Intake BoQ

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

Description

Item No.

CONSTRUCTION OF INTAKE SYSTEM


1 EARTH WORK
1.1 Site Clearing Work to a depth of 0.25m
1.2 Excavation in normal soil including dewatering and protecting the excavated area from side soil
caving according to the excavation depths specified below
1.1.1 Depth between 0 to 2m for Normal soil excavation
1.1.2 Depth between 2 to 4m Normal soil excavation
1.1.4 Depth Greater than 4m Normal soil excavation
1.1.5 Extra over for harad rock excavation
1.1.6 Extra over for soft rock excavation
1.1.7 Cart away all excavated material and deposit to appropriate distance not exceeding 1 km
1.1.8 Backfill with suitable excavated or selected granular material
1.1.9 25cm harad core filling below the bottom slab
2 CONCRETE WORK
50mm thick lean concrete with mix ration (1:3:6) under the base slab
2.1
2.2 Reinforced concrete type C-30 filled into from work and vibrated around reinforced bar in

2.2.1 Base Slab


2.2.2 Plat form
2.2.3 Wall
2.2.4 Column
2.2.5 Beam
3 Provide and fix formwork for
3.1 Base Slab
3.2 Plat form
3.3 Column
3.4 Wall
3.5 Beam
Provide,Cut,bend and fix in position reinforced steel bar.
4 All according to structural drawing. Price should included tying wires.
4.1 Walls(Long ,Short and Partion Wall)
4.1.4 Ø14
4.1.5 Ø16
4.2 Columns and Beams
4.2.1 Ø8
4.2.3 Ø12
4.3 Plat form
4.3.3 Ø12
Base Slab
4.5 Ø16
4.6 Ø20
4.7 Ø24 base slab Anchoring bars
5 Supply and Install sheet metal gate with 0.75m*0.75m with 10mm thick
6 Supply and Install Monorail crane with 2KN Capacity
7 Supply and construct PVC water stop or equivalent joint made of natural rubber
8 2'' GS Pipe for hand rail on the plat form
9 Roofing
supply, assemble & fix in position wooden roof truss price shall include the application of
9.1 three coat & external anti rust treatment
9.2 10cm bottom Member
9.3 10cm top Member
9.4 8cm verticals & diagonals
Supply & fix Wooden purlin
9.5
9.6 Supply & fix G-28 CI on to wooden purlin
9.7 Supply & fix 20*200mm facia board
Unit Price, Total Amount,
Unit Qty.
Birr Birr

-
-
m2 30

m3 60
m3 60
15
m3 210
m3 22.5
m3 375.00
m3 5.63
m2 30.00
474.784 114.256 133.75911
m2 30.00 208.384 114.256 19.364978
266.4 228.512 153.12409
m3 15.00 246.272
m3 8.40 Top tie beam 0.88 3.2
m3 92.40
m3 1.73 67.584
m 3
1.06 1.208666667 0.8 8 2
27.66666667 66.879556 267.51822 267.51822
m2 9.00 535.03644
m2 28.00 76.562044 1378.1168 16
m2 23.04 1.578666667 107.66667 260.26622
m2 144.00 7.666666667 9.6824889 174.28 135.55484
m2 10.56 309.84

138 107.33333 774.59911 774.6

Kg 2,372.21 1.25 1084.44


Kg 1,084.44 12 18.944 3.1573333
309.84
Kg 64.32
Kg 90.112

Kg 246.27

Kg 386.00
Kg 602.59
Kg 281.09 3.52 12 1.2
No 3
No 1.00
m 126.00
m 75.60 75.6

7
m 16
m 25.63
m 15.96
m 32
m2
21.36
m 14.56
520.53244