Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Feb Tower at BFH (Mixed Use Development) : Lead Consultant

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

ABD - 16080

ROOF GENERAL NOTES :-


LEAD CONSULTANT
SMP-PARTY HALL-LP 1. ALL EQUIPMENTS SHALL MEET THE REQUIREMENTS AND APPROVAL OF EWA
42.5 KW PRIOR TO PLACEMENT OF AN ORDER.
LEVEL-24

2. ALL MOLDED CASE CIRCUIT BREAKERS SHALL BE OF ADJUSTABLE TYPE AND


SHALL HAVE SHUNT TRIP FACILITIES.
LEVEL-23
3. ALL L.V PANEL BOARD SHALL BE TYPE TESTED.

LEVEL-22 4. CONTRACTOR SHALL PROVIDE,ALTHOUGH NOT SHOWN ON DRAWINGS, SUITABLE


RATING & SENSITIVITY OF EARTH LEAKAGE RELAY, EARTH FAULT RELAY, EARTH
LEAKAGE CIRCUIT BREAKERS ETC. FOR VARIOUS AIR-CONDITIONING AND
MECHANICAL EQUIPMENTS AS PER EWA REQUIREMENTS.
LEVEL-21
5. FOR OTHER NOTES & LEGEND REFER TO DRG.No:EL-001 & EL-002.

LEVEL-20 6. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH ELECTRICITY


DISTRIBUTION DIRECTORATE FOR THE APPROVAL OF MULTIPLE RUN OF
ARMOURED CABLES AS SHOWN ON DRAWINGS. IN CASE OF THE REQUIREMENT
OF ELECTRICITY DIRECTORATE FOR USING SINGLE CORE ARMOURED CABLES,
LEVEL-19
INSTEAD OF MULTIPLE RUN OF ARMOURED CABLES, CONTRACTOR SHALL BE
RESPONSIBLE TO SUPPLY & INSTALL SINGLE CORE ARMOURED CABLES OF PROJECT

LEVEL-18
SUITABLE RATING TO MATCH WITH THE RATING OF SPECIFIED, MULTIPLE RUNS
OF CABLE WITHOUT ANY ADDITIONAL COST.
FEB TOWER AT BFH
7. BATTERY CHARGER TO BE PROVIDED FOR THE ATS MODULE IN LV ROOM.
(MIXED USE DEVELOPMENT)
LEVEL-17
8. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH EDD TO OBTAIN
APPROVAL FOR THE POWER SCHEMATIC DIAGRAMS.
LEVEL-16 9. THE MINIMUM BMS REQUIREMENTS FOR MONITORING OF LV MAIN PANEL AS
FOLLOWS: CLIENT / OWNER
a) ACB - ON/OFF/TRIP
LEVEL-15 b) ATS PANEL - ON/OFF/TRIP
c) INTERFACE WITH PMU

10. VFD MOTOR DRIVES SHALL INCORPORATE ACTIVE HARMONIC FILTERS FROM
LEVEL-14
SAME MANUFACTURER AS THE DRIVE.

11. ALL CABLES SHALL BE ARMOURED TYPE (AS INDICATED ON DRAWINGS) HAVING
LEVEL-13 COPPER CONDUCTORS AND SHALL BE LAID ON HEAVY DUTY RETURN FLANGE
TYPE CABLE TRAY, UNLESS OTHERWISE STATED.

LEVEL-12 12. ALL CONTROL PANELS FOR SPECIALIST/ MECHANICAL EQUIPMENTS ETC SHALL
BE PROVIDED BY THE SPECIALIST CONTRACTOR / MECHANICAL CONTRACTOR. PROJECT MANAGER
13. ALL ELR'S SHALL BE '0-1A' ADJUSTABLE TYPE.
LEVEL-11

400A SMP-FEB-LVL-10 14. ALL LIFT CONTROL PANELS SHALL BE INTERFACED WITH FIRE ALARM PANEL,
TP 4C 300mm2 CU/XLPE/LSF/SWA/LSF SUCH THAT IN AN EVENT OF FIRE THE LIFTS WILL ALL COME DOWN TO THE
F CABLE + ECC IN TRAY
LEVEL-10 TOB 224 KW GROUND FLOOR WITH DOORS REMAINING OPEN.
250A SMP-FEB-LVL-09 FOR ASB OFFICES
4C 120mm2 CU/XLPE/LSF/SWA/LSF 15. PROVIDE ELECTRONIC SURGE PROTECTION DEVICES FOR MAINS PROTECTION
TP F FOR FEB OFFICES
TOB CABLE + ECC IN TRAY 137 KW AGAINST LIGHTNING SURGES & TRANSIENTS IN ACCORDANCE WITH BSEN-62305.
LEVEL-09

250A SMP-ASB-LVL-08 ATS-G1-11 16. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE AND PROVIDE ALL
TP 4C 120mm2 CU/XLPE/LSF/SWA/LSF NECESSARY ARRANGEMENT FOR HVAC EQUIPMENTS AND MECHANICAL
F CABLE + ECC IN TRAY 42.5 KW
LEVEL-08 TOB 137 KW EQUIPMENTS TO MEET OPERATIONAL REQUIREMENTS AS PER MECHANICAL
SMP-ASB-LVL-07 SPECIFICATIONS AND TENDER DRAWING.
250A ATS-G1-10
TP 4C 120mm2 CU/XLPE/LSF/SWA/LSF FROM SMP-
F CABLE + ECC IN TRAY 85 KW 17. ALL CONTROL PANELS FOR HVAC/MECHANICAL EQUIPMENT (AHU, FAHU,
LEVEL-07 TOB 137 KW ASB-LVL-08
SMP-ASB-LVL-06
EXTRACT FANS, SMOKE FANS, WATER PUMPS, FIRE PUMPS) ETC. ARE TO BE QUANTITY SURVEYORS
250A ATS-G1-9 PROVIDED BY MECHANICAL CONTRACTORS. NECESSARY ELR / ELCB TO BE
TP 4C 120mm2 CU/XLPE/LSF/SWA/LSF FROM SMP-
F CABLE + ECC IN TRAY 42.5 KW PROVIDED IN THESE CONTROL PANELS. FIRE ALARM VOLT FREE CONTACTS TO
LEVEL-06 TOB 137 KW ASB-LVL-07 BE PROVIDED FOR SHUTDOWN OF A/C UNITS OR STARTING OF SMOKE FANS AS
SMP-ASB-LVL-05 ATS-G1-8 APPLICABLE. ELECTRICAL CONTRACTORS SCOPE IS UP TO ISOLATOR, INCLUDING
FROM SMP- ISOLATOR.
440 KW 42.5 KW
LEVEL-05 ASB-LVL-06
18. SMART METERING SYSTEM INCLUDING ALL ASSOCIATED COMPONENTS SHALL BE
250A SMP-ASB-LVL-04 ATS-G1-7
4C 120mm2 CU/XLPE/LSF/SWA/LSF AS PER EDD LATEST REQUIREMENTS AND TO THE APPROVAL OF EDD.
TP F FROM SMP-
PARKING LVL-P5 / LEVEL-04 TOB CABLE + ECC IN TRAY 146 KW 42.5 KW
ASB-LVL-05 19. ALL WORKS ASSOCIATED WITH SMART METERING IS PART OF THE CONTRACTORS
250A SMP-ASB-LVL-03 ATS-G1-6 SCOPE.
TP 4C 120mm2 CU/XLPE/LSF/SWA/LSF FROM SMP-
F CABLE + ECC IN TRAY 85 KW
PARKING LVL-P4 / LEVEL-03 TOB 146 KW ASB-LVL-04 NOTES FOR AMF PANEL :-

1. THE ATS PANEL SHALL BE METAL ENCLOSED FREE STANDING TYPE PANEL. IP41
FROM SMP-
PARKING LVL-P3 PROTECTION SUITABLE FOR THE MAINS FAILURE OPERATION OF THE D.G. SET
ASB-LVL-03
AND SHALL CONSIST OF
250A SMP-ASB-LVL-02 ATS-G1-5 a) MOTORISED ACB/MCCB'S, 4POLE, BOTH MECHANICALLY AND ELECTRICALLY
TP 4C 120mm2 CU/XLPE/LSF/SWA/LSF
F CABLE + ECC IN TRAY 85 KW INTERLOCKED.
PARKING LVL-P2 / LEVEL-02 TOB 146 KW
b) OVERLOAD AND SHORT CIRCUIT PROTECTION.
250A SMP-ASB-LVL-01 ATS-G1-4 c) VOLTMETER WITH SELECTOR SWITCH.
TP 4C 120mm2 CU/XLPE/LSF/SWA/LSF FROM SMP- d) FREQUENCY METER
F CABLE + ECC IN TRAY 85 KW
PARKING LVL-P1 / LEVEL-01 TOB 146 KW ASB-LVL-02 e) DC VOLTMETER & DC AMMETER
f) STATIC BATTERY CHARGER
g) BOOST CHARGE TIMER
FROM SMP- h) DUTY SELECTOR SWITCH 'OFF', 'AUTO', 'MANUAL'.
PARKING LVL-PM ASB-LVL-01 i) INDICATION LAMPS FOR MAINS BREAKER CLOSED, GENERATOR BREAKER
ATS-G1-3 CLOSED.
j) SOLID STATE MAINS SENSING RELAYS
85 KW
UPPER GF k) NECESSARY TIMERS AND RELAYS FOR THE AUTOMATIC MAINS FAILURE
FUNCTION.
l) BUSBAR & TERMINAL ARRANGEMENT FOR CABLE CONNECTIONS FOR MAINS,
LOWER GF GENERATOR & LOAD.

ESMP-MOA+ROA ESMP-COA
LEGEND:-
637 KW 234.2 KW
KWH LANDLORD SMART METER AS PER LATEST
REQUIREMENTS AND TO EDD APPROVAL.
EDD
N AUTOMATIC CAPACITOR PANEL AUTOMATIC CAPACITOR PANEL WITH N

SMP-MOA+ROA SMP-COA N N
WITH MINIMUM 8 STAGES OF MINIMUM 8 STAGES OF CAPACITORS N N
AMF-G1-1 AMF-G1-2 KWH TENANT SMART METER AS PER LATEST
CAPACITORS AND DIGITAL RELAY AND DIGITAL RELAY WITH DISPLAY REQUIREMENTS AND TO EDD APPROVAL.
1172 KW 376 KW EDD TM
WITH DISPLAY
DATA CONTACTOR AS PER EDD LATEST
DC

7R x 1C, 500mm2 CU/MGT/XLPE/LSF/SWA/LSF


REQUIREMENTS AND TO EDD APPROVAL.
400KVAR
B1 B2 400KVAR
CAPACITOR FROM SMP- FROM SMP-
4R X 1C, 1000mm2 CU/XLPE/LSF/SWA/LSF

CAPACITOR PANEL-1
COA

4C, 300mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 120mm2 CU/MGT/XLPE/LSF/SWA/LSF


MOA+ROA
2R x 4C, 300mm2 CU/XLPE/LSF/SWA/LSF
PANEL-2 KWH TENANT SMART METER WITH CUTOUTS AS PER

4C, 70mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 70mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 70mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 70mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/MGT/XLPE/LSF/SWA/LSF


1250A,400V, TPN+E CU.BUSBAR RISER-1

1000A,400V, TPN+E CU.BUSBAR RISER-2

EDD CO TM LATEST REQUIREMENTS AND TO EDD APPROVAL.

2R x 4Cx240mm2 CU/XLPE/SWA/PVC
7R x 1C, 500mm2 CU/XLPE/SWA/LSF

2R, 4Cx240mm2 CU/XLPE/SWA/PVC


4C, 35mm2 CU/XLPE/LSF/SWA/LSF

4C, 70mm2 CU/XLPE/LSF/SWA/LSF

MOA - MAIN OWNERS ASSOCIATION


ROA - RESIDENTIAL OWNERS ASSOCIATION
R-01 COA - COMMERCIAL OWNERS ASSOCIATION
D.L- 466.8 KW
C.L- 772 KW

C.L- 584 KW
D.L- 445 KW
CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY


SPARE SPARE SPARE SPARE SPARE SPARE
1500 KVA DG REVISED BASED ON REVISED
V R-01 26/01/2020 METERING STRATEGY & EMERGENCY
2500A
TP POWER REQUIREMENTS FOR ASB
FREE STANDING FLOOR MOUNTED CUBICLE
TYPE BUSCOUPLER PANEL HOUSED IN ACB VS R-00 14/05/2019 ISSUED FOR CONSTRUCTION
MAIN L.V. ROOM AT BASEMENT FLOOR. No. Date Description
CFIB CFIB ~
PROJECT STAGE
KWH KWH KWH
BUS-COUPLER AS AS AS
EDD EDD EDD
A A A
CONSTRUCTION DRAWINGS
LL 1600A
TPN
LL 1000A
TPN
LL 100A
TPN
800A
TPN
100A
TPN
125A
TPN
1250A
TPN
1000A
TPN
160A
TPN
100A
TPN
125A
TPN
800A
TPN
800A
TPN
1200A
TPN
400A
TPN
250A
TPN
160A
TPN
160A
TPN
160A
TPN
100A
TPN
100A
TPN
100A
TPN
160A
TPN
100A
TPN
100A
TPN
160A
TPN
MAIN WORKS PACKAGE
2500A 4 POLE
ACB MCCB MCCB MCCB MCCB MCCB ACB ACB ACB MCCB MCCB MCCB MCCB MCCB ACB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB R Y B
(FIXED TYPE) KWH KWH
EDD TM EDD TM GCP GEN SET
E E

3200A CU. A CU. EARTH STRIP 3200A CU. TPN+E A CU. EARTH STRIP 3200A CU. A
V VS KWH METER V VS V VS GENERATOR AUTO STAND BY
TPN+E BUSBAR BUSBAR (SMART TYPE) TO EDD TPN+E BUSBAR OUTPUT PANEL GENERATOR
A A A PROJECT NO 2016080 DRAWN NLD
APPROVAL FROM EDD
KWH METER A APPROVED SOURCE) A A
(SMART TYPE) TO EDD KWH KWH
APPROVAL FROM EDD REVIT FILE - CHECKED VVV/PAS
EDD EDD LOWER GF
APPROVED SOURCE) LL MFM MFM MFM
BMS RS485 CL - 1947 KW RS485 BMS BMS
CHK-KWH CHK-KWH CL - 1466.2 KW CHK DATE 07/10/2018 VERIFIED SKK
CL - 1578 KW INTERFACE DL - 1343 KVA INTERFACE INTERFACE
DL (FIRE CONDITION) - 783.7 KVA
2500A TPN BUS 2500A TPN 2500A TPN
DL - 1243 KVA MDL - 1115 KVA DL (POWER FAILURE) - 1176.7 KVA
ACB (DRAW COUPLER ACB (DRAW ACB (DRAW
MP-1 (FORM-3B)(50KA)REFER NOTE # 15 OUT TYPE) (ON) MP-2 (FORM-3B)(50KA) REFER NOTE # 15 OUT TYPE) EMP (FORM-3B)(50KA) OUT TYPE)
SCALE N.T.S. APPROVED SKK
FOR LANDLORD SERVICE ESP R Y B BC-1(55KA) R Y B FOR OFFICE & RETAIL ESP R Y B FOR EMERGENCY POWER SUPPLY R Y B

MECHANICAL & MECHANICAL & MECHANICAL &


FREE STANDING, FLOOR
E MECHANICAL & SHEET TITLE
E FREE STANDING, FLOOR E E E MOUNTED L.V. MAIN PANEL E E FREE STANDING, FLOOR 7 RUNS OF 1C 1000mm² E
ELECTRICAL INTERLOCK ELECTRICAL ELECTRICAL ELECTRICAL INTERLOCK
BOARD HOUSED AT
MOUNTED L.V. MAIN PANEL
BOARD HOUSED AT
WITH BUS COUPLER-BC-1 INTERLOCK WITH INTERLOCK WITH
MAIN L.V ROOM AT BASEMENT-01
WITH BUS COUPLER-BC-1 MOUNTED L.V. MAIN PANEL
BOARD HOUSED AT
600V/1000V CU/MGT/XLPE/LSF/SWA/LSF
CONDUCTOR ON TRAY
LV MAIN POWER
INCOMER OF MP-1 INCOMER OF MP-2
MAIN L.V ROOM AT BASEMENT-01 7 RUNS OF 1C 1000mm² MAIN L.V ROOM AT BASEMENT-01 SCHEMATIC DIAGRAM
7 RUNS OF 1C 1000mm² DC1 TO EWA SERVER TO EWA SERVER DC2 600V/1000V XLPE/AWA/PVC
(SHEET 1 OF 2)
600V/1000V XLPE/AWA/PVC (COMMUNICATION VIA GSM) (COMMUNICATION VIA GSM) COPPER CONDUCTOR ON TRAY
COPPER CONDUCTOR ON TRAY
LEVEL-B1 FROM TRANSFORMER TX-1 (1500 KVA) FROM TRANSFORMER TX-2 (1500 KVA)

R-01
LEVEL-B2

SHEET NUMBER REVISION


EL-GEN-006A R-01
ROOF ABD - 16080
GENERAL NOTES :-
APARTMENTS PENTHOUSE R-01 LEAD CONSULTANT
1. ALL EQUIPMENTS SHALL MEET THE REQUIREMENTS AND APPROVAL OF EWA PRIOR TO
LEVEL-24
PLACEMENT OF AN ORDER.

SMP-LVL-23A-PENTHOUSE-2 SMP-LVL-23-PENTHOUSE
2. ALL MOLDED CASE CIRCUIT BREAKERS SHALL BE OF ADJUSTABLE TYPE AND SHALL
82 KW 111 KW HAVE SHUNT TRIP FACILITIES.
LEVEL-23

SMP-LVL-22-PENTHOUSE-1 SMP-LVL-22-LP-APARTMENTS 3. ALL L.V PANEL BOARD SHALL BE TYPE TESTED.


111 KW 98 KW
LEVEL-22 4. CONTRACTOR SHALL PROVIDE,ALTHOUGH NOT SHOWN ON DRAWINGS, SUITABLE
RATING & SENSITIVITY OF EARTH LEAKAGE RELAY, EARTH FAULT RELAY, EARTH
SMP-LVL-21-LP LEAKAGE CIRCUIT BREAKERS ETC. FOR VARIOUS AIR-CONDITIONING AND MECHANICAL
EQUIPMENTS AS PER EWA REQUIREMENTS.
262 KW
LEVEL-21
5. FOR OTHER NOTES & LEGEND REFER TO DRG.No:EL-001 & EL-002.
SMP-LVL-20-LP
262 KW 6. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH ELECTRICITY
LEVEL-20 DISTRIBUTION DIRECTORATE FOR THE APPROVAL OF MULTIPLE RUN OF ARMOURED
CABLES AS SHOWN ON DRAWINGS. IN CASE OF THE REQUIREMENT OF ELECTRICITY
SMP-LVL-19-LP DIRECTORATE FOR USING SINGLE CORE ARMOURED CABLES, INSTEAD OF MULTIPLE
RUN OF ARMOURED CABLES, CONTRACTOR SHALL BE RESPONSIBLE TO SUPPLY &
PROJECT
250 KW R-01
LEVEL-19 INSTALL SINGLE CORE ARMOURED CABLES OF SUITABLE RATING TO MATCH WITH THE
RATING OF SPECIFIED, MULTIPLE RUNS OF CABLE WITHOUT ANY ADDITIONAL COST.
FEB TOWER AT BFH
APARTMENTS SMP-LVL-18-LP (MIXED USE DEVELOPMENT)
250 KW 7. BATTERY CHARGER TO BE PROVIDED FOR THE ATS MODULE IN LV ROOM.
LEVEL-18
8. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH EDD TO OBTAIN
SMP-LVL-17-LP PLEASE REFER TO DWG. NO. APPROVAL FOR THE POWER SCHEMATIC DIAGRAMS.
250 KW EL-GEN-007B FOR KWH LOCATION.
LEVEL-17 9. THE MINIMUM BMS REQUIREMENTS FOR MONITORING OF LV MAIN PANEL AS FOLLOWS: CLIENT / OWNER
a) ACB - ON/OFF/TRIP
SMP-LVL-16-LP b) ATS PANEL - ON/OFF/TRIP
250 KW c) INTERFACE WITH PMU
LEVEL-16
10. VFD MOTOR DRIVES SHALL INCORPORATE ACTIVE HARMONIC FILTERS FROM SAME
SMP-LVL-15-LP
MANUFACTURER AS THE DRIVE.
274 KW
LEVEL-15
11. ALL CABLES SHALL BE ARMOURED TYPE (AS INDICATED ON DRAWINGS) HAVING
COPPER CONDUCTORS AND SHALL BE LAID ON HEAVY DUTY RETURN FLANGE TYPE
SMP-LVL-14-LP
CABLE TRAY, UNLESS OTHERWISE STATED.
274 KW
LEVEL-14 12. ALL CONTROL PANELS FOR SPECIALIST/ MECHANICAL EQUIPMENTS ETC SHALL BE PROJECT MANAGER
PROVIDED BY THE SPECIALIST CONTRACTOR / MECHANICAL CONTRACTOR.
SMP-LVL-13-LP
274 KW 13. ALL ELR'S SHALL BE '0-1A' ADJUSTABLE TYPE.
LEVEL-13
14. ALL LIFT CONTROL PANELS SHALL BE INTERFACED WITH FIRE ALARM PANEL, SUCH
SMP-LVL-12-LP THAT IN AN EVENT OF FIRE THE LIFTS WILL ALL COME DOWN TO THE GROUND FLOOR
274 KW WITH DOORS REMAINING OPEN.
LEVEL-12
15. PROVIDE ELECTRONIC SURGE PROTECTION DEVICES FOR MAINS PROTECTION
AGAINST LIGHTNING SURGES & TRANSIENTS IN ACCORDANCE WITH BSEN-62305.

LEVEL-11 16. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE AND PROVIDE ALL NECESSARY
ARRANGEMENT FOR HVAC EQUIPMENTS AND MECHANICAL EQUIPMENTS TO MEET
OPERATIONAL REQUIREMENTS AS PER MECHANICAL SPECIFICATIONS AND TENDER
DRAWING.
LEVEL-10
QUANTITY SURVEYORS
17. ALL CONTROL PANELS FOR HVAC/MECHANICAL EQUIPMENT (AHU, FAHU, EXTRACT
FANS, SMOKE FANS, WATER PUMPS, FIRE PUMPS) ETC. ARE TO BE PROVIDED BY
MECHANICAL CONTRACTORS. NECESSARY ELR / ELCB TO BE PROVIDED IN THESE
LEVEL-09
CONTROL PANELS. FIRE ALARM VOLT FREE CONTACTS TO BE PROVIDED FOR
SHUTDOWN OF A/C UNITS OR STARTING OF SMOKE FANS AS APPLICABLE. ELECTRICAL
CONTRACTORS SCOPE IS UP TO ISOLATOR, INCLUDING ISOLATOR.
LEVEL-08
18. SMART METERING SYSTEM INCLUDING ALL ASSOCIATED COMPONENTS SHALL BE AS
PER EDD LATEST REQUIREMENTS AND TO THE APPROVAL OF EDD.

LEVEL-07 19. ALL WORKS ASSOCIATED WITH SMART METERING IS PART OF THE CONTRACTORS
SCOPE.
LEVEL-06
NOTES FOR AMF PANEL :-

1. THE ATS PANEL SHALL BE METAL ENCLOSED FREE STANDING TYPE PANEL. IP41
LEVEL-05
PROTECTION SUITABLE FOR THE MAINS FAILURE OPERATION OF THE D.G. SET AND
SHALL CONSIST OF
a) MOTORISED ACB/MCCB'S, 4POLE, BOTH MECHANICALLY AND ELECTRICALLY
LEVEL-P5 / LEVEL-04
INTERLOCKED.
b) OVERLOAD AND SHORT CIRCUIT PROTECTION.
LEVEL-P4 / LEVEL-03 c) VOLTMETER WITH SELECTOR SWITCH.
d) FREQUENCY METER
e) DC VOLTMETER & DC AMMETER
PARKING LVL-P3 f) STATIC BATTERY CHARGER
g) BOOST CHARGE TIMER
h) DUTY SELECTOR SWITCH 'OFF', 'AUTO', 'MANUAL'.
PARKING LVL-P2 / LEVEL-02 i) INDICATION LAMPS FOR MAINS BREAKER CLOSED, GENERATOR BREAKER CLOSED.
j) SOLID STATE MAINS SENSING RELAYS
k) NECESSARY TIMERS AND RELAYS FOR THE AUTOMATIC MAINS FAILURE FUNCTION.
PARKING LVL-P1 / LEVEL-01
l) BUSBAR & TERMINAL ARRANGEMENT FOR CABLE CONNECTIONS FOR MAINS,
GENERATOR & LOAD.
PARKING LVL-PM

UPPER GF

LOWER GF

N AUTOMATIC CAPACITOR PANEL N AUTOMATIC CAPACITOR PANEL


N N
WITH MINIMUM 8 STAGES OF N N
WITH MINIMUM 8 STAGES OF
CAPACITORS AND DIGITAL RELAY CAPACITORS AND DIGITAL RELAY
WITH DISPLAY WITH DISPLAY

250KVAR 250KVAR
CAPACITOR PANEL-3 CAPACITOR PANEL-4
4C, 240mm2 CU/XLPE/LSF/SWA/LSF

4C, 240mm2 CU/XLPE/LSF/SWA/LSF

4C, 240mm2 CU/XLPE/LSF/SWA/LSF

4C, 240mm2 CU/XLPE/LSF/SWA/LSF

4C, 240mm2 CU/XLPE/LSF/SWA/LSF

4C, 240mm2 CU/XLPE/LSF/SWA/LSF

4C, 240mm2 CU/XLPE/LSF/SWA/LSF

4C, 240mm2 CU/XLPE/LSF/SWA/LSF

4C, 240mm2 CU/XLPE/LSF/SWA/LSF

4C, 240mm2 CU/XLPE/LSF/SWA/LSF


2R, 4Cx185mm2 CU/XLPE/SWA/PVC

2R, 4Cx185mm2 CU/XLPE/SWA/PVC


4C, 70mm2 CU/XLPE/LSF/SWA/LSF

4C, 95mm2 CU/XLPE/LSF/SWA/LSF

4C, 95mm2 CU/XLPE/LSF/SWA/LSF

4C, 95mm2 CU/XLPE/LSF/SWA/LSF


REVISED BASED ON REVISED
R-01 26/01/2020 METERING STRATEGY & EMERGENCY
POWER REQUIREMENTS FOR ASB
R-00 14/05/2019 ISSUED FOR CONSTRUCTION
CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY


SPARE SPARE SPARE SPARE SPARE No. Date Description
PROJECT STAGE
CONSTRUCTION DRAWINGS
FREE STANDING FLOOR MOUNTED
CUBICLE TYPE BUSCOUPLER PANEL
MAIN WORKS PACKAGE
HOUSED IN MAIN L.V. ROOM AT B1 LEGEND:-

LANDLORD SMART METER AS PER LATEST


BUS-COUPLER-2 KWH
REQUIREMENTS AND TO EDD APPROVAL.
EDD
160A 400A 400A 400A 400A 400A 400A 400A 300A 630A 160A 300A 400A 400A 400A 400A 125A 160A 160A 160A 630A
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN 1600A 4POLE TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TENANT SMART METER AS PER LATEST
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB KWH
ACB EDD TM REQUIREMENTS AND TO EDD APPROVAL.
FIXED TYPE) PROJECT NO 2016080 DRAWN NLD
KWH KWH KWH KWH
EDD TM EDD TM EDD TM EDD TM DATA CONTACTOR AS PER EDD LATEST
DC REQUIREMENTS AND TO EDD APPROVAL. REVIT FILE - CHECKED VVV/PAS

2000A CU. A CU. EARTH STRIP 2000A CU. A KWH TENANT SMART METER WITH CUTOUTS AS PER
TPN+E KWH METER V VS TPN+E BUSBAR KWH METER V VS CU. EARTH STRIP EDD CO TM LATEST REQUIREMENTS AND TO EDD APPROVAL.
A A DATE 07/10/2018 VERIFIED SKK
BUSBAR (SMART TYPE) TO EDD (SMART TYPE) TO EDD
APPROVAL FROM EDD APPROVAL FROM EDD
A A
APPROVED SOURCE) APPROVED SOURCE)
KWH KWH SCALE N.T.S. APPROVED SKK
EDD EDD
LL MFM MFM
BMS BMS SHEET TITLE
CL - 1596 KW CHK-KWH RS485 CL - 1426 KW RS485 CHK-KWH
INTERFACE INTERFACE
DL - 831 KVA
BUS
DL - 827 KVA LV MAIN POWER
MDL - 582 KVA 1600A TPN MDL - 578 KVA 1600A TPN
ACB (DRAW COUPLER ACB (DRAW SCHEMATIC DIAGRAM
MP-3 (FORM-3B)(50KA) (ON) MP-4 (FORM-3B)(50KA)
FOR RESIDENTIAL
REFER NOTE # 15 OUT TYPE)
R Y B BC-2 FOR RESIDENTIAL
REFER NOTE # 15 OUT TYPE)
R Y B
(SHEET 2 OF 2)
ESP R Y B ESP
MECHANICAL & MECHANICAL & FREE STANDING, FLOOR
E E MECHANICAL & E E E MECHANICAL & E
FREE STANDING, FLOOR ELECTRICAL ELECTRICAL MOUNTED L.V. MAIN PANEL
ELECTRICAL INTERLOCK ELECTRICAL INTERLOCK
MOUNTED L.V. MAIN PANEL INTERLOCK WITH INTERLOCK WITH BOARD HOUSED AT
WITH BUS COUPLER-BC-2 WITH BUS COUPLER-BC-2
BOARD HOUSED AT INCOMER OF MP-3 INCOMER OF MP-4 MAIN L.V ROOM AT BASEMENT-01
MAIN L.V ROOM AT BASEMENT-01 7 RUNS OF 1C 500mm² 7 RUNS OF 1C 500mm²
600V/1000V XLPE/AWA/PVC DC3 TO EWA SERVER TO EWA SERVER DC4
600V/1000V XLPE/AWA/PVC
COPPER CONDUCTOR ON TRAY (COMMUNICATION VIA GSM) (COMMUNICATION VIA GSM) COPPER CONDUCTOR ON TRAY

FROM TRANSFORMER TX-3 (1000 KVA) FROM TRANSFORMER TX-4 (1000 KVA)
LEVEL-B1

LEVEL-B2

SHEET NUMBER REVISION


EL-GEN-006B R-01
PL-05 PL-06
20 KW W 20 KW W GENERAL NOTES :- ABD - 16080
100A 100A LEAD CONSULTANT
ROOF 1. ALL EQUIPMENTS SHALL MEET THE REQUIREMENTS AND APPROVAL OF EWA PRIOR TO
TP TP
PLACEMENT OF AN ORDER.
SMP-LVL-24-CLP
2. ALL MOLDED CASE CIRCUIT BREAKERS SHALL BE OF ADJUSTABLE TYPE AND SHALL
LEVEL-24 204 KW
HAVE SHUNT TRIP FACILITIES.

3. ALL L.V PANEL BOARD SHALL BE TYPE TESTED.


LEVEL-23 R-01
4. CONTRACTOR SHALL PROVIDE,ALTHOUGH NOT SHOWN ON DRAWINGS, SUITABLE
RATING & SENSITIVITY OF EARTH LEAKAGE RELAY, EARTH FAULT RELAY, EARTH
LEAKAGE CIRCUIT BREAKERS ETC. FOR VARIOUS AIR-CONDITIONING AND MECHANICAL
LEVEL-22
EQUIPMENTS AS PER EWA REQUIREMENTS.

5. FOR OTHER NOTES & LEGEND REFER TO DRG.No:EL-001 & EL-002.


LEVEL-21
6. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH ELECTRICITY
DISTRIBUTION DIRECTORATE FOR THE APPROVAL OF MULTIPLE RUN OF ARMOURED
LEVEL-20 CABLES AS SHOWN ON DRAWINGS. IN CASE OF THE REQUIREMENT OF ELECTRICITY
DIRECTORATE FOR USING SINGLE CORE ARMOURED CABLES, INSTEAD OF MULTIPLE
RUN OF ARMOURED CABLES, CONTRACTOR SHALL BE RESPONSIBLE TO SUPPLY &
PROJECT
INSTALL SINGLE CORE ARMOURED CABLES OF SUITABLE RATING TO MATCH WITH THE
LEVEL-19 RATING OF SPECIFIED, MULTIPLE RUNS OF CABLE WITHOUT ANY ADDITIONAL COST. FEB TOWER AT BFH
7. BATTERY CHARGER TO BE PROVIDED FOR THE ATS MODULE IN LV ROOM. (MIXED USE DEVELOPMENT)
LEVEL-18
8. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH EDD TO OBTAIN
APPROVAL FOR THE POWER SCHEMATIC DIAGRAMS.
LEVEL-17
9. THE MINIMUM BMS REQUIREMENTS FOR MONITORING OF LV MAIN PANEL AS FOLLOWS:
a) ACB - ON/OFF/TRIP CLIENT / OWNER
b) ATS PANEL - ON/OFF/TRIP
LEVEL-16 c) INTERFACE WITH PMU

SMP-LVL-15-CLP 10. VFD MOTOR DRIVES SHALL INCORPORATE ACTIVE HARMONIC FILTERS FROM SAME
LEVEL-15 70 KW MANUFACTURER AS THE DRIVE.

11. ALL CABLES SHALL BE ARMOURED TYPE (AS INDICATED ON DRAWINGS) HAVING
COPPER CONDUCTORS AND SHALL BE LAID ON HEAVY DUTY RETURN FLANGE TYPE
LEVEL-14 R-01 CABLE TRAY, UNLESS OTHERWISE STATED.

12. ALL CONTROL PANELS FOR SPECIALIST/ MECHANICAL EQUIPMENTS ETC SHALL BE
LEVEL-13 PROVIDED BY THE SPECIALIST CONTRACTOR / MECHANICAL CONTRACTOR. PROJECT MANAGER
13. ALL ELR'S SHALL BE '0-1A' ADJUSTABLE TYPE.
LEVEL-12
14. ALL LIFT CONTROL PANELS SHALL BE INTERFACED WITH FIRE ALARM PANEL, SUCH
SMP-LVL-11-CLP PL-01 PL-02 PL-03 THAT IN AN EVENT OF FIRE THE LIFTS WILL ALL COME DOWN TO THE GROUND FLOOR
17KW W 17KW W 17 KW W WITH DOORS REMAINING OPEN.
36 KW
LEVEL-11 63A TP 63A TP 63A TP
15. PROVIDE ELECTRONIC SURGE PROTECTION DEVICES FOR MAINS PROTECTION
AGAINST LIGHTNING SURGES & TRANSIENTS IN ACCORDANCE WITH BSEN-62305.
LEVEL-10 R-01
16. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE AND PROVIDE ALL NECESSARY
ARRANGEMENT FOR HVAC EQUIPMENTS AND MECHANICAL EQUIPMENTS TO MEET
OPERATIONAL REQUIREMENTS AS PER MECHANICAL SPECIFICATIONS AND TENDER
LEVEL-09 DRAWING.

17. ALL CONTROL PANELS FOR HVAC/MECHANICAL EQUIPMENT (AHU, FAHU, EXTRACT QUANTITY SURVEYORS
LEVEL-08 FANS, SMOKE FANS, WATER PUMPS, FIRE PUMPS) ETC. ARE TO BE PROVIDED BY
MECHANICAL CONTRACTORS. NECESSARY ELR / ELCB TO BE PROVIDED IN THESE
CONTROL PANELS. FIRE ALARM VOLT FREE CONTACTS TO BE PROVIDED FOR
SHUTDOWN OF A/C UNITS OR STARTING OF SMOKE FANS AS APPLICABLE. ELECTRICAL
LEVEL-07
CONTRACTORS SCOPE IS UP TO ISOLATOR, INCLUDING ISOLATOR.

18. SMART METERING SYSTEM INCLUDING ALL ASSOCIATED COMPONENTS SHALL BE AS


LEVEL-06 PER EDD LATEST REQUIREMENTS AND TO THE APPROVAL OF EDD.

19. ALL WORKS ASSOCIATED WITH SMART METERING IS PART OF THE CONTRACTORS
LEVEL-05
SCOPE.

NOTES FOR AMF PANEL :-

PARKING LVL-P5 / LEVEL-04 1. THE ATS PANEL SHALL BE METAL ENCLOSED FREE STANDING TYPE PANEL. IP41
PROTECTION SUITABLE FOR THE MAINS FAILURE OPERATION OF THE D.G. SET AND
SHALL CONSIST OF
PARKING LVL-P4 / LEVEL-03 a) MOTORISED ACB/MCCB'S, 4POLE, BOTH MECHANICALLY AND ELECTRICALLY
INTERLOCKED.
b) OVERLOAD AND SHORT CIRCUIT PROTECTION.
c) VOLTMETER WITH SELECTOR SWITCH.
PARKING LVL-P3
d) FREQUENCY METER
e) DC VOLTMETER & DC AMMETER
f) STATIC BATTERY CHARGER
PARKING LVL-P2 / LEVEL-02 g) BOOST CHARGE TIMER
h) DUTY SELECTOR SWITCH 'OFF', 'AUTO', 'MANUAL'.
i) INDICATION LAMPS FOR MAINS BREAKER CLOSED, GENERATOR BREAKER CLOSED.
PARKING LVL-P1 / LEVEL-01
j) SOLID STATE MAINS SENSING RELAYS
k) NECESSARY TIMERS AND RELAYS FOR THE AUTOMATIC MAINS FAILURE FUNCTION.
SMP-PM-CLP l) BUSBAR & TERMINAL ARRANGEMENT FOR CABLE CONNECTIONS FOR MAINS,
223 KW GENERATOR & LOAD.
PARKING LVL-PM m) BMS INTEGRATION.

SMP-UGF-CLP
UPPER GF 48 KW

SMP-LGF-CLP
R-01 35 KW
LOWER GF

LEGEND:-
AMF-G1-1 AMF-G1-2 KWH LANDLORD SMART METER AS PER LATEST
DB-B1-CLP REQUIREMENTS AND TO EDD APPROVAL.
637 KW 234 KW EDD
35 KW
KWH TENANT SMART METER AS PER LATEST
7R x 1C, 500mm2 CU/MGT/XLPE/LSF/SWA/LSF

REQUIREMENTS AND TO EDD APPROVAL.


FROM EMP FROM EMP EDD TM
R-01
DATA CONTACTOR AS PER EDD LATEST
DC REQUIREMENTS AND TO EDD APPROVAL.
SPARE SPARE SPARE SPARE
4C, 240mm2 CU/XLPE/LSF/SWA/LSF

4C, 240mm2 CU/XLPE/LSF/SWA/LSF

4C, 120mm2 CU/XLPE/LSF/SWA/LSF

4C, 300mm2 CU/XLPE/LSF/SWA/LSF


4C, 16mm2 CU/XLPE/LSF/SWA/LSF

4C, 16mm2 CU/XLPE/LSF/SWA/LSF

4C, 25mm2 CU/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/XLPE/LSF/SWA/LSF

4C, 25mm2 CU/XLPE/LSF/SWA/LSF

4C, 25mm2 CU/XLPE/LSF/SWA/LSF

4C, 25mm2 CU/XLPE/LSF/SWA/LSF

KWH TENANT SMART METER WITH CUTOUTS AS PER


EDD CO TM LATEST REQUIREMENTS AND TO EDD APPROVAL.

REVISED BASED ON REVISED


MOA - MAIN OWNERS ASSOCIATION R-01 26/01/2020 METERING STRATEGY & EMERGENCY
ROA - RESIDENTIAL OWNERS ASSOCIATION POWER REQUIREMENTS FOR ASB
CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

COA - COMMERCIAL OWNERS ASSOCIATION


R-00 14/05/2019 ISSUED FOR CONSTRUCTION
No. Date Description

R-01 PROJECT STAGE


CONSTRUCTION DRAWINGS
MAIN WORKS PACKAGE

ELR ELR ELR ELR ELR


CHK-KWH CHK-KWH CHK-KWH

400A 63A 63A 100A 125A 300A 100A 100A 1200A 63A 100A 125A 250A 125A 63A 63A 63A 400A 100A 100A
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB ACB ACB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB ACB MCCB
ESMP-MOA+ROA ESMP-COA PROJECT NO 2016080 DRAWN NLD

NEW AMF-G1-1 AMF-G1-2


1200A 400A REVIT FILE - CHECKED VVV/PAS
TP TP
ACB MCCB
2000A CU. TPN+E A CU. EARTH STRIP 1200A CU. TPN+E A CU. EARTH STRIP
BUSBAR V VS BMS BUSBAR V VS DATE 07/10/2018 VERIFIED SKK
A INTERFACE A
1200A 1200A 400A 400A
4P 4P 4P 4P
A A ACB (EO) M&E ACB (EO) MCCB (EO) M&E MCCB (EO)
INTERLOCK INTERLOCK SCALE N.T.S. APPROVED SKK
AMF AMF
R Y B MODULE R Y B R Y B MODULE R Y B
MFM MFM N EM N EM
SHEET TITLE
LV MAIN POWER
CL - 1168 KW 1600A TPN CL - 376 KW 1000A
ACB (DRAW TPN
FROM
SMP-MOA+ROA
FROM EMP FROM SMP-COA FROM EMP SCHEMATIC DIAGRAM
DL - 1050 KVA DL - 181 KVA
OUT TYPE) ACB AMF-G1-1 DETAIL AMF-G1-2 DETAIL (SHEET 1 OF 9)
SMP-MOA+ROA (FORM-3B) R Y B SMP-COA (FORM-3B) R Y B

E FREE STANDING, FLOOR E E FREE STANDING, FLOOR E


MOUNTED L.V. MAIN PANEL 7 RUNS OF 1C 500mm² MOUNTED L.V. MAIN PANEL 4 RUNS OF 1C 1000mm²
BOARD HOUSED AT 600V/1000V CU/XLPE/SWA/LSF BOARD HOUSED AT 600V/1000V CU/MGT/XLPE/LSF/SWA/LSF
MAIN L.V ROOM AT BASEMENT-01 CONDUCTOR ON TRAY MAIN L.V ROOM AT BASEMENT-01 CONDUCTOR ON TRAY R-01

FROM MP-1 FROM MP-1

LEVEL-B1

SMP-B2-CHWP DB-B2-LP
155 KW 15 KW FA

SHEET NUMBER REVISION


LEVEL-B2
EL-GEN-007A R-01
ABD - 16080
LEAD CONSULTANT

GENERAL NOTES :-
ESMP-RF-LP SL-01
1. ALL EQUIPMENTS SHALL MEET THE REQUIREMENTS AND APPROVAL OF EWA PRIOR TO
105 KW W 20 KW PLACEMENT OF AN ORDER.
ROOF 100A TP
2. ALL MOLDED CASE CIRCUIT BREAKERS SHALL BE OF ADJUSTABLE TYPE AND SHALL
HAVE SHUNT TRIP FACILITIES.
LEVEL-24
3. ALL L.V PANEL BOARD SHALL BE TYPE TESTED.
LEVEL-23
4. CONTRACTOR SHALL PROVIDE,ALTHOUGH NOT SHOWN ON DRAWINGS, SUITABLE
RATING & SENSITIVITY OF EARTH LEAKAGE RELAY, EARTH FAULT RELAY, EARTH
LEAKAGE CIRCUIT BREAKERS ETC. FOR VARIOUS AIR-CONDITIONING AND MECHANICAL
PROJECT
LEVEL-22
EQUIPMENTS AS PER EWA REQUIREMENTS. FEB TOWER AT BFH
LEVEL-21
5. FOR OTHER NOTES & LEGEND REFER TO DRG.No:EL-001 & EL-002. (MIXED USE DEVELOPMENT)
LEVEL-20
6. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH ELECTRICITY
DISTRIBUTION DIRECTORATE FOR THE APPROVAL OF MULTIPLE RUN OF ARMOURED
EVACP 1 KW CABLES AS SHOWN ON DRAWINGS. IN CASE OF THE REQUIREMENT OF ELECTRICITY
LEVEL-19 DIRECTORATE FOR USING SINGLE CORE ARMOURED CABLES, INSTEAD OF MULTIPLE
RUN OF ARMOURED CABLES, CONTRACTOR SHALL BE RESPONSIBLE TO SUPPLY & CLIENT / OWNER
INSTALL SINGLE CORE ARMOURED CABLES OF SUITABLE RATING TO MATCH WITH THE
LEVEL-18
RATING OF SPECIFIED, MULTIPLE RUNS OF CABLE WITHOUT ANY ADDITIONAL COST.

7. BATTERY CHARGER TO BE PROVIDED FOR THE ATS MODULE IN LV ROOM.


LEVEL-17
8. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH EDD TO OBTAIN
APPROVAL FOR THE POWER SCHEMATIC DIAGRAMS.
LEVEL-16
9. THE MINIMUM BMS REQUIREMENTS FOR MONITORING OF LV MAIN PANEL AS FOLLOWS:
a) ACB - ON/OFF/TRIP
LEVEL-15
b) ATS PANEL - ON/OFF/TRIP
ESMP-14-LP c) INTERFACE WITH PMU PROJECT MANAGER
LEVEL-14 36 KW
10. VFD MOTOR DRIVES SHALL INCORPORATE ACTIVE HARMONIC FILTERS FROM SAME
MANUFACTURER AS THE DRIVE.
RFACP 1 KW
LEVEL-13 11. ALL CABLES SHALL BE ARMOURED TYPE (AS INDICATED ON DRAWINGS) HAVING
COPPER CONDUCTORS AND SHALL BE LAID ON HEAVY DUTY RETURN FLANGE TYPE
LEVEL-12
CABLE TRAY, UNLESS OTHERWISE STATED.

ESMP-11-LP PL-04 12. ALL CONTROL PANELS FOR SPECIALIST/ MECHANICAL EQUIPMENTS ETC SHALL BE
PROVIDED BY THE SPECIALIST CONTRACTOR / MECHANICAL CONTRACTOR.
47 KW 17KW W
LEVEL-11
63A TP
13. ALL ELR'S SHALL BE '0-1A' ADJUSTABLE TYPE.

LEVEL-10 14. ALL LIFT CONTROL PANELS SHALL BE INTERFACED WITH FIRE ALARM PANEL, SUCH
THAT IN AN EVENT OF FIRE THE LIFTS WILL ALL COME DOWN TO THE GROUND FLOOR
LEVEL-09 WITH DOORS REMAINING OPEN. QUANTITY SURVEYORS
15. PROVIDE ELECTRONIC SURGE PROTECTION DEVICES FOR MAINS PROTECTION
LEVEL-08 AGAINST LIGHTNING SURGES & TRANSIENTS IN ACCORDANCE WITH BSEN-62305.

EVACP 1 KW 16. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE AND PROVIDE ALL NECESSARY
LEVEL-07 ARRANGEMENT FOR HVAC EQUIPMENTS AND MECHANICAL EQUIPMENTS TO MEET
OPERATIONAL REQUIREMENTS AS PER MECHANICAL SPECIFICATIONS AND TENDER
DRAWING.
LEVEL-06
17. ALL CONTROL PANELS FOR HVAC/MECHANICAL EQUIPMENT (AHU, FAHU, EXTRACT
FANS, SMOKE FANS, WATER PUMPS, FIRE PUMPS) ETC. ARE TO BE PROVIDED BY
LEVEL-05 MECHANICAL CONTRACTORS. NECESSARY ELR / ELCB TO BE PROVIDED IN THESE
ESMP-P5-IND/SEF CONTROL PANELS. FIRE ALARM VOLT FREE CONTACTS TO BE PROVIDED FOR
28.2 KW
SHUTDOWN OF A/C UNITS OR STARTING OF SMOKE FANS AS APPLICABLE. ELECTRICAL
LEVEL-P5 / LEVEL-04
CONTRACTORS SCOPE IS UP TO ISOLATOR, INCLUDING ISOLATOR.
ESMP-P4-IND/SEF
11 KW 18. SMART METERING SYSTEM INCLUDING ALL ASSOCIATED COMPONENTS SHALL BE AS
LEVEL-P4 / LEVEL-03
PER EDD LATEST REQUIREMENTS AND TO THE APPROVAL OF EDD.
ESMP-P3-IND/SEF
PARKING LVL-P3 11 KW 19. ALL WORKS ASSOCIATED WITH SMART METERING IS PART OF THE CONTRACTORS
SCOPE.
ESMP-P2-IND/SEF
PARKING LVL-P2 / LEVEL-02 11 KW NOTES FOR AMF PANEL :-
ESMP-P1-IND/SEF
EVACP 1 KW 1. THE ATS PANEL SHALL BE METAL ENCLOSED FREE STANDING TYPE PANEL. IP41
PARKING LVL-P1 / LEVEL-01 11 KW
PROTECTION SUITABLE FOR THE MAINS FAILURE OPERATION OF THE D.G. SET AND
ESMP-PM-LP SHALL CONSIST OF
a) MOTORISED ACB/MCCB'S, 4POLE, BOTH MECHANICALLY AND ELECTRICALLY
PARKING LVL-PM 50 KW
INTERLOCKED.
b) OVERLOAD AND SHORT CIRCUIT PROTECTION.
ESMP-UGF-LP c) VOLTMETER WITH SELECTOR SWITCH.
UPPER GF
48 KW d) FREQUENCY METER
e) DC VOLTMETER & DC AMMETER
EDB-CONSUMER HV ESMP-LGF-LP
f) STATIC BATTERY CHARGER
10 KW 57 KW
g) BOOST CHARGE TIMER
EDB-EDD EDB-TRANSFORMER ROOM FACP 1 KW h) DUTY SELECTOR SWITCH 'OFF', 'AUTO', 'MANUAL'.
LOWER GF 10 KW 15 KW i) INDICATION LAMPS FOR MAINS BREAKER CLOSED, GENERATOR BREAKER CLOSED.
j) SOLID STATE MAINS SENSING RELAYS
CBS ESMP-B1-LP k) NECESSARY TIMERS AND RELAYS FOR THE AUTOMATIC MAINS FAILURE FUNCTION.
35 KW 46 KW l) BUSBAR & TERMINAL ARRANGEMENT FOR CABLE CONNECTIONS FOR MAINS,
GENERATOR & LOAD.
m) BMS INTEGRATION.
4C, 240mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 240mm2 CU/MGT/XLPE/LSF/SWA/LSF


4C, 95mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 25mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 25mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 25mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 25mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 25mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 25mm2 CU/MGT/XLPE/LSF/SWA/LSF

4C, 16mm2 CU/MGT/XLPE/LSF/SWA/LSF


4C, 120mm2 CU/XLPE/LSF/SWA/LSF
4C, 25mm2 CU/XLPE/LSF/SWA/LSF

4C, 16mm2 CU/XLPE/LSF/SWA/LSF

4C, 16mm2 CU/XLPE/LSF/SWA/LSF

4C, 16mm2 CU/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/XLPE/LSF/SWA/LSF

4C, 70mm2 CU/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/XLPE/LSF/SWA/LSF

4C, 70mm2 CU/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/XLPE/LSF/SWA/LSF

4C, 35mm2 CU/XLPE/LSF/SWA/LSF


R-01
CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY

CABLE + ECC IN TRAY


2H, 4mm2 MICC FIRE

2H, 4mm2 MICC FIRE

2H, 4mm2 MICC FIRE

2H, 4mm2 MICC FIRE

2H, 4mm2 MICC FIRE

SPARE SPARE FA SPARE SPARE SPARE SPARE SPARE SPARE

REVISED BASED ON REVISED


R-01 26/01/2020 METERING STRATEGY & EMERGENCY
POWER REQUIREMENTS FOR ASB
R-00 14/05/2019 ISSUED FOR CONSTRUCTION
No. Date Description
ELR ELR
PROJECT STAGE
CHK-KWH CHK-KWH CHK-KWH CHK-KWH CHK-KWH CHK-KWH CHK-KWH CHK-KWH CHK-KWH CHK-KWH CHK-KWH
CONSTRUCTION DRAWINGS
63A 100A 100A 200A 500A 500A 63A 125A 63A 63A 63A 125A 160A 20A 20A 20A 20A 20A 125A 200A 100A 63A 100A 100A 160A 125A 100A 100A 100A 100A 100A 125A 63A 63A 100A 100A MAIN WORKS PACKAGE
TPN TPN ST TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN SPN SPN SPN SPN SPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB

1600A CU. TPN+E A CU. EARTH STRIP 500A CU. TPN+E A CU. EARTH STRIP LEGEND:-
BUSBAR HOOTER FOR EARTH V VS BUSBAR V VS
LEAKAGE SENSING A A PROJECT NO 2016080 DRAWN NLD
BMS KWH LANDLORD SMART METER AS PER LATEST
A INTERFACE A REQUIREMENTS AND TO EDD APPROVAL.
EDD
REVIT FILE - CHECKED VVV/PAS
KWH TENANT SMART METER AS PER LATEST
MFM MFM REQUIREMENTS AND TO EDD APPROVAL.
EDD TM
BMS BMS DATE 07/10/2018 VERIFIED SKK
CL - 637 KW CHK CL - 234.2 KW CHK
INTERFACE INTERFACE DATA CONTACTOR AS PER EDD LATEST
DL (FIRE CONDITION) - 585.5 KVA DL (FIRE CONDITION) - 198.2 KVA DC REQUIREMENTS AND TO EDD APPROVAL.
DL (POWER FAILURE) - 383.5 KVA 1200A TPN DL (POWER FAILURE) - 198.2 KVA 400A
ACB (DRAW TPN SCALE N.T.S. APPROVED SKK
ESMP-MOA+ROA OUT TYPE) ESMP-COA MCCB
KWH TENANT SMART METER WITH CUTOUTS AS PER
EDD CO TM LATEST REQUIREMENTS AND TO EDD APPROVAL.
(FORM-3B) R Y B (FORM-3B) R Y B

SHEET TITLE
MOA - MAIN OWNERS ASSOCIATION
E 7 RUNS OF 1C 500mm² E E 4C 300mm² E
FREE STANDING, FLOOR
MOUNTED L.V. MAIN PANEL 600V/1000V CU/MGT/XLPE/LSF/SWA/LSF
FREE STANDING, FLOOR
MOUNTED L.V. MAIN PANEL 600V/1000V CU/MGT/XLPE/LSF/SWA/LSF
ROA - RESIDENTIAL OWNERS ASSOCIATION
COA - COMMERCIAL OWNERS ASSOCIATION
LV MAIN POWER
BOARD HOUSED AT CONDUCTOR ON TRAY BOARD HOUSED AT CONDUCTOR ON TRAY SCHEMATIC DIAGRAM
MAIN L.V ROOM AT BASEMENT-01 MAIN L.V ROOM AT BASEMENT-01
AMF-G1-1 AMF-G1-2
(SHEET 2 OF 9)
R-01

LEVEL-B1

63A 500A 500A


W W W
TP TP TP

15 KW 187 KW 187 KW 71 KW 100A


CP CP CP 25 KW W
TP
JOCKEY PUMP FIRE PUMP-01 FIRE PUMP-02 ESMP-B2-LP
GREY WATER SYSTEM
(JP-B2) (MAIN-1) (MAIN-2)
(FWP-B21) (FWP-B22) SHEET NUMBER REVISION
LEVEL-B2 (WORKING) (STAND BY)
EL-GEN-007B R-01

You might also like