Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

16 MVTP

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

Respon SITE TEST REPORT Date :

sibilities Contractor’s name:


Customer:

Legend NG-SA
ALFANAR CO.
CSD Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
CT SUPERVISION RELAY (MVTP11)
Page 1 of 3
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

1. GENERAL DATA AND INFORMATION:-

Bay No. Serial no:


Bay Name. Model no: MVTP11T1CB0751E
Make: ALSTOM Aux. supply 110 / 125 VDC
Frequency 50 / 60 Hz No of contacts 5 NO
Flag type Hand Reset Setting Range 2, 4, 6, 8, 10, 12, 14V

2. MECHANICAL CHECKS AND VISUAL INSPECTION:-

ITEM DESCRIPTION CHECK


1. Inspect for any physical damage or defects.
2. Verify connections as per approved drawing.
3. Check tightness of all connections.
4. Check Apparatus list.
5. Check that serial no. of relay matching with serial no. of case.

3. ELECTRICAL TESTS:-

3.1-FUNCTION TEST:-

ITEM DESCRIPTION Check


1 Case Earthing checked.
2 Flag Operation & Reset checked.
3 Trip contacts checked.
4 Test switch / Plug checked for correct function.
5 CT shorting facility check when the Relay is racked out

3.2 RELAY BURDEN:

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
CT SUPERVISION RELAY (MVTP11)
Page 2 of 3
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

Condition Relay DC voltage Relay DC current Burden Remarks

No operation
Operation

Note: For 110/125V burden no operation/ operation = 3.0 / 4.37W.

3.3 PICKUP TEST;

Voltage Setting Drop off / Pick up Ratio


Pick up (V) Drop off (V)
(V)
1

9
Note: Pickup voltage +/-5% Vs. Drop off/ Pickup ratio >85% after 3 sec delay.

3.4 TIMING TEST:

Contacts No. Actual Operating time at 2xVs Expected operating time (s)

3 +/-5%

3.5 FINAL SETTING:

Relay final voltage setting:

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
CT SUPERVISION RELAY (MVTP11)
Page 3 of 3
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

3.5.1 PICKUP TEST;

Voltage Setting Drop off / Pick up Ratio


Pick up (V) Drop off (V)
(V)

Note: Pickup voltage +/-5% Vs. Drop off/ Pickup ratio >85% after 3 sec delay.

3.5.2 TIMING TEST:

Contacts No. Actual Operating time at 2xVs Expected operating time (s)

3 +/-5%

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________

You might also like