M o S For Grouting-01
M o S For Grouting-01
M o S For Grouting-01
Rev
00
TABLE OF CONTENTS
3.0 RESPONSIBILITY…………………………………………………… 3
4.0 REFERENCES……………………………………………………….. 3
5.0 MATERIALS………………………………………………………….. 3
6.0 PROCEDURES……………………………………………………….. 4
8.0 SAFETY...…………………………………………………………….. 5
1.0 SCOPE:
This Method Statement outlines the methodology for grouting.
2.0 PURPOSE
The purpose of this method is to briefly outline some important steps in grouting
activities. This is intended as a guide for control of workmanship and ensures
compliance with the Project Specification
3.0 RESPONSIBILITY
The originator of this document is responsible for update and validity of contents herein.
4.0 REFERENCES
4.1 Saudi Aramco Construction Specifications
- Section 03600 – Grout
- Section 02271 – Grouted Rip – Rap
- Section 04100 – Mortar & Masonry Grout
SAIC
Cement Based Non-Shrink Grout
Compressive Strength Test Reports - SAIC-Q-1045
5.0 MATERIALS
5.1 Cement and Pre-mixed grout must be stored in a watertight buildings or bins.
5.2
Class I – Pre-packaged, high fluidity, non shrink, non-catalyzed natural aggregate grout
& shall only require addition of water at the mixer. Master Builders MASTER FLOW 713
or equal. Class I grout shall attain minimum compressive strength of 34.5 MPa (5000
psi). @ 28 day Class I grout shall conform to YERP-SAES-Q-010.
Class II – Site mixed grouts, using locally available materials. Class II grout shall consist
of Portland cement Type V conforming to ASTM C150 and clean well graded fine
aggregate conforming to ASTM C33 and potable water. The material shall be no wetter
than necessary for satisfactory placement. Minimum compressive strength shall not be
less than 13.8 MPa (2000 psi).
Site Mixed Grout (Class II) – 1 part Portland cement, 1 part sand and the lease amount of
water to provide hydration and workability.
5.2 Sand Stockpile sand in manner to prevent contamination with other materials or with
other sizes of aggregate. Allow sand to drain until it has reached uniform moisture
content before it is used.
Epoxy grout shall conform to YERP-SAES-Q-011. Mix epoxy grout as per manufacturer’s
instructions.
6.0 Procedures
6.2 Cleaning
6.2.1 Prior to placing grout, remove all foreign matter from concrete bearing surfaces.
6.2.2 Pre-soak all surfaces to be grouted at least 24 hours prior to grouting with Portland
cement grout.
6.3 Application
6.3.1 Class I Grout shall be used for precision, non-shrink grouting in the following applications:
6.3.2 Class II Grout shall be used for all non-precision grouting such as pipe sleeves and drains
and other applications (precast) where non shrink characteristics are not mandatory.
6.3.3 Class II grout will be packed in place to ensure the complete filling of the area to be
grouted.
6.3.4 Class I grout to be cured at manufacturer’s instructions. Class II grout to be kept damp
until it has cured but for not less than 72 hours, subject to modifications of YERP-SAES-
Q-010.
6.3.5 Epoxy grout shall be used for machinery supports as specified in YERP-SAES-Q-011 or if
specified by vendor. Installation shall be as per installation procedure in vendor manual.
6.4.1 General: After being plumbed and properly positioned, column base plates, and
machinery
And equipment base plates shall be grouted, as required by SAES-Q-010 or SAES-Q-
011.
Plates shall be set and anchored to the proper line and elevation. Metal wedges, shims,
And/or setting nuts shall be used for leveling and plumbing structural members.
Concrete and metal surfaces in contact with grout shall be clean and free of oil and
grease.
Concrete surfaces shall be free of laitance and shall be dampened but not puddled.
6.4.2 Nonshrink grout: Literature and test data on the material shall be furnished confirming
that
a flow able mixture will give a hardened grout with a slight expansion and possessing the
Other properties needed for the application proposed. Mixing and placing shall conform
With the manufacturer’s written recommendations. Forms of wood or other suitable
Material shall be used to retain the grout. The grout shall be placed from one side only
Quickly and continuously, completely filling the space without segregation or bleeding of
The mix. Grout shall be cured as per SAES-Q-010.
6.4.3 Epoxy Grout: Literature & test data on the grout material shall be furnished. Application
Shall conform to the manufacturer’s recommendations. Epoxy grout shall be used for
Machinery support grouting for the situations described in SAES-Q-011.
8.0 SAFETY:
8.2 In case of insufficient ventilation, wear suitable respiratory equipment. Avoid skin and
Eye contact.
8.3 Wear rubber boots in addition to the recommended protective clothing.
8.4 For environmental protection, prevent mortar’s entry into drains, sewers and water
Courses.
8.5 Do not breathe dust.
8.6 Wear suitable protective clothing, gloves and eye/face protection.
8.7 In case of contact with eyes, rinse immediately with plenty of water and seek medical
advice.
9.0 ATTACHMENTS:
N/A
**********************************END OF THIS
DOCUMENT************************************