North-South Commuter Railway Extension

(NSCR-EX) Project
Italian-Thai Development Public Company Limited Packages No. CP N-03
Civil Works
Attention : Ref. No. : NSCR-ITD-N03-ZWD-RPT-CN-000
Zone Area : Precast Yard/ Area I SITE DIARY Working Date : 09/09/2021
Work Description : Construction Works at Precast
Yard
REPORT Time : 08:00 AM - 05:00 PM 08:00 PM - 05:00 AM

Equipment and Manpower Report Daily Request No. NSCR-ITD-N03-ZWD-SCH-CN-000944


Equipment Status Manpower Q'ty
Working Break Down
Air Compressor Engineer 1 Weather Report
Trailer 12 m. Foreman
Mobile Crane Asst. Foreman Mostly Sunny Temperature
Water Pump Chief Surveyor 1 Rain Drizzle Max : 31 'C
Generator Surveyor 2 Heavy Rain Min : 23 'C
Electric Welding Set Team Leader 1
Crane Mounted Truck Heavy Equipment 2 Weather Time
Pick up Carpenter 6 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00
Farm Tractor Bar Bender 14
Water Truck Mason 4
12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Survey Equipment Welder 8
Excavator 2 Fitter
Compactor Electrician 2
Dump Truck 1 Labour 15
Motor Grader 1 Safety 1
Bulldozer Technician
Passenger Truck 6w QC
Truck Crane 6w Security
Truck Crane 10w Driller
Soil Boring Rig Subcontractor
Boom Truck 1 Others ( Const. 3
Total Equipment 5 Total Manpower 60
Remark :
No. Description Location Q'ty Unit Issues or Remarks
1 Fabrication Rebar jig pier
2 Water tank Fabrication -/-/6 ea
3 Casting Precast concrete ditch
4 Foundation Extension Footing Mould 5.00 ea Rebar & Formworks: -/5/17 ea
a. Rebar & Formworks Casting: -/5/17 ea
b. Casting

4.a Installation of Rail Square Bar and DT Base Plate Footing Mould 9.00 ea Rail Square Bar: -/9/17 ea

5 Rebar & Formworks, Casting Laboratory Preparation: -/-/611 sq.m


Note :

Reported by (ITD) Reviewed by (ITD) Received by (Engineer)

( Mr. Lertchai Pornsawanwattana ) ( Mr. Varote Tesnes )


Date : 10/09/2021 Date : 10/09/2021 Date :
Document No. Revision Page No.
NSCR-ITD-N03-PRO-QA-000001/11 No. 03 Date: Auguest 2, 2021 1 of 4
September 11, 2021 Printed By : MR.NATEE PARAMEE
North-South Commuter Railway Extension
(NSCR-EX) Project
Italian-Thai Development Public Company Limited Packages No. CP N-03
Civil Works
Attention : Ref. No. : NSCR-ITD-N03-ZWD-RPT-CN-000
Zone Area : Precast Yard/ Area I SITE DIARY Working Date : 09/09/2021
Work Description : Construction Works at Precast
Yard
REPORT Time : 08:00 AM - 05:00 PM 08:00 PM - 05:00 AM

Equipment and Manpower Report Daily Request No. NSCR-ITD-N03-ZWD-SCH-CN-000944


Equipment Status Manpower Q'ty
Working Break Down
Air Compressor Engineer 1 Weather Report
Trailer 12 m. Foreman
Mobile Crane Asst. Foreman Mostly Sunny Temperature
Water Pump Chief Surveyor 1 Rain Drizzle Max : 31 'C
Generator Surveyor 2 Heavy Rain Min : 23 'C
Electric Welding Set Team Leader 1
Crane Mounted Truck Heavy Equipment 2 Weather Time
Pick up Carpenter 6 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00
Farm Tractor Bar Bender 14
Water Truck Mason 4
12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Survey Equipment Welder 8
Excavator 2 Fitter
Compactor Electrician 2
Dump Truck 1 Labour 15
Motor Grader 1 Safety 1
Bulldozer Technician
Passenger Truck 6w QC
Truck Crane 6w Security
Truck Crane 10w Driller
Soil Boring Rig Subcontractor
Boom Truck 1 Others ( Const. 3
Total Equipment 5 Total Manpower 60
Remark :
No. Description Location Q'ty Unit Issues or Remarks
Casting: -/-/611 sq.m

6 Rebars, Formworks and Casting RTG 60T (Casting -B) Rebar & Formworks: -/362/484 m
Casting: -/362/484 m

7 Excavation, Foundation and Wall Ditch U-0.50m. (Casting-B) Excavation: -/279/389 m


Foundation: -/279/389 m
Wall: -/279/389 m

7.a Excavation, Foundation and Wall Ditch U-0.50m. (Stock-B) Excavation: -/324/468 m
Foundation: -/324/468 m
Wall: -/324/468 m

Note :

Reported by (ITD) Reviewed by (ITD) Received by (Engineer)

( Mr. Lertchai Pornsawanwattana ) ( Mr. Varote Tesnes )


Date : 10/09/2021 Date : 10/09/2021 Date :
Document No. Revision Page No.
NSCR-ITD-N03-PRO-QA-000001/11 No. 03 Date: Auguest 2, 2021 2 of 4
September 11, 2021 Printed By : MR.NATEE PARAMEE
North-South Commuter Railway Extension
(NSCR-EX) Project
Italian-Thai Development Public Company Limited Packages No. CP N-03
Civil Works
Attention : Ref. No. : NSCR-ITD-N03-ZWD-RPT-CN-000
Zone Area : Precast Yard/ Area I SITE DIARY Working Date : 09/09/2021
Work Description : Construction Works at Precast
Yard
REPORT Time : 08:00 AM - 05:00 PM 08:00 PM - 05:00 AM

Equipment and Manpower Report Daily Request No. NSCR-ITD-N03-ZWD-SCH-CN-000944


Equipment Status Manpower Q'ty
Working Break Down
Air Compressor Engineer 1 Weather Report
Trailer 12 m. Foreman
Mobile Crane Asst. Foreman Mostly Sunny Temperature
Water Pump Chief Surveyor 1 Rain Drizzle Max : 31 'C
Generator Surveyor 2 Heavy Rain Min : 23 'C
Electric Welding Set Team Leader 1
Crane Mounted Truck Heavy Equipment 2 Weather Time
Pick up Carpenter 6 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00
Farm Tractor Bar Bender 14
Water Truck Mason 4
12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Survey Equipment Welder 8
Excavator 2 Fitter
Compactor Electrician 2
Dump Truck 1 Labour 15
Motor Grader 1 Safety 1
Bulldozer Technician
Passenger Truck 6w QC
Truck Crane 6w Security
Truck Crane 10w Driller
Soil Boring Rig Subcontractor
Boom Truck 1 Others ( Const. 3
Total Equipment 5 Total Manpower 60
Remark :
No. Description Location Q'ty Unit Issues or Remarks
8 Excavation, Foundation and Wall Ditch U-0.30m. (Stock - B) Excavation: -/300/420 m
Foundation: -/288/420 m
Wall: -/288/420 m

9 Gravel Compaction Gravel paving -/16975/21875 sq.m


10 Base course Stock Area -/14291/15210 sq.m
11 Preparation and Casting Rebar Center Completed
12 Excavation, Foundation, Wall Ditch U-0.50m. (Casting-A) Completed
12.a Excavation, Foundation and Wall Ditch U-0.50m. (Stock- A) Completed
13 Excavation, Foundation and Wall Ditch U-0.30m. (Stock-A) Completed

Note :

Reported by (ITD) Reviewed by (ITD) Received by (Engineer)

( Mr. Lertchai Pornsawanwattana ) ( Mr. Varote Tesnes )


Date : 10/09/2021 Date : 10/09/2021 Date :
Document No. Revision Page No.
NSCR-ITD-N03-PRO-QA-000001/11 No. 03 Date: Auguest 2, 2021 3 of 4
September 11, 2021 Printed By : MR.NATEE PARAMEE
North-South Commuter Railway Extension
(NSCR-EX) Project
Italian-Thai Development Public Company Limited Packages No. CP N-03
Civil Works
Attention : Ref. No. : NSCR-ITD-N03-ZWD-RPT-CN-000
Zone Area : Precast Yard/ Area I SITE DIARY Working Date : 09/09/2021
Work Description : Construction Works at Precast
Yard
REPORT Time : 08:00 AM - 05:00 PM 08:00 PM - 05:00 AM

Equipment and Manpower Report Daily Request No. NSCR-ITD-N03-ZWD-SCH-CN-000944


Equipment Status Manpower Q'ty
Working Break Down
Air Compressor Engineer 1 Weather Report
Trailer 12 m. Foreman
Mobile Crane Asst. Foreman Mostly Sunny Temperature
Water Pump Chief Surveyor 1 Rain Drizzle Max : 31 'C
Generator Surveyor 2 Heavy Rain Min : 23 'C
Electric Welding Set Team Leader 1
Crane Mounted Truck Heavy Equipment 2 Weather Time
Pick up Carpenter 6 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00
Farm Tractor Bar Bender 14
Water Truck Mason 4
12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Survey Equipment Welder 8
Excavator 2 Fitter
Compactor Electrician 2
Dump Truck 1 Labour 15
Motor Grader 1 Safety 1
Bulldozer Technician
Passenger Truck 6w QC
Truck Crane 6w Security
Truck Crane 10w Driller
Soil Boring Rig Subcontractor
Boom Truck 1 Others ( Const. 3
Total Equipment 5 Total Manpower 60
Remark :
No. Description Location Q'ty Unit Issues or Remarks
13.a Excavation, Foundation and wall Ditch U-0.30m. (Casting- A) Completed
13.b Excavation, Foundation and Wall Ditch U-0.30m. (Casting- B) Completed
14 Rebars, Formworks and Casting RTG 60T (Casting -A) Completed

Note :

Reported by (ITD) Reviewed by (ITD) Received by (Engineer)

( Mr. Lertchai Pornsawanwattana ) ( Mr. Varote Tesnes )


Date : 10/09/2021 Date : 10/09/2021 Date :
Document No. Revision Page No.
NSCR-ITD-N03-PRO-QA-000001/11 No. 03 Date: Auguest 2, 2021 4 of 4
September 11, 2021 Printed By : MR.NATEE PARAMEE