Design of Precast Pier Cap - 1
Design of Precast Pier Cap - 1
Design of Precast Pier Cap - 1
R0
Rev Date Description
Design consultant :
HINDUSTAN CONSTRUCTION & INFRASTRUCTURE CONSULTANTS
DESIGN OF PRECAST PEIR CAP
0M SPAN
SPAN ARRANGEMENT
SHRINKAGE
End of curring days 14 14.000 14.000 14.000 14.000
days at consideration days 33600 14 21 35 14
b RH 1.356 1.356 1.356 1.356 1.451
e cd0 04.861E-04 05E-04 05E-04 05E-04 05E-04
kh 0.971 0.971 0.971 0.971 0.971
b ds 0.998446452 0 0.118126215 0.286655569 0
e cd(t) 04.712E-04 00.0E+00 55.7E-06 01.4E-04 00.0E+00
fck 50 50 50 50 40
e ca 0.000075 0.000075 0.000075 0.000075 0.000055
b as(t) 0.527 0.527 0.527 0.527 0.527
e ca 3.95133E-05 3.95133E-05 3.95133E-05 3.95133E-05 2.89765E-05
CONCRETE STRENGTH
fcm(t) Mpa 76 54 58 62 45
fck (t) Mpa 50 44 48 50 35
Ecm Mpa 35000 35000 35000 35000 30000
Ecm (t) Mpa 35000 33929 34596 35000 29082
BM due to PIER CAP Selfweight kN-m 10 77 212 426 725 1114 1604
Stresses top -0.04 -0.23 -0.47 -0.73 -0.97 -1.19 -1.45
Cable cg 0.00 0.08 0.26 0.51 0.78 1.06 1.37
bottom 0.04 0.24 0.49 0.77 1.05 1.33 1.66
Combined Stresses immediately After Stressing (Suprior check considering 10% higher pre-stressing stress)
Stresses top 8.8 11.9 12.8 12.7 11.9 11.0 10.1
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000
cable cg 7.3 6.2 5.5 5.2 5.0 4.9 5.0
bottom 5.7 0.2 -2.6 -3.8 -4.2 -4.1 -3.8
COMBINED CAB FORCES AFTER TIME DEPENDENT LOSSES (AND 10% REDUCTION IN CABLE FORCE)
H kN 11085 10999 10859 10775 10760 10790 10834
V kN -460 -457 -394 -301 -210 -120 -30
Stresses due to pre-stressing
top 6 9 10 10 10 9 9
cable cg 5 3 0 -1 -2 -3 -4
bottom 4 0 -2 -4 -4 -5 -5
Precast Girder Erection kn-m 0 221 1692 3164 4636 7507 10451
Addisional loads kn-m 0 0 0 0 0 0 0
Stresses due to Girder top 0.00 -0.67 -3.76 -5.42 -6.17 -8.04 -9.46
cable cg 0.00 0.44 1.82 1.96 1.72 1.81 1.86
bottom 0.00 0.68 3.88 5.71 6.69 8.94 10.80
Combined Stresses During girder erection
top 6.30 7.87 5.41 3.61 2.39 -0.05 -2.05
cable cg 5.11 3.28 2.47 1.17 0.02 -0.32 -0.36
bottom 4.09 0.69 1.87 2.82 3.42 5.61 7.61
Stress Check during deck casting Safe Safe Safe Safe Safe Safe Safe
Sec1-1 Sec2-2 Sec3-3 Sec4-4 Sec5-5 Sec6-6 Sec7-7
Section Distance 0.000 1.000 2.000 3.000 4.000 5.000 6.000
Net Shear Capacity [ kN] 1119 1215 1381 1246 1073 1001 983
Net Design Shear Force -1290.84 3518.61 3790.87 4169.77 4556.65 9130.81 9540.23