Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
105 views

Elmeasure Transducer TR Programming Guide

This document provides instructions for programming and operating Elmeasure transducers. It describes the key features of Elmeasure transducers including isolated input/output signals, true RMS measurement, individual phase overload monitoring, and on-field configurable parameters. Programming instructions are provided for setting parameters such as wiring configuration, PT and CT ratios, analog output selection, and communication settings. The setup procedure involves entering the password to access programming mode and editing parameters using the up and down keys. Parameters can be cleared on some models by selecting clear mode. Auto scrolling of display values can also be enabled or disabled.

Uploaded by

Vinay Krishna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views

Elmeasure Transducer TR Programming Guide

This document provides instructions for programming and operating Elmeasure transducers. It describes the key features of Elmeasure transducers including isolated input/output signals, true RMS measurement, individual phase overload monitoring, and on-field configurable parameters. Programming instructions are provided for setting parameters such as wiring configuration, PT and CT ratios, analog output selection, and communication settings. The setup procedure involves entering the password to access programming mode and editing parameters using the up and down keys. Parameters can be cleared on some models by selecting clear mode. Auto scrolling of display values can also be enabled or disabled.

Uploaded by

Vinay Krishna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Toll Free: 1800 120 5048 User Manual

support@elmeasure.com

Elmeasure India Private Limited


Head office & Manufacturing Unit 1
Plot N0.: 47-P, KIADB Hardware Park,
Huvinayakanahalli, Bengaluru - 562 149,
Karnataka INDIA.
Transducer
Manufacturing Unit 2 TR 1110 | TR 1100 | TR 1200
Goutham Garden, No.4, Veerapandi, TR 2100 | TR 2200 | TR 4200
Coimbatore - 641019 Tamil Nadu, INDIA
TR 5200
www.elmeasure.com PG/TR/V1/0421 www.elmeasure.com

3.3 Clear Mode :


1. FEATURES Press UP key Display CLr.l. ‘n’ Options Option : (YES)/(NO)
can be changed by pressing ‘y’(for clearing )
Input signal is isolated from output signal by 2KV DOWN key. Display will ‘n’ (for not clearing)
prompt to ‘y’ or ‘n’ while
Monitor and displays A,V,Hz,W,VA,PF & VAr based on Models pressing DOWN key.
Din Rail Mounting Press UP key Displays xxxxxx
Quick response time of 300ms in display and communication to Clear (Clear Mode ends here)
Sets to protection mode during high voltage/current
Configurable single phase/ three phase input and output 3.4 Display
Ʊ Programming
Load resistence for current output is up to 500 Default Option/Range
Parameter
True RMS Measurement * StAr. (Star)/ dELt(Delta)/
Individual phase overload monitoring Wiring Connections (EL) 1.Ph(1phase)
Patented customised display PT Primary(P.P) 10 to 999kV
Compact device with dual output and Rs485
Override selection for desired value and range. PT Secondary(P.S) 50V to 550V
On field configurable Input and Output parameters CT Primary(C.P) 0.5A to 99kA
Universal auxiliary supply 60V-300V AC/DC (Optional: 15V-60V DC)
CT Secondary(C.S) 0.5A to 6A
** Arth(Arithmetic)/ VECt(vector)
2. KEY & DISPLAY INDICATION VA selection (VA) /VEC.H (Vector harmonics)
2400/4800/9600/19.20k
Baud rate (bA)
MINUS /38.40k
MEGA Parity (Pr) Odd/ no(none)/EVEn

Device Id (dU.) 1.000 to 247.0


Value Indication
Kilo Password (PW) 1000 to 9999
Communication
(VLL,VLN,F,A,Vry,
Selection Parameters P1 Vyb,Vbr,Vb,Vy,Vr,Ab,Ay,Ar,
Watts,PF,VA,VAR,Wb,Wy,
Wr,PFb,PFy,PFr,VAb,VAy
To view the parameters VAr,VARb,VARy,VARr,wh)
Upwards. Unipolar / Bipolar Un.PL / bi.PL
Selection Parameter 1
To view the parameters
Downwards. *** (VLL,VLN,F,A,Vry,
Selection Parameter P2 Vyb,Vbr,Vb,Vy,Vr,Ab,Ay,Ar,
Watts,PF,VA,VAR,Wb,Wy,
Wr,PFb,PFy,PFr,VAb,VAy
3. PROGRAMMING MODE VAr,VARb,VARy,VARr,wh)
*** Un.PL / bi.PL
3.1 Programming Keys Unipolar / Bipolar
Select / Edit & save Value To decrement value Selection Parameter 2
3.2 Setup Procedure 0 to 5 / 1 to 5 / 2 to 10 /
Analog o/p 1 selection
Press the & keys together to enter the setup, display shows 0000 with first digit 0 to 10 / 4 to 20 / 0 to 20
“0”blinking 0 to 5 / 1 to 5 / 2 to 10 /
***
Press key to decrement the first digit “9 - 1”. Analog o/p 2 selection 0 to 10 / 4 to 20 / 0 to 20
If any password is already set, use and key to set the correct password.(Default
password is '1000') Frequency Selection nor (Normal)/
Continue the same method for 2nd digit to 4th digit. dISt (Distortion)
After entering 4th digit password display shows "CLr.l" (Clear). (For TR5200 only)
Press key to clear the energy values. Refer Steps 3.3. (For TR5200 only) Save Yes/No
Press key to Setup/Configuration mode. Refer Step 3.4.
Note:
Press key to view the setup parameters and press UP key to edit. * Not applicable for TR1110 model
Press key to decrement values or to select from available options.
Press key to save the value / parameter. ** Not applicable for TR11100, TR1100, TR1200 models
Press key to edit next parameter till end of last parameter &Display screen will *** Not applicable for TR11100, TR1100, TR2100 models
prompt “ ” display reads (YES).
Press DOWN to change to “ ” (NO). 3.5 Enabling and Disabling Auto Scrolling
Press UP to save/accept.
Press Down key for 5 Secs. Display shows : Again press
(If the provided password is incorrect display shows “StAr.El” (Star Element). But not
possible to edit, then press the DOWN key continuously to come out. Again follow down key to disable. Display shows :
the same steps with correct password)
4. WIRING DIAGRAM 5. MECHANICAL SPECIFICATION
Dimension : 90 x 72 mm (Depth 67mm)
Mount : Dinrail
LOAD LINE
V1
V2 67
V3 72
N

A1 A2 A3 Note : Connection to terminals


to be made by using
S2 S1 S2 S1 S2 S1 copper wire of
V G A G
90
appropriate gauge. Refer table
Amps AWG mm2
A/O 1 RS 485 45
5 16 1.3
63 6 13.3
80 4 21.2

V1 V2 V3 N AUX
49
}
60-300V AC/DC
Optional: 15V-60V DC

6. TROUBLE SHOOTING

1) Meter display does not turn ON.


a) Check that there is power supply applied on AUX supply terminals.
b) Check fuse connection (Use fuse connection of specified ratings).
LOAD LINE 2) Data displayed / reading incorrect.
V1 a) Check that CT/PT ratios are properly set.
V2
V3 b) Check if proper configuration mode Star/Delta/1Phase is correctly set.
N
c) Check if proper frequency selection normal, distortion is selected properly.
A1 A2 A3
3) PT reading are incorrect / Active Power reading is negative.
a) CT connections may be reversed, check and correct CT connection.
S2 S1 S2 S1 S2 S1
V G A G b) Check Voltage and current phases are connected in proper sequence.

A/O 1 RS 485 4) RS485 communication does not work.


a) Check baud rate & parity maintained in the connected computers is same as
meter.
b) Memory mapping in software is correct.
V1 V2 V3 N AUX c) Check device ID of meter is unique & properly maintained.
d) Check converter is working properly.
}

60-300V AC/DC
Optional: 15V-60V DC

7. INFORMATION

Manufacturer assumes no responsibility for a hazard or damage caused by incorrect


or non-application of any of the instructions mentioned herein. ELMEASURE shall
LOAD LINE not be liable for any consequential or resulting injury or for loss, damage or expense
V1 directly or indirectly from the use of this product under any circumstances.
N ELMEASURE does not claim any responsibility for the damage caused by using the
product directly or indirectly as sufficient care has been taken to provide all
A1 A2 A3
information regarding the product. The user is advised to use according to the
S2 S1 S2 S1 S2 S1 operating instructions, professional practices, wiring rules, codes, safety
V G A G
regulations applicable to the given installation.
A/O 1 RS 485

V1 V2 V3 N AUX
8. CAUTION

During normal operation of this instrument, hazardous voltages are present at the
}

60-300V AC/DC rear terminals, which may cause injury or death. Installation, disconnection or
Optional: 15V-60V DC
removal of the meter should be carried out only by qualified, trained personnel,
after de-energizing connected circuit. The warranty will become void incase the seal
is broken, improper installation as well as improper grounding.

(Applicable only for TR1110 model)


LOAD LINE
V1

A1 A2 A3

S2 S1 S2 S1 S2 S1
V G A G

A/O 1 RS 485

V1 N AUX
}

60-300V AC/DC
Optional: 15V-60V DC

You might also like