Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

DC

Download as pdf or txt
Download as pdf or txt
You are on page 1of 39

DATE STAMP

03.08.2020
17:47
220KV THUAN NAM 12 SS
Customer THANH VINH SOLAR JSC
Consultant DINA CO.LTD
Drawing set TN12_DC SYSTEM
Stage FINAL
Issue Date 20.04.2020
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
COVER 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page A1
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM of 612
DATE STAMP
03.08.2020
17:47
Table of Contents
Project Name: 220KV THUAN NAM 12 SS
Job Number : 19138.220TN12
Drawing Set Installation Location Page Number Description
TN12_DC SYSTEM DC G A1 COVER
TN12_DC SYSTEM DC G B1 BILL OF MATERIAL
TN12_DC SYSTEM DC G B2 BILL OF MATERIAL
TN12_DC SYSTEM DC G B3 BILL OF MATERIAL
TN12_DC SYSTEM DC G B4 BILL OF MATERIAL
TN12_DC SYSTEM DC G G1 DC - SINGLE LINE
TN12_DC SYSTEM DC G G2 DC LAYOUT
TN12_DC SYSTEM DC RP 1 DC INCOMING
TN12_DC SYSTEM DC RP 2 MEASUREMENT DC1
TN12_DC SYSTEM DC RP 3 MEASUREMENT DC2
TN12_DC SYSTEM DC RP 4 DC1 DISTRIBUTION
TN12_DC SYSTEM DC RP 5 DC2 DISTRIBUTION
TN12_DC SYSTEM DC RP 6 HEATING & LIGHTING
TN12_DC SYSTEM DC RP 7 DC DISTRIBUTION
TN12_DC SYSTEM DC RP 8 DC SUPPLY FOR 24kV PANEL
TN12_DC SYSTEM DC RP 9 INVERTER
TN12_DC SYSTEM DC RP 10 BCU
TN12_DC SYSTEM DC RP 11 BCU
TN12_DC SYSTEM DC RP 12 DIGITAL INPUTS BCU
TN12_DC SYSTEM DC RP 13 DIGITAL INPUTS BCU
TN12_DC SYSTEM DC RP 14 DIGITAL INPUTS BCU
TN12_DC SYSTEM DC RP 15 DIGITAL INPUTS BCU
TN12_DC SYSTEM DC RP 16 DIGITAL INPUTS BCU
TN12_DC SYSTEM DC RP 17 DIGITAL INPUTS BCU
TN12_DC SYSTEM DC RP 18 DIGITAL INPUTS BCU
TN12_DC SYSTEM DC RP 19 DIGITAL INPUT BCU
TN12_DC SYSTEM DC RP 20 DIGITAL INPUTS BCU
TN12_DC SYSTEM DC RP 21 DIGITAL INPUT BCU
TN12_DC SYSTEM DC RP 22 SIGNALS & INDICATOR
TN12_DC SYSTEM DC RP 23 CONTROL MCCB
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
TABLE OF CONTENTS 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page A2
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:47
Drawing Set Installation Location Page Number Description
TN12_DC SYSTEM DC RP 24 SYMBOL OF DEVICES
TN12_DC SYSTEM DC RP 25 TERMINAL OF LIST
TN12_DC SYSTEM DC RP 26 TERMINAL OF LIST
TN12_DC SYSTEM DC RP 27 TERMINAL OF LIST
TN12_DC SYSTEM DC RP 28 TERMINAL OF LIST
TN12_DC SYSTEM DC RP 29 TERMINAL OF LIST
TN12_DC SYSTEM DC RP 30 TERMINAL OF LIST
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
TABLE OF CONTENTS 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page A3
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:47
BILL OF MATERIAL
Project name: 220KV THUAN NAM 12 SS
Item No. Device Tag Installation Location Page Part Number Description Manufacturer
1 BCU DC RP /10.1 C650-D-N-J-F-1-G-1-HI-6-E-1-1-1-0 Bay Control Unit BCU GE
2 F27.1 DC RP /2.5 EMR6-VM600-A-1 Rơ le giám sát điện áp F27/59 Eaton
3 F27.2 DC RP /3.5 EMR6-VM600-A-1 Rơ le giám sát điện áp F27/59 Eaton
4 F59.1 DC RP /2.7 EMR6-VM600-A-1 Rơ le giám sát điện áp F27/59 Eaton
5 F59.2 DC RP /3.7 EMR6-VM600-A-1 Rơ le giám sát điện áp F27/59 Eaton
6 F64.1 DC RP /2.4 EMR6-R250-A-1 Insulation monitoring relays Eaton
7 F64.2 DC RP /3.4 EMR6-R250-A-1 Insulation monitoring relays Eaton
8 FAC DC RP /6.3 PLS6-C10/2 MCB, AC, 6kA 2poles 10A Eaton
9 FAC DC RP /6.3 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
10 FBCU DC RP /7.5 FAZ-C10/2-DC MCB, DC, 10kA 2poles 10A Eaton
11 FBCU DC RP /7.5 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
12 FINV DC RP /9.4 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
13 FINV DC RP /9.4 FAZ-C16/2-DC MCB, DC, 10kA 2poles 16A Eaton
14 FM1 DC RP /1.3 FAZ-C2/2-DC MCB, 110DC, 10kA 2poles 2A Eaton
15 FM1 DC RP /1.3 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
16 FM2 DC RP /1.6 FAZ-C2/2-DC MCB, 110DC, 10kA 2poles 2A Eaton
17 FM2 DC RP /1.6 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
18 FS DC RP /7.6 FAZ-C10/2-DC MCB, DC, 10kA 2poles 10A Eaton
19 FS DC RP /7.6 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
20 FSLV DC RP /8.4 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
21 FSLV DC RP /8.4 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
22 FV1 DC RP /1.3 FAZ-C2/2-DC MCB, 110DC, 10kA 2poles 2A Eaton
23 FV1 DC RP /1.3 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
24 FV2 DC RP /1.6 FAZ-C2/2-DC MCB, 110DC, 10kA 2poles 2A Eaton
25 FV2 DC RP /1.6 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
26 INV1 DC RP /9.4 YK-DA-HD-3000 Bộ biến đổi 220VDC/220VAC Yucoo
27 INV2 DC RP /9.6 YK-DA-HD-3000 Bộ biến đổi 220VDC/220VAC Yucoo
28 KINV DC RP /9.3 NC1- 6508 Contactor 2NO2NC CHINT
29 KL DC RP /7.2 BF-4BB-220VDC Latch relay Arteche
30 KL DC RP /7.2 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
31 KQF00 DC RP /22.3 REL-IR4/LDP-220DC/4X21 Auxiliary Relays Phoenix
32 KQF00 DC RP /22.3 PR2-BSC2/4X21 Auxiliary Relay Phoenix/EU
33 KQF01 DC RP /22.2 REL-IR4/LDP-220DC/4X21 Auxiliary Relays Phoenix
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
BILL OF MATERIAL 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page B1
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:47
Item No. Device Tag Installation Location Page Part Number Description Manufacturer
34 KQF01 DC RP /22.2 PR2-BSC2/4X21 Auxiliary Relay Phoenix/EU
35 KQF02 DC RP /22.4 REL-IR4/LDP-220DC/4X21 Auxiliary Relays Phoenix
36 KQF02 DC RP /22.4 PR2-BSC2/4X21 Auxiliary Relay Phoenix/EU
37 KS DC RP /7.2 PR2-BSC2/4X21 Auxiliary Relay Phoenix/EU
38 KS DC RP /7.2 REL-IR4/LDP-220DC/4X21 Auxiliary Relays Phoenix
39 KS1 DC RP /8.6 RF-4R Relay fast trip Arteche
40 KS1 DC RP /8.6 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
41 LD0 DC RP /22.6 ADWZ25-K/2 Switch position display Leelen
42 LD1 DC RP /22.5 ADWZ25-K/2 Switch position display Leelen
43 LD2 DC RP /22.7 ADWZ25-K/2 Switch position display Leelen
44 MA1 DC RP /2.2 CS1-VA-DVB-8-ADH Ammeter Adtek
45 MA2 DC RP /3.2 CS1-VA-DVB-8-ADH Ammeter Adtek
46 MV1 DC RP /2.2 CS1-VA-DV5-8-ADH Voltmeter Adtek
47 MV2 DC RP /3.2 CS1-VA-DV5-8-ADH Voltmeter Adtek
48 PBG0 DC RP /24.4 YW1B-M1E11G Green Push Button IDEC
49 PBG1 DC RP /24.2 YW1B-M1E11G Green Push Button IDEC
50 PBG2 DC RP /24.6 YW1B-M1E11G Green Push Button IDEC
51 PBR0 DC RP /24.5 YW1B-M1E11R Red Push Button IDEC
52 PBR1 DC RP /24.3 YW1B-M1E11R Red Push Button IDEC
53 PBR2 DC RP /24.7 YW1B-M1E11R Red Push Button IDEC
54 PL1 DC RP /2.8 YW1P-2EQM3 R YW control unit dome full voltage LED red IDEC
55 PL2 DC RP /3.8 YW1P-2EQM3 R YW control unit dome full voltage LED red IDEC
56 QF1.01 DC RP /4.1 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
57 QF1.01 DC RP /4.1 FAZ-C63/2-DC MCB, DC, 10kA 2poles 63A Eaton
58 QF1.02 DC RP /4.2 FAZ-C63/2-DC MCB, DC, 10kA 2poles 63A Eaton
59 QF1.02 DC RP /4.2 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
60 QF1.03 DC RP /4.3 FAZ-C50/2-DC MCB, DC, 10kA 2poles 50A Eaton
61 QF1.03 DC RP /4.3 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
62 QF1.04 DC RP /4.4 FAZ-C50/2-DC MCB, DC, 10kA 2poles 50A Eaton
63 QF1.04 DC RP /4.4 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
64 QF1.05 DC RP /4.5 FAZ-C50/2-DC MCB, DC, 10kA 2poles 50A Eaton
65 QF1.05 DC RP /4.5 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
66 QF1.06 DC RP /4.6 FAZ-C50/2-DC MCB, DC, 10kA 2poles 50A Eaton
67 QF1.06 DC RP /4.6 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
BILL OF MATERIAL 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page B2
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:47
Item No. Device Tag Installation Location Page Part Number Description Manufacturer
68 QF1.07 DC RP /4.7 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
69 QF1.07 DC RP /4.7 FAZ-C32/2-DC MCB, 220VDC,10kA 2 poles 32A Eaton
70 QF1.08 DC RP /4.8 FAZ-C32/2-DC MCB, 220VDC,10kA 2 poles 32A Eaton
71 QF1.08 DC RP /4.8 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
72 QF1.09 DC RP /4.8 FAZ-C32/2-DC MCB, 220VDC,10kA 2 poles 32A Eaton
73 QF1.09 DC RP /4.8 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
74 QF1.10 DC RP /4.7 FAZ-C32/2-DC MCB, 220VDC,10kA 2 poles 32A Eaton
75 QF1.10 DC RP /4.7 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
76 QF1.11 DC RP /4.6 FAZ-C32/2-DC MCB, 220VDC,10kA 2 poles 32A Eaton
77 QF1.11 DC RP /4.6 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
78 QF1.12 DC RP /4.5 FAZ-C32/2-DC MCB, 220VDC,10kA 2 poles 32A Eaton
79 QF1.12 DC RP /4.5 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
80 QF1.13 DC RP /4.5 FAZ-C32/2-DC MCB, 220VDC,10kA 2 poles 32A Eaton
81 QF1.13 DC RP /4.5 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
82 QF1.14 DC RP /4.4 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
83 QF1.14 DC RP /4.4 FAZ-C32/2-DC MCB, 220VDC,10kA 2 poles 32A Eaton
84 QF1.15 DC RP /4.3 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
85 QF1.15 DC RP /4.3 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
86 QF1.16 DC RP /4.2 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
87 QF1.16 DC RP /4.2 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
88 QF2.01 DC RP /5.1 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
89 QF2.01 DC RP /5.1 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
90 QF2.02 DC RP /5.2 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
91 QF2.02 DC RP /5.2 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
92 QF2.03 DC RP /5.3 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
93 QF2.03 DC RP /5.3 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
94 QF2.04 DC RP /5.4 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
95 QF2.04 DC RP /5.4 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
96 QF2.05 DC RP /5.5 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
97 QF2.05 DC RP /5.5 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
98 QF2.06 DC RP /5.6 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
99 QF2.06 DC RP /5.6 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
100 QF2.07 DC RP /5.7 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
101 QF2.07 DC RP /5.7 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
BILL OF MATERIAL 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page B3
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:48
Item No. Device Tag Installation Location Page Part Number Description Manufacturer
102 QF2.08 DC RP /5.8 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
103 QF2.08 DC RP /5.8 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
104 QF2.09 DC RP /5.8 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
105 QF2.09 DC RP /5.8 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
106 QF2.10 DC RP /5.7 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
107 QF2.10 DC RP /5.7 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
108 QF2.11 DC RP /5.6 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
109 QF2.11 DC RP /5.6 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
110 QF2.12 DC RP /5.5 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
111 QF2.12 DC RP /5.5 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
112 QF2.13 DC RP /5.5 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
113 QF2.13 DC RP /5.5 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
114 QF2.14 DC RP /5.4 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
115 QF2.14 DC RP /5.4 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
116 QF2.15 DC RP /5.3 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
117 QF2.15 DC RP /5.3 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
118 QF2.16 DC RP /5.2 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
119 QF2.16 DC RP /5.2 FAZ-C16/2-DC MCB, 220VDC,10kA 2 poles 16A Eaton
120 QF00 DC RP /1.5 M22-CK11 Auxiliary contacts MCCB 1NO1NC Eaton
121 QF00 DC RP /1.5 M22-K10 Trip indicating auxiliary contact (HIA) 1NO Eaton
122 QF00 DC RP /1.5 NZM2-XR220-250DC Motor for NZM2 (-4), LZM(-4) 220-250VDC Eaton
123 QF00 DC RP /1.5 NZMN2-A100 MCCB 100A,30kA,3P,DC Eaton
124 QF01 DC RP /1.2 M22-CK11 Auxiliary contacts MCCB 1NO1NC Eaton
125 QF01 DC RP /1.2 M22-K10 Trip indicating auxiliary contact (HIA) 1NO Eaton
126 QF01 DC RP /1.2 NZM2-XR220-250DC Motor for NZM2 (-4), LZM(-4) 220-250VDC Eaton
127 QF01 DC RP /1.2 NZMN2-A100 MCCB 100A,30kA,3P,DC Eaton
128 QF02 DC RP /1.7 M22-CK11 Auxiliary contacts MCCB 1NO1NC Eaton
129 QF02 DC RP /1.7 M22-K10 Trip indicating auxiliary contact (HIA) 1NO Eaton
130 QF02 DC RP /1.7 NZM2-XR220-250DC Motor for NZM2 (-4), LZM(-4) 220-250VDC Eaton
131 QF02 DC RP /1.7 NZMN2-A100 MCCB 100A,30kA,3P,DC Eaton
132 SAM DC RP /24.4 R601-202_02 Auto/man Switch two postion 2NO 2NC (auto/man) Comeletric
133 SBP DC RP /24.6 R601-202_02 ON/OFF Khóa 2 vị trí, 2 poles (2NO2NC), ON/OFF Comeletric
134 SH1 DC RP /1.2 SH100 Shunt 100A 60mV Adtek
135 SH2 DC RP /1.7 SH100 Shunt 100A 60mV Adtek
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
BILL OF MATERIAL 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page B4
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:48
TỪ TỦ AC TỪ TỦ AC
BATTERY BATTERY
220VDC-300Ah/5h 220VDC-300Ah/5h
BATTERY CHARGER
FUSE FUSE BATTERY CHARGER
380VAC/220VDC 380VAC/220VDC
No.1 100A 100A No.2
HỆ THỐNG
MÁY TÍNH
DC DISTRIBUTION MCB
R R
MCB
2P-2A 2P-2A
27/59 27/59
QF02 QF01
C650/GE
MCCB LIÊN ĐỘNG ĐIỆN MCCB
OFF ON ON OFF
3P-100A 3P-100A
V V
SHUNT A A SHUNT
QF00 MCCB
3P-100A
MCB 64 MCB 64
2P-2A 2P-2A
ON
OFF

NGUỒN 2 TỦ LỘ TỔNG
NGUỒN 1 TỦ LỘ TỔNG
NGUỒN 1 DÃY TỦ 22KV
TỦ ĐKBV THANH CÁI

TỦ ĐKBV THANH CÁI


CHIẾU SÁNG SỰ CỐ
TỦ ĐKBV 271+CRP3

TỦ ĐKBV 271+CRP3
TỦ ĐKBV T1+RP1

TỦ NGUỒN DC48
TỦ NGUỒN DC48

TỦ ĐKBV T1+RP2

TỦ ĐKBV+CRP4
TỦ ĐKBV T1+RP1
TỦ ĐKBV+CRP4

TỦ ĐKBV T1+RP2

TỦ THÔNG TIN
TỦ MÁY TÍNH

TỦ MÁY TÍNH

TỦ CÔNG TƠ
DỰ PHÒNG
DỰ PHÒNG

INVERTER 1

DỰ PHÒNG

DỰ PHÒNG

DỰ PHÒNG
TỦ 271+ MK

INVERTER 2
TỦ T1+ MK

TỦ FL, FR
TỦ FL, FR

22KV
22KV

TỦ AC
D00

D00
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DC - SINGLE LINE 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page G1
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:48
BILL OF MATERIAL
STT Tên Chức năng Mã hiệu/Nhà sản xuất Số lượng
Yucoo 1 PL1,PL2 Đèn báo nguồn YW1P/IDEC 2
Yucoo
2 A1,A2 Ampermet CS1/Adtek 2
Yucoo
Yucoo 3 V1,V2 Volmeter CS1/Adtek 2
4 SLR Khóa lựa chọn Local/Remote R601/Comelettric 1
PL1 PL2
5 SAM Khóa lựa chọn Auto/Man R601/Comelettric 1
A1 V1 A2 V2 QF01 QF00 QF02
6 LD1,LD2,LD0 Bộ chỉ thị ADWZ25/Leelen 3
PBG0,PBG1
7 Nút nhấn ON/OFF màu xanh YW1B/IDEC 3
PBG2
8 PBR0,PBR1 3
Nút nhấn ON/OFF màu đỏ YW1B/IDEC
PBR2
9 INV1, INV2 Bộ biến đổi 220VDC/220VAC YK/Yucoo 3
dan ger
GHI CHÚ:
- KÍCH THƯỚC :2200x800x800 (HxWxD)
- CẤP BẢO VỆ TỦ: IP41
- VẬT LIỆU CHẾ TẠO TỦ: THÉP DÀY 2mm
Bỏ cánh ngoài - MÀU SƠN VỎ TỦ: RAL7032
800,00
800,00
- CỬA MỞ MẶT TRƯỚC VÀ MẶT SAU. GÓC MỞ : 140
694,00
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DC LAYOUT 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page G2
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
1 2 3 4 5 6 7 8
03.08.2020
17:48
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DC INCOMING 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 1
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:48
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
MEASUREMENT DC1 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 2
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:48
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
MEASUREMENT DC2 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 3
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:48
DỰ PHÒNG
CHIẾU
DỰ PHÒNG SÁNG
SỰ CỐ
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DC1 DISTRIBUTION 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 4
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:48
DỰ PHÒNG DỰ PHÒNG
DỰ PHÒNG DỰ PHÒNG DỰ PHÒNG
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DC2 DISTRIBUTION 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 5
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:49
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
HEATING & LIGHTING 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 6
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:49
7 3
11
8 4
12
9 5
13
10 6
14
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DC DISTRIBUTION 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 7
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:49
7
3
11
8
4
12
9
5
13
10
6
14
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DC SUPPLY FOR 220KV THUAN NAM 12 SS + RP
24kV PANEL Job Number Drawing set Page 8
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:49
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
INVERTER 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 9
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:49
TYPE 1 - INPUT/OUTPUT

TYPE 1 - INPUT/OUTPUT

TYPE 1 - INPUT/OUTPUT
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
BCU 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 10
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:49
TYPE 1 - INPUT/OUTPUT

TYPE 1 - INPUT/OUTPUT
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
BCU 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 11
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:49
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DIGITAL INPUTS BCU 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 12
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:49
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DIGITAL INPUTS BCU 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 13
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:50
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DIGITAL INPUTS BCU 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 14
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:50
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DIGITAL INPUTS BCU 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 15
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:50
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DIGITAL INPUTS BCU 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 16
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:50
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DIGITAL INPUTS BCU 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 17
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:50
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DIGITAL INPUTS BCU 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 18
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:50
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DIGITAL INPUT BCU 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 19
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:50
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DIGITAL INPUTS BCU 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 20
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:50
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
DIGITAL INPUT BCU 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 21
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:51
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
SIGNALS & INDICATOR 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 22
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:51
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
CONTROL MCCB 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 23
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020
17:51
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
SYMBOL OF DEVICES 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 24
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020 DC RP
17:51 X1
Core Cable ID Device ID Installation Location Part Number Jumper Installation Location Device ID Cable ID Core
TB6-TI /17.7 DC RP BCU.H:17
TB6-TI /17.8 DC RP BCU.H:18
TB6-TI /17.8
TB6-TI /19.1 FLR RP X1:61
TB6-TI /19.2 D00 CRP5 X5:1
TB6-TI /19.3 CH48 RP X1:1
TB6-TI /19.4 COM RP X1:1
TB6-TI /19.5 SVR RP X1:1
TB6-TI /19.6 CMR RP X4:1
TB6-TI /19.7 BAT1 RP XX:3
TB6-TI /19.8 BAT2 RP XX:3
TB6-TI /19.8
TB6-TI /19.8
TB6-TI /19.8
X1:62 FLR RP TB6-TI /19.1 DC RP BCU.J:11
X5:2 D00 CRP5 TB6-TI /19.2 DC RP BCU.J:12
X1:2 CH48 RP TB6-TI /19.3 DC RP BCU.J:13
X1:2 COM RP TB6-TI /19.4 DC RP BCU.J:14
X1:2 SVR RP TB6-TI /19.5 DC RP BCU.J:15
X4:2 CMR RP TB6-TI /19.6 DC RP BCU.J:16
XX:4 BAT1 RP TB6-TI /19.7 DC RP BCU.J:17
XX:4 BAT2 RP TB6-TI /19.8 DC RP BCU.J:18
TB6-TI /19.8
TB6-TI /19.8
TB6-TI /19.8
TB6-TI /20.1 DC RP BCU.2H:1
TB6-TI /20.2 DC RP BCU.2H:2
TB6-TI /20.3 DC RP BCU.2H:3
TB6-TI /20.4 DC RP BCU.2H:4
TB6-TI /20.5 DC RP BCU.2H:5
TB6-TI /20.6 DC RP BCU.2H:6
TB6-TI /20.7 DC RP BCU.2H:7
TB6-TI /20.8 DC RP BCU.2H:8
TB6-TI /21.1 DC RP BCU.2H:11
TB6-TI /21.2 DC RP BCU.2H:12
TB6-TI /21.3 DC RP BCU.2H:13
TB6-TI /21.4 DC RP BCU.2H:14
TB6-TI /21.5 DC RP BCU.2H:15
TB6-TI /21.6 DC RP BCU.2H:16
TB6-TI /21.7 DC RP BCU.2H:17
TB6-TI /21.8 DC RP BCU.2H:18
TB6-TI /21.8
TB6-TI /21.8
TB6-TI /21.8
TB6-TI /21.8
TB6-TI /21.8
TB6-TI /21.8
TB6-TI /21.8
TB6-TI /21.8
TB6-TI /21.8
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
TERMINAL OF LIST 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 25
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020 DC RP
17:51 XAC
Core Cable ID Device ID Installation Location Part Number Jumper Installation Location Device ID Cable ID Core
TB6-TI /6.3 DC RP FAC:1
TB6-TI /6.5
TB6-TI /6.6
TB6-TI /6.3 DC RP FAC:3
TB6-TI /6.5
TB6-TI /6.6
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
TERMINAL OF LIST 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 26
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020 DC RP
17:51 XDC
Core Cable ID Device ID Installation Location Part Number Jumper Installation Location Device ID Cable ID Core
FS:2 DC RP TB6-TI /7.6
TB6-TI /7.6 DC RP KQF00:21
TB6-TI /7.6 DC RP QF01:1.X3
TB6-TI /7.7 DC RP KQF01:11
TB6-TI /7.7 DC RP MA1:9
TB6-TI /7.7 DC RP F64.1:A1
TB6-TI /7.7 DC RP F64.2:A1
TB6-TI /7.7 DC RP SAM:1
TB6-TI /7.8 DC RP QF01:72
TB6-TI /7.8 DC RP X1:4
FS:4 DC RP TB6-TI /7.6
TB6-TI /7.6 DC RP BCU.F:9
TB6-TI /7.6 DC RP KQF01:A2
TB6-TI /7.7 DC RP LD1:1
TB6-TI /7.7 DC RP MA1:10
TB6-TI /7.7 DC RP F59.1:A2
TB6-TI /7.7 DC RP F59.2:A2
TB6-TI /7.7 DC RP QF01:74
TB6-TI /7.8
TB6-TI /7.8
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
TERMINAL OF LIST 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 27
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020 DC RP
17:51 XDC1
Core Cable ID Device ID Installation Location Part Number Jumper Installation Location Device ID Cable ID Core
TB6-TI /8.2 DC RP KS1:7
TB6-TI /8.3 DC RP KS1:9
TB6-TI /8.6 DC RP KS1:1
TB6-TI /9.4 DC RP INV1:DC(+)
TB6-TI /9.7
TB6-TI /8.4 DC RP KS1:8
TB6-TI /8.5 DC RP KS1:10
TB6-TI /8.6 DC RP KS1:2
TB6-TI /9.4 DC RP INV1:DC(-)
TB6-TI /9.7
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
TERMINAL OF LIST 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 28
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020 DC RP
17:52 XDC2
Core Cable ID Device ID Installation Location Part Number Jumper Installation Location Device ID Cable ID Core
TB6-TI /8.2 DC RP KS1:11
TB6-TI /8.3 DC RP KS1:13
TB6-TI /8.7
TB6-TI /9.6 DC RP INV2:DC(+)
TB6-TI /9.7
TB6-TI /8.4 DC RP KS1:12
TB6-TI /8.5 DC RP KS1:14
TB6-TI /8.7
TB6-TI /9.6 DC RP INV2:DC(-)
TB6-TI /9.7
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
TERMINAL OF LIST 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 29
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM
DATE STAMP
03.08.2020 DC RP
17:52 XINV
Core Cable ID Device ID Installation Location Part Number Jumper Installation Location Device ID Cable ID Core
FINV:2 DC RP TB6-TI /9.4
TB6-TI /9.4
TB6-TI /9.4 SVR RP XAC2:1
TB6-TI /9.5
TB6-TI /9.5 M1 RP X220:1
TB6-TI /9.6
TB6-TI /9.6
TB6-TI /9.6
TB6-TI /9.6
TB6-TI /9.7
FINV:4 DC RP TB6-TI /9.4
TB6-TI /9.4
TB6-TI /9.5 SVR RP XAC2:3
TB6-TI /9.5
TB6-TI /9.5 M1 RP X220:6
TB6-TI /9.6
TB6-TI /9.6
TB6-TI /9.6
TB6-TI /9.6
TB6-TI /9.7
Revision Description Date Name Date Name Project Name = DC
Drawn 15.03.2020 MAN.NT
TERMINAL OF LIST 220KV THUAN NAM 12 SS + RP
Job Number Drawing set Page 30
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_DC SYSTEM

You might also like