/2015 Active

Saudi Aramco: Company General Use


5/11/2015 Active

5/11/2015 Active

5/11/2015 Active

5/11/2015 Active

5/11/2015 Active

3/24/2015 Active
5/20/2015 Active
5/25/2013 Active
3/7/2017 Active

11/3/2012 Active
7/24/2016 Active
3/30/2017 Active
3/20/2017 Active

8/6/2017 Active

7/11/2005 Active

10/25/2015 Active

3/30/2016 3/30/2019 Active

3/30/2016 3/30/2019 Active

7/11/2005 Active

7/11/2005 Active

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
11/1/2010 Active

2/1/1991 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active
11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active
3/8/2009 Active
3/8/2009 Active

2/1/1991 Active

9/23/1996 Active

3/1/1999 Active

3/1/1999 Active

11/1/2010 Active

11/1/2010 Active
3/1/1999 Active
11/1/2010 Active

3/1/1999 Active

Saudi Aramco: Company General Use


3/1/1999 Active

3/1/1999 Active

3/1/1999 Active

11/1/2010 Active

3/1/1999 Active
11/1/2010 Active

11/1/2010 Active
3/1/1999 Active
3/8/2009 Active
3/8/2009 Active

4/1/2003 Active

11/1/2010 Active

2/1/1990 Active

8/6/2015 Active
7/30/2015 Active
11/1/2010 Active
11/1/2010 Active

9/14/2015 Active

11/1/2010 Active
11/1/2010 Active

11/1/2010 Active

10/20/2015 Active

10/20/2015 Active

11/1/2010 Active

Saudi Aramco: Company General Use


11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

Saudi Aramco: Company General Use


11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active
11/1/2010 Active

11/1/2010 Active

7/31/2002 Active
11/1/2010 Active
3/1/1999 Active
3/8/2009 Active
3/8/2008 Active
5/1/1992 Active
10/1/1990 Active
11/1/2010 Active
3/1/1999 Active
8/1/1989 Active
4/30/2003 Active
11/1/2010 Active
4/30/2003 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active

11/1/2010 Active
11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

Saudi Aramco: Company General Use


11/1/2010 Active
11/1/2010 Active

11/1/2010 Active

11/1/2010 Active
11/15/2016 Active
11/15/2016 Active
8/1/1994 Active
11/1/1993 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

6/8/2017 Active
3/1/1999 Active
3/8/2009 Active
2/1/1991 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active
11/1/2010 Active
11/1/2010 Active

3/1/1999 Active
11/1/2010 Active

11/1/2010 Active

Saudi Aramco: Company General Use


11/1/2010 Active
11/1/2010 Active
11/1/2010 Active

11/1/2010 Active

11/1/2010 Active
11/1/2010 Active
3/8/2009 Active

11/1/2010 Active

11/1/2010 Active
3/1/1993 Active
3/1/1993 Active
3/1/1993 Active
1/27/2016 Active
11/1/2010 Active
2/1/1991 Active
11/1/2010 Active
11/1/2010 Active

11/1/2010 Active

10/1/1990 Active
4/30/2003 Active
11/1/2010 Active
3/1/1999 Active
3/8/2009 Active
3/8/2009 Active
3/8/2009 Active

4/30/2003 Active
9/23/1996 Active

8/1/1993 Active

5/1/1991 Active
1/27/2016 Active

8/1/2006 Active

Saudi Aramco: Company General Use


8/1/2006 Active
8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

Saudi Aramco: Company General Use


8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active

8/1/2006 Active
8/1/2006 Active

11/1/2010 Active

11/1/2010 Active
11/1/2010 Active

Saudi Aramco: Company General Use


11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

Saudi Aramco: Company General Use


11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active

11/1/2010 Active
11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2013 Active

6/1/2012 Active

6/1/2012 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

Saudi Aramco: Company General Use


11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

5/29/2011 Active

4/18/2011 Active

11/1/2010 Active

11/1/2010 Active

3/31/2013 Active

8/26/2015 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active
8/1/2017 Active

Saudi Aramco: Company General Use


11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/7/2016 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

10/1/2012 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

Saudi Aramco: Company General Use


11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

4/18/2011 Active

4/18/2011 Active

4/18/2011 Active

Saudi Aramco: Company General Use


11/1/2010 Active
3/1/1999 Active
3/8/2009 Active
3/8/2009 Active

3/1/1999 Active

3/8/2009 Active

3/8/2009 Active

3/1/1999 Active

11/1/2010 Active

11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active

11/1/2010 Active
11/1/1990 Active
1/27/2016 Active

1/27/2016 Active

1/27/2016 Active
1/27/2016 Active
11/1/2010 Active

11/1/2010 Active
11/1/2010 Active
7/30/2003 Active
11/1/2010 Active

11/1/2010 Active
11/1/2010 Active

Saudi Aramco: Company General Use


7/3/2017 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active
11/1/2010 Active

11/1/2010 Active
11/1/2010 Active
12/31/2003 Active

8/1/2006 Active

8/1/2006 Active
10/1/2002 Active
11/12/2015 Active
3/23/1997 Active
3/23/1997 Active
3/23/1997 Active
3/23/1997 Active
7/19/1998 Active
3/23/1997 Active
3/23/1997 Active
3/23/1997 Active

3/23/1997 Active
5/31/2009 Active
7/19/1998 Active
11/22/2005 Active
11/22/2005 Active
11/22/2005 Active
11/22/2005 Active

11/22/2005 Active
11/22/2005 Active
11/22/2005 Active

11/22/2005 Active
11/22/2005 Active

11/22/2005 Active

11/22/2005 Active

11/22/2005 Active

Saudi Aramco: Company General Use


11/22/2005 Active

3/6/2007 Active

11/22/2005 Active
11/22/2005 Active
11/22/2005 Active

11/22/2005 Active

11/22/2005 Active
11/22/2005 Active

11/22/2005 Active

11/22/2005 Active
11/22/2005 Active

3/1/2009 Active
11/22/2005 Active
11/22/2005 Active
11/22/2005 Active

11/22/2005 Active
11/22/2005 Active

11/22/2005 Active
3/20/2006 Active
3/20/2006 Active

3/20/2006 Active
3/20/2006 Active

8/28/2017 Active
3/20/2006 Active
3/20/2006 Active

3/20/2006 Active

3/20/2006 Active

3/20/2006 Active

3/20/2006 Active

Saudi Aramco: Company General Use


6/30/2004 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active

9/1/2006 Active
3/20/2006 Active
3/20/2006 Active
3/20/2006 Active

7/19/1998 Active

7/19/1998 Active

7/19/1998 Active

7/19/1998 Active

7/19/1998 Active

7/19/1998 Active

7/19/1998 Active

7/19/1998 Active

7/19/1998 Active

7/19/1998 Active

7/19/1998 Active

Saudi Aramco: Company General Use


7/31/2005 Active

7/21/2013 Active

8/2/2017 Active
8/11/2012 Active

1/20/2016 Active

7/21/2013 Active

2/28/2016 Active

1/20/2016 Active

7/21/2013 Active

7/21/2013 Active
4/11/2007 Active

9/8/2009 Active
11/18/2015 Active
6/25/2007 Active
4/27/2008 Active
3/8/2010 Active

2/8/2010 Active

3/12/2008 Active
9/6/2008 Active

8/25/2008 Active

1/20/2016 Active
2/28/2009 Active

1/6/2009 Active
7/17/2010 Active

2/14/2016 Active
1/27/2010 Active

Saudi Aramco: Company General Use


7/21/2013 Active
7/5/2010 Active

3/30/2013 Active

2/26/2013 Active

2/26/2013 Active

2/26/2013 Active

2/26/2013 Active

3/9/2013 Active

9/18/2011 Active
12/4/2011 Active

4/22/2012 Active
5/19/2012 Active

12/24/2012 Active
10/15/2015 Active
4/6/2013 Active
10/15/2015 Active

9/1/2013 Active

6/24/2013 Active

10/2/2013 Active

1/11/2017 Active

7/14/2014 Active

6/24/2015 Active

11/6/2016 Active

1/11/2015 Active

Saudi Aramco: Company General Use


8/23/2015 Active

1/17/2016 Active

2/8/2015 Active
3/23/2016 Active

3/25/2015 Active
4/26/2015 4/26/2020 Active

1/18/2016 Active
10/25/2015 Active

5/24/2016 Active
5/24/2016 Active

8/23/2015 Active
1/24/2016 Active

1/17/2016 Active

5/9/2016 Active

7/14/2016 Active

6/15/2016 Active

6/15/2016 Active

9/25/2017 9/25/2020 Active

3/16/2017 3/16/2020 Active

6/29/2011 Active

4/25/2012 Active

3/27/2008 Active

Saudi Aramco: Company General Use


1/25/2016 Active
11/23/2010 Active

4/20/2010 Active
2/7/2007 Active

10/5/2008 Active

11/14/2010 Active
12/15/2012 Active

7/25/2009 Active

10/31/2004 Active

10/31/2004 Active

12/29/2004 Active

8/22/2010 Active

3/30/2005 Active

6/27/2016 Active

6/27/2016 Active

6/27/2016 Active

11/25/2012 Active

7/19/2008 Active

6/27/2016 Active

10/8/2007 Active

6/8/2008 Active
11/16/2008 Active

10/20/2009 Active

Saudi Aramco: Company General Use


6/27/2016 Active

10/25/2010 Active

10/18/2010 Active

5/2/2012 Active

4/30/2014 Active

5/11/2015 Active

5/11/2015 5/11/2018 Active


10/26/2015 Active

7/23/2017 Active

9/25/2017 Active

6/24/2009 Active

3/21/2010 Active

2/20/2011 Active

6/18/2017 Active

4/17/2016 Active

9/1/2016 Active
9/1/2016 Active
4/20/2017 Active

5/21/2015 5/21/2018 Active

6/5/2011 Active

5/30/2016 Active

9/1/2016 Active
5/17/2009 Active

Saudi Aramco: Company General Use


7/11/2007 Active

4/1/2009 Active

4/6/2013 Active

5/18/2013 Active
11/11/2007 Active

5/7/2011 Active

1/28/2007 Active
5/19/2007 Active
1/9/2010 Active

2/24/2013 Active

9/5/2009 Active
1/31/2010 Active

3/29/2010 Active

3/29/2010 Active

8/8/2010 Active
11/1/2011 Active

2/2/2013 Active

2/18/2012 Active

11/18/2012 Active

12/12/2012 Active

5/11/2008 Active

5/31/2005 Active
11/11/2006 Active
2/2/2013 Active

Saudi Aramco: Company General Use


4/21/2012 Active

12/15/2015 Active

5/31/2006 Active

7/14/2013 Active

6/30/2006 Active

11/18/2015 Active
10/28/2006 Active

10/8/2006 Active

1/21/2007 Active
1/15/2007 Active

1/3/2009 Active

1/7/2008 Active

12/11/2007 Active

1/13/2008 Active

6/10/2008 Active

1/7/2008 Active
5/12/2008 Active

3/12/2011 Active

11/22/2009 Active

1/3/2009 Active
12/8/2014 Active

12/6/2009 Active
2/15/2010 Active

3/9/2010 Active

Saudi Aramco: Company General Use


7/14/2013 Active

2/23/2010 Active

2/23/2010 Active
2/23/2010 Active

6/11/2011 Active

3/26/2011 Active
7/14/2013 Active

5/28/2011 Active

7/14/2013 Active

12/31/2011 Active

9/6/2011 Active

7/28/2012 Active

6/23/2013 Active

8/20/2013 Active

12/2/2013 Active

3/31/2014 Active

5/5/2014 Active
8/20/2015 Active

10/11/2015 Active

5/16/2016 Active

7/1/2016 Active
5/24/2009 Active
1/31/2005 Active
4/30/2005 Active

11/6/2007 Active
3/26/2008 Active

Saudi Aramco: Company General Use


10/2/2006 Active
7/30/2008 Active

2/28/2005 Active

9/15/2010 Active

4/18/2016 Active

4/18/2016 Active
6/8/2017 Active

10/2/2016 Active
11/1/2015 Active

1/31/2016 Active

9/28/2014 Active
9/28/2014 Active
7/14/2012 Active

9/29/2014 Active

9/29/2014 Active
3/31/2008 Active

12/14/2011 Active
11/30/2016 Active

9/24/2007 Active

6/3/2015 Active

4/1/2012 Active

8/25/2010 Active

6/22/2016 Active

8/16/2016 Active

Saudi Aramco: Company General Use


5/2/2017 Active

6/22/2016 Active

6/22/2016 Active

11/16/2014 Active

8/13/2015 Active

12/14/2014 Active

12/14/2014 Active

12/14/2014 Active

12/15/2014 Active

12/14/2014 Active

11/17/2007 Active

11/17/2007 Active

12/14/2014 Active

11/17/2007 Active

5/20/2012 Active

11/17/2007 Active

11/17/2007 Active

1/11/2009 Active

10/24/2009 Active

3/9/2010 Active

Saudi Aramco: Company General Use


3/9/2010 Active

3/9/2010 Active

3/9/2010 Active
7/3/2016 Active
11/16/2014 Active

11/10/2014 Active
10/2/2016 Active

11/21/2006 Active

9/15/2013 Active
11/16/2014 Active
1/2/2017 Active

1/20/2016 Active
8/23/2015 Active

4/30/2015 4/30/2020 Active

4/30/2015 4/30/2020 Active

5/3/2015 5/3/2020 Active

5/3/2015 5/3/2020 Active

5/3/2015 5/3/2020 Active

5/4/2015 5/4/2020 Active

5/4/2015 5/4/2020 Active

5/4/2015 5/4/2020 Active

5/4/2015 5/4/2020 Active

5/5/2015 5/5/2020 Active

5/6/2015 5/6/2020 Active

5/6/2015 5/6/2020 Active

Saudi Aramco: Company General Use


5/6/2015 5/6/2020 Active

5/7/2015 5/7/2020 Active

5/7/2015 5/7/2020 Active

5/7/2015 5/7/2020 Active

5/7/2015 5/7/2020 Active

5/7/2015 5/7/2020 Active

10/16/2016 Active
10/16/2016 Active

8/9/2015 Active

11/10/2015 Active

10/1/2015 Active

11/8/2015 Active

12/28/2015 Active
6/9/2016 Active

2/21/2016 Active

7/1/2016 Active
7/10/2016 Active

5/24/2016 Active

4/20/2016 Active

4/20/2016 Active

4/20/2016 Active

4/20/2016 Active

4/20/2016 Active

Saudi Aramco: Company General Use


4/20/2016 Active

4/20/2016 Active

10/9/2016 Active

12/19/2016 Active
9/18/2014 7/2/2019 Active

12/11/2014 6/11/2018 Active


Major 10/16/2016 10/16/2019 Active

Major 12/31/2016 12/31/2019 Active

7/17/2012 7/17/2017 Active

5/28/2014 5/28/2019 Active


1/19/2010 1/19/2015 Active
5/15/2014 5/15/2019 Active

Major 3/21/2017 3/21/2020 Active


12/29/2014 12/29/2019 Active

Major 8/29/2016 8/29/2019 Active

Major 7/12/2016 7/12/2019 Active

12/4/2014 12/4/2019 Active


10/2/2014 10/2/2019 Active
7/23/2016 7/23/2019 Active
7/23/2016 7/23/2019 Active
7/9/2014 7/9/2019 Active
3/31/2014 3/31/2019 Active

11/18/2012 11/18/2017 Active

5/25/2014 5/25/2019 Active


3/31/2014 3/31/2019 Active

8/2/2016 8/2/2019 Active

3/26/2015 3/26/2020 Active

Saudi Aramco: Company General Use


3/11/2014 3/11/2019 Active
9/8/2015 9/15/2019 Active

Major 9/20/2017 9/20/2020 Active

Major 2/7/2017 2/7/2020 Active


7/2/2014 7/2/2019 Active
Major 1/24/2017 1/24/2020 Active

2/9/2016 3/11/2019 Active

4/23/2013 4/23/2016 Active

3/9/2016 12/9/2019 Active

Major 4/25/2017 4/25/2020 Active

9/19/2013 9/19/2018 Active

Major 2/9/2017 2/9/2020 Active

12/31/2015 12/31/2018 Active

Major 8/23/2017 8/23/2020 Active


8/21/2017 Active

5/1/2016 5/1/2019 Active


Major 5/2/2017 4/30/2020 Active
11/5/2012 11/5/2017 Active

6/14/2015 6/14/2018 Active


6/14/2015 Active

New 9/15/2016 9/15/2019 Active

New 9/15/2016 9/15/2019 Active

New 9/15/2016 9/15/2019 Active

6/27/2016 6/27/2019 Active

Saudi Aramco: Company General Use


12/10/2015 11/25/2018 Active
11/25/2015 Active

New 9/17/2017 9/17/2020 Active


5/27/2015 Active

1/24/2016 1/24/2019 Active

New 2/16/2017 2/16/2020 Active

Major 3/14/2017 11/12/2018 Active

6/25/2013 6/25/2016 Active

1/18/2012 1/18/2017 Active


2/6/2013 2/6/2018 Active
7/25/2012 7/25/2017 Active

Major 3/14/2017 1/15/2018 Active


Major 3/14/2017 7/25/2017 Active
6/18/2015 7/11/2017 Active
7/9/2014 7/9/2019 Active
Major 10/16/2016 10/16/2019 Active
Major 7/2/2017 7/2/2020 Active
4/12/2010 4/12/2015 Active

5/12/2016 5/12/2019 Active

9/11/2013 9/11/2018 Active


Major 6/27/2016 6/27/2019 Active
5/11/2016 5/11/2019 Active

12/4/2012 12/4/2017 Active


Major 6/7/2017 6/5/2020 Active

Major 6/6/2017 6/6/2020 Active

Major 7/23/2016 7/23/2019 Active

11/27/2014 11/27/2019 Active

Saudi Aramco: Company General Use


1/1/2016 1/1/2019 Active

2/15/2016 2/15/2019 Active


1/4/2009 Active
1/4/2009 Active
3/30/2015 Active

Major 8/1/2017 8/1/2020 Active


5/4/2014 5/4/2019 Active
Major 7/17/2017 7/17/2020 Active
5/22/2016 5/22/2019 Active

3/8/2015 3/8/2020 Active

3/31/2014 3/31/2019 Active


Major 7/20/2017 7/20/2020 Active

3/31/2014 3/31/2019 Active


11/19/2008 Active

11/19/2008 Active

11/19/2008 Active

2/19/2015 Active
11/19/2008 Active

3/31/2014 3/31/2019 Active


11/19/2008 Active

11/19/2008 Active

11/19/2008 Active

2/19/2015 Active
11/19/2008 Active

Saudi Aramco: Company General Use


3/31/2014 3/31/2019 Active
11/19/2008 Active

11/19/2008 Active

11/19/2008 Active

2/19/2015 Active
11/19/2008 Active

3/17/2013 3/17/2018 Active

7/31/2016 3/11/2020 Active

7/13/2014 7/13/2019 Active

Major 7/2/2017 7/2/2020 Active

12/10/2014 12/10/2019 Active

6/30/2014 6/30/2019 Active

5/4/2014 5/4/2019 Active

5/15/2014 5/15/2019 Active

10/12/2015 10/12/2018 Active

10/20/2014 10/20/2019 Active

5/15/2016 5/15/2019 Active


12/11/2014 7/2/2019 Active

12/2/2014 Active

11/30/2014 Active

5/14/2014 Active
Major 1/25/2017 1/25/2020 Active
12/25/2011 Active

Saudi Aramco: Company General Use


Major 1/30/2017 1/30/2020 Active
7/31/2004 Active

Major 9/27/2016 9/27/2019 Active


Major 7/23/2017 7/23/2020 Active

Major 7/23/2016 7/23/2019 Active

Major 11/14/2016 11/14/2019 Active


5/5/2016 5/5/2019 Active

6/1/2014 6/1/2019 Active

7/7/2015 8/21/2018 Active

1/16/2014 1/16/2019 Active


11/24/2014 11/24/2019 Active

Major 4/27/2017 4/26/2020 Active


12/3/2014 12/5/2017 Active

Major 5/4/2017 5/4/2020 Active

11/25/2013 11/25/2018 Active


Major 1/11/2017 1/11/2020 Active
9/24/2014 9/24/2019 Active

Major 9/27/2016 9/27/2019 Active


7/17/2014 7/17/2019 Active

Major 7/23/2016 7/23/2019 Active

9/28/2014 9/28/2019 Active

Major 1/11/2017 1/10/2020 Active


Major 12/8/2016 10/26/2018 Active

Major 6/6/2017 6/6/2020 Active

2/29/2016 1/1/2018 Active


Major 9/26/2016 9/26/2019 Active

Saudi Aramco: Company General Use


1/12/2015 1/12/2020 Active
9/16/2015 9/16/2018 Active
Major 6/22/2016 6/22/2019 Active
6/2/2016 6/2/2019 Active
7/17/2014 7/17/2019 Active
Major 5/4/2017 5/3/2020 Active
Major 7/2/2017 7/2/2020 Active

Major 9/6/2016 9/6/2019 Active


7/23/2016 7/23/2019 Active
12/10/2015 12/10/2018 Active
2/11/2016 1/28/2017 Active

Major 7/13/2017 7/13/2020 Active

1/18/2016 10/13/2018 Active

12/5/2012 12/5/2017 Active


11/4/2013 11/4/2018 Active

Major 1/24/2017 1/24/2020 Active

8/25/2012 8/25/2017 Active

4/23/2015 4/23/2020 Active

10/8/2013 10/8/2018 Active


9/28/2014 9/28/2019 Active
10/20/2015 10/20/2018 Active
New 8/28/2017 8/28/2020 Active
Major 8/25/2016 8/25/2019 Active

11/30/2011 11/30/2016 Active

11/30/2011 Active
New 1/5/2017 1/5/2020 Active

New 3/8/2017 3/8/2020 Active

Saudi Aramco: Company General Use


New 2/2/2017 2/2/2020 Active

New 8/7/2017 8/7/2020 Active

2/29/2016 10/15/2019 Active

7/4/2016 7/4/2019 Active


New 6/1/2017 6/1/2020 Active

Major 8/16/2017 8/16/2020 Active

9/10/2015 9/10/2018 Active


7/13/2015 7/13/2018 Active

11/9/2015 11/9/2018 Active

8/21/2014 8/21/2019 Active


10/26/2015 10/26/2018 Active

New 8/30/2017 8/30/2020 Active


12/5/2012 12/5/2017 Active

3/18/2015 12/5/2017 Active


3/31/2014 3/31/2019 Active

New 2/26/2017 2/26/2020 Active

New 2/26/2017 2/26/2020 Active

2/3/2014 2/3/2019 Active

11/25/2015 11/25/2018 Active

New 2/2/2017 2/2/2020 Active


11/29/2015 11/29/2018 Active
Major 4/16/2017 4/16/2020 Active

10/29/2015 10/29/2018 Active

10/26/2015 10/26/2018 Active


1/4/2016 1/4/2019 Active

Saudi Aramco: Company General Use


7/18/2012 9/6/2016 Active

2/15/2016 2/15/2019 Active

New 1/30/2017 1/30/2020 Active

7/22/2013 7/22/2018 Active

10/29/2015 3/25/2017 Active


9/15/2015 3/4/2019 Active

New 11/14/2016 11/14/2019 Active


New 9/7/2016 9/7/2019 Active
New 9/7/2016 9/7/2019 Active
New 1/17/2017 1/17/2020 Active

New 11/30/2016 11/30/2019 Active


New 1/30/2017 1/30/2020 Active
New 2/2/2017 2/2/2020 Active

11/4/2015 11/4/2018 Active

Major 1/25/2017 1/25/2020 Active

Saudi Aramco: Company General Use


11/16/2008 Active
11/16/2008 Active
11/16/2008 Active
5/13/2015 Active
8/10/2008 Active

11/23/2008 Active

Saudi Aramco: Company General Use


6/22/2014 Active

6/22/2014 Active

8/29/2016 Active
3/21/2010 11/15/2017 Active

8/24/2016 8/24/2019 Active


2/26/2013 2/26/2018 Active
2/20/2013 2/20/2018 Active

3/2/2013 3/2/2018 Active

2/11/2016 1/8/2019 Active

9/7/2015 9/7/2018 Active

6/12/2016 4/1/2018 Active

Major 6/26/2017 6/26/2020 Active

7/23/2016 Active

1/14/2015 6/27/2017 Active

5/25/2016 5/25/2019 Active

Saudi Aramco: Company General Use


Major 12/8/2016 12/8/2019 Active

Major 7/25/2017 7/25/2020 Active


4/7/2015 4/7/2020 Active
3/27/2013 3/27/2018 Active
Major 7/25/2017 7/25/2020 Active
Major 3/27/2017 3/27/2020 Active
9/30/2014 9/30/2019 Active

9/11/2013 9/11/2018 Active


12/4/2014 12/4/2019 Active

5/25/2014 5/25/2019 Active


5/25/2014 5/25/2019 Active
Major 3/25/2017 3/25/2020 Active

3/14/2017 3/14/2020 Active

3/14/2017 3/14/2020 Active

3/14/2017 3/14/2020 Active


5/5/2016 5/5/2019 Active
12/2/2013 12/2/2018 Active
3/9/2016 7/17/2019 Active
Major 5/31/2017 5/23/2020 Active

9/4/2014 9/4/2019 Active


10/26/2015 10/26/2018 Active
10/29/2015 10/29/2018 Active
11/29/2015 11/29/2018 Active

Major 2/14/2017 2/14/2020 Active

2/2/2015 2/2/2020 Active

1/13/2015 1/13/2020 Active


New 10/16/2016 10/16/2019 Active

Major 3/25/2017 3/25/2020 Active


Major 4/16/2017 4/16/2020 Active

Major 9/13/2017 9/13/2020 Active

Major 11/27/2016 11/27/2019 Active

Saudi Aramco: Company General Use


7/3/2012 7/3/2017 Active
Major 9/28/2016 9/28/2019 Active
Major 4/23/2017 4/23/2020 Active

Major 4/26/2017 4/26/2020 Active


Major 8/15/2017 8/15/2020 Active

Major 3/28/2017 3/28/2020 Active


Major 8/20/2017 8/20/2020 Active

Major 11/27/2016 11/27/2019 Active

Major 3/15/2017 3/15/2020 Active

8/20/2015 1/23/2017 Active


8/20/2015 3/11/2020 Active
4/25/2016 4/25/2019 Active
5/11/2011 8/29/2015 Active
3/11/2015 9/30/2019 Active
8/14/2014 8/14/2019 Active
Major 11/27/2016 11/27/2019 Active

Major 5/25/2017 5/25/2020 Active

Major 11/30/2016 11/30/2019 Active


6/21/2015 6/21/2018 Active
Major 8/20/2017 8/20/2020 Active

Major 8/14/2017 8/14/2020 Active

7/13/2015 6/11/2018 Active

7/13/2015 7/13/2018 Active

Major 12/25/2016 12/25/2019 Active

Major 12/25/2016 12/25/2019 Active


8/5/2012 3/25/2013 Active

Major 6/29/2017 6/29/2020 Active

6/30/2014 6/30/2018 Active

Saudi Aramco: Company General Use


Major 7/6/2017 7/6/2020 Active

Major 7/2/2017 7/2/2020 Active

7/2/2014 7/2/2019 Active


12/10/2014 12/16/2019 Active
7/10/2011 5/3/2016 Active
Major 3/14/2017 3/14/2020 Active

2/11/2016 2/11/2019 Active

11/12/2013 11/12/2018 Active

1/28/2015 1/28/2020 Active

5/27/2014 5/27/2019 Active

New 2/14/2017 2/14/2020 Active

4/5/2016 4/5/2019 Active

Major 8/1/2017 8/1/2020 Active

Major 2/7/2017 2/7/2020 Active

9/25/2012 9/25/2017 Active

12/15/2015 12/15/2018 Active

9/24/2014 9/24/2019 Active

10/9/2012 9/25/2017 Active

10/24/2012 10/24/2017 Active

Major 2/7/2017 2/7/2020 Active

Major 2/7/2017 1/7/2020 Active


Major 9/15/2016 9/15/2019 Active
Major 11/28/2016 11/28/2019 Active

Saudi Aramco: Company General Use


6/25/2013 6/25/2018 Active

4/10/2016 4/10/2019 Active


6/20/2016 6/20/2019 Active

2/28/2016 12/26/2018 Active


9/15/2016 9/15/2019 Active
7/13/2016 7/13/2019 Active

Major 7/12/2017 7/12/2020 Active

5/26/2016 5/26/2019 Active

10/20/2015 10/20/2018 Active


5/15/2014 5/15/2019 Active

12/2/2013 12/2/2017 Active


5/17/2015 9/6/2016 Active
10/16/2016 10/16/2019 Active
Major 1/19/2017 1/19/2020 Active
3/4/2015 3/4/2020 Active
2/29/2016 7/28/2018 Active

3/7/2016 6/3/2018 Active

8/15/2012 10/31/2017 Active

5/5/2016 5/5/2019 Active


Major 8/20/2017 8/20/2020 Active
5/5/2016 5/5/2019 Active
3/27/2016 3/27/2019 Active
Major 5/21/2017 5/21/2020 Active
1/12/2015 1/12/2020 Active
3/27/2016 3/27/2019 Active
5/29/2013 5/29/2018 Active
6/30/2014 6/30/2019 Active
7/13/2015 7/13/2018 Active

Major 2/16/2017 2/16/2020 Active


7/7/2013 7/7/2018 Active
3/1/2016 3/1/2019 Active

1/12/2015 7/22/2019 Active

Saudi Aramco: Company General Use


Major 1/9/2017 1/9/2020 Active
9/9/2015 9/9/2018 Active

Major 2/16/2017 2/16/2020 Active


4/13/2014 4/13/2019 Active

Major 8/24/2016 8/24/2019 Active

1/3/2015 1/3/2020 Active

Major 12/31/2016 12/31/2019 Active


3/17/2016 3/17/2019 Active

Major 9/11/2017 9/11/2020 Active


Major 7/18/2017 7/18/2020 Active
3/11/2014 3/11/2019 Active
1/15/2017 1/15/2020 Active
Major 1/10/2017 1/10/2020 Active
11/3/2014 11/3/2019 Active

10/12/2015 10/12/2018 Active

7/22/2014 7/22/2019 Active

3/5/2015 11/4/2018 Active


7/22/2014 7/22/2019 Active

3/11/2015 3/11/2020 Active

6/30/2014 6/30/2018 Active


12/24/2012 12/24/2017 Active
Major 3/30/2017 3/30/2020 Active

Major 3/8/2017 3/8/2020 Active

5/22/2013 5/22/2018 Active


11/1/2015 11/1/2018 Active

Major 7/17/2017 7/17/2020 Active


New 1/19/2017 1/19/2020 Active

New 3/2/2017 3/2/2020 Active

Saudi Aramco: Company General Use


New 3/1/2017 3/1/2020 Active

New 1/24/2017 1/24/2020 Active


6/20/2016 6/20/2019 Active
1/16/2014 1/16/2019 Active

9/8/2013 6/4/2018 Active


Major 8/7/2017 8/7/2020 Active

Major 7/19/2017 7/19/2020 Active

Major 4/30/2017 4/30/2020 Active

Major 4/30/2017 4/30/2020 Active

Major 9/20/2017 9/20/2020 Active


Major 9/20/2017 9/20/2020 Active
Major 9/20/2017 9/20/2020 Active
Major 9/20/2017 9/20/2020 Active
Major 9/20/2017 9/20/2020 Active
Major 9/20/2017 9/20/2020 Active
Major 9/20/2017 9/20/2020 Active

Major 9/20/2017 9/20/2020 Active

Major 9/20/2017 9/20/2020 Active


Major 9/20/2017 9/20/2020 Active

New 9/20/2017 9/20/2020 Active

New 9/20/2017 9/20/2020 Active

New 9/20/2017 9/20/2020 Active


New 9/20/2017 9/20/2020 Active

New 9/20/2017 9/20/2020 Active

Major 8/1/2017 8/1/2020 Active


Major 6/11/2017 6/11/2020 Active

2/24/2014 2/24/2019 Active

9/16/2015 6/30/2019 Active

Saudi Aramco: Company General Use


Major 1/24/2017 1/24/2020 Active
Major 1/17/2017 1/17/2020 Active

12/5/2012 12/5/2017 Active


Major 8/8/2017 8/8/2020 Active
Major 7/30/2017 7/30/2020 Active
1/28/2016 1/28/2019 Active

9/3/2014 9/3/2019 Active

1/21/2015 1/21/2020 Active

New 12/18/2016 12/18/2019 Active

1/7/2016 1/7/2019 Active

Major 12/18/2016 6/30/2019 Active


11/24/2013 11/24/2018 Active

5/22/2016 5/22/2019 Active

5/4/2014 5/4/2019 Active


5/25/2014 5/25/2019 Active

9/2/2014 9/2/2019 Active


9/8/2014 9/8/2019 Active

Major 7/9/2017 7/9/2020 Active

New 1/2/2017 1/2/2020 Active

Major 7/9/2017 7/9/2020 Active


7/11/2012 Active
3/22/2016 10/28/2019 Active
4/18/2016 5/22/2018 Active
3/9/2016 7/9/2019 Active
9/2/2014 9/2/2019 Active
Major 7/2/2017 7/2/2020 Active

3/1/2016 3/1/2019 Active


5/15/2016 5/15/2019 Active
Major 3/1/2017 3/1/2020 Active

Saudi Aramco: Company General Use


6/30/2014 6/30/2019 Active
4/20/2014 6/5/2016 Active
2/29/2016 3/1/2019 Active
Major 3/14/2017 3/14/2020 Active

6/12/2013 2/14/2015 Active


7/24/2012 11/30/2016 Active

10/26/2015 3/17/2018 Active

4/3/2013 4/13/2016 Active

Major 10/18/2016 10/18/2019 Active

Major 10/18/2016 10/18/2019 Active

Major 10/18/2016 10/18/2019 Active

5/2/2012 2/21/2016 Active

Major 4/23/2017 4/23/2020 Active

Major 10/18/2016 10/18/2019 Active

5/25/2014 5/25/2019 Active

9/17/2013 9/17/2018 Active

Major 4/30/2017 4/30/2020 Active


9/9/2013 12/31/2017 Active
9/17/2013 1/31/2015 Active
6/30/2014 6/30/2019 Active
Major 6/11/2017 6/11/2020 Active

5/15/2016 5/15/2019 Active


5/18/2016 5/18/2019 Active
8/10/2016 8/10/2019 Active

1/22/2015 1/22/2020 Active

Saudi Aramco: Company General Use


Major 9/29/2016 9/29/2019 Active
Major 9/29/2016 9/29/2019 Active

11/10/2014 11/10/2019 Active


Major 9/29/2016 9/29/2019 Active

6/15/2016 6/15/2019 Active


12/11/2013 2/27/2018 Active
Major 1/25/2017 1/25/2020 Active

7/24/2013 4/22/2018 Active


1/30/2014 4/3/2018 Active

11/7/2013 12/5/2017 Active

2/18/2013 2/18/2018 Active


Major 11/22/2016 11/22/2019 Active

Major 6/27/2016 6/27/2019 Active

Major 6/29/2016 6/29/2019 Active


10/29/2015 7/22/2017 Active
8/28/2013 7/22/2017 Active

10/29/2015 11/10/2018 Active


7/7/2015 7/7/2018 Active
10/29/2015 10/29/2018 Active

Major 8/30/2017 8/30/2020 Active

Saudi Aramco: Company General Use


4/25/2006 Active

4/25/2006 Active

4/25/2006 Active

4/25/2006 Active

4/25/2006 Active

4/25/2006 Active

4/25/2006 Active

4/25/2006 Active

4/25/2006 Active

4/25/2006 Active

4/25/2006 Active
4/25/2006 Active

4/25/2006 Active

4/25/2006 Active

4/25/2006 Active
4/25/2006 Active

5/25/2006 Active
4/25/2006 Active
8/15/2006 Active

Saudi Aramco: Company General Use


4/25/2006 Active
4/25/2006 Active

4/25/2006 Active
4/25/2006 Active

4/25/2006 Active
4/25/2006 Active

4/25/2006 Active
4/25/2006 Active

4/25/2006 Active

4/25/2006 Active

4/25/2006 Active

4/25/2006 Active

2/27/2007 Active

4/25/2006 Active

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use

You might also like