TFC On Double Line
TFC On Double Line
TFC On Double Line
COMMUNICATION ON
DOUBLE LINE ABSOLUTE
BLOCK SYSTEM
D.K.SINGH/Instructor/ZRTI,Bhuli
any of the means of communication
available at the station, such a
situation is termed as total failure of
communication
TOTAL FAILURE OF COMMUNICATION ON
DOUBLE LINE ABSOLUTE BLOCK SYSTEM
MEANS OF COMMUNICATION
1) Block Instrument, Track Circuit & Axle
D.K.SINGH/Instructor/ZRTI,Bhuli
Counter
2) Block Telephone
3) Control Phone
4) VHF Set
5) Station to Station fixed telephone or BSNL
Phone
TOTAL FAILURE OF COMMUNICATION ON
DOUBLE LINE ABSOLUTE BLOCK SYSTEM
D.K.SINGH/Instructor/ZRTI,Bhuli
The Guard & Driver of the train will be
informed about the fact by the SM
If the Driver is not convergent with the
rules for working of trains under such
situation the SM shall explain it in
presence of Guard
TOTAL FAILURE OF COMMUNICATION ON
DOUBLE LINE ABSOLUTE BLOCK SYSTEM
The SM will issue form T/C 602 to the driver and
obtain the signature of Guard & Driver on the form.
The form T/C 602 includes the following items:
D.K.SINGH/Instructor/ZRTI,Bhuli
a) Authority to proceed without Line Clear
b) Authority to pass departure signals at ‘ON’
c) Caution Order: The Speed of the train will be
restricted to:
i) 25kmph – during day and when visibility is clear
ii) 10kmph – during night and when visibility is not
clear
iii) walking pace – during thick foggy weather &
dust storm
TOTAL FAILURE OF COMMUNICATION ON
DOUBLE LINE ABSOLUTE BLOCK SYSTEM
Dispatching of Trains:
a) Route shall be set correctly and all facing point
D.K.SINGH/Instructor/ZRTI,Bhuli
shall be locked properly.
b) Fixed Signal, except LSS shall be taken ‘OFF’ (if
possible).
c) 2nd & subsequent trains will be dispatched after
30 minutes of interval along with the same
forms & with same speed restriction as already
mentioned above till normal working is
resumed.
TOTAL FAILURE OF COMMUNICATION ON
DOUBLE LINE ABSOLUTE BLOCK SYSTEM
Reception of Train:
a) The train will stop at the foot of FSS, there from it will be
received by taking ‘OFF’ signal/signals or otherwise.
D.K.SINGH/Instructor/ZRTI,Bhuli
b) On arrival of the train at the station, the Driver will
handover the form T/C 602 to the SM on duty.
c) The SM will keep this form in his safe custody for
inspection by TI(M) who will prepare a report on the
working of trains and shall forward the same to DRM,
within 7 days of resumption of normal working.
d) The SM will record all particulars in the TSR