Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Instruction Sheet Is Jf239: - Style Number Jf239Hd:: Package Contents

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

INSTRUCTION SHEET : IS - JF239

STYLE NUMBER : JF239HD


6 CORPORATE PARKWAY
GOOSE CREEK , SC . 29445
www . quoizel . com

PACKAGE CONTENTS ISSUED 09- 20 09 Revised 2009-09-30

Part Description Quantity


A Crossbar 1pc A
K
B Green Ground Screw 1pc
C Lock Washer 2pcs B

D Hex Nut 2pcs


L
E Nipple 1pc C
F Fixture Chain 2pcs
G Lock Ball 1pc D
H Socket Collar 2pcs E
I Shade 2pcs
J Fixture Assembly 1pc F M
K Ceiling Canopy 1pc
L Ring 2pcs G

M Side Rod 2pcs H


N Center Rod Assembly 1pc

I
N

! WARNINGS AND CAUTIONS


WARNING:
● Before beginning the installation, turn off electricity at the circuit breaker box or the main fuse box by
switching off the circuit breaker or removing the fuse.
CAUTION:
● These instructions are provided for your safety. It is very important that they are read completely before
the installation of your fixture. We strongly recommend that a professional electrician install the fixture.
● Disconnect fixture from the power source before replacing the bulb(s), making sure the bulb(s) had
sufficient time to cool down. DO NOT subject the lamp to any shock while lit as shattering of lamp may
result.

PREPARATION
● Before beginning installation of product, make sure all parts are present. Compare parts with package
contents list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or
operate the product. Contact customer service for replacement part.
● Estimated Assembly Time : 30 - 45 minutes
● Tools Required for Assembly (not included) : Flathead Screwdriver , Phillips Screwdriver, Pliers,
Electrical Tape, Wire Cutters, Safety Glasses & 2, 100 Watt, G40 Medium Base Bulbs.
● Helpful Tools (not included) : Wire Strippers.

1 OF 3
INSTALLATION INSTRUCTIONS STYLE NUMBER : JF239HD

STEP 1 :
a. Thread the end of the Center Rod Assembly onto the nipple
on the top center of the Fixture Assembly. Line up Scroll on Scroll Ring
the side of the Center Rod Assembly and the Support Arms
before tighten them together. Center Rod
b . Attach Rings onto the Scroll on the side of the Center Rod Assembly
Side Rod
Assembly. And then attach ends of Side Rods onto Rings
on the Support Arms and Scrolls. Ring

Support Arm Fixture Assembly

STEP 2 : Ceiling
a. Decide the length of the chain needed for your Canopy
application . You will be required to remove excess Ceiling Loop
links with bolt cutters .
b . Attach one ends of Fixture Chains onto Fixture Loops on
the top of the Fixture Assembly and attach the another
ends of the Chains onto the Ceiling Loops on the bottom of
the Ceiling Canopy.
Fixture Chain

Fixture Loop

STEP 3 : Outlet Box


a. Place the Crossbar onto the Outlet Box and aligning the
Mounting Holes on the Outlet Box with a set of holes on the
Crossbar. Secure the Crossbar with Outlet Box Screws
and tighten until snug.

Crossbar

Outlet Box
Screw

STEP 4:
* Pliers is required on this step .
a . Thread Hex Nut onto top end of the Nipple .
b . Place Lock Washer over the top end of the Nipple and
then thread the Nipple into the center lock hole of the
Lock Washer
Crossbar .
c . Us ing pliers , thread the Hex Nut against the c rossbar Crossbar Hex Nut
and hand tighten until snug .

Nipple

2 OF 3
INSTALLATION INSTRUCTIONS STYLE NUMBER : JF239HD

STEP 5 :
a . Locate the Ceiling Canopy onto the Crossbar and slip the
Button Stop on the end of Lanyard into the Slot on the Crossbar
Crossbar as shown. Slot
Button Stop
Lanyard
Ceiling
Canopy

STEP 6 :
* Use Wire Connectors ( not supplied ) to connect the WHITE OR RIBBED WHITE OR RIBBED
wires . FROM HOUSE FROM FIXTURE
a . Connect the House Ground Wire to the Fixture Ground
Wire.
b . Connect the House White ( or Ribbed ) Wire to the BLACK ( OR RED ) WIRE BLACK OR SMOOTH
Fixture Supply Wire ( White or Ribbed Side ) .
c . Connect the House Black ( or Red ) Wire to the Fixture FROM HOUSE FROM FIXTURE
Supply Wire ( Black or Smooth Side ).
d . Wrap each connection with approved electrical tape
GROUND WIRE GROUND WIRE
and carefully stuff all of the connected wires into the
Outlet Box . FROM HOUSE FROM FIXTURE

STEP 7 :
a. Screw the Hex Nut onto the end of the Nipple and adjust to
proper location for Lock Washer, Ceiling Canopy and
Finial.
b. Pass the Lock Washer and the Ceiling Canopy over the Nipple
end of the Nipple and secure with the Lock Ball. Hand
tighten until snug.
Hex Nut
Lock Washer
Ceiling
Canopy

Lock Ball

STEP 8 :
a. Place the Shade over the Socket as shown. Secure by
threading the Socket Collar onto the Socket. Hand tighten
until snug.

Socket

STEP 9 : Shade
a . Install correct Bulbs referring to fixture markings
and / or labels for maximum wattage .

Your installation is completed now . Restore electricity . Socket Collar


Retain this sheet for future reference .
3 OF 3

You might also like