Procedure For Design and Development Control-01
Procedure For Design and Development Control-01
PY
Ahmad Nawaz
Sr. Engineer Design Transformers
CO
Ahsan Waseem
Asst. Manager ITR
Prepared By:
Hafiz Shahzad Ahmad
Engineer Design EMP
Mehtab AhmadED
Asst.Manager Design SG
LL
Ali Mahmood
Team lead QHSE
Reviewed By:
RO
Muhammad Shoaib
Head Design Transformers
CO
Jalil-ul-Rehman
General Manager Mfg (SG)
Page 1 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
Amendment History
CO
1 01 - -
energy meter section(s) 359
2 01 - - Existing design is deleted in all EMP section
3 02 - - Procedure has been amended by adding new
department “Instrument Transformer (ITR)”. 578
ED
LL
RO
NT
CO
Page 2 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
1. PURPOSE
PY
The purpose of this procedure is to provide a consistent and disciplined approach to all
design and development work.
CO
2. SCOPE
This procedure applies to all design and development work leading a new deliverable
product and for the modification of an existing design for Distribution Transformer, Power
Transformer, Switchgear Department, Energy Meter Plant & Instrument Transformer.
3. RESPONSIBILITIES:
and development.
3.1.3 To get WAPDA prototype re-approval before expiry.
3.1.4 To issue Fabrication Number against new development and WAPDA prototype.
3.1.5 To review Design inputs for adequacy.
NT
3.1.8 To ensure that review at suitable stages of design and development is performed
and conducted in accordance with planned arrangements.
3.1.9 To ensure that participants of all concerned functions take part in all design and
development stages being reviewed.
3.1.10 To perform design verification and validation at different stages of design and
development.
3.1.11 To investigate about the root cause(s) of failure in any routine/type test for new
development/prototype transformers in coordination with Production and QC
departments.
3.1.12 To ensure that all design & development changes are identified and
documented.
3.1.13 To maintain all relevant records pertaining to Design and Development activities.
Page 3 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
3.3 Concerned Department
CO
3.3.2 To provide updated rate lists of raw materials/components on monthly basis or
when required by Head of Design/ Product Development department.
4. PROCEDURE
c. Identification of design team and members from other appropriate functions with
intimation to departmental heads to ensure effective interface and coordination
where applicable.
e. The review, verification and validation that are appropriate to each design stage.
Page 4 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
4.1.2 Switchgears
The Head of Manufacturing Switchgear (Mfg SG) is responsible for documenting a design
plan prior to commencing design activities as per Form PD/SDD/FM/01. The design plan
CO
shall include:
a. A project schedule in the form of table or similar scheduling technique. The plan
breaks the design process into phases and schedules the design activities including
design reviewsand validations.
ED
b. Identification of persons responsible for the design and development activities.
c. Identification of the design team and members from other appropriate functions
LL
with intimation to departmental heads to ensure effective interface and
coordination, when applicable.
d. The review, verification and validation that are appropriate to each design stage.
RO
The head of Mfg SG shall manage interface between different groups/ departments
involved in design and development to ensure effective communication and that clear
NT
responsibilities are assigned for effective execution of design and development activities.
The planning outputs shall be updated, as appropriate, as the design and development work
progresses and shall be distributed to the departmental heads and / or section in charges.
It is a responsibility of concerned design personnel to revise and update the design plan if
CO
Head of design EMP is responsible for planning and documenting all design & development
activities. Prior to commencing any design & development activity, concerned Design
personnel shall fill in the Form, PD/EDD/FM/02, for the new design. The overall design &
development planning shall address
Page 5 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
planning output shall be updated and upon completion shall be distributed to all concerned
PY
including Production and Process & Development.
CO
Head of ITR Department is responsible for documenting a Design & Development Plan prior
to commencing New Development/Prototype as per Form (PD/IDD/FM/01). The design plan
shall include;
a. A project schedule that breaks the design process into phases and schedules the
ED
design activities including design reviews, verifications and validations. The expected
dates of subsequent operations in Plan form will be flexible until the Target date of
completion.
LL
b. Assigned responsibilities/authorities in each stage to the concerned.
where applicable.
d. The review, verification and validation that are appropriate to each design stage.
NT
e. Nomination of Project Owner. The nominated Project owner will be responsible for
overall monitoring of new product/prototype design & development.
CO
4.2.1.1d. Head of Design/ Product Development Department will evaluate the working and
PY
the budgetary development cost before approval and get it approved by Functional Head.
CO
a) Need of the prototype manufacturing: This defines the basic purpose of introducing
new prototype. This could be initiated by any one from the Senior Management or
Marketing personnel.
ED
b) Time Frame required for prototype/new product approval: This defines the
targeted time period within which the prototype/new product should be
satisfactorily approved.
LL
c) Required Quality parameters/standards of the prototype/new product to be
established, different tests to be performed, testing criteria to be met etc.
RO
of prototype after approval. For the purpose of WAPDA prototype approval, two
transformers for any rating will be manufactured but this quantity can be different based
upon the Management Decision.
contract or which is necessary to achieve end use performance and customer satisfaction or
PY
information derived from similar design. Design inputs are reviewed by Head of Design/
Product Development department for adequacy. The Head of Design/ Product Development
department is responsible for resolving any incomplete, ambiguous or conflicting
requirements before proceeding with the Design and Development activities.
CO
Head of Local and Foreign Procurement Departments will provide updated rate lists of raw
materials/components on monthly basis or when required by Head of Design/ Product
Development Department for the preparation of new and / or updated material costs.
In case of internal customer, design inputs will be provided to design department either
ED
from the concerned customer department or from the Marketing department, which will
also be reviewed by Head of Design/ Product Development Department and the procedure
defined above will be followed.
Records of the design inputs and any necessary actions shall be maintained in accordance
LL
with the Documentation and Record Management Procedure.
4.2.2 Switchgears
RO
The Marketing department shall provide the design input which may be in the form of
Customer approved technical / commercial specifications, sale advice / purchase order to
Head of Mfg SG who defines the design requirement of the product. Head of Mfg SG shall
NT
Page 8 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
Head of design EMP shall ensure to interpret all the provided information into product
design & development requirements. Moreover, documenting these requirements shall also
be included in the responsibilities of concerned design personnel.
CO
Marketing department shall provide Commercial/Technical specifications along with Tender
and/or Purchase Order to Head of design EMPwho sends a copy to concerned Design
personnel. Other inputs may include information derived from previous similar designs
(functional and/or performance requirements) and/or other required essentials for
improvements.
ED
Any individual/supervisor/executive concerning Energy Meter Plant or the Marketing
department could request for design change by filling in ‘Design Input Form
LL
(PD/EDD/FM/03). Head of Production EMP and concerned Design personnel shall review
these inputs for adequacy. If the change is accepted, the form shall be forwarded to Head of
EMP for approval. If requested change is not accepted, the form shall be filed in Design
records with a reason of disapproval and copy shall be sent to the initiator by the Design
RO
a. Need of the prototype manufacturing: This defines the basic purpose of introducing
new prototype. This could be initiated by any one from the Senior Management or
Marketing personnel.
Page 9 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
b. Time Frame required for prototype/new product approval: This defines the
PY
targeted time period within which the prototype/new product should be
satisfactorily approved.
CO
c. Required Quality parameters/standards of the prototype/new product to be
established, different tests to be performed, testing criteria to be met etc.
ED
After approval, fabrication number is issued by Head of ITR Department and a copy of Form
PD/DND/FM/01 is sent to Functional Head Finance, concerned Head Manufacturing and
LL
MPS Department for information.
Design activities shall be initiated after opening a development fabrication number in case
RO
of prototype after approval. For the purpose of WAPDA prototype approval, For Instrument
transformers for any rating will be manufactured but this quantity can be different based
upon the Management Decision.
NT
Head of ITR Department will be responsible for WAPDA prototype re-approval before
expiry.
CO
Page 10 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
materials/components on monthly basis or when required by Head of ITR Department for
the preparation of new and/or updated material costs.
Records of the design inputs and any necessary actions shall be maintained in accordance
CO
with the Documentation and Record Management Procedure.
ED
Head of Design/ Product Development Department is responsible for the documentation of
design output. Design output shall be documented and expressed in terms of Winding Data
Sheet, Dimensional Drawings, BOQ and Work order that can be verified prior to release
LL
against design and development input requirements and shall be approved prior to release.
Design output shall:
a) Meet the input requirements for design and development.
RO
local purchasing and foreign procurement (if necessary), BOQ and dimensional
drawings / specifications will be provided.
CO
c) Contain or refer to the product acceptance criteria that may be in the form of client
Approved Technical Data Sheet, Dimensional Drawings or specification.
d) Specify the characteristics of the product that are essential for its safe and proper
use.
Quantity of products mentioned in work order matches with that on the sale advice but
advice may be taken from production department in case of WAPDA.
4.3.2 Switchgears
Head of Mfg SG is responsible for the documentation of the design output. Design output
may be in the form of GA Drawings, BOQs, LOMs, Fabrication Drawings, Work Orders and
Wiring Diagram that can be verified prior to release against design and development input
requirements and shall be approved by Head of Mfg SG / Sr. Design Engineer prior to their
release. In case of their absence, Design Engineer will be responsible for approval. Design
output shall:
a) Meet the input requirements for design and development.
Page 11 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
Procurement (if necessary) and Quality Control Department. Information can be in
the form of GA Drawings, BOQs, LOMs, Fabrication Drawings, Work Orders and
Wiring Diagrams.
CO
4.3.2.1 Work Orders
The Production requirements are specified by work order (WO). Work orders along with
other manufacturing information; also contain fabrication (FB) Number. Fabrication number
ED
is assigned to every manufacturing order. A separate work order and fabrication number is
opened for every individual type of Switchgear for every order. The Production Section In
charges that receive the work order is responsible for ensuring that the requirements of the
work order are met. For WAPDA standard design, Head of Mfg SG issues Work Order after
LL
receiving Sale advice from Marketing Department.
RO
Head of design EMP shall be responsible for documenting design & development outputs.
NT
The outputs shall be in the form of Bill of Quantity (BOQ), which shall be approved and
verifiable. Design & Development output shall be able to verify,
d) Referring/specifying characteristics of the product for its safe and proper use.
This can be in the form of a circuit diagram or product leaflet
Page 12 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
Procurement.
CO
d. Refer/specify characteristics of the product for its safe and proper use.
ED
4.4.1.1 Design and Development Review Meeting
For new developments defined in paragraph 4.2.1.1, Head of Design/ Product Development
LL
department will decide for a review meeting prior to issuance of Design output like winding
data sheet, dimensional drawings, and BOQ and work order. It will be the responsibility of
Project Owner to arrange a Design review meeting and ensure that participants of all
RO
concerned functions take part in the review meeting. Design Review meeting is conducted
in order to evaluate the ability of meeting the customer requirements & feasibility. Design
review meeting will be mandatory in case of WAPDA prototypes however in case of new
development other than WAPDA prototype; it will be defined as product falling under
NT
Participation of Design, Production and I&QC will be mandatory in all cases. Project Owner
will define the requirement of representative of functions which should participate in
Design Review for a particular project other than mandatory participants. All participants
will confirm the parameters of different Design out-puts & other Manufacturing
requirements, if any by printing their initials on Design Review Forms. Once all participants
agree on the design and manufacturing parameters, all Design out-puts will be issued to all
concerned. Records of the reviews and any necessary actions shall be maintained in
accordance with the Documentation and Record Management procedure.
4.4.1.2 Design and Development Review (Manufacturing Stage)
(PD/TDD/FM/02)/(PD/PDD/FM/02),(PD/TDD/FM/03)/(PD/PDD/FM/03),(PD/TDD/FM/04)/(P
PY
D/PDD/FM/04), (PD/TDD/FM/05)/(PD/PDD/FM/05) and PD/TDD/FM/06.
Reviews are conducted to evaluate that the ability of the results of the design and
development to meet requirements. During reviews any problem arising will be identified
CO
and the necessary actions will be proposed for execution. Head of Design/ Product
Development department will ensure that participants of all concerned functions take part
in all design and development stages being reviewed. Records of the results of the reviews
and any necessary actions shall be maintained in accordance with the Documentation and
Record Management Procedure.
4.4.2 Switchgears
ED
LL
It is the responsibility of Head of Mfg SG to ensure that review at critical stages of design
and development shall be performed and conducted in accordance with planned
arrangements as per Review forms PD/SDD/FM/02 and PD/SDD/FM/03. Reviews are
conducted to evaluate the ability of the results of the design and development to meet the
RO
requirements. During reviews any problem arising will be identified and necessary action
will be proposed for execution. Head of Mfg SG will ensure that participants of all concerned
functions take part in all design and development stage(s) being reviewed. Records of the
NT
results of reviews and any necessary action/s shall be maintained in accordance with
Documentation and Record Management Procedure.
For new design & development, detailed reviews shall be carried out at both Electrical and
Mechanical stages. These reviews shall be done utilizing two forms, PD/EDD/FM/04 &
PD/EDD/FM/05 for Electrical & Mechanical stages respectively.
The review forms shall address the activities, participants, result of review, and comments
as per need. All reviews shall be finalized after the approval of Head of design and Head of
production. The review forms shall be able to
Page 14 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
4.4.4.1 Design and Development Review Meeting
For new developments defined in paragraph 4.2.4.1, Head of ITR Department will decide for
a review meeting with all concerned functions prior to issuance of Design output like
CO
Electrical Data Sheet, Dimensional drawings and Work orders. Design Review meeting is
conducted in order to evaluate the ability of meeting the customer requirements &
feasibility. Design review meeting will be mandatory in case of WAPDA / KE prototypes
however in case of new development other than WAPDA / KE prototype; it will be defined
as product falling under following points for which the review meeting shall be coordinated:
a) Non-compliance
Drawing/Data.
of
ED
any manufacturing process to the Design
LL
b) Limitation of the testing with respect to agreed specifications.
Participation of Design, Production and I&QC will be mandatory in all cases and all
participants will confirm the parameters of different Design out-puts & other Manufacturing
NT
requirements, if any by printing their initials on Design Review Forms. Once all participants
agree on the design and manufacturing parameters, all Design out-puts will be issued to all
concerned. Records of the reviews and any necessary actions shall be maintained in
accordance with the Documentation and Record Management procedure.
CO
It is the responsibility of Head of ITR Department to ensure that review at suitable stages of
design and development shall be performed and conducted in accordance with planned
arrangements as per review form PD/IDD/FM/03.
During reviews any problem arising will be identified and the necessary actions will be
proposed for execution. Head of ITR Department will ensure that participants of all
concerned functions take part in all design and development stages being reviewed. Records
of the results of the reviews and any necessary actions shall be maintained in accordance
with the Documentation and Record Management Procedure.
Development department before issuance. Records of the results of the verification and any
PY
necessary action shall be maintained in accordance with the Documentation and Record
Management Procedure.
4.5.2 Switchgears
CO
At different stages of design and development, design verification shall be performed to
Ensure that design and development output have met the design and development input
requirements. Records of the results of the verification and any necessary actions shall be
maintained in accordance with the Documentation and Record Management Procedure. All
ED
the design documents are verified by Head of Mfg SG before issuance.
During the Mechanical Stage, with the participation of Production, Process & Development
shall carry out dimensional and functional verification and shall maintain the record. While,
NT
during the Electrical Stage, Design department shall perform verification of the product and
shall keep the record.
Records of the results of the verification and any necessary action shall be maintained in
CO
Verification shall be performed at Different stages of design & development to ensure that
output has met the input requirements. For new design, verification shall be carried out
during Mechanical as well as Electrical stage.
During the Mechanical Stage, with the participation of Production, Process & Development
shall carry out dimensional and functional verification and shall maintain the record. While
during the Electrical Stage, Design department shall perform verification of the product and
shall keep the record.
Records of the results of the verification and any necessary action shall be maintained in
accordance with the Documentation and Record Management Procedure.
Page 16 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
4.6.1 Distribution and Power Transformers
CO
that the resulting product is capable of meeting the requirements for the specified
application or defined user needs, where known. Validation shall be completed prior to
delivery or after onsite installation (where practicable) of the product. Along with the
routine tests, additional tests may be performed if deemed necessary.
Records of the results of the validation and any necessary actions shall be maintained in
ED
accordance with the Documentation and Record Management Procedure.
maintained. Head of Design/ Product Development department will decide about the
repair/replacement of non-conforming product.
NT
4.6.2 Switchgears
that the resulting product is capable of meeting the requirements for the specified
application or defined user needs, where known. Validation shall be completed prior to
delivery or implementation (where practicable) of the product. Records of the results of the
validation and any necessary actions shall be maintained in accordance with the
Documentation and Record Management Procedure.
Design & Development validation shall be performed in accordance with design &
development plan to ensure that resulting product conforms to defined user needs and/or
requirements. For new design, Prototype Testing shall be done for design validation as
appropriate. Prototype testing can be done by customer and/or by any independent
laboratory and/or Product Engineering Laboratory of PEL as the case may be. Validation
shall be performed prior to the delivery of the product. Validation shall be done using
validation review form, PD/EDD/FM/06. Records of the results of the validation and any
necessary actions shall be maintained in accordance with the Documentation and Record
Management Procedure.
Page 17 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
Design validation shall be performed to ensure that the resulting product is capable of
meeting the requirements for the specified application or defined user needs, where
known. Validation shall be completed prior to delivery of the product. Along with the
CO
routine tests, additional tests may be performed if deemed necessary.
Records of the results of the validation and any necessary actions shall be maintained in
accordance with the Documentation and Record Management Procedure.
All design changes are identified, documented, and approved in compliance with
“Modification In Engineering Drawings/Data” procedure, which require impact analysis for
CO
each change i.e. evaluation of the affect on the change on constituent parts and products
already delivered. All changes shall review, verified and validated as appropriate and
approved by Head of Design/ Product Development department before implementation.
Records of the results of the review of changes and any necessary actions shall be
maintained as per the Documentation and Record Management Procedure.
4.7.2 Switchgears
All design changes are identified, documented, and approved in compliance with
“Modifications In Engineering Drawings/Data” procedure, which requires impact analysis for
each change i.e. evaluation of the effect on the changes on constituent parts and products
already delivered. All changes shall be reviewed verified and validated as appropriate and
approved by Head of Mfg SG /Sr. Design Engineer before implementation. In case of their
absence, Design Engineer will be responsible for approval. Records of the results of review
of changes and necessary action(s) shall be maintained as per the Documentation and
Record Management Procedure.
Page 18 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
All design & development changes shall be identified and documented. Prior to
implementation, they shall be reviewed, verified, and validated as appropriate. Moreover,
Head of design & Production shall approve the changes before their realization. The records
CO
shall be maintained in accordance with the Documentation and Record Management
Procedure.
ED
All design changes are identified, documented, and approved in compliance with
“Modifications in Engineering Drawings/Data” procedure, which requires impact analysis for
each change i.e. evaluation of the effect on the changes on constituent parts and products
already delivered. All changes shall be reviewed verified and validated as appropriate and
LL
approved by Head of ITR before implementation. In case of their absence, Design Engineer
will be responsible for approval. Records of the results of review of changes and necessary
action(s) shall be maintained as per the Documentation and Record Management
RO
Procedure.
NT
CO
Page 19 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
5. PROCESS FLOW CHARTS
CO
ED
LL
RO
NT
CO
Page 20 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
Design & Development Inputs
CO
ED
LL
RO
NT
CO
Page 21 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
CO
ED
LL
RO
NT
CO
Page 22 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
CO
ED
LL
RO
NT
CO
Page 23 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
CO
ED
LL
RO
NT
CO
Page 24 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
CO
ED
LL
RO
NT
CO
Page 25 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
CO
ED
LL
RO
NT
CO
Page 26 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
CO
ED
LL
RO
NT
CO
Page 27 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
6. RELATED FORMS:
PY
Sr. Form Title Code Minimum
No. Retention
1 Design and Development Plan (DTR) PD/TDD/FM/01 3 Years
CO
2 Design and Development Plan (PTR) PD/PDD/FM/01 3 Years
3 Winding Shop Review Form (DTR/PTR) (PD/TDD/FM/02) 3 Years
/(PD/PDD/FM/02)
4 Core Shop Review Form (DTR/PTR) (PD/TDD/FM/03) 3 Years
/(PD/PDD/FM/03)
5
6
(DTR/PTR) ED
Mechanical Components Review Form (PD/TDD/FM/04)
/(PD/PDD/FM/04)
Inspection and Testing Review Form (PD/TDD/FM/05)
3 Years
3 Years
LL
(DTR/PTR) /(PD/PDD/FM/05)
7 Prototype / new development Initialization PD/DND/FM/01 3 Years
Request
RO
Existing Design)
12 Product Design & Development Plan (For New PD/EDD/FM/02 3 Years
Design)
CO
7. ASSOCIATED PROCEDURES:
Page 28 of 29
Pak Elektron Limited
Division: Power Department: Design Document No.: PD/DND/SP/01
Supersedes: 17-10-2016 Effective:28-10-2020 Rev.#: 02
Procedure for Design and Development Control
PY
Nil
CO
ED
LL
RO
NT
CO
Page 29 of 29