The cost of building wind farms is currently at least $ 1 million for each megawatt of installed

capacity. - https://esfccompany.com/en/services/wind-farms/wind-farm-financial-model/

 Groundworks, construction of roads and foundations of a wind farm


 Building foundations and platforms for wind generators
 Wind turbine installation works Installation of electrical equipment for wind farms
 How much does it cost to build a wind power plant
 Wind farm construction: EPC contract

- https://esfccompany.com/en/services/wind-farms/wind-farm-construction-services/

Our wind farm construction services include the following steps:

 Construction of access roads and land clearing.


 Construction of main buildings and structures for the operation of the power plant.
 Pouring foundations, purchase, delivery and installation of wind generators.
 Installation of medium / low voltage lines, fiber optic communication, etc.
 Construction of an electrical substation for wind farms.
 Testing and commissioning.

ESFC's services include engineering, legal services, obtaining the necessary permits, carrying
out formal procedures, as well as carrying out construction and installation works and tests.

The company provides professional project management, as well as oversees investment


projects with the participation of leading industry experts.

Groundworks, construction of roads and foundations of a wind farm

Before starting excavation, it is important to examine the soil and evaluate the climatic and
topographic features of the construction area.

At the stage of excavation and foundation pouring, heavy equipment will be involved, which
requires the presence of appropriate access roads to the construction site.

Detailed geotechnical studies carried out at the site make it possible to accurately determine
the characteristics of the terrain and make a conclusion about the safety (feasibility) of further
work.

At the design stage, a rational layout of the facility is selected and the optimal location of
substations, roads, communication and power lines is developed
HOW ARE THEY AS AN INVESTMENT?

The wind system will usually recoup its investment through utility savings within 6-30
years and after that the electricity it produces will be virtually free. Compared to
purchasing utility power, a wind system can be a good investment because your money
goes to increasing the value of your home rather than just paying for a service. Many
people buy wind systems for their retirement because they are concerned about utility
rate increases.

You might also like