Production Planning Course Code: 3352904

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT

COURSE CURRICULUM
COURSE TITLE: PRODUCTION PLANNING
(COURSE CODE: 3352904)

Diploma Programme in which this courses offered Semester in which offered

Textile Manufacturing Technology 5th Semester

1. RATIONALE

Due to rapid rate of change in technology, needs of industries have also changed so the
industries require highly skilled technicians. Accordingly production planning in spinning and
weaving has also changed. This course will make the students able to understand production
planning technique with respect to latest spinning and weaving technology. The students also
will be able to plan production schedule for textile industries especially in the area of spinning
and weaving with either conventional or sophisticated machines.

2. LIST OF COMPETENCY

The course content should be taught and implemented with the aim to develop required skills
in the students so that they are able to acquire following competency:
 Plan the production for various types of jobs according to available machines in a
textile manufacturing plant.

3. COURSE OUTCOMES

The theory should be taught and practical should be carried out in such a manner that students
are able to acquire required learning out comes in cognitive, psychomotor and affective
domain to demonstrate following course outcomes.
i. Plan production in spinning and weaving.
ii. Calculate the production of spinning machinery.
iii. Calculate the production of weaving machinery.
iv. Compute the various parameters related to fabric manufacturing
v. Compute speed and draft in textile manufacturing.

4. TEACHING AND EXAMINATION SCHEME

Teaching Scheme Total Credits Examination Scheme


(In Hours) (L+T+P) Theory Marks Practical Marks Total
Mark
s
L T P C ESE PA ESE PA
150
4 2 2 8 70 30 20 30

Legends: L-Lecture; T – Tutorial/Teacher Guided Student Activity; P -Practical; C – Credit;; ESE -End
Semester Examination; PA - Progressive Assessment.

GTU/ NITTTR Bhopal/14-15 Gujarat State


1
Production Planning Course Code: 3352904

5. COURSE DETAILS

Unit Major Learning Outcomes Topics and Sub-topics


(in cognitive domain)
I-Layout 1a. Sketch the plan and layout of Spinning 1.1 Lay out of spinning
and Yarn and weaving machines. machine and weaving
Numbering 1b. Distinguish the relation of each of the machine
System numbering systems in Textile production 1.2 Computation of count,
sector length and weight of yarn
1c. Compute Average count (Direct and from given data (Direct
Indirect) and Indirect)
1d. Compute Resultant count (Direct and 1.3 Average count and
Indirect) Resultant count (Direct
1e. Convert given count system in different and Indirect)
count system (Nm., Ne., NeC.) 1.4 Count system in different
1f. Explain planning and controlling the count system (Nm., Ne.,
processes of Spinning, Weaving and the NeC.)
sub-processes of sizing machine,
warping machine, winding machine,
according to the end product for
optimum efficiency and best quality.

II-Spinning 2a. Compute production efficiency, hank of 2.1 Production efficiency,


calculation lap, weight of lap, length of lap, time hank of lap, weight of lap,
required to prepare lap, draft between C length of lap, time
R and L R for Blow room required to prepare lap,
2b. Compute time required to exhaust and draft between C R and L R
fill up can from given data for carding for Blow room.
machine, draw frame machine, comber 2.2 Production efficiency,
machine, draw sliver can, ring frame, hank of sliver, draft,
O.E machine, two for one twister. cleaning efficiency, time
2c. Compute hank of roving, draft of required to exhaust and
machine, TPI, and time required prepare fill up can from given data
lap, to exhaust lap, to fill can, to exhaust for carding machine, draw
can, to exhaust roving bobbin, to prepare frame machine. comber
ring bobbin. machine, speed frame,
2d. Describe the steps to compute spinning ring frame, O.E machine,
organization for production of various two for one twister
carded, combed, P/C yarn and OE yarn. 2.3 Calculation of spinning
organization for
production of various
carded, combed, P/C yarn
and OE yarn.

III- 3a. With the given data, compute the 4.1 Production efficiency,
Weaving production efficiency, time required to time required to prepare
Calculation prepare one cone, exhaust one ring one cone, time required to
bobbin for winding machine, warping exhaust one ring bobbin
machine, sizing machine. for winding machine,
3b. Calculate the production of loom, warping machine, sizing

GTU/ NITTTR Bhopal/14-15 Gujarat State


2
Production Planning Course Code: 3352904

Unit Major Learning Outcomes Topics and Sub-topics


(in cognitive domain)
efficiency, waste of warp, waste of weft. machine.
3c. Compute production of weaving 4.2 production of loom,
organization for different fabrics (i.e. efficiency, waste of warp,
shirting suiting, saree, bedsheet) waste of weft
3d. Calculate the production weaving
department and time to exhaust ring
bobbin, time to prepare cone, beam
length, size take up %,
3e. Describe the methods to control the warp
and weft waste.

IV-Fabric 4a. Describe the procedure to set the GSM of 4.1 Weight of warp, weight of
Calculation fabric. weft, GSM, heald count,
, 4b. Describe the steps and precautions to set reed count for give data.
the fabric cover, EPI and PPI on loom. 4.2 Contraction of warp, weft,
4c. Compute weight of warp, weight of weft, cover factor for warp,
GSM, heald count, reed count for give weft, max. epi and ppi for
data. given data.
4d. For given data, compute contraction of
warp, weft, cover factor for warp, weft,
max. epi and ppi.
4e. From the given data, identify to control
the problem related to loss of production.

V-Speed 5a. Explain the need of gearing techniques in Speed and draft
and draft textile manufacturing machines such as Computation
calculation spinning, weaving, winding, twisting, 5.1 Gearing calculation.
warping, sizing, Draw frame and 5.2 Calculation of draft from
Carding, combing, gilling – auto- gearing, from hank fed
levelling, control Mixing machines. and hank delivered.
5b. Distinguish draft, hank fed and hank
delivered from gearing.
5c. Compute gearing ratio, draft from
gearing, hank fed and hank delivered.

6. SUGGESTED SPECIFICATION TABLE WITH HOURS and MARKS (Theory)

Unit Unit Title Teaching Distribution of Theory Marks


No. Hours R U A Total
Level Level Level
I. Layout an Yarn Numbering 08 04 06 08 88
System
II. Spinning Calculation 16 04 08 06 18
III. Weaving Calculation 16 04 06 06 16
IV. Fabric Calculation, 08 02 04 03 09
V. Speed and Draft calculation 08 02 04 03 09
Total 56 16 28 26 70

GTU/ NITTTR Bhopal/14-15 Gujarat State


3
Production Planning Course Code: 3352904

Legends: R = Remember; U= Understand; A= Apply and above levels (Bloom’s Revised Taxonomy)
Note: This specification table shall be treated as a general guideline for students and teachers. The actual
distribution of marks in the question paper may vary slightly from above table.

7. SUGGESTED LIST OF PRACTICALS

The practical/exercises should be properly designed and implemented with an attempt to


develop different types of skills (outcomes in psycho-motor and affective domain) so that
students are able to acquire the competencies/programme outcomes. Following is the list of
practical exercises for guidance.
Note: Here only outcomes in psycho-motor domain are listed as practical/exercises.
However, if these practical/exercises are completed appropriately, they would also lead to
development of certain outcomes in affective domain which would in turn lead to development
of Course Outcomes related to affective domain. Thus over all development of Programme
Outcomes (as given in a common list at the beginning of curriculum document for this
programme) would be assured.
Faculty should refer to that common list and should ensure that students also acquire
outcomes in affective domain which are required for overall achievement of Programme
Outcomes/Course Outcomes.

S. Unit No. Practical/Exercise Approx.


No. (Major outcomes in Psychomotor Domain) No. of
Hours
1 III Layout for Blowroom machines. 04
2 III Prepare a layout for carding machines for required 02
production.
3 III Prepare a layout for Draw Frame machines for required 02
production.
4 VI Prepare a layout for Speed Frame machines for required 02
production.
5 III Prepare a layout for Ring Frame machines for required 02
production.
6 III Prepare a layout for O.E. machines for required production. 02
7 III Prepare a layout for Winding machines for required 02
production.
8 IV Prepare a layout for Warping machines for required 02
production.
9 IV Prepare a layout for Sizing machines for required 03
production.
10 IV Prepare a layout fot Non-Auto machines for required 02
production.
11 V Prepare a layout for Loom machines for required production. 03
12 V Prepare a layout for Auto Loom machines for required 02
production.
Total 28

8.SUGGESTED LIST OF PROPOSED STUDENT ACTIVITIES


Following is the list of proposed student activities like: course/topic based seminars, internet
based assignments, teacher guided self learning activities, course/library/internet/lab based
mini-projects--etc.

GTU/ NITTTR Bhopal/14-15 Gujarat State


4
Production Planning Course Code: 3352904

i. Internet based assignment topic wise.


ii. Collection of various process parameters of draw frame lap former, comber and speed
frame from industries (Lmw, Rieter, Trutzscheler.)
iii. Visit to Spinning unit, and preparing report with sketches.
iv. Industrial visit.

9. SPECIAL INSTRUCTIONAL STRETERGY (If Any)

i. Arrange industrial visit and show production planning and control systems in use.
ii. Arrange expert lectures on related topics.
iii. Project based on spinning organisation and weaving organisation.

10. SUGGESTED LEARNING RESOURCES

A. List of Books
S.No. Author Title of Books Publication

1 R.Jagannathan Textile mechanics and Mahajan publication


spinning calculation
2 T. K. Pattabhiraman Spinning calculation Soumaya Pub,Bombay
3 San gupata Weaving Calculation Mahajan publication
4 T C Shah, P M Valand, Aritho spin weave Vadalikar publication
V H Vadalikar

B. List of Major Equipment/ Instrument with Broad Specification


i. Textile laboratory: spinning machine, weaving machine.

C. LIST OF SOFTWARE /LEARNING WEBSITES-


i. http:// www.textileschool.com/.../spinning-form
ii. http:// www.textilelearner.blogspot.com/.../calculation
iii. http:// www.cs.arizona.edu/patterns/
iv. http://www.textile.netal.net/spinning/spinning
v. http:// www.cs.arizona.edu/.../pea_calc.pdf
vi. http://www.acedemia.edu/.../spinning_calculation
vii. http://www.textileschool.com/.../weaving
viii. http://www.weavetex.blogspot.com
ix. http://www.acedemia.edu/.../textile_calculation
x. http://www.scribd.com/.../weaving_calculation
xi. http://www.docstoc.com/.../spinning_calculation.

11. COURSE CURRICULUM DEVELOPMENT COMMITTEE


Faculty Members from Polytechnics
 Prof. R T Patel, Lecturer in Textile Manufacturing, R.C Technical Institute,
Ahmedabad
 Prof. S. S. Parmar, Lecturer in Textile Manufacturing, R C technical Institute
Ahmedabad
 Prof. S. P. Patel, Lecturer in Textile Manufacturing, R C technical Institute
Ahmedabad
 Prof. D. V. Bihola, Lecturer in Textile Manufacturing, R C technical Institute
Ahmedabad
GTU/ NITTTR Bhopal/14-15 Gujarat State
5
Production Planning Course Code: 3352904

Co-ordinator and Faculty Member from NITTTR Bhopal


 Dr. C. K. Chugh, Professor, Department of Mechanical Engineering
 Dr. Joshua Earnest, Professor, Department of Electrical and Electronics Engineering

GTU/ NITTTR Bhopal/14-15 Gujarat State


6

You might also like