HC Quality Manual
HC Quality Manual
HC Quality Manual
Brian McMillan
PRESIDENT
Scope
The design and delivery of education and training to students including
support services.
General (4.2.1)
The College maintains electronic copies of a Quality Manual,
Procedures Manual and supporting documentation. These are available
to staff at all sites via the College’s website.
The operation of the Quality System is subjected to audit and review in
order to monitor, maintain and improve its effectiveness. Quality
System documentation is kept abreast of educational and College
developments. Measures are taken to ensure continuing compliance
whenever the ISO 9001 Standard itself undergoes revision.
The College has established Quality Objectives that are monitored on a
continual basis and reviewed annually. The process of monitoring the
objectives is one mode by which the College can evaluate the
effectiveness of the Quality Management System and to determine if
client requirements are being satisfied. The Quality Objectives are
included in section 5.4 of this Manual.
Management Responsibility ∆
Planning (5.4) ∆
General (5.6.1)
Members of the Management Executive Committee (MEC) and other
designated personnel meet to review the adequacy and effectiveness
of the College’s Quality Management System on an ongoing basis
throughout the year. Review meetings are chaired by the President
and meeting agenda items over the period of the year cover all the
requirements identified in Procedure D05 (Management Review).
A Management Executive Committee meeting may occasionally be
designated as a Quality Management Review Meeting, however,
regular (generally weekly) MEC meetings often deal with items relating
to the Quality Management System. Minutes of MEC meetings are
forwarded to the Quality Coordinator on a regular basis. The degree to
which the requirements of ISO 9001 and the College quality policy and
objectives are being satisfied is reviewed on an annual basis.
Review meetings are minuted, and necessary corrective action,
preventive action and improvement are initiated. Summaries of
review minutes and other information regarding the effectiveness of
the Quality Management System are posted on the College's Quality
Website. Any items that are considered to be proprietary or sensitive
in nature are excluded.
General (6.2.1)
All employees, including members of management, performing work
that affects the quality of any service related to the design and
delivery of education and training to students including support
services, are hired on the basis of appropriate education, training,
skills and experience.
Infrastructure (6.3) ∆
The College reviews the requirements for facilities and equipment
through the Strategic and Operating Planning and budgeting
processes. A Computer Greening Project managed by the Manager of
Computer Services annually reviews the currency of computers in the
College and provides a process for keeping student computer labs and
computers used by individual staff current. This process involves an
assessment of what the requirements of all users are and the
allocation of more technically advance computers to those areas where
they are most needed, and the reallocation of other computers to
other areas of the College as needed.
The Computer Services Department maintains the College's computer
network system and provides an electronic mail system for all staff
and full-time students. (C09) The Department also provides support
for a number of general software programs utilized by College staff
and students. (C04)
The College also maintains a website that provides information on
many aspects of the College including registration information, current
marketing information and College job postings. There is also an
internal staff website that provides staff with relevant information and
links.
Purchasing (7.4) ∆
General (8.1) ∆
The College uses a range of performance indicators to evaluate the
quality and success of each program offered by the College. These
indicators are compiled yearly by the Research Analyst from a
combination of internally generated statistical data and graduate
employment and satisfaction surveys (D01) and a report is prepared
and circulated to the Management Executive Committee and the
Quality Coordinator. The indicators are used to identify performance
trends, and provide a basis for strategic decision-making and
improvement. (D11) The indicators are also used to establish Quality
Objectives and provide a basis for measurement of the achievement of
objectives.
In addition to feedback provided by students and graduates of the
College, Industry Advisory Committees and Community Advisory
Committees, also provide the College with a valuable source of
information regarding programs and courses, the curriculum and the
success of graduates. (A06) Minutes of Advisory Committee meetings
are recorded and circulated to program staff, various members of
College management and the Quality Coordinator.
Internal reviews of programs and curriculum by the Curriculum
Services Department and internal quality audits (D10) are used to
ensure conformity within the Quality Management System.
Improvement (8.5) ∆
5 Management responsibility
5.1 Management commitment Procedures D05, D06 and the Quality Manual
5.2 Customer focus Procedures A03, A06, A10, A16, B01, B02, B03,
B09, B12, B13, C03, C06, C10, C11, D01, D02,
D03, D05, D11, D12
5.4 Planning
5.4.2 Quality management system Quality Manual and Procedures A01, A06, D01,
planning D02, D05, D06, D08, D11, E03, E04, E06 & E14
5.6.2 Review input Procedures D01, D02, D03, D05, D08, D10, D11
6 Resource management
6.2.1 General Procedures E01, E02, E03, E04, E05, E06, E07,
E08, E10, E11, E14
6.2.2 Competence, awareness and training Procedures E03, E04,
7 Product realization
7.1 Planning of product realization Procedures A01, A03, A11, A15 , A16, A18, B01,
B02, B03, B04, B06, B09, B10, B12, B13, C01,
C03, C06, C07, C08, C09, C10, C11, C12
7.3.1 Design and development planning Procedures A01, A03, A15, A16, Board
Regulation 70-02-1 and Administrative
Regulations 70-02-1 and 70-02-3
7.3.3 Design and development outputs Procedures A01 and Administrative Regulations
70-02-3
7.3.4 Design and development review Procedures A01, A06
7.3.5 Design and development verification Procedures A01, Board Regulation 70-02-1 and
Administrative Regulations 70-02-1 and 70-02-3
7.3.6 Design and development validation Procedures A01, Board Regulation 70-02-1 and
Administrative Regulations 70-02-1 and 70-02-3
7.3.7 Control of design and development Procedures A01, Board Regulation 70-02-1 and
changes Administrative Regulations 70-02-1 and 70-02-3
7.4 Purchasing
7.5.1 Control of production and service Procedures A03, A04, A05, A06, A07, A08, A09,
provision A11, A15, A16, A18, B03, B04, B06, B07, BO8,
B09, B10, B12, B13, C02, C03, C04, C06, C10,
C11
7.5.2 Validation of processes for production Procedures A01, A03, A04, A11, A15, A16, A18,
and service provision B01, B02, B03, B04, B06, B09, B10, B12, B13,
C01, C03, C06, C08, C09, C10, C11
7.5.3 Identification and traceability Procedures A04, A08, A18, B03, B04, B08, B09,
B10, B12, B13
7.5.4 Customer property Procedure A12
7.5.5 Preservation of product Procedures A01, A03, A15. Board Policies 70-
02 & 70-03. Board Regulations 70-02-1 & 70-
03-1. Administrative Regulations 70-02-1, 70-
02-3, 70-03-1 & 70-03-2.
8.2.1 Customer satisfaction Procedures A10, D01, D02, Web Site Feedback
Form, Library Services Satisfaction Survey
8.2.2 Internal audit Procedure D10
8.2.3 Monitoring and measurement of Procedures A10, D01, D02, Web Site Feedback
processes Form, Library Services Satisfaction Survey
8.2.4 Monitoring and measurement of product Procedure D05. Also see section 7.1
8.3 Control of nonconforming product Procedures A04, A07, A09, A10, A15, A16, A18,
C01, D02, D03, D07
8.5 Improvement
8.5.2 Corrective action Procedures A02, A07, A09, A10, D02, D03, D08,
F01
8.5.3 Preventive action Procedures A02, A07, A09, A10, D02, D03, D08,
D10, F01