HSE ALERT AND LESSON LEARNT: Unsafe Working at Height

Ref: NE1-IV-SEGC-HSE-ALERT-06.2020-046
700MW CSP + 250MW PV HYBRID IPP - DEWA PHASE IV

 DESCRIPTION:  KEY FINDINGS:


Client: NE1 • Poor planning of work.
Principal Contractor: SEGC
• In-adequate specific training.
During the scaffolding dismantling activity, workers
observed not complying with implementation of fall • In-competent supervision.
protection required 100 % tie-off.

 LESSON LEARNED AND KEY MESSAGES:


• Identification of all possible hazards and risk evaluation
for all activities and ensure safety measures in place.
• Clear communication of risk evaluation and hazards.
• Enforce HSE rules and procedures strictly to avoid grave
accidents resulting due to ignorance.
• Pre-work training and effective toolbox talk prior to start
an activity should be delivered and make sure awareness
and safety measures are clearly understood by workers.
• Empowered and adequate HSE, management
supervision, especially for high risk activities.
• Continuous and close monitoring by HSE & management
personnel to immediately stop any unsafe acts or
conditions till safety measures are in place and followed.
• Zero tolerance for unsafe acts and unsafe conditions
whilst carrying out any activity.
Issued by: SEGC HSE Department Issued Date: 23 June 2020