PRE-FEASIBILITY REPORT
1. SUMMARY
Project Chhirralewa Crushers tone Quarry(B)
Name of Company / Mine Owner BARBARIK PROJECT LIMITED SURAJPUR
(Director. Shri Dhruv Kumar Agrawal)
Location
Village Chhirralewa
Taluka Basna
District Mahasamund
State Chhattisgarh
1 Mining Lease Area & Type of The lease area is 1.00 Ha.
land The surface topography of the area is of
gently sloping land profile.
It is non forest land.
2 Geographical Bounda Latitude Longitude
co-ordinates ry
point
1 21°23'32.09"N 82°58'34.40"E
2 21°23'32.50"N 82°58'36.10"E
3 21°23'31.11"N 82°58'38.10"E
4 21°23'28.31"N 82°58'38.69"E
5 21°23'28.92"N 82°58'35.50"E
4
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)
8 Rate of Production (in tons) Based on 300 working days, avg. production
per day is 237.8 T
9 Mineral Reserve in Tons The Geological reserve – 206492 T
Mineable reserve – 139716.2 T
5
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)
Project Proponent
6
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)
(iii) Need for the Project and its importance to the country and or region
Stones have the great importance as building material. Bigger size stone as
blocks are used to fill the foundation of building while small pieces are
usually mixed with cement and other ingredients to create mortar for
building. As a building material, stones have good demand in the market.
Hence small scale mining of stone is a good source of earning of local
villagers for their lively hood.
In order to have the great demand for stone gitty the supply is limited. To
fulfill the demand of market the mined out Stones will be supplied in the
market.
Unskilled 15 labors will be required for loading the mined out stones on
trucks etc and skilled 1people will be required for supervision purpose,
maintain the record of production and shipment etc.
7
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)
3. PROJECT DESCRIPTION
(i) Type of Project (including interlinked and interdependent project, if
any)
(ii) Location (map showing general location, specific location and project
boundary & project site-specific layout) with coordinates.
The stone quarry lease area is situated near village Mandir Hasaud in Tehsil-
Tilda, District - Raipur of Chhattisgarh. The area falls in survey of India
Toposheet No.64 K/15.
District : Mahasamund
Tahsi : Basna
Village : Chhirralewa
BP Latitude Longitude
1 21°23'32.09"N 82°58'34.40"E
2 21°23'32.50"N 82°58'36.10"E
3 21°23'31.11"N 82°58'38.10"E
4 21°23'28.31"N 82°58'38.69"E
5 21°23'28.92"N 82°58'35.50"E
Location Map and Google Map showing coordinates of the lease area is
attached herewith.
8
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)
(iii) Details of alternate sites considered and the basis of selecting the
proposed site, particularly the environmental considerations gone into
should be highlighted.
The mining lease area is 1.000 Ha in which the working area is 0.770 ha and
the production of Crusher stone is about 237 tons per day that too with
blasting etc. Hence the size or magnitude of operation is very small.
(vi) Drilling
Drilling is not required for exploration purpose but for production of Crusher
stonejack hammer drill holes are required for blasting purpose to break the
rock.
(vii) Blasting:
In view of this small scale quarrying activity the blasting parameters will be
simple and use of explosive will also be less. Blasting will be done by
licensedcontractor.
9
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)
About 10 % sub grade materials will be generated. This sub grade material is
nothing but the crushed and breakage part of stone. Hence it is proposed to
stack this sub grade material in a suitable place.
The stacking of the sub grade material generated during mining is proposed
in the mine area itself at a suitable place.
SITE ANALYSIS
The area is about 100 km from District Mahasamund. Raigarh Railway
Station is about 70.0 km.
10
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)
The land on which this quarry lease sanctioned is the Private land in Khasra
No. 97 covering an area of 1.000 Ha shown in the map.
The area is almost flat, which is covered by lateritic soil with scanty
vegetation. The maximum elevation is about 276m MSL.
Climatic data from Secondary Sources
Raipur district having dry climate except during the monsoon season. The
annual rainfall of the area is 1050-1080 mm. The maximum temperature
goes about 40° C and minimum 10° C during summer. The winter season is
cool and the humidity is 70% rest of the year the air is dry.
5) PLANNING IN BRIEF
The stone mining activity has no other concept except mining and
transportation of mined out material to end-users after crushing the Crusher
stone to different sizes as per the demand.
11
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)
Area of stone mining is 1.000 Ha. The area under excavation will be only
0.ha while for stacking surface soil and for waste dump required area will be
0.230Ha. (Along lease boundary) and plantation the required area will be
0.230 ha. (Along lease boundary)
It is non forest; private land situated near the village Mandir Hasaud which
is a thinly populated village.
6. PROPOSED INFRASTRUCTURE
(i) Industrial Area (Processing Area)
There is no proposal for any infrastructure development.
(ii) Residential
The drinking water requirement for personnel working at the site will be met
from the nearby village/river.
12
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)
Not required.
Not required as the area is away from village and free from habilitation.
Recommendations
The quarrying of stone and allied activities has no impacts on the
surrounding environment. Moreover based on development of this project
certain positive impact will be there on the nearby village population in
terms of employment generation etc. Hence this project may be cleared and
clearances accorded.