Given the necessary equipments, tools, materials, supplies and information the candidate
is expected to perform the following four projects.
A. Connect the peripherals provided (Monitor, system unit, keyboard ,Printer,UPS etc)
B. Startup the computer and create the following directory structure inside my
C.
documents
Access system information of one of the computers you are provided with and fill the
table below correctly
Table1. Basic System Information
4
System parameter
System manufacturer
Assessor’s Package for IT and Hard ware and net work servicing
System Description
1
5 System Model
6 System Type
7 Processor(S)
8 Bios version
2 Username IC Support
3 Password !QAZxsw2
Task 1. A client requested you to install l Microsoft Office 2007, but he/she
needs Only Microsoft office word 2007 and Microsoft offices OneNote 2007 are
to be installed.
Minimum OS requirement:
Assessor’s Package for IT and Hard ware and net work servicing 2
B. Install the software as requested by your client in one of the computers
provided
Suppose you are working in Ethio-life Hospital as an IT support service technician; today
you have received the following four support request forms (Form 1, Form 2, Form 3,
Form 4,) from departments of the hospital. In addition you received a call from W/t
Frehiwot from reception to fix the mouse that is not fast enough to work with and Ato
Demena came to your workshop and requested you to provide him a latest Dell computer.
Assessor’s Package for IT and Hard ware and net work servicing 3
For IT Support technician Only
Technician Name: __________
Identified problem Description: _____________________________ Response
_______________________________________________________ Time:______________
Task 1: Record the details of all the requests by preparing a request recording list (you
need to record all the details including their current status)
Task 2: prioritize and escalate the requests considering your working environment and
your roles and responsibilities.
Assessor’s Package for IT and Hard ware and net work servicing 4
Table 5. User Account Information
No User Name Privilege Password
1 IT Support Computer administrator #EDCvfr4
2 Admin1 Computer administrator -
3 New Guest Limited -
Task 2. Install an antivirus program provided and configure it to scan and update
automatically on weekly bases
Assessor’s Package for IT and Hard ware and net work servicing 5
LEVEL_II
Project Information
Given the necessary equipments, tools, materials, supplies and information the candidate
is expected to perform the following four projects.
Recommended Assessment place: Well equipped computer Lab with Internet
connection.
Total time allotted: 3:30
Project One: LAN Configuration (45 Minutes)
Task 1: Configure a simple Local Area Network (LAN) which consists of two computers
and a network printer using a Hub.
Note: you need to prepare appropriate cable for your network
Open internet browser (Internet Explorer, Firefox Mozilla ,Opera or any other)
Browse the Ethiopian government portal (www.ethiopia.gov.et), and make it a
default home page.
Browse and bookmark the website of the Ethiopian Reporter Newspaper and
Ethiopian Airlines.
Task 2: Using a known search engine find and download an audio and video driver for
the Lenovo ThinkPad Notebook (Family: T500) which has a windows Vista
Operating System installed.
Task 1: Disassemble the PC’s major components (Processor, RAM, Hard Disk, NIC (If
applicable), CD-Rom, and power and data cables)
Task 2: Demonstrate each hardware components function and reassemble the system
unit by installing all system components as required.
Task 3: Test the computers functionality to insure that all components and peripherals are
working correctly.
Task 4: Propose a computer specification for graphic design and multimedia work. The
Specification document that you are expected to produce may contain but are not
limited to the following information:
Processor type and speed,
Assessor’s Package for IT and Hard ware and net work servicing 6
Capacity of memory
CD-Rom type
Operating system installed
Hard disk capacity
(Hint: Take the specification of the computer that you are working as a reference.)
A Garment Company has 100 employees. The company would like to have a report that
contains the Name, Birthday, Salary and Gender of the employee based on their
education level (MA, BSC, Diploma and Certificate). Assume you are working in that
company’s IT Department and expected to design and develop a database according to
the requirement. The database expected to have the following features
Assessor’s Package for IT and Hard ware and net work servicing 7
Figure 2. Data Entry Form
Figure 3. Query
Figure 4. Report
Assessor’s Package for IT and Hard ware and net work servicing 8
LEVEL III
Project Information
Given the necessary materials and supplies the candidate is expected to perform the
following project:
Recommended Assessment place: Well equipped IT lab with server environment
Project Title: - Server Configuration and Administration
Assessor’s Package for IT and Hard ware and net work servicing 9
B For ADMINISTRATION group, Users (COCUser3 and COCUser4), Password
(user3 and user4) respectively.
3. Create user privileges to change their passwords at first login for Users COCUser3 and
COCUser4.
4. Set the Access limitation time for the FINANCE group users to access the network from
Monday to Friday from 8:00AM to 5:00PM only.
5. Add (join) the Client Computers to the Domain COC.local.
6. Turn on Windows Firewall for the Server Computer
Assessor’s Package for IT and Hard ware and net work servicing 10
LEVEL_IV
Project Information
Given the necessary materials and supplies the candidate is expected to perform the
following project:
Assessment place: Well equipped Training Centre
Project 1: - Design Network Infrastructure
Time allotted: 4:30 hrs
Task: - Given the following scenario, do according to the following
XYZ Company has four building in a compound that is in average distance of 75m
between them. Each building has two floors. Assume that in average there are 20
users per floor. The company also has a SOHO 1MB speed of internet connection
from the service provider. Here, it is expected that you should propose the cost
efficient and maximum throughput way of implementing this network.
The candidate should demonstrate the following by using Visio 2003 software
1. The physical and logical network diagram
2. The appropriate type of cable to be used
3. The appropriate cabling to be used for the network
4. The appropriate network devices required
Project 2: install and configure server 2008
Task1: installing server 2008 operating system
1. Install Windows Server 2008 Operating System on the Server Computer
2. Establish connections among the Server and the two Clients
3. Configure the Server as a DNS and Active Directory for the Server Computer using
the HRM .local as a domain name.
4. Configure server as DHCP with range of 192.168.1.2 to 192.168.1.4
Assessor’s Package for IT and Hard ware and net work servicing 11
9. print the shared document from the clients
Assessor’s Package for IT and Hard ware and net work servicing 12