1.0 Scope of Work: Structural Analysis and Design Contract Document
1.0 Scope of Work: Structural Analysis and Design Contract Document
1.0 Scope of Work: Structural Analysis and Design Contract Document
Dear Ma’am/sir:
Further to your email dated Nov 22, 2021 regarding the request for proposal in the structural
design and analysis of the above-mentioned project, we are pleased to inform you that we
are formalizing our contract subject but not limited to the following terms and conditions:
1.1. Perform data collection basis of design, architectural plan and geotechnical
investigation report prepared by geotechnical Engineer (if available) and etc.
Please take note that shear wall/ Bearing wall is not an option in this project,
only an exhaustive analysis and design to implement successfully the Special
Moment Resisting Space Frame shall be performed.
1.3. Perform an analysis of lateral loads as designed, subject to the effects of cyclic
loading, drift, and strong column-weak beam limitations.
1.4. Perform a complete and detailed structural analysis with load combinations and
design investigation of each structural member based on the requirements of the
National Structural Code of the Philippines (NSCP) 2015 and governing building
codes of the Philippines.
The scope of work stipulated in this agreement shall be completed within the
following periods starting from the date of payment receipt
For the scope of work mentioned above, the professional fee shall be PESOS:
FIFTY THOUSAND PESOS (P50, 000.00) ONLY, not included of Value-Added Tax
(VAT).
The contract price shall be fixed and cannot be subjected to adjustment regardless of
price and labor escalation. The contract price shall be inclusive of all time cost and
expenses associated with the aforementioned scope of work.
4.1. Fifty percent (50%) upon acceptance and signing of this agreement.
4.2. Twenty percent (20%) upon receipt of Reports in pdf format.
4.3. Thirty percent (30%) upon completion of the services and receipt delivery of
Report (Sign and Seal)
5.0 OTHER
5.1. The Engineer shall exercise full comprehensive skill and care (no short-
cutting/simplifying or magic evaluation) in the performance of the services in
conformity with the normal standards of profession.
5.2. The Engineer reserves the right to stop work if fees are not paid within a
reasonable number of days from the date the payment is due.
5.3. The Architect of the project will provide Civil/Structural Engineer. with the
following:
a) Complete set of Architectural plans;
b) Soil Investigation Report (if Available)
Thank you.
Lenielle B. Amatosa
Civil/Structural Engineer
09979831411
Nida Eborde
Conforme