Air System Sizing Summary for 4.

OFFICE 2
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:23PM

Air System Information


Air System Name 4. OFFICE 2 Number of zones 1
Equipment Class CW AHU Floor Area 253.6 m²
Air System Type SZCAV Location Kuala Lumpur, Malaysia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 32.0 kW Load occurs at Jun 1500
Sensible coil load 23.3 kW OA DB / WB 33.9 / 25.6 °C
Coil L/s at Jun 1500 1725 L/s Entering DB / WB 25.5 / 19.1 °C
Max block L/s 1725 L/s Leaving DB / WB 14.3 / 13.7 °C
Sum of peak zone L/s 1725 L/s Coil ADP 13.0 °C
Sensible heat ratio 0.729 Bypass Factor 0.100
m²/kW 7.9 Resulting RH 55 %
W/m² 126.0 Design supply temp. 14.4 °C
Water flow @ 5.6 K rise 1.38 L/s Zone T-stat Check 0 of 1 OK
Max zone temperature deviation 0.0 K

Central Heating Coil Sizing Data


Max coil load 3.7 kW Load occurs at Jan 0900
Coil L/s at Jan 0900 1725 L/s W/m² 14.5
Max coil L/s 1725 L/s Ent. DB / Lvg DB 14.7 / 16.4 °C
Water flow @ 11.1 K drop 0.08 L/s

Supply Fan Sizing Data


Actual max L/s 1725 L/s Fan motor BHP 0.00 BHP
Standard L/s 1721 L/s Fan motor kW 0.00 kW
Actual max L/(s·m²) 6.80 L/(s·m²) Fan static 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s 136 L/s L/s/person 5.67 L/s/person
L/(s·m²) 0.54 L/(s·m²)

Hourly Analysis Program v5.01 Page 1 of 11


Zone Sizing Summary for 4. OFFICE 2
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:23PM

Air System Information


Air System Name 4. OFFICE 2 Number of zones 1
Equipment Class CW AHU Floor Area 253.6 m²
Air System Type SZCAV Location Kuala Lumpur, Malaysia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Zone Terminal Sizing Data

Reheat Zone Zone


Design Minimum Reheat Coil Htg Unit Htg Unit Mixing
Supply Supply Coil Water Coil Water Box Fan
Airflow Airflow Zone Load L/s Load L/s Airflow
Zone Name (L/s) (L/s) L/(s·m²) (kW) @ 11.1 K (kW) @ 11.1 K (L/s)
Zone 1 1725 1725 6.80 0.0 0.00 0.0 0.00 0

Zone Peak Sensible Loads

Zone Zone Zone


Cooling Time of Heating Floor
Sensible Peak Sensible Load Area
Zone Name (kW) Cooling Load (kW) (m²)
Zone 1 19.6 Jul 1600 0.0 253.6

Space Loads and Airflows

Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s·m²)
Zone 1
4. OFFICE 2 1 19.6 Jul 1600 1725 0.0 253.6 6.80

Hourly Analysis Program v5.01 Page 2 of 11


Ventilation Sizing Summary for 4. OFFICE 2
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:23PM

1. Summary
Ventilation Sizing Method Sum of Space OA Airflows
Design Ventilation Airflow Rate 136 L/s

2. Space Ventilation Analysis


Floor Maximum Required Required Required Required Uncorrected
Zone Name / Space Name Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Mult. (m²) Occupants (L/s) (L/s/person) (L/(s·m²)) (L/s) (% of supply) (L/s)
Zone 1
4. OFFICE 2 1 253.6 24.0 1725.0 2.50 0.30 0.0 0.0 136.1
Totals (incl. Space Multipliers) 1725.0 136.1

Hourly Analysis Program v5.01 Page 3 of 11


Air System Design Load Summary for 4. OFFICE 2
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:23PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jun 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 33.9 °C / 25.6 °C HEATING OA DB / WB 21.7 °C / 15.2 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 0 m² 0 - 0 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 3550 W 3129 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 11816 W 10691 - 0 0 -
People 24 1264 1442 0 0 0
Infiltration - 2545 4064 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 1763 551 0% 0 0
>> Total Zone Loads - 19391 6057 - 0 0
Zone Conditioning - 20723 6057 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 1725 L/s 0 - 1725 L/s 0 -
Ventilation Load 136 L/s 1498 2617 136 L/s -91 0
Supply Fan Load 1725 L/s 0 - 1725 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 22222 8674 - -91 0
Central Cooling Coil - 23286 8674 - 0 0
Central Heating Coil - -1064 - - 0 -
>> Total Conditioning - 22222 8674 - 0 0
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v5.01 Page 4 of 11


Zone Design Load Summary for 4. OFFICE 2
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:23PM

Zone 1 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 34.2 °C / 25.5 °C HEATING OA DB / WB 21.7 °C / 15.2 °C
OCCUPIED T-STAT 23.9 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 0 m² 0 - 0 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 3550 W 3157 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 11816 W 10765 - 0 0 -
People 24 1294 1442 0 0 0
Infiltration - 2617 3879 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 1783 532 0% 0 0
>> Total Zone Loads - 19616 5853 - 0 0

Hourly Analysis Program v5.01 Page 5 of 11


Space Design Load Summary for 4. OFFICE 2
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:23PM

TABLE 1.1.A. Component Loads For Space "4. OFFICE 2" In Zone "Zone 1"
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Jul 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 34.2 °C / 25.5 °C HEATING OA DB / WB 21.7 °C / 15.2 °C
OCCUPIED T-STAT 23.9 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
SPACE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 0 m² 0 - 0 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 3550 W 3157 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 11816 W 10765 - 0 0 -
People 24 1294 1442 0 0 0
Infiltration - 2617 3879 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 1783 532 0% 0 0
>> Total Zone Loads - 19616 5853 - 0 0

TABLE 1.1.B. Envelope Loads For Space "4. OFFICE 2" In Zone "Zone 1"
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(m²) (W/(m²·K)) Coeff. (W) (W) (W)

Hourly Analysis Program v5.01 Page 6 of 11


Hourly Air System Design Day Loads for 4. OFFICE 2
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:23PM

DESIGN MONTH: JULY


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (°C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 27.1 33 0.5 1.1 0.0 0.0 0.0 0.0 0.0 0.0
0100 26.6 31 0.5 1.0 0.0 0.0 0.0 0.0 0.0 0.0
0200 26.2 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0300 25.8 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0400 25.5 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0500 25.4 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0600 25.6 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0700 26.1 32 0.5 1.1 0.0 0.0 0.0 0.0 0.0 0.0
0800 26.9 1725 22.1 30.5 1.4 0.0 0.0 0.0 0.0 0.0
0900 28.1 1725 22.4 30.9 1.3 0.0 0.0 0.0 0.0 0.0
1000 29.4 1725 22.5 31.0 1.5 0.0 0.0 0.0 0.0 0.0
1100 30.9 1725 22.7 31.1 1.3 0.0 0.0 0.0 0.0 0.0
1200 32.4 1725 22.9 31.4 1.0 0.0 0.0 0.0 0.0 0.0
1300 33.5 1725 23.1 31.4 1.1 0.0 0.0 0.0 0.0 0.0
1400 34.2 1725 23.2 31.6 0.9 0.0 0.0 0.0 0.0 0.0
1500 34.4 1725 23.2 31.6 0.8 0.0 0.0 0.0 0.0 0.0
1600 34.2 1725 23.2 31.5 1.1 0.0 0.0 0.0 0.0 0.0
1700 33.5 1725 23.1 31.5 1.0 0.0 0.0 0.0 0.0 0.0
1800 32.6 43 0.6 1.4 0.0 0.0 0.0 0.0 0.0 0.0
1900 31.4 56 0.8 1.8 0.0 0.0 0.0 0.0 0.0 0.0
2000 30.2 51 0.8 1.6 0.0 0.0 0.0 0.0 0.0 0.0
2100 29.2 46 0.7 1.5 0.0 0.0 0.0 0.0 0.0 0.0
2200 28.3 41 0.6 1.3 0.0 0.0 0.0 0.0 0.0 0.0
2300 27.6 36 0.5 1.2 0.0 0.0 0.0 0.0 0.0 0.0

Hourly Analysis Program v5.01 Page 7 of 11


Hourly Zone Loads for 4. OFFICE 2
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:23PM

ZONE: Zone 1
DESIGN MONTH: JULY
ZONE TERMINAL TERMINAL ZONE
OA ZONE ZONE SENSIBLE ZONE COOLING HEATING HEATING
TEMP TEMP RH AIRFLOW LOAD COND COIL COIL UNIT
Hour (°C) (°C) (%) (L/s) (W) (W) (W) (W) (W)
0000 27.1 26.7 73 33.4 2785.7 491.6 0.0 0.0 0.0
0100 26.6 26.7 73 30.6 2535.1 450.3 0.0 0.0 0.0
0200 26.2 26.7 - 0.0 2292.6 391.6 0.0 0.0 0.0
0300 25.8 26.7 - 0.0 2083.1 341.1 0.0 0.0 0.0
0400 25.5 26.7 - 0.0 1905.9 301.4 0.0 0.0 0.0
0500 25.4 26.7 - 0.0 1785.7 297.8 0.0 0.0 0.0
0600 25.6 26.7 - 0.0 1747.3 355.6 0.0 0.0 0.0
0700 26.1 26.7 73 32.4 1790.4 476.9 0.0 0.0 0.0
0800 26.9 24.8 55 1725.0 16086.6 20357.7 0.0 0.0 0.0
0900 28.1 24.6 55 1725.0 16647.4 20477.5 0.0 0.0 0.0
1000 29.4 24.7 55 1725.0 17243.2 20260.6 0.0 0.0 0.0
1100 30.9 24.8 55 1725.0 17875.0 20398.6 0.0 0.0 0.0
1200 32.4 24.7 55 1725.0 18468.3 20665.3 0.0 0.0 0.0
1300 33.5 24.8 55 1725.0 18948.4 20539.0 0.0 0.0 0.0
1400 34.2 24.8 55 1725.0 19316.0 20792.7 0.0 0.0 0.0
1500 34.4 24.8 55 1725.0 19546.7 20799.5 0.0 0.0 0.0
1600 34.2 24.8 55 1725.0 19616.1 20576.1 0.0 0.0 0.0
1700 33.5 24.7 55 1725.0 19575.1 20656.8 0.0 0.0 0.0
1800 32.6 26.7 72 42.7 5277.6 630.1 0.0 0.0 0.0
1900 31.4 26.7 71 56.5 4762.7 832.5 0.0 0.0 0.0
2000 30.2 26.7 71 51.2 4260.1 755.6 0.0 0.0 0.0
2100 29.2 26.7 72 46.4 3819.4 683.8 0.0 0.0 0.0
2200 28.3 26.7 72 40.8 3414.7 601.1 0.0 0.0 0.0
2300 27.6 26.7 73 36.3 3070.3 535.5 0.0 0.0 0.0

Hourly Analysis Program v5.01 Page 8 of 11


System Psychrometrics for 4. OFFICE 2
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:23PM

June DESIGN COOLING DAY, 1500

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Ventilation Air Inlet 33.9 0.01728 136 400 1498 2617
Vent - Return Mixing Outlet 25.5 0.01126 1725 793 - -
Central Cooling Coil Outlet 14.3 0.00955 1725 793 23286 8674
Central Heating Coil Outlet 14.8 0.00955 1725 793 1064 -
Supply Fan Outlet 14.8 0.00955 1725 793 0 -
Cold Supply Duct Outlet 14.8 0.00955 1725 793 - -
Zone Air - 24.7 0.01074 1725 827 20723 6057
Return Plenum Outlet 24.7 0.01074 1725 827 0 -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.204 W/(L/s-K)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2939.9 W/(L/s)
Site Altitude = 21.9 m

TABLE 2: ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (W) Mode (W) (°C) (L/s) (ppm) (W) (W)
Zone 1 19391 Cooling 20723 24.7 1725 827 0 0

Hourly Analysis Program v5.01 Page 9 of 11


System Psychrometrics for 4. OFFICE 2
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:23PM

WINTER DESIGN HEATING

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Ventilation Air Inlet 21.7 0.00810 136 400 91 0
Vent - Return Mixing Outlet 21.2 0.00810 1725 517 - -
Central Cooling Coil Outlet 21.1 0.00810 1725 517 0 0
Central Heating Coil Outlet 21.1 0.00810 1725 517 0 -
Supply Fan Outlet 21.1 0.00810 1725 517 0 -
Cold Supply Duct Outlet 21.1 0.00810 1725 517 - -
Zone Air - 21.1 0.00810 1725 527 0 0
Return Plenum Outlet 21.1 0.00810 1725 527 0 -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.204 W/(L/s-K)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2939.9 W/(L/s)
Site Altitude = 21.9 m

TABLE 2: ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (W) Mode (W) (°C) (L/s) (ppm) (W) (W)
Zone 1 0 Deadband 0 21.1 1725 527 0 0

Hourly Analysis Program v5.01 Page 10 of 11


Psychrometric Analysis for 4. OFFICE 2
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:23PM

Location: Kuala Lumpur, Malaysia


Altitude: 21.9 m.
Data for: June DESIGN COOLING DAY, 1500
0.020
1. Outdoor Air
2. Mixed Air
3. Central Cooling Coil Outlet
4. Central Heating Coil Outlet 1 0.018
5. Supply Fan Outlet
6. Room Air
0.016

Specific Humidity ( kg/kg )


0.014

2 0.012
6
3 45 0.010

0.008

0.006

0.004

0.002

0.000
0 5 10 15 20 25 30 35
Temperature ( °C )

Hourly Analysis Program v5.01 Page 11 of 11