Indian Railways

Train Protection &


Warning System
Roll Out Plan

December 2011,New Delhi


Train Protection & Warning System (TPWS)
------- Roll Out Plan for Indian Railways (IR) -------
Objective Provision of cost effective Train Protection & Warning System to mitigate the risk of
Signal Passing At Danger (SPAD) by Motormen/Loco Pilots of trains leading to
accidents.
Solution to be Train Protection and Warning System conforming to Open Specifications, Interoperable,
deployed Upgradeable, Multiple Vendor with indigenized manufacturing for long term sustained
support
Migration/ Indian Railways plan to deploy Train Protection & Warning System first on its Automatic
Roll Out Plan Block Signalling Sections followed by other High Density Routes, as per following Roll
Out plan (indicative).

Segment 1 :
To cover all dense Automatic Block Signaling sections of IR spread over eight Zonal
Railways covering approx. 3300 Route Kilometers in two phases, with provision of
approx. 2300 On Board equipment on EMUs, MEMUs, Locomotives & other vehicles,
running on these sections.

Phase I: approx. 1500 RKMs


Phase II: approx. 1800 RKMs

Time Period: 2012-2015

Segment 2:
Cover entire A route of IR approx. 5024 RKMs (balance) with approx. 3400 On board
equipment on EMUs, MEMUs, Locomotives & other vehicles running on the sections

Time Period : 2012-2016

Segment 3 :
Cover entire ‘B’ route of IR approx. 10,800 RKMs with approx. 1100 On board
equipment on EMUs, MEMUs, Locomotives & other vehicles running on the sections

Time Period : 2013-2020


Note:

1. The above figures/timelines are indicative.

2. For ensuring economy in costs and sustained long term maintenance support, while
initial part quantity may be imported to commence the projects, major quantities shall
be manufactured in the country with suitable transfer-of-technology.

3. Onboard equipment fitment on new Locos/EMUs/MEMUs shall be carried out in IR’s


Production Units along with their manufacturing.

4. A central dedicated organization Central Organisation for Railway Safety Systems


(CORSS) created for expeditious roll out of TPWS and other Safety Projects.

Please note this is not a Tender Notice 2


TPWS Roll Out Plan: Route & Section Details
Phase 1 of Segment 1
Railways/ Railway Section Route KMs Onboard equipment
Sections
WR Mumbai Central-Virar-Vadodara- 500 60
Ahmedabad
ER Sealdah-Howrah-Khana & Automatic 326 125
Signalling sections on
Howrah/Sealdah Divisions
SER Howrah-Kharagpur-Tatanagar 250 250
NCR Ghaziabad-Tundla-Kanpur 414 100
Total 1490 535

Draft Broad Technical Specifications

For ‘A’ & ‘C’ Routes of IR


A cost effective, inter-operable, upgradable TPWS solution generally conforming
to RDSO’s Specification no. RDSO/SPN/183/2011 Version2, as under:

ETCS Level 1 (SIL 4) with following reduced functionalities

a. Simplified User friendly IR DMI


b. Shunt Signals not to be covered (shunt speed regulation to be enforced
from Onboard)
c. A broad ceiling speed limit for Turnouts
d. Temporary Speed Restrictions not covered

………………………………………………………