THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 1
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
SERIES 7000: TOLERANCES, TESTING removed immediately from the Site by and without
recompense to the Contractor.
AND QUALITY CONTROL
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 2
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
The Contractor’s programme shall allow sufficient time shall produce, when called upon to do so, certificates
for materials testing and no claim for delays or extra from the manufacturer confirming that the materials or
costs arising out of this will be accepted. products supplied comply with the relevant
specifications. All costs of providing such certificates
All materials supplied for use in the Works shall shall be borne by the Contractor.
conform within specified tolerances, to the quality of the
approved samples, which will be retained at the (c) Testing materials and products covered by
Engineer’s office until the completion of the Contract. certificates
The Engineer shall be entitled to take samples of, and
Where a material has been specified by a order tests to be made on, products and materials in
manufacturer’s trade name, the product of another respect of which certificates of compliance may be
manufacturer will be accepted provided that, in the required. The Contractor shall only be paid at the
opinion of the Engineer, it is in all respects of an appropriate rates if the costs of such tests are itemised
equivalent or higher quality. in the Bill of Quantities.
7105 LABORATORY FOR THE ENGINEER 7109 TAKING AND SUBMITTING SAMPLES
The Contractor shall facilitate independent testing by
the Engineer as he may deem necessary in accordance (a) General
with SECTION 1410. Where the Contractor is required in these Specifications
to submit samples of materials or mixtures to the
Engineer for approval prior to their being used in the
7106 TESTING BY THE CONTRACTOR Works, the use of these materials or mixtures without
The Contractor shall provide, use and maintain on the the Engineer’s written approval shall constitute default
site throughout the period of execution of the works a on the part of the Contractor, who shall be liable for the
suitable laboratory and adequate equipment operated consequence of such default. All samples shall be
by competent staff for carrying out tests required for the submitted in sufficient time for proper testing.
selection and control of the quality of materials and for
the control of workmanship in accordance with this The Engineer’s approval of any materials or mixtures
specification, in accordance with SECTION 1410. The shall in no way relieve the Contractor of his obligation to
contractor shall assume that tests will be required on all provide materials, mixtures and workmanship which
materials used in the works and on all finished work. comply with the Specifications.
The Contractor shall carry out all necessary tests and All samples for testing shall be taken from the road after
shall report to the Engineer the results of such tests completion of work on the particular layer to be tested
before submitting materials and finished work to the except as specified elsewhere in these Specifications.
Engineer for approval. In appropriate circumstances, Where specified or required by the Engineer, stratified
tests may be carried out at the place of manufacture. random sampling methods, as defined in SUBCLAUSES
7203(b) and 7204(b), shall be followed. For the testing
of layer work stratified random sampling methods shall
be used for obtaining all the sample portions and for
7107 ACCEPTANCE STANDARDS OR determining the locations of in situ test sites.
MATERIALS
All materials used in or upon the works shall comply The method of taking samples shall be as specified in
with this Specification and the Special Specification and the appropriate sampling and testing methods listed in
shall be acceptable to the Engineer. Where so SECTION 7502 (a) or similar approved by the Engineer.
specified, the material shall comply with the US
specification named or with an alternative national The Engineer shall have full access to the Works for the
specification on the approval of the Engineer. purpose of taking samples. The Contractor shall render
any assistance necessary for taking the samples and
Similarly, where a material has been specified by shall be responsible for the reinstatement of pavement
manufacturer’s trade name, the product of another layers or other structures at the positions where the
manufacturer will be acceptable provided it is in all samples have been taken. Full compensation for
respects of equivalent or higher quality and provided rendering assistance with sampling and for
that the Engineer’s approval has been obtained. reinstatement where samples have been taken shall be
included in the rates tendered for the various items of
Samples of all materials proposed to be used shall be work tested, and no additional payment will be made in
submitted to the Engineer and shall, where required, be this respect.
tested prior to the material being delivered in bulk upon
the works. (b) Sampling frequency
Samples shall be taken for laboratory testing for each
new material encountered, or when there is a significant
7108 THE COST OF TESTING change in material properties in the opinion of the
Engineer.
(a) Process control
The cost of testing undertaken by the Contractor in The minimum sampling frequencies shall be as given in
terms of his obligations under CLAUSE 1205 for TABLE 7109/1. Samples for tests that are not mentioned
purposes of process control, including the taking of in TABLE 7109/1, but for which there are material
samples, reinstating where samples have been taken, requirements in these Specifications, shall be taken as
and all testing equipment, labour, materials, etc, shall required in the opinion of the Engineer.
be included in the rates bid for the various items of work
supplied and will not be paid for separately.
7110 TESTING METHODS
(b) Producing certificates All tests shall be conducted in accordance with the
Where the properties of materials or manufactured standard methods specified in the Specifications. Other
products are required in these Specifications to comply equivalent national standard specifications may only
with specified specifications published by a Standards substitute the prescribed test method at the sole
Authority approved by the Engineer, the Contractor discretion of the Engineer.
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 3
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
TABLE 7109/1
SAMPLING FREQUENCIES
Layer and nominal class of material Tests to be carried out Sampling frequency, minimum
1)
Roadbed CBR 1 sample per 10000 m2
MDD, PI, grading 1 sample per 5000 m2
Earthworks fill using soils: (G3) CBR, PI, grading 1 sample per 2000 m3
MDD 1 sample per 1000 m3
Backfill to culverts and structures CBR, PI, grading 1 sample per 500 m3
MDD 1 sample per 200 m3
Improved subgrade (G7, G15) or CBR, PI, grading 1 sample per 10000 m2
Gravel wearing course (GW) MDD 1 sample per 5000 m2
Subbase: (G30, G45) CBR, incl. swell, grading 1 sample per 5000 m2
MDD, PI, LL, LS 1 sample per 5000 m2
Subbase: (CM, C0.7, C1.0) UCS, PI 1 sample per 5000 m2
MDD 1 sample per 5000 m2
Base course: (G60, G80) CBR, PI, grading 1 sample per 5000 m2
MDD 1 sample per 2500 m2
Base course: (C1.0, C1.5) UCS, PI 1 sample per 5000 m2
MDD 1 sample per 2500 m2
Base course using crushed aggregate: (CRS) LS, grading 1 sample per 5000 m2
MDD 1 sample per 2500 m2
Base course using crushed aggregate: (CRR) LL, LS, grading, flakiness 1 sample per 5000 m2
MDD, TFV, CBR 1 sample per 10000 m2
Base course of a bituminous mix or asphalt concrete Extraction, grading 1 sample per 10000 m2
surfacing Marshall test / Gyratory 1 sample per 5000 m2
Compaction Test
Surface treatments TFV 1 sample per 20000 m2
Grading, flakiness 1 sample per 5000 m2
Tray Test 2 1 sampler per 500 m²
The referred tests shall be carried out in accordance with standards test methods indicated in the special specifications or
other standards approved by the Engineer. Tray test shall be performed for both bitumen spraying rate and chipping
spreading rate.
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 4
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
Accelerated tests shall be carried out to determine the Fill the mould halfway and vibrate it and spade it on
potential alkali reactivity of aggregates where this is all four sides with a suitable trowel to remove air
considered appropriate by the Engineer. bubbles. Stop the vibration as soon as a wet sheen
appears on the surface. Fill the mould and repeat
(b) Test for cementitious- binder content the procedure, but stop when again a wet sheet
The test method used for determining the cementitious appears on the surface.
binder content of soils, gravels or crushed stone mixed (ii) Stiff Concrete
with a chemical stabilising agent shall be determined by The same procedure is followed, except that the
the Engineer and may be any test method currently mould is filled in three to four steps instead of in
recognised by the Engineer as being acceptable. two. The vibration is stopped for each layer when a
wet sheen appears.
Where the cementitious binder content is determined,
due allowance shall be made for the presence in the (g) Consistency
un-stabilised material of naturally occurring MgO or The test method described in shall apply in regard to
CaO which affects the result of such tests. If the the slump test.
standard deviation of the natural CaO plus MgO content
of the untreated material exceeds 0.35% any (h) Air content
determination of the cementitious- binder content shall The air content of the freshly mixed concrete shall be
be ignored. tested by the method given in BS 1881, Part 106 or
equivalent. Air content tests shall be conducted on the
Sample holes shall be randomly (as defined in same samples of concrete from which cubes were
SUBCLAUSES 7203(b) and 7204(b)) spaced transversely made for the 28 – day compressive strength tests.
as well as longitudinally over the area to be tested, or
as directed by the Engineer, and if the material is road (i) Drilling and testing the cores
– mixed, samples shall be taken from the top and Where sections of concrete which have failed to comply
bottom of each hole. The minimum number of samples with the Specifications are required to be further
per test shall be 10. investigated by extracting and testing concrete cores,
100 mm or 150 mm cores shall be drilled and tested.
(c) Canvas patch test for the spreading rate of The sampling and testing procedure to be followed shall
cementitious binder be in accordance with the publication Concrete Core
The following method shall be used for determining the Testing for Strength – Concrete Society Technical
spreading rate of a chemical stabilising agent where Report No.11, published by the Concrete Society of
bulk distributors are used. Great Britain.
At least 10 clean canvas patches, each measuring 1.0 The instructions of this report shall be followed for
m x 1.0 m shall be placed flat on the road in selected determining the “estimated potential strength”, which
positions in relation to the bulk distributor’s track. After shall be compared with the 28 days cube strength
the stabilising agent has been spread by the bulk specified for each type of concrete. Corrections to the
distributor, the canvas patches shall be carefully lifted actual core strength to allow for excess voids, included
and all the material on the patches transferred to a steel and the length :diameter ratio of cores shall be as
container and weighed. The total mass of stabilising stated in this publication, and the correction for curing
agent on each patch is then recorded and the average shall be determined by the Engineer in accordance with
rate of application determined. Instead of canvas this publication and such other information as he may
patches, flat metal trays may be used for collecting the deem to be appropriate.
stabilising agent.
The Engineer’s decision regarding the degree to which
(d) Test for mix uniformity in chemically stabilised the concrete, which is represented by the cores tested
layers as described above, complies with the requirements
Where required by the Engineer, the Contractor shall and also regarding the properties and suitability of the
determine the mix uniformity in chemically stabilised concrete, shall be final and binding.
layers by means of unconfined compressive strength
tests, using an approved method.
7112 TESTING SOILS, GRAVEL AND
The Contractor shall without delay make the necessary
CRUSHED AGGREGATE FOR
arrangements to take samples in accordance with the
requirements in the method used. EARTHWORKS AND PAVEMENT
LAYERS
(e) Test for initial consumption of lime Specimens of soils, gravel and crushed stone materials
The objective of the gravel ICL test is the control of the in earthworks and pavement layers shall be taken in
pH in lime and cement stabilised soil in order to allow accordance with CLAUSE 7104, and subjected to tests
the possible formation of cement minerals, calcium as prescribed for each respective layer in the relevant
silica hydrate in particular, and for proper modification sections of SERIES 3000.
to take place. It is recommended that the stabiliser to
be used during construction (or the nearest equivalent)
should be used to carry out this test. 7113 TESTING BITUMINOUS BINDERS AND
MIXES
(f) Determining the compressive strength
Specimens of soils, gravel and crushed stone materials
The procedure for sampling and manufacturing, storing,
in earthworks and pavement layers shall be taken in
curing and testing test cubes shall be in accordance
accordance with SECTION 7105. And subjected to tests
with appropriate tests in SECTION 7502 (a).
as prescribed for each respective layer in the relevant
sections of SERIES 4000.
Where specified in the Special Specifications, the
compaction of concrete specimens in the moulds by
The Engineer shall be entitled to order the Contractor to
means of a vibrating table shall be obligatory. In such
have material tested by an approved laboratory for
case the method of compaction shall be as follows:
compliance with all of the requirements specified, and
the results of such tests shall be submitted direct to the
(i) Plastic concrete
Engineer by the testing laboratory with copies, if
requested, to the Contractor.
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 5
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
Earthworks fill using soils: (G3) 1 test per 200 m3 3 per section per layer
tests
Backfill to culverts and structures 2 10 m3 2 per section
per
Fill or improved subgrade layers using dump rock: (DR)
Method specification
Improved subgrade layers using gravel/soils: (G7, G15)
1 test per 1000 m2 4 per section per layer
Gravel wearing course used on gravel roads: (GW)
1 test per 1000 m2 4 per section
Subbase: (G30, G45, CM, C 0.7, C 1.0) 1 test per 750 m2 5 per section
Base course: (G60, G80, CRS, CRR) 1 test per 500 m2 6 per section
Base course of bituminous mix: (BEMIX, FBMIX, DBM40,
DBM30, 37.5, 25.0 Nominal mixes) 1 test per 500 m2 6 per section
Asphalt concrete surfacing
(AC20, AC14, AC10, 19.0, 12.5, 9.5 Nominal mixes) 1 test per 400 m2 6 per section
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 6
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
7115 TESTS OF SURFACE REGULARITY, on the road at any angle to the centreline as
directed by the Engineer. Measurements shall be
LEVELS AND LAYER THICKNESS carried out by measuring the largest deviation from
true surface along the straightedge.
(a) General
Using the rolling straight edge for measuring
(i) Straight edge measurements, normal conditions
surface irregularities, the apparatus and testing
Measurements of surface regularity shall be carried
method for this shall be in accordance with testing
out with a 3 m straight edge having sharp right
Method ST3 of TMH6 of South Africa.
angled corners at the bottom, and shall be placed
.
TABLE 7114/2
MINIMUM FIELD DENSITY, NOMINAL VALUES
Layer and nominal class of material Field density, Lower Specification Limit
Fill or improved subgrade layers using dump rock: (DR) Method specification
Asphalt concrete surfacing: (19.0, 12.5, 9.5 Nominal mixes) > 93.5 % of Max. Theoretical Density G mm
1) Marshall density cannot be used on coarse bituminous material types, i.e. with nominal aggregate size 30 mm or larger.
Whether or not Marshall compaction can be applied for a specific type of cold bituminous mix shall be decided by the
Engineer.
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 7
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
TABLE 7115/1
(b) Surface regularity, straight edge measurements SURFACE REGULARITY, MEASUREMENTS WITH 3 METRE
The required surface regularity, measured with a 3 m STRAIGHT EDGE
straight edge at any angle in relation to the centreline,
shall be within the limits shown in TABLE 7115/1. Layer Maximum straight edge
deviation (mm)
(c) Surface levels Bituminous wearing 6
The maximum deviation in levels shall be as shown in course
TABLE 7115/2.
Bituminous binder 7
course
Base course (not PM 7
materials)
Gravel wearing course 15
Subbase 30
TABLE 7115/2
SURFACE LEVELS
H90 value 1) Absolute max Hmax H90 value 1) Absolute max Hmax
value value
Base course, when 10 15 10 15
followed by a seal only
Base course, when NIL NIL 10 20
followed by AC surfacing
Subbase NIL NIL 25 35
1) H90 is the limit within which 90% of the measurements shall fall when assessing 50 or more measurements against the
specified level at the respective locations the measurements were taken.
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 8
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 9
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 10
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 11
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
Bituminous wearing 5 10
course
Bituminous base 10 15
course (not PM
materials)
Base course, 10 20
aggregate or natural
gravel
Subbase 15 25
Improved subgrade 20 35
layers
Gravel wearing 15 25
course
1) T90 is the value with which 90% of the
measurements shall comply when assessing 20 or
more measurements against the specified layer
thickness.
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 12
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
(i) The composition and grading of the material before of testing prestressing steel, anchorage assemblies
the site trial. and couplings shall be included in his rates.
(ii) The composition and grading of the material Material represented by samples which do not
including the cement, lime or bitumen content. comply with the specified requirements shall be
(iii) The moisture content at the time of compaction and removed and replaced with suitable material.
the optimum moisture content for the specified
compaction. (ii) Anchorage’s and couplers
Anchorage’s and couplers shall be tested in
(iv) The type, size, tyre pressure, frequency of vibration accordance with the requirements of CLAUSE 6503.
and the number of passes of the compaction The anchorages and couplers shall be assembled
equipment. in accordance with their practical application on the
site where all components necessary for anchoring
(v) The maximum dry density or target density as shall be used, but excluding the ducts.
appropriate measured on a sample before and at
intervals through the site trials. (iii) Prestressing steel
Prestressing steel shall be tested in accordance
(vi) The density achieved. with the requirements of CLAUSE 6503. Should any
test piece fail to comply with the requirements
(vii) The compacted thickness of the layer. specified for the prestressing steel, the material
represented by that sample shall be replaced with
(viii) Any other relevant information as directed by the materials conforming to the specifications if further
Engineer. testing confirms that they do not comply with the
specifications.
At least eight sets of tests shall be made by the
Contractor and the Engineer on each 100 metres of trial (iv) Grout
for each level of compactive effort and provided all eight The fluidity of grout shall be measured with a flow
sets of results over the range of compactive effort cone, immersion apparatus or viscometer. The
proposed by the Contractor meet the specified instrument shall be accurately calibrated in a
requirements for the material the site trial shall be laboratory so that the specified viscosity of grout
deemed successful. The above data recorded in the can be controlled satisfactorily.
trial shall become the agreed basis on which the
particular material shall be provided and processed to The readings obtained during grouting shall be
achieve the specified requirements. compared with the times determined in the laboratory
for grouts of the specified viscosities.
The Contractor shall not proceed with the placing of the
layer tried in the trial section until the methods, The bleeding of grout shall be measured in a metal or
materials and procedures established in the trials have glass container with an internal diameter of
been approved. Such approval shall be based on a approximately 100 mm and a height of approximately
detailed trial section report prepared by the Contractor 120 mm. The grout and water levels in the container
including all observations and test results. Should the shall be controlled with a metal bridge into which two
trial fail, the Contractor shall perform additional trials at adjustable studs A and B are secured.
his own cost until a trial and the trial section report has
been approved by the Engineer. The procedure for determining the bleeding of grout
shall be as follows:
If during the execution of the works, the construction
control tests indicate that the requirements for a Studs A and B in the metal bridge shall be adjusted and
material are not being consistently achieved, then work locked so that the distance from the lower tips of studs
on that layer shall stop until the cause is investigated by to the bottom of the container will be approximately 100
the Contractor. Such investigation may include, effect of mm and 107 mm respectively. The volume V a and Vb for
using other compaction methods, further laboratory and the container at the respective levels of the stud
site trials on the material to determine a revised set of settings shall then be determined to the nearest
data as above which, when agreed, shall be the basis millilitre.
on which all subsequent material will be provided and
processed to achieve the specified requirements. The container shall be filled with freshly mixed grout to
a level where the grout will just touch the tip of stud A
Agreement by the Engineer to a set of data recorded in which points downwards. The bridge shall then be
a site trial shall not relieve the Contractor of any removed and the container tightly sealed to prevent
responsibility to comply with the requirements of this evaporation. The container shall then be stored at 20°C
Specification and the Special Specification. and kept free from vibrations for the entire duration of
the test.
7117 TESTS ON STRUCTURES Three hours after the grout has been mixed, the
container shall be opened and the free (bleed) water
(a) Test on elastomeric bearings poured off. The bridge shall be placed over the
Tests on elastomeric bearings shall be conducted in container with tip of stud B pointing downwards and
accordance with BS 5400 Part 9.2: 1983 and the water poured onto the grout with measuring apparatus
bearings shall comply with the test requirements until the water level touches the tip of stud B. The
specified in the said specification. volume of water added shall be determined to the
nearest millilitre.
(b) Prestressed concrete
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 13
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
alternative, the head may be cut at right angles and the equal to twice the specified working load or the ultimate
load applied directly to the pile. test load whichever is the smaller.
The test load shall be applied to the top of the pile with A load increment may not be applied before the
a hydraulic jack. Where more than one jack is used for subsidence or the rate has stabilised at a rate of not
applying the load, all the jacks in the circuit shall be more than 0.10 mm in 20 minutes under the load
activated by the same pumping unit. The jack (s) shall applied.
be placed so as to ensure that the load is applied
axially. After the load loading has been completed, the
maximum test load shall be maintained until the
The applied load shall be calculated in accordance with movement is less than 0.2 mm within a period of 24
the hydraulic pressure which is being monitored by two hours. The load shall be removed in decrements of 20%
pressure meters in the circuit. The pressure meter shall of the specified working load at intervals of not less than
be calibrated in divisions not exceeding 2% of the 20 minutes.
maximum pressure applied, and the range of the
metres shall not exceed 150% of the maximum After the loading has been removed, the readings on
pressure. The jack(s) and meters shall be calibrated by both meters registering the movement of the pile shall
an approved testing laboratory not more than four be recorded accurately to 0.1 mm at intervals of 5.10
weeks before the test will commence. and 20 minutes and then every 30 minutes until the
load is changed. The final recovery shall be recorded
The deflection of the pile head shall be measured with 24 hours after the maximum test load has been
two scale rulers and two dial extensometers. The scale removed.
rulers shall be fixed to the pile and placed on both sides
of the pile on a diameter line and the dial During the test, the pile shall be loaded with up to 100%
extensometers shall be similarly placed but on a of the specified working load and the load shall then be
diameter line at right angles to that in which the scale removed. It shall then be loaded to the maximum test
rulers have been mounted. load after which the test load shall be removed.
SERIES 7000: TOLERANCES, TESTING This Section describes the scheme used for
determining, by means of tests and measurements and
AND QUALITY CONTROL by applying statistical judgement plans, whether certain
specified requirements in regard to the properties of
SECTION 7200: QUALITY materials and workmanship are being complied with.
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 14
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
(d) Acceptance limit for sample mean For this purpose use shall be made of tables of random
This is the limit value of a product property within which numbers according to standard instructions approved
the sample mean shall lie for a product to be by the Engineer.
acceptable.
(c) Sample Sizes
(e) Acceptance limits for individual test values For purposes of acceptance control, the Engineer will
These are the limit values of a product property within determine sample size, i.e. the number of values to be
which the sample values representing a product shall lie assessed in a lot.
for the product to be acceptable.
(d) Outliers
(f) Conditional acceptance Test results shall be scanned for possible outliers.
This is the acceptance of a lot at conditions that specific Where there is reason to believe that a test result may
rectification measures are taken and carried through to be erroneous, it shall, if possible, be re-examined by
completion to the satisfaction of the Engineer before the further testing, and, if there is reasonable evidence to
lot can be approved in the permanent Works and suggest that the test result is erroneous, it shall be
certified for payment. Conditional acceptance shall be regarded as an outlier, rejected and replaced with a
subject to the provisions of CLAUSE 7202. fresh result.
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 15
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 16
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
density requirements shall be determined by the (2) Examine the results for outliers and replace
statistical method specified below unless a fixed them if any in the opinion of the Engineer.
minimum average value and/or absolute minimum value
has been specified for the compaction elsewhere in (ii) Analysis
these Specifications. The lot will be considered to comply with the
requirements for cementitious binder content if the
The lot will be considered to comply with the following conditions are both fulfilled:
requirements for field density if the following conditions
are fulfilled: (1) The mean cementitious-binder content shall be
not less than 91% of the specified binder
(1) For a lower limit specification, LLs content.
(2) The cementitious binder content in not more
Xn > LLs + Sn*K than 12 of the 50 samples may be lower than
70% of the specified binder content.
Accept the lot if the sample mean satisfies the
expression, otherwise reject the lot.
where
t is the Student's t.
(i) Method
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 17
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
TABLE 7205/1:
VALUES OF STUDENT’S-T AND K FOR DIFFERENT SAMPLE
SIZES TABLE 7205/3
MINIMUM NUMBER OF TESTS OF STRUCTURAL CONCRETE
FOR COMPRESSION STRENGTH
t
n Student's-t K =
n Volume of lot (m3) Minimum number of
3 1.89 1.09 tests in lot 1)
4 1.64 0.82 0 – 20 4
21 – 40 6
5 1.53 0.68
41 – 70 9
6 1.48 0.60
71 – 100 12
7 1.44 0.54
101 – 150 14
8 1.42 0.50
> 150 16
9 1.40 0.47
1) Each test consists of the average value of a set of
10 1.38 0.44 three cubes.
11 1.37 0.41
12 1.36 0.39 (ii) Analysis
Examine the results for outliers and disregard as
13 1.36 0.38 required in the opinion of the Engineer. The results
14 1.35 0.36 are then assessed according to the criteria set out
15 1.34 0.35 below. A lot will comply with the requirements for
the characteristic strength denoted X, if it meets the
16 1.34 0.34 following requirements by using the acceptance
17 1.34 0.32 factors A and B given in TABLE 7205/4:
18 1.33 0.31
− Mean value: minimum ( X + A )
19 1.33 0.31 − Single test value: minimum ( X - B )
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 18
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
(b) Application
7208 PROCESS CONTROL BY THE
Conditional acceptance may be applied in respect of
the properties of structures as shown in TABLE 7206/1. CONTRACTOR
The requirements of Clause 1205 shall apply in respect
(c) Criteria of the Contractor's obligation to institute and implement
When properties to which conditional acceptance may a control system for monitoring the quality of the work
apply are assessed in accordance with this Section, two and materials supplied.
requirements shall always apply, viz one in relation to
the sample mean and one in relation to individual tests For continuous concrete and asphalt-production
value. A lot may be conditionally accepted when it processes, the Engineer may order the Contractor to
complies with one of the two requirements for augment the above control system by introducing a
acceptance, but not with the second requirement process-control system for monitoring the various
provided that it complies with the requirements for properties to be controlled. The specific system to be
conditional acceptance in relation to the second applied shall be subject to the Engineer's approval, and
requirement. the attention of the Contractor is drawn to the systems
described in TRH5, which will normally be regarded as
suitable.
TABLE 7206/1
PROPERTIES TO WHICH CONDITIONAL ACCEPTANCE MAY The Contractor shall take immediate steps to rectify any
APPLY deviation from the specified requirements indicated by
his process-control system, and the Engineer shall have
Property Structure the right to inspect and be given all details of tests and
testing procedures in order to satisfy himself that the
Contractor is implementing adequate process-control
Relative − Bituminous base course or system.
compaction surfacing
− Cemented layers
− Plant mixed, paver laid layers 7209 MEASUREMENT AND PAYMENT
Bituminous Layers of bituminous mixes No separate measurement or payments apply to this
binder content Section.
Cementitious Cemented layers
binder content
28-day cube All structural concrete (excepting
strength concrete pavements
Levels Earthworks and pavement layers
(d) Resubmission
Where a lot has been accepted conditionally or has
been rejected, the Engineer may agree to its
resubmission for approval if it has been reworked and
the Engineer is satisfied that a proper attempt was
made to improve the properties which were
unacceptable. A fresh sample shall be taken, and a
fresh (second) set of test values determined. The first
and second sets of test values shall then be compared
with each other to determine whether their properties
differ significantly. Where in the opinion of the Engineer
a significant difference does occur, the submission of
the lot shall be regarded as a first submission and
assessed as such, and only the second set of test
values shall then be used for this purpose.
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 19
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
SERIES 7000: TOLERANCES, TESTING AND After completion of the setting out and site clearance
the Contractor shall take ground cross sections at
QUALITY CONTROL intervals of 25 m along the road centreline and along
the centreline of all culverts and structures. These shall
SECTION 7300: SETTING OUT be plotted to a natural scale of 1:100 on a stable
transparent material or other approved material and a
AND TOLERANCES copy of the plot submitted to the Engineer for
agreement. If the Contractor fails to take requisite
levels, levels determined by the Engineer shall be taken
CONTENTS: as correct.
CLAUSE PAGE
The Contractor shall programme for a period of 30 days
7301 SCOPE 7000-17 between submitting the ground cross sections and
7302 GENERAL 7000-17 being issued with final road, culvert and structure levels.
7303 DETAILED SETTING OUT 7000-17 A minimum 5 km section of road shall be submitted, but
7304 TOLERANCES 7000-17 where the Contractor submits cross sections for more
7305 MEASUREMENT AND PAYMENT 7000-18 than 10 km of road within the same 30 day period the
initial 30 days shall be extended by 30 days for each
additional 10 km or part thereof. Final road, culvert or
structure levels will be determined by the Engineer and
7301 SCOPE may be different from the levels shown on the
This Section covers the procedures for setting out and Drawings.
gives the limits for geometric tolerances for earthworks
and layer work. On receipt of the final road levels the Contractor shall
mark up the details on the transparencies and the
original and one print of the cross-sections shall be
7302 GENERAL provided free of charge by the Contractor for the
The Engineer will provide sufficient basic survey Engineer.
information to enable the contractor to set out the works
and the Contractor shall be responsible for setting out On completion of the earthworks but before starting
all necessary reference points and for the maintenance formation or pavement layers the Contractor shall
thereof. establish steel pins at a constant offset to the edges of
the carriageway shoulders. The offset may however
The Contractor shall satisfy himself as to the accuracy vary between sections in cut and those in fill. The steel
in line, level and dimension of the basic survey and pins will be clearly and indelibly marked with all the
setting out details provided and should the Contractor relevant information necessary to directly establish the
discover any error in the information provided by the centreline and level at any point across the carriageway
Engineer, he should at once notify the Engineer. If the by using either boning rods or a string line.
information is confirmed to be in error the Engineer will
issue amended drawings or instructions regarding the The interval between pins shall not be more that 12.5 m
correction of the error. and the pins shall be maintained by the Contractor for
as long as they are needed by the Engineer to check
Prior to commencing construction, the Contractor shall the work.
establish the road reserve boundary posts, or if no
boundary posts are instructed, then the Contractor shall
establish reference points to define the road reserve at 7304 TOLERANCES
100 m intervals on both sides.
(a) General
The Contractor shall establish temporary benchmarks In addition to the requirements set out in this Clause
along the road at intervals not exceeding 200 m and attention is drawn to the requirements of CLAUSE 7115
shall provide the Engineer with a schedule of their which shall all be fulfilled.
levels and locations.
(b) Horizontal alignments
The Contractor shall not remove, damage, alter or Horizontal alignments shall be determined from the
destroy in any way plot beacons or survey beacons. centreline of the pavement surface as constructed, and
Should the Contractor consider that any beacon will be all other parallel alignments shall be corrected within a
interfered with by the works he shall notify the Engineer tolerance of ±13 mm therefrom.
who, if he considers necessary, will make arrangements
for the removal and replacement of the beacon. (c) Thickness of pavement layers
The thickness of any pavement layer as specified or
If the Contractor removes or disturbs a beacon without ordered by the Engineer, measured at five points in any
permission of the Engineer, he shall be liable for the full length of 100 m, shall meet the requirements given in
cost of its replacement and any legal consequences TABLE 7115/4.
thereof.
(d) Surface levels of payment layers and formation
The level measured at any point on the surface of a
7303 DETAILED SETTING OUT pavement layer or the formation level shall not deviate
The Contractor shall set out the line and level of the from the corresponding level calculated from the
works at intervals of not more than 25 m or such lesser Drawings by more than the tolerances shown in TABLE
intervals as are required to construct the Works to the 7115/2.
tolerances specified in this Specification. Reference
pegs and batter rails clearly and indelibly marked with For checking compliance with TABLE 7115/2
all the relevant information shall be provided clear of the measurements of surface levels will be taken at points
road and at right angles to it from which the centreline, to be selected by the Engineer at 12.5 m centres
level and batter slope can be directly established at any longitudinally and at 2 m centres transversely. At
time. These shall be maintained by the Contractor for junctions, the grid point spacing shall be determined by
as long as they are needed to check the work. the Engineer.
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 20
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
(f) Shoulders
Shoulders shall be constructed to the same thickness,
level and surface regularity requirements as for the
adjacent pavement layers.
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 21
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
SERIES 7000: TOLERANCES, TESTING wide or such area to be determined by the Engineer as
necessary to obtain compliance with this Specification.
AND QUALITY CONTROL
Where the results of the construction control tests are
SECTION 7400: RECTIFICATION less than that specified the full depth of the layer shall
be reworked to specification. The area treated shall be
OF EARTHWORKS AND the whole section submitted for approval or following a
retest a length of at least 50 m both sides of each test
PAVEMENT LAYERS OUTSIDE and retest, failure.
PERMITTED GEOMETRIC (c) Base course and subbase
TOLERANCES Where the levels or widths are out of tolerance and the
courses consist of unbound (i.e. natural or graded
stone) material, the full depth of the material shall be
CONTENTS: reworked to specification. The area treated shall be at
CLAUSE PAGE least 30 m long and 3 m wide or such area to the
determined by the Engineer as necessary to obtain
7401 SCOPE 7000-19 compliance with this Specification.
7402 RECTIFICATION MEASURES 7000-19
7403 MEASUREMENT AND PAYMENT 7000-19 Where the courses consist of cement or lime treated
material or lean concrete the full depth of the layer shall
be removed from the pavement and replaced to
specification. The area treated shall be at least 5m long
7401 SCOPE and the full width of the paving laid in one operation. If
This Section sets out the methods for rectification of areas are corrected within 7 days of laying no
earthworks and pavement layers constructed outside construction traffic or compaction plant shall use the
permitted geometric tolerances. Where any tolerances surrounding satisfactory areas during that period.
in SECTION 7300 are exceeded, the Contractor shall
determine the full extent of the area which is out of For bituminous bases the full depth of layer shall be
tolerance and shall make good the surface of the removed and replaced with fresh material laid and
pavement course, earthworks or formation in the compacted to specification. Any area so treated shall be
manner described below. at least 5 m long and the full width of the paving laid in
one operation.
7402 RECTIFICATION MEASURES Where the results of the construction control tests for
any of the base or subbase materials are less than that
(a) Earthworks excluding improved subgrade specified, the full depth of the layer shall be reworked to
layers specification in case of unbound material and removed
Where a cutting slope is steeper, and an embankment and replaced to specification in case of cemented and
slope is slacker, than the specified slope then the slope bituminous materials. The area treated shall be the
shall be trimmed to the specified slope. Where a cutting whole section submitted for approval or, following a
slope in slacker, and an embankment slope is steeper, retest, such area to be determined by the Engineer as
than the specified slope then the slope shall be necessary to obtain compliance with the Specification.
benched and fill material placed and compacted and
the slope shall be trimmed all in accordance with (d) Asphalt concrete surfacing
requirements of SERIES 3000 and any other relevant Where the levels or widths are out of tolerance the full
part of this Specification. depth of the layer shall be removed and replaced with
fresh material laid and compacted to specification. The
Where the width of a cutting is less than, and the width area rectified shall be the full width of the paving laid in
of an embankment more than, the specified width then one operation and at least 15 m long.
the cutting or embankment shall be trimmed to the
specified width. Where the width of a cutting is more Where the results of the construction control tests for
than, and the width of an embankment is less than, the the wearing course are less than that specified the full
specified width then the embankment or cutting shall be depth of the layer shall be removed and replaced to
benched and fill material placed and compacted and specification. The area treated shall be the whole
the slopes shall be trimmed all in accordance with the section submitted for approval or, following a retest,
requirements of this Specification. such area to be determined by the Engineer as
necessary to obtain compliance with the Specification.
Where the depth of a side drain is less than that
specified the side drain shall be trimmed to the
specified depth. Where the depth of a side drain is more 7403 MEASUREMENT AND PAYMENT
than specified the side drain shall be backfilled with fill The Contractor shall be deemed to have allowed in his
material compacted to a dry density of at least 90% general rates and prices for the cost of complying with
MDD of BS-Heavy up to the specified depth. the requirements in this Section and no additional
payment will be made.
Where the results of the construction control tests are
less than that specified the full depth of the layer shall
be reworked to specification. The area treated shall be
the whole section submitted for approval or, following a
retest, a length of at least 50 m both sides of each test
and retest failure or such area to be determined by the
Engineer as necessary to obtain compliance with this
Specification.
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 22
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
Guide to sampling and testing aggregates BS 812: Part 101 and BS 5835
Methods of sampling US 145:2000 or BS 812: Part 102
Determination of physical properties US 146:2000
Moisture content of aggregates BS 812: Part 109:1990 and BS 5835
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 23
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
TESTING CEMENT
Determination of strength US 100-1/ EAS 148-1: Part 1
Chemical analysis of cement US 100-2 / EAS 148-2: Part 2
Determination of standard consistency, setting time and soundness US 100-3 / EAS 148-3: Part 3
Determination of chloride, carbon dioxide and alkali content US 100-4 / EAS 148-8: Part 4
Pozzolanicity test for pozzolanic cements soundness US 100-5:2001 / EAS 148-5: Part 5
Determination of fineness US 100-6:2001 / EAS 148-6: Part 6
Methods of taking and preparing samples of cement US 100-7:2001 / EAS 148-7
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 24
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
(b) Uganda National Bureau of Standards (UNBS) US 401: 1993 Reflective sheeting materials for
US 100 Cement - methods of testing traffic control signs
US 101: 2000 Aggregates from natural sources
for concrete (c) American Association of State Highway and
US 104: 1993 Pozzolanas for use with lime Transport Officials (AASHTO)
US 144: 2000 Aggregates-particle size and M – 85 Ordinary Portland cement
particle shape determination M – 140 Bituminous prime coat
US 145: 2000 Aggregates-methods of sampling M – 153 Joint filler
US 146: 2000 Aggregates-determination of M – 154 Air entraining agents.
physical properties M – 173 Thermoplastic hot poured sealant
US 288: 2001 Lime for soil stabilisation M – 194 Concrete Admixtures
US 290: 2001 Glossary terms used in lime M – 213 Joint filler
products M – 216 Road lime
US 310: 2001 Compositions, specifications, M – 240 Portland blast furnace cement
conformity criteria and evaluation T – 87 Atterberg limits test method
for common cements T – 89 Atterberg limits test method
US 320: 2001 Cement-Definition of terminologies T – 90 Atterberg limits test method
T – 132 Sealant tests
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 25
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
T – 180 Maximum dry density test method BS – 6089 Concrete strength in existing structures
BS – 6543 Recycling
(d) American Society for Testing and Materials BS – 6572 Specification for High Density
(ASTM) Polyethylene (HDPE) pipes
A – 252-68 Pile castings BS – 6588 Portland pulverised fuel ash cements
C – 156 Curing agents BS – 6610 Pozzolanic pulverised fuel ash cement
C – 260 Air entraining agents BS – 6677 Clay and calcium silicate paver for
C – 309 Curing agents flexible pavements
C – 494 Concrete admixtures BS – 6699 Ground granulated blast-furnace slag
C – 719 Sealant tests for use with Portland cement
C – 920 Thermosetting chemically cured sealant BS – 6717 Precast concrete paving blocks
C – 227-90 Test method for alkali reactivity of BS – 7263 Precast concrete kerbs, edgings,
aggregates channels and quadrants
D – 36 Bitumen tests (Softening point) Bs – 7373 Preparation of specifications
D – 244 Bitumen tests (binder content test) BS – 7533 Pavement design-clay or concrete
D – 1557 Maximum dry density tests pavers
D – 4402 Bitumen tests (dynamic viscosity) BS – 7583 Portland and Limestone cement
BS – 7755 Soil quality
(e) British Standards Institute (BS) BS – 7850 Total Quality Management
BS – 7903 Selection and use of gully trops and
BS – 4 Structural steel hot rolled sections manholes
BS – 63 Road aggregates BS – 8000 Code of practice for concrete work
BS – 76 Tars BS – 8004 Code of practice for foundations
BS – 162 Working under power lines BS – 8006 Strengthened / reinforced soils and
BS – 146 Portland blast furnace cement with other fills
strength properties outside the scope of BS – 8110 Structural use of concrete
BS EN 197
BS – 410 Test sieves for particle analysis (f) Standard Coordination Specification (CKS)
Bs – 434 Bitumen road emulsions CKS – 82 Steel sections
BS – 594 Hot rolled asphalt CKS – 176 Corrugated metal culverts
BS – 470 Aluminium plate CKS – 191 Retro-reflective materials
BS – 709 Welding CKS – 192 Retro-reflective road marking paint
BS – 812 Fillers for asphalt CKS – 388 Natural rubber water stops
BS – 873 Traffic signs, road studs and bollards CKS – 389 PVC rubber water stops
BS – 881 VEBE test BS - 915 High alumina CKS – 437 Corrugated metal culverts
cement CKS – 564 Bonding liquid for concrete surfaces
BS – 970 Stainless steel CKS – 592 Barbed tape concertina wire
BS – 1134 Stainless steel plate
BS – 1154 Natural rubber (g) Deutshe Ingineur Norme (DIN)
BS – 1474 Aluminium sections DIN – 52013 Bitumen tests (ductility and elastic
BS – 1707 Hot binder distributors for road surface recovery)
dressing
BS – 1721 Fire extinguishers (h) South African Bureau of Standards (SABS)
BS – 1780 Pressure gauges SABS – 044 Welding procedures
BS – 2499 Hot applied joint sealants SABS – 064 Abrasive blasting
BS – 2752 Synthetic rubber SABS – 094 Holes for friction grip fasteners
BS – 2994 Cold rolled steel sections SABS – 0100 Concrete cores
BS – 3262 Hot applied thermoplastic road marking SABS – 0142 Electrical installations
materials SABS – 0162 Design of work/codes of practice
BS – 3662 Plastic road marking paint SABS – 05 Timber treatment
BS – 3690 Specification of bitumens for road SABS – 82 Steel reinforcing bars
purposes SABS – 92 Roofing felt (bridge bearings)
BS – 3837 Joint filler (rigid foams) SABS – 113 pH test (Water)
BS – 3892 Pulverised fuel ash SABS – 134 Paint
BS – 3921 Clay bricks SABS – 135 Bolts and nuts
BS – 4246 Low heat Portland blast-furnace cement SABS – 136 Bolts and nuts
BS – 4254 Joint sealant SABS – 141 Paint thickness test
BS – 4360 Structural steel SABS – 202 Chloride content (Water)
BS – 4447 Anchorages and couplers SABS – 212 Sulphate content (Water)
BS – 4486 High tensile alloy steel bars SABS – 213 Total dissolved solids (Water)
BS – 4840 Joint filler (rigid foams) SABS – 227 Bricks
BS – 4987 Coated macadams for roads and other SABS – 307 Penetration grade bitumen
paved areas SABS – 308 Prime
BS – 5047 Polymised types of butadiene rubber SABS – 309 Bitumen emulsion
(BR) SABS – 435 Rivets
BS – 5075 Concrete admixtures SABS – 455 Welding electrodes
BS – 5268 Timber SABS – 457 Timber Posts
BS – 5135 Welding SABS – 471 Ordinary Portland Cement
BS – 5212 Cold applied joint sealants SABS – 533 Pipes
BS – 5328 Specifying concrete SABS – 538 Timber treatment
Bs – 5273 Dense tar surfacing SABS – 539 Timber treatment
BS – 5400 Bridge bearings SABS – 548 Bitumen emulsion
BS – 5750 Quality systems SABS – 558 Manhole covers
BS – 5896 Steel wire SABS – 626 Portland blast-furnace cement
BS – 5911 Precast concrete pipes SABS – 630 Finishing coats (paint)
BS – 5930 Site investigation SABS – 634 Finishing coats (paint)
BS – 6031 Earthworks SABS – 657 Steel tubes
BS – 6044 Rubber lattices SABS – 673 Timber treatment
BS – 6088 Glass beads SABS – 675 Wire
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 26
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 27
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE WORKS SERIES 7000 - TOLERANCES, TESTING AND QUALITY CONTROL
THE REPUBLIC OF UGANDA, MINISTRY OF WORKS, HOUSING AND COMMUNICATIONS PAGE 7000 - 28