Sea Water Desalination Plant - MRPL: Commissioning Check Sheet

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 6

SEA WATER DESALINATION PLANT - MRPL

commissioning Check Sheet

BATTERY BANK
ITEM/TAG NO. FORM NO. E-03C
EQUIPMENT DESCRIPTION
SYSTEM NO. SYSTEM DESCRIPTION
SUB-SYSTEM
SUB-SYSTEM NO
DESCRIPTION
DATA SHEET LOCATION
DRAWING REFERENCE DATE

No Status
Description
OK NA PL
1 Ensure valid PTW is obtained
2 Ensure LOTO system is in place
Confirm all vendor documentations applicable to associated equipment -
3
complete / available
Record battery information: -
Name :
Manufacturer :
4 Type :
Cell Capacity : Ah
No of cells : _________
Total Capacity : Ah
Check the battery construction and pre-commissioning check sheets are
5
Completed.
Commissioning of Battery and Battery charger carried out in accordance with
6
manufacturer's instruction manual and the test results appended
Battery tools and all required safety equipment is provided and readily available
7 Batteries, battery racks and charger cleaned. Terminals and inter-connectors
covered with protective coating (grease).
Accessory equipment such as hydrometer, thermometer, special
8
wrenches and spare electrolyte are available
Safety eyewash is available and operating properly and protective clothing
9
provided.
10 Ensure Ventilation fan for battery Rack are working
11 Ensure Electrolyte Level for all Battery
Records Hourly Battery Voltage, Temperature and Total Current during Initial
12
Charging & Float Modes as per Log Sheet.
13 Attach Vendor Report
OK = PASSED, NA = Not Applicable, PL = Punch List

WABAG Representative FICHTNER Representative MRPL Representative


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

Page 1/6
SEA WATER DESALINATION PLANT - MRPL

commissioning Check Sheet

BATTERY BANK
ITEM/TAG NO. FORM NO. E-03C
EQUIPMENT DESCRIPTION
SYSTEM NO. SYSTEM DESCRIPTION
SUB-SYSTEM
SUB-SYSTEM NO
DESCRIPTION
DATA SHEET LOCATION
DRAWING REFERENCE DATE

TIME DATE
AMBIENT
BATTERY FUNCTION: INITIAL CHARGING
TEMPERATURE
TOTAL VOLTAGE: TOTAL CURRENT
AVERAGE
ELECTROLYTE LEVEL 20 MM Below Maximum Level

CELL NO VOLTAGE CELL NO VOLTAGE CELL NO VOLTAGE CELL NO VOLTAGE

WABAG Representative FICHTNER Representative MRPL Representative


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

Page 2/6
SEA WATER DESALINATION PLANT - MRPL

commissioning Check Sheet

BATTERY BANK
ITEM/TAG NO. FORM NO. E-03C
EQUIPMENT DESCRIPTION
SYSTEM NO. SYSTEM DESCRIPTION
SUB-SYSTEM
SUB-SYSTEM NO
DESCRIPTION
DATA SHEET LOCATION
DRAWING REFERENCE DATE

Total Volts --------V Dc

BATTERY INITIAL CHARGING:

BATTERY DISCHARGE TEST (starting reading):

TIME DATE

NO OF CELLS DISCHARGE CURRENT

CELL TYPE DURATION

CELL NO VOLTAGE CELL NO VOLTAGE CELL NO VOLTAGE CELL NO VOLTAGE

WABAG Representative FICHTNER Representative MRPL Representative


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

Page 3/6
SEA WATER DESALINATION PLANT - MRPL

commissioning Check Sheet

BATTERY BANK
ITEM/TAG NO. FORM NO. E-03C
EQUIPMENT DESCRIPTION
SYSTEM NO. SYSTEM DESCRIPTION
SUB-SYSTEM
SUB-SYSTEM NO
DESCRIPTION
DATA SHEET LOCATION
DRAWING REFERENCE DATE

Total Volts --------V Dc

BATTERY DISCHARGE TEST (Ending reading):

TIME DATE

NO OF CELLS DISCHARGE CURRENT

CELL TYPE DURATION

CELL NO VOLTAGE CELL NO VOLTAGE CELL NO VOLTAGE CELL NO VOLTAGE

WABAG Representative FICHTNER Representative MRPL Representative


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

Page 4/6
SEA WATER DESALINATION PLANT - MRPL

commissioning Check Sheet

BATTERY BANK
ITEM/TAG NO. FORM NO. E-03C
EQUIPMENT DESCRIPTION
SYSTEM NO. SYSTEM DESCRIPTION
SUB-SYSTEM
SUB-SYSTEM NO
DESCRIPTION
DATA SHEET LOCATION
DRAWING REFERENCE DATE

Total Volts --------V Dc

BATTERY RE CHARGING (FLOAT MODE):

TIME DATE
AMBIENT
BATTERY FUNCTION: FLOAT CHARGING
TEMPERATURE
TOTAL VOLTAGE: TOTAL CURRENT

AVERAGE
ELECTROLYTE LEVEL 20 MM Below Maximum Level

CELL NO VOLTAGE CELL NO VOLTAGE CELL NO VOLTAGE CELL NO VOLTAGE

WABAG Representative FICHTNER Representative MRPL Representative


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

Page 5/6
SEA WATER DESALINATION PLANT - MRPL

commissioning Check Sheet

BATTERY BANK
ITEM/TAG NO. FORM NO. E-03C
EQUIPMENT DESCRIPTION
SYSTEM NO. SYSTEM DESCRIPTION
SUB-SYSTEM
SUB-SYSTEM NO
DESCRIPTION
DATA SHEET LOCATION
DRAWING REFERENCE DATE

Total Volts --------V Dc

Record Type,Model,Serial No. Cal Cert. No. & Calibration Expiry Date of all test Equipment used
Type of Test Calibration Expiry
Make / Model Serial No. Calib. Cert. No.
Equipment Date

Remarks:

WABAG Representative FICHTNER Representative MRPL Representative


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

Page 6/6

You might also like