T-1 & T3 T-2 & T4

ELEVATION A-A

B
SECTION B-B

NOTES:-

T-1 T-2

A A
T-3 T-4

PLAN
B

STAGE OF LOADING

1st 2nd 3rd 4th

PRECAUTIONS TO BE TAKEN:-

CLIENT: CONCESSIONARE: EPC CONTRACTOR : DESIGN CONSULTANT : INDEPENDENT ENGINEER : PROJECT : DRAWING TITLE :
FOUR-LANING OF ALIGARH-KANPUR SECTION DRG. NO. D1023/LOADTEST/30M/14.5M/007
FROM KM 229.000 (DESIGN CHAINAGE KM
240.897) TO KM 289.000 (DESIGN CHAINAGE KM LOAD TESTING SCHEME FOR DATE : SEPTEMBER 2021 REV: R0
R1 SEP-2021 AS PER SITE CONDITION
302.108) (PACKAGE -3 FROM 30M SPAN & 14.5M WIDTH
R0 MAR-2021 FOR REVIEW KALYANPUR-NAVIGANJ) OF NH-91 IN THE STATE DESIGNED DRAWN CHECKED APPROVED
NATIONAL HIGHWAYS APCO NAVKALYAN OF UTTAR PRADESH ON HYBRID ANNUITY
APCO INFRATECH PVT LTD. CIVILMANTRA INFRACON PVT LTD. AK SJ SB AA
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA EXPRESSWAY PVT LTD. MODE. SCALE : AS SHOWN PAPER SIZE : A2