MEPC.127 (53) - Guidelines For Ballast Water Management and Development of Ballast Water Management Plans (G4)
MEPC.127 (53) - Guidelines For Ballast Water Management and Development of Ballast Water Management Plans (G4)
MEPC.127 (53) - Guidelines For Ballast Water Management and Development of Ballast Water Management Plans (G4)
127(53)
Adopted on 22 July 2005
GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT
OF BALLAST WATER MANAGEMENT PLANS (G4)
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT MEPC 53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
RESOLUTION MEPC.127(53)
RECALLING ALSO that the International Conference on Ballast Water Management for
Ships held in February 2004 adopted the International Convention for the Control and
Management of Ships’ Ballast Water and Sediments, 2004 (the Ballast Water Management
Convention) together with four Conference resolutions,
NOTING that Regulation A-2 of the Ballast Water Management Convention requires that
discharge of ballast water shall only be conducted through Ballast Water Management in
accordance with the provisions of the Annex to the Convention,
NOTING FURTHER that Regulation B-1 of the Annex to the Ballast Water Management
Convention provides that each ship shall have on board and implement a ballast water
management plan approved by the Administration, taking into account Guidelines developed by
the Organization,
HAVING CONSIDERED the draft Guidelines for ballast water management and
development of ballast water management plans developed by the Ballast Water Working Group
and the recommendation made by the Sub-Committee on Bulk Liquids and Gases at its
ninth session,
1. ADOPTS the Guidelines for ballast water management and development of ballast water
management plans, as set out in the Annex to this resolution;
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
MEPC GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT
53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 2
ANNEX
1 INTRODUCTION
1.1 Ballast water is essential to control trim, list, draught, stability, or stresses of the ship.
However, ballast water may contain aquatic organisms or pathogens which, if introduced into the
sea including estuaries, or into fresh water courses, may create hazards to the environment,
human health, property or resources, impair biological diversity or interfere with other legitimate
uses of such areas.
1.2 The selection of appropriate methods of ballast water management should take into
account the need ensure that Ballast Water Management practices used to comply with this
Convention do not cause greater harm than they prevent to the environment, human health,
property or resources of any States and the safety of ships.
1.3 The objectives of these Guidelines are to assist Governments, appropriate authorities,
ships masters, operators and owners, and port authorities, as well as other interested parties, in
preventing, minimizing and ultimately eliminating the risk of introducing harmful aquatic
organisms and pathogens from ships' ballast water and associated sediments while protecting
ships’ safety in applying the International Convention for the Control and Management of Ships’
Ballast Water and Sediments (hereinafter referred to as the “Convention”).
2 DEFINITIONS
2.1 For the purposes of these Guidelines, the definitions in the Convention apply.
2.2 Ballast Water Tank means any tank, hold, or space used for the carriage of ballast water.
3 APPLICATION
3.1 The Guidelines apply to all ships and to Flag Administrations, port States, coastal States,
ship owners, ship operators, ships’ personnel involved in Ballast Water Management, ship
designers, ship builders, classification societies as well as other interested parties.
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT MEPC 53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 3
1.1.1 If it is necessary to take on and discharge ballast water in the same port to facilitate safe
cargo operations, care should be taken to avoid unnecessary discharge of ballast water that has
been taken up in another port.
1.1.2 Managed ballast water which is mixed with unmanaged ballast water is no longer in
compliance is no longer in compliance with Regulations D-1 and D-2 of the Annex to the
Convention.
1.1.3 When loading ballast, every effort should be made to avoid the uptake of potentially
harmful aquatic organisms, pathogens, and sediment that may contain such organisms. The
uptake of ballast water should be minimized or, where practicable, avoided in areas and
situations such as:
.1 in areas identified by the port State in connection with advice provided by ports
under paragraph 2.2.2;
1.2.1.1 Ballast water exchange is to be conducted in accordance with Regulation B-4 of the
Convention and in accordance with the Guidelines for Ballast Water Exchange.
1.2.1.2 The voyage should be planned taking into account when ballast water exchange in
accordance with Regulation B–4 of the Convention can be carried out.
1.2.1.3 Because of the possibility that partially exchange may encourage re-growth of
organisms, ballast water exchange should only be commenced in any tank if there is sufficient
time to complete the exchange to comply with the standard in Regulation D-1 and the ship can
comply with the distance from land and minimum water depth criteria in Regulation B-4. As
many complete tanks should be exchanged to the standard in Regulation D-1 as the time allows,
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
MEPC GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT
53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 4
if for any tank the standard in Regulation D-1 can not be fully met the exchange should not be
commenced for that tank.
1.2.1.4 If ballast water exchange is not undertaken for the reasons in Regulation B-4.4, i.e. if the
master reasonably decides that such exchange would threaten the safety or stability of the ship,
its crew, or its passengers because of adverse weather, ship design or stress, equipment failure, or
any other extraordinary condition, then details of the reasons ballast water exchange was not
undertaken are to be recorded in the Ballast Water Record Book.
1.2.1.5 A port State may designate areas in which exchange may be conducted taking into
account the Guidelines on designation of areas for ballast water exchange. Designated areas
should only be used for those ballast water tanks that are intended to be discharged in the port of
that State and that could not be exchanged in accordance with Regulation B-4.1 of the
Convention.
1.2.2.1 Ballast Water Management Systems installed for compliance with Regulation B-3 are to
be approved in accordance with Regulation D-3. Such systems are to be operated in accordance
with the system design criteria and the manufacture’s operational and maintenance instructions.
The use of such systems should be detailed in the ship’s Ballast Water Management Plan. All
failures and malfunctions of the system are to be recorded in the Ballast Water Record Book.
1.2.3.1 If ballast water reception facilities provided by a port State are utilized,
Regulation B-3.6 applies.
1.2.4.1 Prototype ballast water treatment technologies should be used within a programme
approved by the Administration in accordance with Regulation D-4.
1.3.1 Regulation B-5 requires that all ships shall remove and dispose of sediments from spaces
designated to carry ballast water in accordance with the ballast water management plan.
1.3.2 All practical steps should be taken during ballast uptake to avoid sediment accumulation,
however, it is recognized that sediment will be taken on board and will settle on tank surfaces.
When sediment has accumulated, consideration should be given to flushing tank bottoms and
other surfaces when in suitable areas, i.e. areas complying with the minimum depth and distance
described by Regulations B-4.1.1 and B-4.1.2.
1.3.3 The volume of sediment in a ballast tank should be monitored on a regular basis.
1.3.4 Sediment in ballast tanks should be removed in a timely basis in accordance with the
Ballast Water Management Plan and as found necessary. The frequency and timing of removal
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT MEPC 53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 5
will depend on factors such as sediment build up, ship’s trading pattern, availability of reception
facilities, work load of the ship’s personnel and safety considerations.
1.3.5 Removal of sediment from ballast tanks should preferably be undertaken under controlled
conditions in port, at a repair facility or in dry dock. The removed sediment should preferably be
disposed of in a sediment reception facility if available, reasonable and practicable.
1.3.6 When sediment is removed from the ship’s ballast tanks and is to be disposed of by that
ship at sea, such disposal should only take place in areas outside 200 nm from land and in water
depths of over 200 m.
1.3.7 Regulation B-5 requires that ships constructed in or after 2009 should, without
compromising safety or operational efficiency, be designed and constructed with a view to
minimize the uptake and undesirable entrapment of sediments, facilitate removal of sediments,
and provide safe access to allow for sediment removal and sampling, taking into account the
Guidelines for sediments control on ships (G12). This also applies to ships constructed prior
to 2009, to the extent practicable.
1.4.1 Ships to which additional measures apply, under Regulation C-1, should take them into
account in the ships voyage planning. Actions taken to comply with any additional measures
should be recorded in the Ballast Water Record Book.
1.5 Exemptions
1.5.1 Regulation A-4 provides that an exemption may be granted from the requirements of
Regulations B-3 or C-1 by a Party or Parties to a ship in specific circumstances. Applications for
and the granting of such exemptions should be completed in accordance with the Guidelines for
risk assessment (G7).
1.5.2 Ships granted an exemption referred to in paragraph 1.5.1 above should record the
exemption in the Ballast Water Record Book and what actions have been taken with regards to
the ships ballast water.
2 RECORDING PROCEDURES
2.1.1 To facilitate the administration of ballast water management and treatment procedures on
board each ship, a responsible officer is to be designated in accordance with Regulation B-1 to
ensure the maintenance of appropriate records and to ensure that ballast water management
and/or treatment procedures are followed and recorded.
2.1.2 When carrying out any ballast water operation the details are to be recorded in the
Ballast Water Record Book together with any exemptions granted in accordance with
Regulation B-3 or C-1.
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
MEPC GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT
53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 6
2.1.3 Where a port State requires information on ships ballast operations, relevant
documentation, which takes account of the information requirements of the Convention, should
be made available to the port State.
2.2.1 Port States should provide ships with details of their requirements concerning ballast
water management including:
.1 the location and terms of use of areas designated for ballast water exchange under
Regulation B-4.2 of the Convention;
.3 warnings concerning ballast uptake and any other port contingency arrangements
in the event of emergency situations; and
.4 the availability, location, capacities of reception facilities that are provided for the
environmentally safe disposal of ballast water and/or sediments, under Article 5
and Regulation B-3.6.
2.2.2 To assist ships in applying the precautionary practices described in section 1.1 of Part A,
port States are required by Regulation C-2 of the Convention to endeavour to notify mariners of
area(s), where ships should not uptake Ballast Water due to known conditions. Similar
notification should be given for areas where the uptake of ballast water should be minimized,
such as:
.2 areas with current phytoplankton blooms (algal blooms, such as red tides);
3.1 Regulation B-6 requires that officers and crew shall be familiar with their duties in the
implementation of Ballast Water Management particular to the ship on which they serve.
Owners, managers, operators, and others involved in officer and crew training for ballast water
management should consider the following:
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT MEPC 53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 7
3.2 Training for ships’ masters and crews as appropriate should include instructions on the
requirements of the Convention, the ballast water and sediment management procedures and the
Ballast Water Record Book particularly having regard to matters of ship safety and maintenance
of records in accordance with the information contained in these Guidelines.
3.3 The Ballast Water Management Plan should include training and education on ballast
water management practices and the systems and procedures used on board the ship.
1 INTRODUCTION
1.1 These Guidelines have been developed to assist with the preparation of a ship’s Ballast
Water Management Plan (hereafter referred to as the “Plan”). The Plan must be approved by the
Administration in accordance with Regulation B-1 of the Convention.
.1 General: this section provides the objectives and a general overview of the
subject matter and introduces the reader to the basic concept of the Guidelines and
the Plan that is expected to be developed from them. This section also contains
guidance on updating and use of the Plan.
1.3 The format for a Ballast Water Management Plan is given in Appendix 1.
2 GENERAL
2.1.1 These Guidelines are intended to provide a basis for the preparation of the Plans for
individual ships. The broad spectrum of ships for which Plans are required makes it impractical
to provide specific guidelines for each ship type. For a Plan to be effective and to comply with
Regulation B-1 of the Annex of the Convention, it must be carefully tailored to the particular
ship for which it is intended. Properly used, the Guidelines will ensure that all appropriate issues
that may be applicable to a particular ship are considered in developing the Plan.
2.1.2 The issues that may require consideration include but are not limited to: type and size of
ship, volume of ballast carried and total capacity of tanks used for ballast, ballast pumping
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
MEPC GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT
53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 8
capacity, ship and crew safety issues, voyage type and length, the ship’s typical operational
requirements, and ballast water management techniques used on board.
2.2.1 The Plan is required to be onboard the ship and available to guide personnel in safe
operation of the Ballast Water Management system employed on a particular ship. Effective
planning ensures that the necessary actions are taken in a structured, logical, and safe manner.
2.2.3 The Plan envisioned by Regulation B-1 of the Annex to the Convention is intended to be
a simple document. Inclusion of extensive background information on the ship, its structure, etc.,
should be avoided, as this is generally available elsewhere. If such information is relevant, it
should be kept in annexes, or an existing document or manual reference should be made to the
location of the information.
2.2.4 The Plan is a document to be used on board by the ship’s personnel engaged in ballast
water management. The Plan must therefore be available in a working language of the ship’s
personnel. A change in the personnel and or the, working language or would require the issuance
of the Plan in the new language(s).
2.2.5 The Plan should be readily available for inspection by officers authorized by a Party to
the Convention.
2.3 Exemptions
2.3.1 Regulation A-4 allows that exemption may be granted to a ship from Regulation B-3
or C-1.
2.3.3 Any exemption granted is to be recorded in the Ballast Water Record Book.
2.4.1 The Convention, in Regulation C-1 Additional Measures, gives a Party individually or
jointly with other Parties, the right to introduce measures in addition to those in Section B. Such
Additional Measures are to be communicated to the Organization at least 6 months prior to the
projected date of implementation.
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT MEPC 53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 9
2.4.2 The Plan should be accompanied by a most recent list of Additional measures, as
communicated by the Organization relevant to the ship’s trade. The Plan should contain details
and advice on the actions a ship must take to comply with any additional measures that may be
required in accordance with Regulation C-1 and for any emergency or epidemic situations.
2.5.1 Regular review of the Plan by the owner, operator, or master should be conducted to
ensure that the information contained is accurate and updated. A feedback system should be
employed which will allow quick capture of changing information and incorporation of it into
the Plan.
2.5.2 Changes to the provisions of this Plan will need Administration approval.
3 MANDATORY PROVISIONS
3.1 This section provides individual guidelines for the seven mandatory provisions of
Regulation B-1 of the Annex to the Convention. In addition, it provides information to assist
ships personnel in managing ballast water and sediments.
3.2 Regulation B-1 of the Annex to the Convention provides that the Plan shall be specific to
each ship and shall at least:
.1 detail safety procedures for the ship and the crew associated with Ballast Water
Management as required by the Convention;
.3 detail the procedures for the disposal of sediments at sea and to shore;
.5 designates the officer on board in charge of ensuring that the Plan is properly
implemented;
.6 contain the reporting requirements for ships provided for under the Convention;
and
.7 be written in the working language of the ship. If the language used is not
English, French or Spanish, a translation into one of these languages should be
provided.
3.3 The Ballast Water Management Plan should give guidance on the ballast handling
procedures to be followed, including:
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
MEPC GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT
53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 10
.2 step-by-step procedures and sequences for the Ballast Water Management System
used; and
.3 any operational or safety restrictions including those associated with the Ballast
Water Management System used. This will also assist ship’s personnel when
responding to enquiries from inspection officers authorized by a Party.
3.4 Safety aspects of the Ballast Water Management system used should include, as
applicable, guidance on:
.1 stability to be maintained at all times to values not less than those recommended
by the Organization (or required by the Administration);
.2 approved longitudinal stress and, where applicable, torsional stress values are to
be maintained within permitted values;
.5 forward and aft draughts and trim, with particular reference to bridge visibility,
slamming and minimum forward draft;
.6 the effects of any potential hazards and occupational health that may affect ship’s
personnel shall also be identified together with any safety precautions that need to
be taken; and
3.5 If a ship is able to complete at least 95 per cent volumatic exchange in less than three
pumped volumes, documentation indicating that this ballast water exchange process has been
approved under Regulation D-1.2 should be provided in the Plan.
3.6 The Plan should also include procedures for the disposal of sediments and in particular:
.1 on the sediment removal or reduction at sea, and when cleaning of the ballast
tanks to remove sediments;
3.7 The Plan should clearly identify the officer in charge of ballast water management and
outline his/her duties which should include:
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT MEPC 53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 11
.1 ensuring that the Ballast Water Management performed follows the procedures in
the Plan;
.2 ensuring that the Ballast Water Record Book and any other necessary
documentation are maintained; and
.3 being available to assist the inspection officers authorized by a Party for any
sampling that may need to be undertaken.
3.8 The Plan should contain guidance on the recording requirements according to ship’s
Ballast Water Record Book provided for under this Convention including details of exemptions
granted to the ship.
3.9 In addition to the above, the Plan should include the following:
.1 A foreword which should provide the ship’s crew with explanations on the need
for ballast water management and for record keeping. The foreword should
include a statement that, “This Plan must be kept available for inspection on
request by an authorized authority”.
.1 ships’ name, flag, port of registry, Gross Tonnage, IMO number*, length
(BP), beam, international call sign; deepest ballast drafts (normal and
heavy weather);
.2 the total ballast capacity of the ship in cubic meters and other units if
applicable to the ship;
.3 a ballast water piping and pumping arrangement, including air pipes and
sounding arrangements;
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
MEPC GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT
53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 12
.2 This section should make clear that sampling of ballast water is primarily a
matter for the authorized inspection officers, and there is unlikely to be
any need for crew members to take samples except at the express request,
and under the supervision, of the authorized inspection officers.
.8 safety aspects associated with the particular systems and procedures used
onboard the ship which affect the safety or human health of crew and
passengers and/or the safety of the ship;
.10 procedures for the safe handling and packaging of sediment; and
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT MEPC 53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 13
4 NON-MANDATORY INFORMATION
4.1 In addition to the provisions required by Articles and regulations of the Convention, the
owner/operator may include in the Plan, as appendices, additional information such as: provision
of additional diagrams and drawings, shipboard equipment and reference materials. National or
regional requirements that differ from the Convention may also be recorded for reference.
4.2 Non-mandatory information may also include manufactures manuals (either as extracts or
complete) or reference to the location on board of such manuals and other relevant material.
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
MEPC GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT
53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 14
APPENDIX
PREAMBLE
The ballast water management plan should contain the information required by Regulation B-1
of the Convention.
For guidance in preparing the plan the following information is to be included. The plan should
be specific to each ship.
INTRODUCTION
At the beginning of each plan, wording should be included to reflect the intent of the following
text.
1 This Plan is written in accordance with the requirements of Regulation B-1 of the
International Convention for the Control and Management of Ships’ Ballast Water and
Sediments, 2004 (the Convention) and the associated Guidelines.
2 The purpose of the Plan is to meet the requirements for the control and management of
ship’s ballast water and sediments in accordance with the Guidelines for Ballast Water
Management and the Development of Ballast Water Management Plans
resolution MEPC XX(YY) (The Guidelines). It provides standard operational guidance for the
planning and management of ships’ ballast water and sediments and describes safe procedures to
be followed.
3 This Plan has been approved by the Administration and no alteration or revision shall be
made to any part of it without the prior approval of the Administration.
Note: The Plan is to be written in the working language of the crew, if the text is not in
English, French, or Spanish, the plan is to include a translation into one of these languages.
SHIP PARTICULARS
Ships’ name;
Flag;
Port of registry;
Gross Tonnage;
IMO number*;
*
In accordance with resolution A.600(15), IMO Ship Identification Number Scheme.
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT MEPC 53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 15
Length (BP);
Beam;
International call sign;
Deepest ballast drafts (normal and heavy weather);
Total ballast capacity of the ship in cubic meters and other units if applicable to the ship;
A brief description of the main ballast water management method(s) used on the ship; and
Identification (rank) of the appointed ballast water management officer.
INDEX
PURPOSE
Should contain a brief introduction for the ship’s crew, explaining the need for ballast water
management, and the importance of accurate record keeping.
Lists and/or diagrams indicating the location of sampling and access points in pipelines and
ballast water tanks.
A note that sampling of ballast water is primarily a matter for the authorized authority, and there
is unlikely to be any need for crew members to take samples except at the express request, and
under the supervision, of the authorized authority.
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
MEPC GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT
53/24/Add.1
OF BALLAST WATER MANAGEMENT PLANS (G4)
ANNEX 5
Page 16
A detailed description of the operation of the Ballast Water Management System(s) used
on board.
Details of specific safety aspects of the ballast water management system used.
Details of specific operational or safety restrictions including those associated with the
management system which affects the ship and or the crew including reference to procedures for
safe tank entry.
Details of the method(s) used on board for the management of ballast and for sediment control
including step-by-step operational procedures.
METHODS OF COMMUNICATION
Details of the procedures for co-ordinating the discharge of ballast in waters of a coastal State.
RECORDING REQUIREMENTS
EXEMPTIONS
APPROVING AUTHORITY
***
I:\MEPC\53\24-Add-1.doc
RESOLUTION MEPC.127(53)
Adopted on 22 July 2005
GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT
OF BALLAST WATER MANAGEMENT PLANS (G4)