Preliminary 12.03.2019: Client Global Hydro
Preliminary 12.03.2019: Client Global Hydro
Preliminary 12.03.2019: Client Global Hydro
00
6000 11700
1000
1000
operation range
of crane
6000
6500 4000
approx. 5360
5000
generator
by Global Hydro
HEROS
by Global Hydro lubrication unit 5000
piping for cooling and
transformer
7000
heat exchanger
by Global Hydro by Global Hydro
4210
NGR
by Global Hydro
hydraulic unit
by Global Hydro
11000
A
28000
DN1200 PN25
butterfly valve,
dismantling joint,
connection flange,
bypass line and
drain line for spiral case A
client Global
by Global Hydro Hydro
6500
auxiliary transformer general pump sump
11000
6500
diesel generator
by Global Hydro
DN1200 PN25
4210
Hydro
1200
sution head
tailwater level
830
Q=4,5m³/s
6800
1210
1400
30°
tailwater level
Q=0,0m³/s
medium voltage
570
3800
by Global Hydro
266
SCADA overlap
by Global Hydro
the whole force of the penstock
has to be absorbed at the foundation
AC / DC panel of the penstock and the bifurcation pipe, SECTION A-A
by Global Hy it´s not allowed to put this forces
onto the turbine 1:80
penstock must have
preliminary
NOTE:
a possibility for flushing and
All measurements of the turbine house are proposals and we do not take on any warranty for the adequate static calculation. cleaning (maintenance hole) Turbine Data: 3740 Nam Long 2
The measurements can be changed if necessary, but they must not get smaller.
The measurements of the turbine unit are basically as signed, subject to change by GHE without notice. Beton-Qualität:
Concrete quality:
DIN EN 1992-1-1 min. C25/30
by client
penstock must have Francis - Turbine 3: 12.03.2019
strictly for the purpose of erection, operation and maintenance of the subject hydro power plant. Any
In case of advanced penstock installation until inside the turbine house, the distance of penstock end has to be approx. 500 mm to wall of building. Beton-Toleranz:
DIN 18202 a possibility for draining
This drawing and all other information are produced and provided by Global Hydro Energy Gmbh
After installation of turbine, connection of turbine and penstock end has to be done by CLIENT according GHE welding specification of penstock ME-0027. Concrete tolerance: into discharge channel
The whole forces of the penstock have to be absorbed at the foundation of the penstock and the bifurcation pipe, -rated net head HN = 118,50 [m]
it´s not allowed to stress the turbine with any forces.
Erstbeton (drain line at least DN150 PN25)
First concrete The dimensions of sub*supplier*parts like including block valve by CLIENT -rated discharge QN = 4,500 [m³/s]
In the penstock there must be an inspection hole for cleaning and a possibility for flushing (draining) before commissioning (drain pipe with a valve) Zweitbeton generator, butterfly valve, ... Rev. / Änd. Date / Datum Name / Name Description / Beschreibung
-rated turbine output PT = 4924,00 [kW] Designation General Tolerances - Allgemeintoleranzen Material
Second concrete has also to be reinforced sufficiently. Reinforcement of first concrete has to reach into second concrete to get a sufficient connection. Second concrete are not fixed until now. -rated speed nG = 750,00 [rpm]
Benennung geomet. product spec. (GPS) acc. DIN EN ISO 286
threads acc. DIN 13
Werkstoff
-runaway speed nD = 1418,00 [rpm] general layout length & angle acc. DIN ISO 2768-1 m
geometric tolerances acc. DIN ISO 2768-2 K
Raw dimensions
Rohmaße
The turbine house has to be adequate air ventilated! Proposal for designing of cable ducts see drawing
use for another purpose requires our prior written approval.
Minimum temperature inside the power house 15° C ! possibility for covering client identification: Turbine 1 Turbine 2 molded parts acc. DIN EN ISO 8062-3 DCTG11
Designed 3D Date
identification GHE: xxxx_01_01 xxxx_01_02 Drawing number Revision Nr. DIN ISO 5456-2 Kanten ohne Angabe simon.hofmann 11.02.2019
(covering done by CLIENT) machine number GHE: **** ****
Weight: Zeichnungsnummer revision nr. nach DIN ISO 13715
-0,0
-0,6
+0,8 Gezeichnet 3D
+0,0 Designed 2D
Datum
Date
Positions and dimensions of ducts and covers are proposals. Ducts and covers are not included in GHE scope of supply. Edges without specification simon.hofmann 12.02.2019
Data for crane 3740_01_EBP acc. DIN ISO 13715 Gezeichnet 2D
checked
Datum
Date
depth
geprüft
Crane specifications for assembling and maintenance by client, two speeds are necessary for installation of the turbines -generator: ~ xxxx [kg] Released
Datum
Date
Hoist power kg missing dimensions according 3D-file Freigegeben Datum
If no crane is installed in the turbine house the client has to organize and pay all crane costs. That is also valid during the warranty period. -turbine: ~ xxxx [kg] Weight (in kg)
Speed from / slow speed up to / high speed
-draft tube elbow ~ xxxx [kg] EN ISO 5459 A B C Gewicht (in kg) 5350983,8 kgScale
Maßstab 1:80
Hoist speed 0,60 4,00
The dimensions of sub-supplier-parts like generator, butterfly-valve, emergency diesel generator, transformer .... are given from the sub-supplier in advance and aren´t fixed until now -dismantling joint ~ xxxx [kg]
Status
Vorfreigabe Intern part ID
drain pipe in each Cross travel speed 5,00 m/min 20,00 m/min Status Interne Teile ID
Also dimensions concerning customer´s scope of supply are schematically shown and have not to be used as valid dimensions in final drawings.
width cable duct
supplier client Long travel speed 20,00 40,00 -butterfly valve ~ xxxx [kg] © AUTHORSHIP
Working Step
Arbeitsschritt scope of supply
Sheet
Blatt 1/2 Sheet Size
Blattgröße A1
R21.00
6260
4800
4000
1976
30°
960
Q=4,5m³/s
1400
1950
tailwater level
4210
570
Q=0,0m³/s
R2 49 6
200 0
3508
4000
960
0
1210
188
45 °
1000
1700
DN1200 PN25
1950
F
O
100
3000
30°
1790
310
100
561
SECTION C-C
300 3575 1:50
9000
1300 680 13503
875 2349 2200
5500 4000
6500
750 750
960
1300
25
1300 1300
E
120
O 1219
O 1169
DETAIL F 1000 1500 1250 1250
1:2 6000 2750
7000
SECTION E-E
1:50
7000
6000
16 °
960
1300
1300
q 800
client Global Hydro
1300 1300 2700
1500
D D
1000
SECTION D-D
750
1:50
preliminary
750
B B
12.03.2019
1500
strictly for the purpose of erection, operation and maintenance of the subject hydro power plant. Any
2500
2750
This drawing and all other information are produced and provided by Global Hydro Energy Gmbh
1250
welding seams acc. DIN EN ISO 5817 class C Material Dimension EMD acc. ME0036
3740 Nam Long 2 thermal cutting acc. DIN EN ISO 9013 - 321
molded parts acc. DIN EN ISO 8062-3 DCTG11
Werkstoff Maß-Norm EMD nach ME0036
Drawing number Revision Nr. DIN ISO 5456-2 Kanten ohne Angabe Designed 3D Date 11.02.2019
Zeichnungsnummer revision nr. nach DIN ISO 13715
-0,0 +0,8 Gezeichnet 3D simon.hofmann Datum
-0,6 +0,0 Designed 2D Date
Edges without specification simon.hofmann 12.02.2019
3740_01_EBP acc. DIN ISO 13715 Gezeichnet 2D
checked
geprüft
Datum
Date
Datum
missing dimensions according 3D-file Released Date
Freigegeben Datum
Weight (in kg)
E EN ISO 5459 A B C Gewicht (in kg) 5350983,8 kgScale
Maßstab 1:100
1300 561 Status
Status Vorfreigabe Intern part ID
Interne Teile ID
Sheet Sheet Size
© AUTHORSHIP
Working Step
Arbeitsschritt turbine sections Blatt 2/2 Blattgröße A1