SEWAGE TREATMENT PLANT: AN OVERVIEW
Sewage Treatment Plant is a plant or installation setup that
is used to purify contaminated substances. These
substances may be solid, liquid, and semi-solids. Sewage
treatment is one of the treatments that a waste treatment
plant works on in the oil and gas industry and in other
manufacturing industries.
Sewage treatment is the process of removing containments
from wastewater and household sewage, both effluents and
domestic. It includes physical, chemical, and biological
processes.
The Objective of sewage treatment is to produce a
disposable effluent without causing harm to the surrounding
environment and preventing pollution.
Sewage treatment generally involves three stages ->
1. Primary Treatment: Concerned with the removal of
suspended solids.
Now the primary treatment is collectively performed by:
(i) Screening: Removal of Heavy Solids.
(ii) Grit Chamber: Removal of fine inorganic
Suspended Solids.
(iii) PST: Removal of fine inorganic Suspended
Solids.
.
Detailed design of the STP is in the following section.
1. Screens:
Q = 6.3MLD = 0.073m3 /sec
Clear spacing between bars = 60mm and bar diameter = 20mm
Inclination of bars with horizontal = 60° (For Manual Cleaning)
Q 𝑝𝑒𝑎𝑘
Surface Area = = (0.073m3 /sec)/(50m3 /m2 /day) =
OFR 𝑝𝑒𝑎𝑘
126m2
Providing maximum surface area = 252𝑚2
Now Volume of tank = (0.073m3 /m2 /sec) * 2hrs = 525.6 m2
Height of tank = Volume/ Surface area = 2.1m
Now Length of tank = V𝑓 ∗ t 𝑑 = 36m
Width of Tank = Surface Area/ Length = 7m
Dimensions of PST: (36* 7* 2.1 m3 )
4. Trickling Filter
Assumptions
1. Design Population = 14000
2. Sewage discharge rate = 150lpcd
3. Influent BOD = S𝑖 = 225mg/l
4. Organic Loading Rate (Excluding Recirculation) = OLR =
104 kg/hac-m/day
5. R= Recirculation Ratio = 1
6. Solid Loading Rate (Including Recirculation) = SLR =
180ML/hac/day
7. Efficiency of Filter = n𝑓𝑖𝑙𝑡𝑒𝑟 = 75%
Design Steps:
So, Q 𝑡𝑜𝑡𝑎𝑙 = 14000 * 150lpcd = 2.1MLD
Given: R=1
Q 𝑡𝑜𝑡𝑎𝑙 / Q 𝑟𝑒𝑐𝑖𝑟𝑐𝑢𝑙𝑎𝑡𝑖𝑜𝑛 = 1
Q 𝑡𝑜𝑡𝑎𝑙 = Q 𝑟𝑒𝑐𝑖𝑟𝑐𝑢𝑙𝑎𝑡𝑖𝑜𝑛
Now, Plan area = (Q 𝑡𝑜𝑡𝑎𝑙 + Q 𝑟𝑒𝑐𝑖𝑟𝑐𝑢𝑙𝑎𝑡𝑖𝑜𝑛 )/ SLR = 2Q 𝑡𝑜𝑡𝑎𝑙 / SLR
= (2*2.1)/180 = 233.33 m2
𝜋
∗ dia2 = 233.33 m2
4