Pre-Feasibility Report 1. Project Name of Company / Mine Owner Location

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.

048 Hect, Village – Mandir Hasaud


Teshsil – Arang District – Raipur (C.G.)

PRE-FEASIBILITY REPORT
1. SUMMARY
Project Chhirralewa Crushers tone Quarry(B)
Name of Company / Mine Owner BARBARIK PROJECT LIMITED SURAJPUR
(Director. Shri Dhruv Kumar Agrawal)
Location
Village Chhirralewa
Taluka Basna
District Mahasamund
State Chhattisgarh

1 Mining Lease Area & Type of The lease area is 1.00 Ha.
land The surface topography of the area is of
gently sloping land profile.
It is non forest land.
2 Geographical Bounda Latitude Longitude
co-ordinates ry
point
1 21°23'32.09"N 82°58'34.40"E
2 21°23'32.50"N 82°58'36.10"E
3 21°23'31.11"N 82°58'38.10"E
4 21°23'28.31"N 82°58'38.69"E
5 21°23'28.92"N 82°58'35.50"E

3 Name of There is no any Nalla or river near by the lease


Rivers/Nallahs/Tanks/ area
Spring/Lakes etc
4 Name of Reserve Forest(s), Wild There is no any reserve Forest(s), Wild life
life Sanctuary/ National parks Sanctuary/ National parks present nearby the
etc. lease area.
5 Topography of the area The surface topography of the area located in
village Chhirralewa which is sloping land profile
situated in the eastern part of the village however
the mine is located along the slopes suggesting
deposition of crusher Stone . There are several gentle
depressions and elevated parts at surface of the stone
deposit.The general elevation of the area is 276m
MSL. The general ground slope is towards east of
the area.
6 Project Proposal Maximum rate of production of 71351 T
7 Name of Mineral mined Crusher stone

4
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)

8 Rate of Production (in tons) Based on 300 working days, avg. production
per day is 237.8 T
9 Mineral Reserve in Tons The Geological reserve – 206492 T
Mineable reserve – 139716.2 T

Name and address of the company BARBARIK PROJECT LIMITED SURAJPUR


(Director. Shri Dhruv Kumar Agrawal)

10 Life of mine 2 years


11 Drilling/ Blasting Drilling is not required but jack hammer
drilling may be used for blasting purpose.
The blasting will be carried out by authorized
blasting contractor.
12 Mining method Opencast, semi mechanized method of
quarrying.
13 Ground water table Ground water table is at a depth of much
intersection below and the mining activities are confined
only up to a depth of 9m from top surface
during mining tenure. Hence there is no
chance of intersection of water table during the
mining activities.
14 Drainage pattern/ water Dendritic to Sub dendritic drainage pattern.
courses
15 Break-up of Land Utilization The Total area is 1.000Ha
Pattern This is private land
Area under excavation – 0.770Ha.
Area for soil dumping – 0.230 Ha. (along lease
boundary)
Plantation – 0.230 Ha. (along lease boundary)

16 Water requirement & Source As much as about 4 KLPD Water will be


required for quarrying operations including
dust suppression along haul road / mine
faces, cleaning, washing, drinking as well as
plantation.
17 Solid waste/Tailings Only about 5% waste materials will be
generated
18 IBM approval : Date Not applicable
19 Cost of project Cost of the project:
(Rs. Lakhs] About 20 lakhs/-
20 Any Other (specify) Not required.

5
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)

Mine office Village- Chhirralewa


Tehsil –Basna
Dist. – Mahasamund(C.G.)
Email --
Prospecting Agency Prospecting is not required as the near by pit
section depth more than 10m.
Type of Activity Opencast semi mechanized quarry
Utilities (Power, water Requirement) No. water, power required for quarry purpose.

Manpower Requirement Skilled Person - 1


Unskilled labour-15

2. IDENTIFICATION OF THE PROJECT / BACKGROUND INFORMATION


(i) Identification of Project and Project Proponent
Name of the Project:
Chhirralewa Crusher stone Quarry, Village – Chhirralewa, Taluka –Basna
and District-Mahasamund, Chhattisgarh- 493555.

Project Proponent

Collector, Raipur granted Crusher stone for quarry to BARBARIK


PROJECTLIMITED SURAJPUR (Prop.-Shri Dhruv Kumar Agrawal) Vill.
Chhirralewa Teh.-Basna Dist.-Mahasamund (Chhattisgarh).
As per Environment Impact Assessment (EIA) Notification ,2006,as amended
requires mining projects (new projects, expansion or modernization of
existing projects as also at the stage of renewal of quarry lease) all the
mining projects (new projects, expansion or modernization of existing
projects as also at the stage of renewal of mine lease), irrespective of the
mineral (major or minor ) to obtained prior environment clearance under the
provisions there of Mining projects with lease area up to 50 ha are
categorized as category „B‟.
Category „B‟ projects are considered by the respective State Level
Environment Impact Assessment Authority, notified by MoEF under the EIA
Notification, 2006.
Supreme Court of India in Special leave petition ( C ) dated 27 th February
2012 directs that “ leases of minor mineral including their renewal for an
area less than 25ha be granted by the states/UTs only after getting
environment clearance from the MoEF.

6
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)

Further Government of India, Ministry of Environment and Forest issued


guidelines dated 24th Dec 2013 and amendments are made regarding
categorization of „B‟ category projects as “B1” and “B2”.

(ii) Brief Description of Nature of the Project


This is a small mining project for exploiting stone. The method of quarrying
will be opencast manual by deploying equipments for excavation of stone
and loading for transportation.

(iii) Need for the Project and its importance to the country and or region

Stones have the great importance as building material. Bigger size stone as
blocks are used to fill the foundation of building while small pieces are
usually mixed with cement and other ingredients to create mortar for
building. As a building material, stones have good demand in the market.
Hence small scale mining of stone is a good source of earning of local
villagers for their lively hood.

(iv) Demand Supply Gap

The demand of stone is huge as after crushing in to small pieces it is the


main raw material for constructions. To fill up the demand, the stone mined
out from the mining lease area will be supplied in the open market in raw
form or after crushing it to different sizes.

(v) Demand Supply Analysis

In order to have the great demand for stone gitty the supply is limited. To
fulfill the demand of market the mined out Stones will be supplied in the
market.

(vi) Employment Generation (Direct and Indirect) Due to the Project

Unskilled 15 labors will be required for loading the mined out stones on
trucks etc and skilled 1people will be required for supervision purpose,
maintain the record of production and shipment etc.

7
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)

3. PROJECT DESCRIPTION
(i) Type of Project (including interlinked and interdependent project, if
any)

This project is a small mining project interlinked with crushing unit.

(ii) Location (map showing general location, specific location and project
boundary & project site-specific layout) with coordinates.

The stone quarry lease area is situated near village Mandir Hasaud in Tehsil-
Tilda, District - Raipur of Chhattisgarh. The area falls in survey of India
Toposheet No.64 K/15.

The detail of the area is as under:

District : Mahasamund

Tahsi : Basna

Village : Chhirralewa

Area (ha) : 1.000 Ha.

The coordinates of the area are:

BP Latitude Longitude

1 21°23'32.09"N 82°58'34.40"E

2 21°23'32.50"N 82°58'36.10"E

3 21°23'31.11"N 82°58'38.10"E

4 21°23'28.31"N 82°58'38.69"E

5 21°23'28.92"N 82°58'35.50"E
Location Map and Google Map showing coordinates of the lease area is
attached herewith.

8
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)

(iii) Details of alternate sites considered and the basis of selecting the
proposed site, particularly the environmental considerations gone into
should be highlighted.

No alternate site is considered as the quarry lease is a site specific activity. In


the present case, the collector has granted the mining lease to the owner for
the quarry of stone. As for as the environmental considerations are
concerned the area is away from the human habitation, in the Private land,
free from forest. This quarry activity does not affect the water table of the
area. Limited machinery will be required for mining of stone and limited
transport vehicles are needed for shipment of produced material.

(iv) Size or Magnitude of operation

The mining lease area is 1.000 Ha in which the working area is 0.770 ha and
the production of Crusher stone is about 237 tons per day that too with
blasting etc. Hence the size or magnitude of operation is very small.

(v) Project Description with Process details (a schematic diagram/ Flow


chart showing the project layout, components of the project etc. should
be given.
The Crusher stone mining will be carried out mainly by semi mechanized
with the use of mining equipments. Only limited drill holes with the help of
jack hammer will be required for limited blasting purpose in the mining
process. The mined out Crusher stone will be transported through trucks,
tippers etc.

(vi) Drilling
Drilling is not required for exploration purpose but for production of Crusher
stonejack hammer drill holes are required for blasting purpose to break the
rock.

(vii) Blasting:

In view of this small scale quarrying activity the blasting parameters will be
simple and use of explosive will also be less. Blasting will be done by
licensedcontractor.

9
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)

Type of explosives used / to be used


Not required to be mentioned as blasting will be done by the licensed
contractor.

Storage of explosive (like capacity and type of explosive magazine)


Blasting will be done by licensed contractor hence magazine is not required
in the quarry site.

(viii) Raw Material/ Consumables Required along with estimated quantity,


likely source, marketing area of final product, mode of transport of raw
material and finished product.
No any raw material/ consumables are required. The stone produced from
the mine will transported through trucks, tippers etc. to the end users.

(ix) Availability of water, its source, Energy/power requirement and source


should be given.
As much as about 4 KLPD Water will be required for mining operations
including dust suppression along haul road / mine faces, cleaning, washing,
drinking as well as plantation. Energy/power is not required as the mining
activities are carried out in day time only.

Quantity of wastes to be generated (liquid and solid) and scheme for


their management/ disposal

About 10 % sub grade materials will be generated. This sub grade material is
nothing but the crushed and breakage part of stone. Hence it is proposed to
stack this sub grade material in a suitable place.

Selection of Dumping Site:

The stacking of the sub grade material generated during mining is proposed
in the mine area itself at a suitable place.

SITE ANALYSIS
The area is about 100 km from District Mahasamund. Raigarh Railway
Station is about 70.0 km.

10
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)

(i) Land Form and Land Ownership

The land on which this quarry lease sanctioned is the Private land in Khasra
No. 97 covering an area of 1.000 Ha shown in the map.

(ii) Topography along with maps

The area is almost flat, which is covered by lateritic soil with scanty
vegetation. The maximum elevation is about 276m MSL.
Climatic data from Secondary Sources
Raipur district having dry climate except during the monsoon season. The
annual rainfall of the area is 1050-1080 mm. The maximum temperature
goes about 40° C and minimum 10° C during summer. The winter season is
cool and the humidity is 70% rest of the year the air is dry.

(iv) Social infrastructure available


There is no social infrastructure existing at / or in the near vicinity of 0.5
Km radius of the mining area.

5) PLANNING IN BRIEF

Planning Concept (type of industries, facilities, transportation etc) town


and country Planning / Development authority classification:

The stone mining activity has no other concept except mining and
transportation of mined out material to end-users after crushing the Crusher
stone to different sizes as per the demand.

(i) Population Projection:


Since there will be hardly any influx of people from outside in the region,
hence there will not by any impact on the population projection of the region
accept the normal increase in population.

11
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)

(ii) Land Use Planning

Area of stone mining is 1.000 Ha. The area under excavation will be only
0.ha while for stacking surface soil and for waste dump required area will be
0.230Ha. (Along lease boundary) and plantation the required area will be
0.230 ha. (Along lease boundary)
It is non forest; private land situated near the village Mandir Hasaud which
is a thinly populated village.

(iii) Assessment of Infrastructure Demand (Physical & Social):


Since there will not be any major influx of people from outside, in this
region because of the project, no adverse effect on physical and social
infrastructure like roads, electricity, water supplies etc. are anticipated.

6. PROPOSED INFRASTRUCTURE
(i) Industrial Area (Processing Area)
There is no proposal for any infrastructure development.

(ii) Residential

There is no plan for development of residential area in the region.

(iii) Green Belt


Dump slopes will be stabilized by planting saplings, grass and good root
bearing saplings such as local species. Retention wall will be made along the
dump to channelize the rainwater out of the dumping area.

Development of green belt along lease boundary will be completed by


planting about 622 trees in during this plan period.

(iv) Social Infrastructure


It is expected that the project will lead to much needed employment
opportunities in the villages which will contribute to the socio-economic
development of this area.

(v) Drinking Water Management (Source and Supply of Water)

The drinking water requirement for personnel working at the site will be met
from the nearby village/river.

12
Pre Feasibility Report of Mandir Hasaud Limestone Quarry, Area- 4.048 Hect, Village – Mandir Hasaud
Teshsil – Arang District – Raipur (C.G.)

(vi) Sewerage System


In view of the personals engaged in the project the movable type of sewerage
system may be installed /deployed nearby the mine area. This may avoid
polluting the land / water / air of the area.

(vii) Industrial Waste Management

No industrial waste will be generated hence management not required.

(viii) Power Requirement & Supply / Source.

Not required.

7. Rehabilitation and Resettlement (R & R) Plan

Not required as the area is away from village and free from habilitation.

8. Project Schedule and Cost Estimates

Total expenses estimated about 20 lakhs.

Recommendations
The quarrying of stone and allied activities has no impacts on the
surrounding environment. Moreover based on development of this project
certain positive impact will be there on the nearby village population in
terms of employment generation etc. Hence this project may be cleared and
clearances accorded.