The Republic of The Union of Myanmar: U Han Zaw
The Republic of The Union of Myanmar: U Han Zaw
The Republic of The Union of Myanmar: U Han Zaw
MYANMAR
U HAN ZAW
IMMEDIATE PAST PRESIDENT
MYANMAR ENGINEERING SOCIETY
6 Conclusion
2
I Myanmar Profile
Population
60 Million (2010-
2011) Road Length
676578 km2
936 km (East – West)
2051 km (North – South)
Neighboring Countries
• Bangladesh, India, China,
Loas, Thailand 3
I Myanmar Profile
Official Language
•Myanmar
Climate
•Seasons ( Summer, Raining, Winner)
•Temperature (Mean max: 31˚C)
•Humidity (Mean ~ 70 %)
•Avg. Annual rainfall (~ 1800 mm)
Economy
•Currency – Kyat ( 1 US $ ~ 900 kyats )
•Per capita GDP – 700 US $ (March 2011)
4
II Current Practice in Bridge
Background Data
5
No. Name Span(ft) Type of Bridge
Major Bridges
River Ayeyarwaddy
1 Innwa Bridge(Sagaing) 3,960 Steel Truss
2 Nawaday Bridge 4,183 Steel Truss
Steel Truss +
3 Maubin Bridge 2,362
RCC
4 Bala Min Htin Bridge 2,688 Steel Truss
Chindwin
28 4,730 Steel Truss
Bridge(Monywa)
II Current Practice in Bridge
Bridge Design
1'-6"
7'
Sub Structure
2'-9"
3'-1"
D12-6"c/c
D10-24"c/c
D20-5"c/c both way
D12-6"c/c
6'-11"
7'-3"
D20-10"c/c
14'
14'
D20-18"c/c NGL
both way
4'
D10-18"c/c
D20-5"c/c
4'
4'
both way
D20-8"c/c
both way
3'
1'-6"
7'
8'-6"
D12-6"c/c
D20-8"c/c
D20-5"c/c
6'
10'
12'
D20-10"c/c
14'
NGL
6'-6"
D12-6"c/c
2'-0"
6'
D20-8"c/c
4'
6' 16' 6'
28'
PILE CAP SECTIONAL PLAN BACK WALL &WING WALL PLAN
12'
WING WALL DETAIL
Well Foundation
9
II Current Practice in Bridge
10
II Current Practice in Bridge
BETC
Design and
( Bridge Engineering Construction of Bridge
Training Center)
11
ASEAN Outstanding Awards
for 2011 in CAFEO-30
Completion of
Three Major Bridge Projects
across the Ayeyarwaddy River
within Two Years' period (2009-2011)
III Major Issues on Bridge
Bridge Design
Bridge Design
Sub Structure
D12-6"c/c
D12-9"c/c
D12-9"c/c
Stirrup
D12-6"c/c
D12-6"c/c
b/w
D12-6"c/c
b/w
D20-6"c/c
D20-6"c/c
D12-6"c/c
Notes
1) Design strength of concrete 3000 psi Cube
2) Yield strength of Re-bar 40,000-psi
Open
Foundation
14
III Major Issues on Bridge
Bridge Design
2'-5"
2'-5"
3'-0" 2'-7"
D12-5"c/c
D12-6"c/c D12-6"c/c
1:
1
D10-18"c/c
both way
D20-10"c/c
D20-5"c/c
12'-4"
19'-0"
9'-2"
D20-5"c/c
N.G.L
D12-6"c/c
D18-18"c/c
both way 2'-0"
A A
4'-0"
4'-0"
D10-18"c/c
both way
.
3"
D20-8"c/c
both way
3'-0" 2'-7"
29'-0"
HALF SECTIONAL FRONT VIEW
1:
1'-6" 1
D12-6"c/c
9'-2"
D12-6"c/c
6'-0"
N.G.L
D20-8"c/c
D20-8"c/c
D20-5"c/c
2'-0"
1'-6"
4'-0"
Note - Slab tk; = 1'-10"
4'-0"
D20-10"c/c
4'-0"
- Bearing = 0'-1"
- Pavement= 0'-6"
Total = 2'-5"
Spun Pipe
Foundation
15
III Major Issues on Bridge
Bridge Design
Sub Structure
Bored Pile
Foundation
16