0 15-08-2019 Issued for Tender GRR RN RI DOC TITLE: ELECTRICAL CABLE SCHEDULE FOR NEW MCC
DATE:
A 04.08.2019 Issued for Approval GRR RN RI DOC. No. EGLOBP -00-EL-ELL-002 REV.0
15.08.2019
WOOD PROJECT NO: 192235
REV. DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY PAGE 1 OF 7
MCC UPGRADE PROJECT - BASIC ENGINEERING
WOOD PROJECT NO: 192235 DOC. No. EGLOBP -00-EL-ELL-002 REV.0 15-08-2019
GSWA Galvanised Steel Wire Armour EGLOBP -00-EL-ELL-001 Electrical Load List for New MCC
kW kilo Watt SHELL DEP 01.00.09.10-Gen. Specification for Tagging Specification And Symbol
LCS Low Control Station SHELL DEP 33.64.10.10-Gen. Electrical Engineering Design
LV Low Voltage
V Volt
Notes:
1. Cable Schedule has been prepared based on Load List for New MCC and Site Visit Report .
2. Cable glands shall be Nickel/chromium plated brass double compression type. For explosion proof equipment, cable glands shall be explosion proof type.
3. Cable lengths mentioned in this document are preliminary only and are based on layout mark-ups in Site Visit Report. Cable length to be re-confirmed at site as per actual measurement in the next phase of engineering.
4. Cables shall be routed on new cable trays. The new cable trays shall be installed inside electrical room and on pipe racks adjacent to existing cable trays.
6.Cables for future motors are not covered under this cable schedule.
7. Interface cables between New MCC and Existing PLC (through Interposing relay panel) are not covered in this cable schedule. This shall be part of instrumentation cable schedule which shall be provided in the next phase of engineering.
Cable Tagging Procedure is based on SHELL DEP Specification Tagging Specification And Symbol (DEP:-DEP 01.00.09.10-Gen.)
Equipment numbering procedure for Electrical distribution and control equipment Equipment numbering procedure for MCC to Consumers (Motor and LCS)
Electrical Equipment
MCC Tag Number type(Motor/Control
Panel)
Cable number
Sequence Number- Process unit code
001
Page 2 of 7
MCC UPGRADE PROJECT - BASIC ENGINEERING
WOOD PROJECT NO: 192235 DOC. No. EGLOBP -00-EL-ELL-002 REV.0 15-08-2019
SB-111E1001-CEL-1 POWER SUPPLY 481.00 400 VAC LV Switchgear MPBP New Motor Control Centre SB-111E1 M63 M63 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 4 240 1 20 20
SB-111E1-001-CEL-2 POWER SUPPLY 481.00 400 VAC LV Switchgear MPBP New Motor Control Centre SB-111E1 M63 M63 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 4 240 1 20 20
SB-111E1-001CEL-3 POWER SUPPLY 481.00 400 VAC LV Switchgear MPBP New Motor Control Centre SB-111E1 M63 M63 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 4 240 1 20 20
SB-111E1-001CEC-C Control - 125 VDC LV Switchgear MPBP New Motor Control Centre SB-111E1 M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 12 2.5 1 20 20 Fire and alarm trip
PM-020001-CEL POWER SUPPLY 4.00 400 VAC New Motor Control Centre SB-111E1 Finished Product tank(2001)Motor PM-02001 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 55 55
PM-020002-CEL POWER SUPPLY 7.50 400 VAC New Motor Control Centre SB-111E1 Finished product tank(2002)Motor PM-02002 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 50 50
PM-020003-CEL POWER SUPPLY 4.00 400 VAC New Motor Control Centre SB-111E1 Finished product tank(2003)Motor PM-02003 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 50 50
PM-020004-CEL POWER SUPPLY 7.50 400 VAC New Motor Control Centre SB-111E1 Finished product tank(2004)Motor PM-02004 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 65 65
PM-020005-CEL POWER SUPPLY 7.50 400 VAC New Motor Control Centre SB-111E1 Finished product tank(2005)Motor PM-02005 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 65 65
PM-020006-CEL POWER SUPPLY 7.50 400 VAC New Motor Control Centre SB-111E1 Finished product tank(2006)Motor PM-02006 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 75 75
PM-020007-CEL POWER SUPPLY 18.50 400 VAC New Motor Control Centre SB-111E1 Finished product tank(2007)Motor PM-02007 M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 70 70
Page 3 of 7
MCC UPGRADE PROJECT - BASIC ENGINEERING
WOOD PROJECT NO: 192235 DOC. No. EGLOBP -00-EL-ELL-002 REV.0 15-08-2019
PM-020008-CEL POWER SUPPLY 7.50 400 VAC New Motor Control Centre SB-111E1 Finished product tank(2008)Motor PM-02008 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 70 70
PM-020009-CEL POWER SUPPLY 7.50 400 VAC New Motor Control Centre SB-111E1 Finished product tank(2009)Motor PM-02009 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 80 80
PM-030001-CEL POWER SUPPLY 15.00 400 VAC New Motor Control Centre SB-111E1 Finished product tank(3001)Motor PM-03001 M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 75 75
PM-030002-CEL POWER SUPPLY 18.50 400 VAC New Motor Control Centre SB-111E1 Finished product tank(3002)Motor PM-03002 M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 80 80
PM-030003-CEL POWER SUPPLY 18.50 400 VAC New Motor Control Centre SB-111E1 Finished product tank(3003)Motor PM-03003 M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 85 85
PM-030004-CEL POWER SUPPLY 18.50 400 VAC New Motor Control Centre SB-111E1 Finished product tank(3004)Motor PM-03004 M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 90 90
PM-01301-CEL POWER SUPPLY 7.50 400 VAC New Motor Control Centre SB-111E1 Base oil tank(1301) Motor PM-01301 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 95 95
PM-01302-CEL POWER SUPPLY 7.50 400 VAC New Motor Control Centre SB-111E1 Base oil tank(1302) Motor PM-01302 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 55 55
Page 4 of 7
MCC UPGRADE PROJECT - BASIC ENGINEERING
WOOD PROJECT NO: 192235 DOC. No. EGLOBP -00-EL-ELL-002 REV.0 15-08-2019
PM-01303A-CEL POWER SUPPLY 30.00 400 VAC New Motor Control Centre SB-111E1 Base oil tank(1303A) Motor PM-01303A M32 M32 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 35 1 45 45
PM-01313-CEL POWER SUPPLY 15.00 400 VAC New Motor Control Centre SB-111E1 Base oil tank(1313) Motor PM-01313 M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 55 55
PM-01304A-CEL POWER SUPPLY 30.00 400 VAC New Motor Control Centre SB-111E1 Base oil tank(1304A) Motor PM-01304A M32 M32 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 35 1 60 30
PM-01314-CEL POWER SUPPLY 22.00 400 VAC New Motor Control Centre SB-111E1 Base oil tank(1304B) Motor PM-01314 M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 70 70
PM-01305-CEL POWER SUPPLY 11.00 400 VAC New Motor Control Centre SB-111E1 Base oil tank(1305) Motor PM-01305 M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 60 60
PM-01307-CEL POWER SUPPLY 22.00 400 VAC New Motor Control Centre SB-111E1 Base oil tank(1307) Motor PM-01307 M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 110 110
PM-01308-CEL POWER SUPPLY 15.00 400 VAC New Motor Control Centre SB-111E1 Base oil tank(1308) Motor PM-01308 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 80 80
PM-01401-CEL POWER SUPPLY 22.37 400 VAC New Motor Control Centre SB-111E1 Additive Tank (1401) Motor PM-01401 M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 30 30
PM-01402-CEL POWER SUPPLY 9.00 400 VAC New Motor Control Centre SB-111E1 Additive Tank (1402) Motor PM-01402 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 35 35
Page 5 of 7
MCC UPGRADE PROJECT - BASIC ENGINEERING
WOOD PROJECT NO: 192235 DOC. No. EGLOBP -00-EL-ELL-002 REV.0 15-08-2019
PM-01403-CEL POWER SUPPLY 9.00 400 VAC New Motor Control Centre SB-111E1 Additive Tank (1403) Motor PM-01403 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 40 40
PM-01404-CEL POWER SUPPLY 11.00 400 VAC New Motor Control Centre SB-111E1 Additive Tank (1404) Motor PM-01404 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 47 47
PM-01405-CEL POWER SUPPLY 11.00 400 VAC New Motor Control Centre SB-111E1 Additive Tank (1405) Motor PM-01405 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 65 65
PM-01406-CEL POWER SUPPLY 11.00 400 VAC New Motor Control Centre SB-111E1 Additive Tank (1406) Motor PM-01406 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 55 55
PM-01407-CEL POWER SUPPLY 11.00 400 VAC New Motor Control Centre SB-111E1 Additive Tank (1407) Motor PM-01407 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 58 58
PM-01408-CEL POWER SUPPLY 11.00 400 VAC New Motor Control Centre SB-111E1 Additive Tank (1408) Motor PM-01408 M20 M20 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 10 1 65 65
PM-01310A-CEL POWER SUPPLY 22.00 400 VAC New Motor Control Centre SB-111E1 Unloading Pump-1 PM-01310A M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 95 95
Unloading Pump-1
CP-01310A-CEC CONTROL - 125 VDC New Motor Control Centre SB-111E1 CP-01310A M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 12 2.5 1 95 95 New LCS
LCS
PM-01310B-CEL POWER SUPPLY 11.00 400 VAC New Motor Control Centre SB-111E1 Unloading Pump-2 PM-01310B M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 100 100
Unloading Pump-2
CP-01310B-CEC CONTROL - 125 VDC New Motor Control Centre SB-111E1 CP-01310B M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 12 2.5 1 100 100 New LCS
LCS
Page 6 of 7
MCC UPGRADE PROJECT - BASIC ENGINEERING
WOOD PROJECT NO: 192235 DOC. No. EGLOBP -00-EL-ELL-002 REV.0 15-08-2019
PM-01310C-CEL POWER SUPPLY 22.00 400 VAC New Motor Control Centre SB-111E1 Unloading Pump-3 PM-01310C M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 105 105
Unloading Pump-3
CP-01310C-CEC CONTROL - 125 VDC New Motor Control Centre SB-111E1 CP-01310C M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 12 2.5 1 105 105 New LCS
LCS
PM-04001-CEL POWER SUPPLY 22.00 400 VAC New Motor Control Centre SB-111E1 ABB pump motor 1801 PM-04001 M25 M25 CU/XLPE/PVC/GSWA/PVC 0.6/1kV 3 25 1 40 40