Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

5b. STP Weekly Log Book

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

www.hydroteches.

com

HYDROTECH ENERGY SOLUTIONS


1st Floor, T.C.79/1779(3), Muttathara,
Vallakkadavu.PO, Thiruvananthapuram, Kerala

STP WEEKLY MAINTENANCE SCHEDULE


Note:- Switch-off electrical control panel before starting maintenance work.
Site: 60KLD STP, ARTECH GATEWAY, THRISSUR Date: In time:
WEEK NO. Operator Name: Out time:
Sl No. WORK TO BE DONE STATUS REMARKS
1 Clean All Electro mechanical equipments. (Surface cleaning). Done

2 Check oil level of Blowers (Top up if necessary). Done

3 Check Tension of Belt. Done

4 Check that Float switches are working properly. Y/N

5 Clean Float switches by using Fresh water. Done

6 Clean Bar screens. Done

7 Remove Oil and Grease from Oil and Grease trap. Done
Supervisor Name: Sign:

Site: 60KLD STP, ARTECH GATEWAY, THRISSUR Date: In time:


WEEK NO. Operator Name: Out time:
Sl No. WORK TO BE DONE STATUS REMARKS
1 Clean All Electro mechanical equipments. (Surface cleaning). Done

2 Check oil level of Blowers (Top up if necessary). Done

3 Check Tension of Belt. Done

4 Check that Float switches are working properly. Y/N

5 Clean Float switches by using Fresh water. Done

6 Clean Bar screens. Done

7 Remove Oil and Grease from Oil and Grease trap. Done
Supervisor Name: Sign:

Site: 60KLD STP, ARTECH GATEWAY, THRISSUR Date: In time:


WEEK NO. Operator Name: Out time:
Sl No. WORK TO BE DONE STATUS REMARKS
1 Clean All Electro mechanical equipments. (Surface cleaning). Done

2 Check oil level of Blowers (Top up if necessary). Done

3 Check Tension of Belt. Done

4 Check that Float switches are working properly. Y/N

5 Clean Float switches by using Fresh water. Done

6 Clean Bar screens. Done

7 Remove Oil and Grease from Oil and Grease trap. Done
Supervisor Name: Sign:

You might also like