1.0 PURPOSE
2.0 SCOPE
3.0 REFERENCES
4.0 ANNEXURES :
Annexure A - Process Maps & Flow-Charts
Annexure B - Records Table
EMCO ELECTRONICS Appr. By :
Page No. 2 of 8
Doc No. DD00-201
DOC. TITLE : Procedure for Design and Development Issue No. 3
Issue Dt. 01-04-10
Page No. 3 of 8
Doc No. DD00-201
DOC. TITLE : Procedure for Design and Development Issue No. 3
Issue Dt. 01-04-10
DD00-501
Obtain necessary
Sales Engr.
Information No information through
A1.2
Customer
Drawings / adequate? marketing
Samples
Yes
Preparation of Design &
Development Plan, indicating
the following :
Design Input Ÿ Design & development stages
Des. Hd.
Design Plan
A1.3
DD00-502
Outputs
as per list of Design outputs
Customer A
Drawings /
Samples
EMCO ELECTRONICS Appr. By :
Page No. 4 of 8
Doc No. DD00-201
DOC. TITLE : Procedure for Design and Development Issue No. 3
Issue Dt. 01-04-10
Design Input
Specification
A
Des. Hd.
& Development plan for Verification
A1.5
Des. Hd.
Design Output No
A1.6
OK? ensure that the same
Design
meet the Design Input
Outputs
Specifications
Yes
Review of Design & Development
Outputs with concerned functions,
Design Plan (namely marketing, purchase,
production, QA, service as
applicable), at the stages defined Design
Des. Hd.
No the comments /
B changes required by
the concerned functions
EMCO ELECTRONICS Appr. By :
Page No. 5 of 8
Doc No. DD00-201
DOC. TITLE : Procedure for Design and Development Issue No. 3
Issue Dt. 01-04-10
Customer Yes
approval
required ?
Forwarding of required
Des. Hd.
drawings / documents
A1.9
to marketing for
No obtaining customer's
approval
Manufacturing of
Des. Hd.
A2.2
prototype
Yes Drawings /
Documents
approved ?
No
F
Functional
Testing of prototype Test Report
Des. Hd.
Verification
A2.3
(Product)
Checklist
ITxx-402
Necessary Modification of
Functional No No
changes/ drawings / documents
Des. Hd.
Verification
modifications as per customer's
A2.1
OK
cariied out comments and
re-submission to
Yes customer for approval
F
Prototype send to
Des. Hd.
A2.4
Master List of
Updating of Master-list
Des. Hd.
Documents
A2.5
C
EMCO ELECTRONICS Appr. By :
Page No. 6 of 8
Doc No. DD00-201
DOC. TITLE : Procedure for Design and Development Issue No. 3
Issue Dt. 01-04-10
Manufacturing of Pilot
Prod. sup
Batch where
A2.6
necessary, as per
manufacturing process
Procedure for
Production Final Inspection and
Prod. sup
testing of Pilot Batch as Test Report
A2.7
Test Results No
OK?
Yes
Procedure for Necessary
Release of drawings / modifications / changes
Des. Hd.
Document
A2.8
Documents to production /
Des. Hd.
Design
Design Changes are
Des. Hd.
Change
A3.0
Page No. 7 of 8
Doc No. DD00-201
DOC. TITLE : Procedure for Design and Development Issue No. 3
Issue Dt. 01-04-10
Des. Hd.
Review problems in implementing the changes.
A3.4
Page No. 8 of 8
Doc No. DD00-201
DOC. TITLE : Procedure for Design and Development Issue No. 3
Issue Dt. 01-04-10
RECORDS TABLE