Agile model advantage are__?

a. Little or no planning required


b. All of the answer options are correct
c. Functionality can be developed rapidly and demonstrated
d. Gives flexibility to developers Feedback

The correct answer is: All of the answer options are correct

Which model is also called as the classic life cycle or the Waterfall model?
a. Incremental Development
b. RAD Model
c. Linear Sequential Development
d. Iterative Development

The correct answer is: Linear Sequential Development

Which of these is not one of the phase names defined by the Unified Process model for software
development?
a. Validation phase
b. Construction phase
c. Elaboration phase
d. Inception phase Feedback

The correct answer is: Validation phase

Which term is best defined by the text? "A class should not force any client to implement an
interface that is irrelevant to them."
a. Open-Closed Principle
b. Dependency Inversion Principle
c. Interface Segregation Principle
d. Liskov Substitution Principle
e. Single-Responsibility Principle Feedback
The correct answer is: Interface Segregation Principle

Usually the Probability of defects in reusable software components is ______ and its impact on
the ongoing IT project is _______
a. low, insignificant
b. moderate, serious
c. low, catastrophic
d. high, tolerable

The correct answer is: moderate, serious

Consider the following Steps: (i) Waterfall Model (ii) Agile Model (iii) Scrum Model (iv)
Unified Process Model. Among them which model is use-case driven ?
a. iv
b. i. ii.
c. iii
d. iii. iv.

The correct answer is: iv

Which of the following is NOT an indicator of Risk for an IT Project?


a. Many requirements change requests from customers
b. Demands for higher-powered workstations
c. No report on technology problems from the developers
d. Good availability of IT Jobs in the socio-economic condition

The correct answer is: No report on technology problems from the developers

Usually Project Planning is _________ activity of project management.


a. least time-consuming
b. critical time-consuming
c. moderately time-consuming
d. most time-consuming

The correct answer is: most time-consuming

Which one is the not the properties of Software Prototype Model?


a. Building software application prototypes which displays the functionality of the product under
development
b. Enables to understand customer requirements at an early stage of development
c. Hold the exact logic of the original software
d. Becoming very marketable

The correct answer is: Hold the exact logic of the original software

Which are true about OCP, LSP and ISP?


a. OCP is about class design and feature extensions
b. ISP is about business logic to clients communication
c. LSP is about subtyping and inheritance
d. All of the options are true

The correct answer is: All of the options are true

Which of the following is NOT an indicator of Risk for an IT Project?


a. Good availability of IT Jobs in the socio-economic condition
b. Complaints about CASE tools
c. Lack of requirements change requests from customers
d. Organisational gossip

The correct answer is: Lack of requirements change requests from customers
Which phase of Prototype Model focuses on a representation of those aspects of software that
will be visible to end user?
a. Communication
b. Quick design
c. Deployment
d. Construction of Prototype
The correct answer is: Quick design

Who is originator of the term Single Responsibility Principle(SRP)?


a. Robert C. Martin
b. John Backus
c. Konrad Zuse
d. Dennis Ritchie

The correct answer is: Robert C. Martin

What does Liskov substitution principle specify?


a. Parent class cannot be substituted by child class
b. Child class can be substituted by parent class
c. Parent class can be substituted by child class
d. No classes can be replaced by each other

The correct answer is: Parent class can be substituted by child class

In dependency inversion principle _______ should not depend on details.


a. Details
b. Abstructions
c. Modules
d. None of them

The correct answer is: Abstructions

Which of these is not one of the phase names defined by the Unified Process model for software
development?
a. Construction phase
b. Inception phase
c. Validation phase
d. Elaboration phase

The correct answer is: Validation phase

High level and low level modules both should be dependent on _________
a. Classes
b. Interface
c. All of them
d. Abstractions
The correct answer is: Abstractions

The milestone document related to Requirements Specification is ______


a. Evaluation report
b. Architectural design
c. NONE of the answer options is true
d. User requirements

The correct answer is: NONE of the answer options is true

_______ is Probably the most time-consuming activity of project management.


a. Personnel selection and evaluation
b. Project Verification and Validation
c. Project monitoring and reviews
d. Project Planning

The correct answer is: Project Planning

Which of the following is not a Major type of project plan?


a. Monitoring plan
b. Maintenance plan
c. Quality plan
d. Validation plan

The correct answer is: Monitoring plan


2/11/22, 4:48 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:08 AM


State Finished
Completed on Friday, 11 February 2022, 10:48 AM
Time taken 40 mins 33 secs
Marks 18.00/20.00
Grade 9.00 out of 10.00 (90%)

Question 1
Correct

Mark 1.00 out of 1.00

Which of the following is not a Major Component of the Project Plan Structure?

a. Introduction
b. Project organisation
c. Resource monitoring and reporting
d. Work breakdown

The correct answer is: Resource monitoring and reporting

Correct
Marks for this submission: 1.00/1.00.

Question 2
Correct

Mark 1.00 out of 1.00

What is the primary way a Scrum Master keeps a Development Team working at its highestlevel of productivity?

a. By ensuring the meetings start and end at the proper time


b. By preventing changes to the backlogs once the Sprint begins
c. By facilitating Development Team decisions and removing impediments
d. By keeping high value features high in the Product Backlog

The correct answer is: By facilitating Development Team decisions and removing impediments

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2914&cmid=151 1/8
2/11/22, 4:48 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 1.00 out of 1.00

In Unified Process model construction phase uses the architectural model from the elaboration phase as input.

a. None of the answer options are correct


b. True
c. All of the answer options are correct
d. False

The correct answer is: True

Correct
Marks for this submission: 1.00/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

Which of the following is a Component of the Project Plan Structure?

a. Conclusion
b. Validation procedure
c. Work breakdown
d. Requirements analysis procedure

The correct answer is: Work breakdown

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 1.00 out of 1.00

Which of the following is NOT an indicator of Risk for an IT Project?

a. Good availability of IT Jobs in the socio-economic condition


b. Lack of requirements change requests from customers
c. Complaints about CASE tools
d. Organisational gossip

The correct answer is: Lack of requirements change requests from customers
Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2914&cmid=151 2/8
2/11/22, 4:48 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6

Correct

Mark 1.00 out of 1.00

Single Responsibility Principle (SRP) features are

a. Maintainability
b. All the answer options are OK
c. Flexibility and extensibility
d. Testability

The correct answer is: All the answer options are OK

Correct
Marks for this submission: 1.00/1.00.

Question 7
Correct

Mark 1.00 out of 1.00

Which one is the international standard of SDLC?

a. ISO/IEC 12209
b. ISO/IEC 12207
c. ISO/IEC 12206
d. ISO/IEC 12208

The correct answer is: ISO/IEC 12207

Correct
Marks for this submission: 1.00/1.00.

Question 8
Correct

Mark 1.00 out of 1.00

Which are true about OCP, LSP and ISP?

a. LSP is about subtyping and inheritance


b. ISP is about business logic to clients communication
c. OCP is about class design and feature extensions
d. All of the options are true

The correct answer is: All of the options are true


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2914&cmid=151 3/8
2/11/22, 4:48 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 9

Correct

Mark 0.67 out of 1.00

Client-specific interfaces are better than one general-purpose interface in____

a. Liskov Substitution Principle


b. Single-Responsibility Principle
c. Interface Segregation Principle
d. Open-Closed Principle
e. Dependency Inversion Principle

The correct answer is: Interface Segregation Principle

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 10
Correct

Mark 0.33 out of 1.00

Which of the following is not set out by the project plan?

a. A schedule for the work


b. The validation procedure
c. The work breakdown
d. The resources available to the project

The correct answer is: The validation procedure


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2914&cmid=151 4/8
2/11/22, 4:48 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 11

Correct

Mark 1.00 out of 1.00

Which Agile methodology advocates the use of problem domain?

a. Evo
b. Extreme programming (XP)
c. Feature-Driven Development (FDD.
d. Scrum

The correct answer is: Feature-Driven Development (FDD.

Correct
Marks for this submission: 1.00/1.00.

Question 12
Correct

Mark 1.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. moderately time-consuming
b. critical time-consuming
c. most time-consuming
d. least time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00.

Question 13
Correct

Mark 0.00 out of 1.00

Which of the following is a Component of the Project Plan Structure?

a. Introduction
b. Verification requirements
c. Schedule breakdown
d. Validation procedure

The correct answer is: Introduction


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2914&cmid=151 5/8
2/11/22, 4:48 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 14

Correct

Mark 1.00 out of 1.00

Which one true about SOLID principles?

a. Describe certain properties that a class should have


b. A class should have only one reason to change
c. SPR should have only one responsibility
d. All the answer options are OK

The correct answer is: All the answer options are OK

Correct
Marks for this submission: 1.00/1.00.

Question 15
Correct

Mark 1.00 out of 1.00

The RAD model focuses on _________

a. Pressure on the customer to sign off the requirements


b. High emphasis on requirement analysis and gathering before the coding starts
c. Iterative and incremental delivery of working models to the customer
d. Rigid process models

The correct answer is: Iterative and incremental delivery of working models to the customer

Correct
Marks for this submission: 1.00/1.00.

Question 16
Correct

Mark 1.00 out of 1.00

Who have edit permission product backlog?

a. Development Team
b. Product Owner
c. Scrum Master
d. Product Designer

The correct answer is: Product Owner


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2914&cmid=151 6/8
2/11/22, 4:48 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 17

Correct

Mark 1.00 out of 1.00

What will be the correct option of the following Java code snippet: interface ICust{} class RegularCustomer implements ICust{} class
OneTimeCustomer implements ICust{}

a. ICust can be replaced with RegularCustomer


b. OneTimeCustomer can be replaced with RegularCustomer
c. We can instantiate objects of ICust
d. RegularCustomer can be replaced with OneTimeCustomer

The correct answer is: ICust can be replaced with RegularCustomer


Correct
Marks for this submission: 1.00/1.00.

Question 18
Correct

Mark 1.00 out of 1.00

SOLID principle consists

a. Open Closed Principle (OCP)


b. Dependency – Inversion Principle (DIP)
c. Interface Segregation Principle (ISP)
d. All of the options are true
e. Liskov Substitute Principle (LSP)
f. Single Responsibility Principle (SRP)

The correct answer is: All of the options are true

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2914&cmid=151 7/8
2/11/22, 4:48 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 19

Correct

Mark 1.00 out of 1.00

Which model is most popular process model for the developer now a days?

a. RAD
b. Big Bang
c. Waterfall
d. Agile

The correct answer is: Agile

Correct
Marks for this submission: 1.00/1.00.

Question 20
Correct

Mark 1.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Validation plan
b. Quality plan
c. Maintenance plan
d. Monitoring plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2914&cmid=151 8/8
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2899&cm...

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:06 AM


State Finished
Completed on Friday, 11 February 2022, 10:56 AM
Time taken 50 mins 1 sec
Marks 13.00/20.00
Grade 6.50 out of 10.00 (65%)

Question 1

Correct

Mark 1.00 out of 1.00

How many phases of ASD in Agile Model?

a. 2
b. 4
c. 3
d. 5

The correct answer is: 3


Correct
Marks for this submission: 1.00/1.00.

Question 2

Correct

Mark 0.00 out of 1.00

In a typical IT project, the Probability that Computer-Aided Software Engineering (CASE) tools cannot be integrated is usually ______ and
its effects are _________

a. moderate, serious
b. low, catastrophic
c. low, insignificant
d. high, tolerable

The correct answer is: high, tolerable


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

1 of 9 2/11/2022, 2:57 AM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2899&cm...

Question 3

Correct

Mark 0.00 out of 1.00

The ___________ model is an SDLC model where we do not follow any specific process and the development just starts with the required
money and efforts.

a. Prototype
b. None of them
c. Big Bang
d. Waterfall

The correct answer is: Big Bang


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 4

Correct

Mark 0.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Validation plan
b. Quality plan
c. Monitoring plan
d. Maintenance plan

The correct answer is: Monitoring plan


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 5

Correct

Mark 1.00 out of 1.00

Which are true about OCP, LSP and ISP?

a. OCP is about class design and feature extensions


b. All of the options are true
c. LSP is about subtyping and inheritance
d. ISP is about business logic to clients communication

The correct answer is: All of the options are true


Correct
Marks for this submission: 1.00/1.00.

2 of 9 2/11/2022, 2:57 AM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2899&cm...

Question 6

Correct

Mark 1.00 out of 1.00

Why SOLID Principles are important in Software Development?

a. Makes the code more extendable,logical & easier


b. Makes the code more complicated
c. Increases dependencies in software development
d. Creates a complex system

The correct answer is: Makes the code more extendable,logical & easier
Correct
Marks for this submission: 1.00/1.00.

Question 7

Correct

Mark 1.00 out of 1.00

High level module should not depend on low level modules in_____

a. Dependency-Inversion Principle (DIP)


b. Liskov Substitution Principle (LSP)
c. Interface Segregation Principle (ISP)
d. Open Closed Principle (OCP)

The correct answer is: Dependency-Inversion Principle (DIP)


Correct
Marks for this submission: 1.00/1.00.

3 of 9 2/11/2022, 2:57 AM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2899&cm...

Question 8

Correct

Mark 0.00 out of 1.00

Who is bound to assessing the Project’s achievement?

a. The Scrum Master


b. The Product Owner
c. The Delivery Manager
d. The Development Team
e. The Scrum Team

The correct answer is: The Product Owner


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 9

Correct

Mark 1.00 out of 1.00

What dose "O" means in SOLID?

a. Open Close Principle


b. Open Open Principle
c. Open Correct Principle
d. Open Extend Principle

The correct answer is: Open Close Principle


Correct
Marks for this submission: 1.00/1.00.

4 of 9 2/11/2022, 2:57 AM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2899&cm...

Question 10

Correct

Mark 0.33 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. least time-consuming
b. moderately time-consuming
c. critical time-consuming
d. most time-consuming

The correct answer is: most time-consuming


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 11

Correct

Mark 0.67 out of 1.00

An individual who plans and directs the work.

a. Project manager
b. Programmer
c. Team leader
d. Stakeholder

The correct answer is: Project manager


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 12

Correct

Mark 0.67 out of 1.00

Which of the following is NOT an indicator of Risk for an IT Project?

a. Complaints about CASE tools


b. Organisational gossip
c. Good availability of IT Jobs in the socio-economic condition
d. Lack of requirements change requests from customers

The correct answer is: Lack of requirements change requests from customers
Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

5 of 9 2/11/2022, 2:57 AM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2899&cm...

Question 13

Correct

Mark 1.00 out of 1.00

SOLID principle consists

a. Liskov Substitute Principle (LSP)


b. Single Responsibility Principle (SRP)
c. Dependency – Inversion Principle (DIP)
d. Interface Segregation Principle (ISP)
e. All of the options are true
f. Open Closed Principle (OCP)

The correct answer is: All of the options are true


Correct
Marks for this submission: 1.00/1.00.

Question 14

Correct

Mark 1.00 out of 1.00

In the waterfall model, in what phase is the project team most likely to spend a lot of time?

a. Deployment Phase
b. Implementation Phase
c. Verification Phase
d. Requirements Phase

The correct answer is: Requirements Phase


Correct
Marks for this submission: 1.00/1.00.

6 of 9 2/11/2022, 2:57 AM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2899&cm...

Question 15

Correct

Mark 1.00 out of 1.00

Full form of OCP ______

a. Open Clone Principle


b. Open Cline Principle
c. Open Close Principle
d. Open Class Principle

The correct answer is: Open Close Principle


Correct
Marks for this submission: 1.00/1.00.

Question 16

Correct

Mark 1.00 out of 1.00

Open Closed Principle (OCP) states

a. Open for both extension and modification


b. Open for modification but closed for extension
c. All the options are true
d. An entity allow to be extended without modifying its source code

The correct answer is: An entity allow to be extended without modifying its source code
Correct
Marks for this submission: 1.00/1.00.

Question 17

Correct

Mark 0.33 out of 1.00

Which of the following is NOT an indicator of Risk for an IT Project?

a. No report on technology problems from the developers


b. Demands for higher-powered workstations
c. Good availability of IT Jobs in the socio-economic condition
d. Many requirements change requests from customers

The correct answer is: No report on technology problems from the developers
Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

7 of 9 2/11/2022, 2:57 AM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2899&cm...

Question 18

Correct

Mark 1.00 out of 1.00

Which of the following is not a Major type of Risk for IT projects?

a. Recruitment problems
b. Case tools' inefficiency
c. Organizational restructuring
d. Verification and validation problems

The correct answer is: Verification and validation problems


Correct
Marks for this submission: 1.00/1.00.

Question 19

Correct

Mark 0.33 out of 1.00

Typically the Probability that Customers fail to understand the impact of requirements changes is ________ and its impact on the ongoing
IT project is _________

a. moderate, insignificant
b. moderate, tolerable
c. high, tolerable
d. high, catastrophic

The correct answer is: moderate, tolerable


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 20

Correct

Mark 0.67 out of 1.00

Increment List Contain ________

a. Product Backlog
b. Sprint requirement complete list
c. Sprint requirement incomplete List
d. Sprint Backlog

The correct answer is: Sprint requirement complete list


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

8 of 9 2/11/2022, 2:57 AM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2899&cm...

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

9 of 9 2/11/2022, 2:57 AM
Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:06 AM


State Finished
Completed on Friday, 11 February 2022, 10:47 AM
Time taken 40 mins 31 secs
Marks 16.00/20.00
Grade 8.00 out of 10.00 (80%)

Question 1
Correct

Mark 1.00 out of 1.00

In which principle we can split the interface.

a. Liskov Substitution Principle


b. Open Closed Principle
c. Interface Segregation Principle
d. Single Responsibility Principle

The correct answer is: Interface Segregation Principle

Correct
Marks for this submission: 1.00/1.00.

Question 2
Correct

Mark 1.00 out of 1.00

Who is originator of the term Single Responsibility Principle(SRP)?

a. Konrad Zuse
b. Dennis Ritchie
c. Robert C. Martin
d. John Backus

The correct answer is: Robert C. Martin

Correct
Marks for this submission: 1.00/1.00.
Question 3

Correct

Mark 1.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. least time-consuming
b. most time-consuming
c. critical time-consuming
d. moderately time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

_________ is Probably the most time-consuming activity of project management.

a. Project monitoring and reviews


b. Personnel selection and evaluation
c. Project Verification and Validation
d. Project Planning

The correct answer is: Project Planning

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 0.67 out of 1.00

In dependency inversion principle _________ should not depend on details.

a. Abstructions
b. None of them
c. Modules
d. Details

The correct answer is: Abstructions


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.
Question 6

Correct

Mark 0.67 out of 1.00

The milestone document related to Requirements Specification is ________

a. NONE of the answer options is true


b. User requirements
c. Evaluation report
d. Architectural design

The correct answer is: NONE of the answer options is true

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 7
Correct

Mark 0.33 out of 1.00

In a typical IT project, the Probability that Computer-Aided Software Engineering (CASE) tools cannot be integrated is usually ______ and its
effects are _________

a. low, catastrophic
b. moderate, serious
c. high, tolerable
d. low, insignificant

The correct answer is: high, tolerable

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.
Question 8

Correct

Mark 0.67 out of 1.00

In the spiral model, at what phase do customers evaluate the project?

a. Planning Phase
b. Customer Feedback Phase
c. Risk Analysis Phase
d. Evaluation Phase

The correct answer is: Evaluation Phase

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 9
Correct

Mark 1.00 out of 1.00

The main reason behind the use of V-model in the medical development field is _______

a. Strictly a disciplined domain


b. Technology is not dynamic
c. Ambiguous or undefined requirements
d. The project is short

The correct answer is: Strictly a disciplined domain

Correct
Marks for this submission: 1.00/1.00.

Question 10
Correct

Mark 1.00 out of 1.00

Which of the following is a Component of the Project Plan Structure?

a. Work breakdown
b. Conclusion
c. Requirements analysis procedure
d. Validation procedure

The correct answer is: Work breakdown


Correct
Marks for this submission: 1.00/1.00.
Question 11

Correct

Mark 1.00 out of 1.00

SOLID stands for ________ basic principles of object oriented programming and design.

a. Three
b. Five
c. Four
d. Six

The correct answer is: Five

Correct
Marks for this submission: 1.00/1.00.

Question 12
Correct

Mark 1.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Maintenance plan
b. Validation plan
c. Monitoring plan
d. Quality plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00.

Question 13
Correct

Mark 1.00 out of 1.00

RAD model is mainly based on

a. incremental development
b. Sequential development
c. Agile development
d. Iterative development

The correct answer is: Iterative development


Correct
Marks for this submission: 1.00/1.00.
Question 14

Correct

Mark 0.67 out of 1.00

An individual who plans and directs the work.

a. Stakeholder
b. Project manager
c. Programmer
d. Team leader

The correct answer is: Project manager

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 15
Correct

Mark 1.00 out of 1.00

In the web development domain which software prototyping is used in the industry?

a. Extreme Prototyping
b. Incremental Prototyping
c. Evolutionary Prototyping
d. Throwaway/Rapid Prototyping

The correct answer is: Extreme Prototyping

Correct
Marks for this submission: 1.00/1.00.

Question 16
Correct

Mark 0.00 out of 1.00

Which two of the following are the goals of Transition phase?

a. Define quality attributes; Identifying critical risks


b. Refine the Risk Assessment; Create an executable architectural baseline
c. Establishing feasibility; Conduct a post project review
d. Correct defects; Provide user consultancy

The correct answer is: Correct defects; Provide user consultancy


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.
Question 17

Correct

Mark 1.00 out of 1.00

Phone call dial up or send SMS is an example of _________

a. Interface segregation principle


b. Single responsibility principle
c. Liskov Substitution Principle
d. Open Closed principle

The correct answer is: Single responsibility principle

Correct
Marks for this submission: 1.00/1.00.

Question 18
Correct

Mark 1.00 out of 1.00

Class design principle is used to be known as ________

a. SOLID
b. SRP
c. Abstraction
d. Modeling

The correct answer is: SOLID

Correct
Marks for this submission: 1.00/1.00.

Question 19
Correct

Mark 1.00 out of 1.00

Which one of the following models is not suitable for accommodating any change?

a. RAD Model
b. Waterfall Model
c. Build & Fix Model
d. Prototyping Model

The correct answer is: Waterfall Model


Correct
Marks for this submission: 1.00/1.00.
Question 20

Correct

Mark 0.00 out of 1.00

Which of the following is not a Valid type of project plan?

a. Quality plan
b. Staff development plan
c. Verification plan
d. Maintenance plan

The correct answer is: Verification plan

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►


2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:11 AM


State Finished
Completed on Friday, 11 February 2022, 11:00 AM
Time taken 48 mins 28 secs
Marks 14.00/20.00
Grade 7.00 out of 10.00 (70%)

Question 1
Correct

Mark 1.00 out of 1.00

Which of the following is not set out by the project plan?

a. The validation procedure


b. The work breakdown
c. The resources available to the project
d. A schedule for the work

The correct answer is: The validation procedure

Correct
Marks for this submission: 1.00/1.00.

Question 2
Correct

Mark 0.00 out of 1.00

Reorganizastion of teams with more joins and intersections could be a possible strategy to deal with _______

a. Recruitment problems
b. Underestimated development time
c. Organisational financial problems
d. Staff sickness

The correct answer is: Staff sickness

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2919&cmid=151 1/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 1.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. least time-consuming
b. critical time-consuming
c. moderately time-consuming
d. most time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

'Agility' means-

a. effective response to change.


b. All of them
c. effective communication.
d. emphasize an incremental delivery strategy.

The correct answer is: All of them

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 0.33 out of 1.00

The Module design is also referring as __________ in software development process.

a. System design
b. Low level design
c. All of them
d. High Level design

The correct answer is: Low level design


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2919&cmid=151 2/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6

Correct

Mark 1.00 out of 1.00

Which one isn’t true about Liskov Substitution Principle (LSP)?

a. Behavioral subtyping is a character of LSP


b. All the answer options are OK
c. LSP introduced by Barbara Liskov
d. Correctness is a character of LSP

The correct answer is: All the answer options are OK

Correct
Marks for this submission: 1.00/1.00.

Question 7
Correct

Mark 1.00 out of 1.00

Why we use SOLID principles?

a. To avoid bad design


b. Small changes result in bugs
c. For flexible coding
d. All of the options are true

The correct answer is: All of the options are true

Correct
Marks for this submission: 1.00/1.00.

Question 8
Correct

Mark 1.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Quality plan
b. Validation plan
c. Maintenance plan
d. Monitoring plan

The correct answer is: Monitoring plan


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2919&cmid=151 3/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 9

Correct

Mark 0.00 out of 1.00

Which of the following activities of a Generic Process framework provides a feedback report?

a. Deployment
b. Communication
c. Modeling & Construction
d. Planning

The correct answer is: Deployment

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 10
Correct

Mark 1.00 out of 1.00

_________ is Probably the most time-consuming activity of project management.

a. Project monitoring and reviews


b. Personnel selection and evaluation
c. Project Planning
d. Project Verification and Validation

The correct answer is: Project Planning

Correct
Marks for this submission: 1.00/1.00.

Question 11
Correct

Mark 0.33 out of 1.00

Which of the following is NOT an indicator of Risk for an IT Project?

a. Good availability of IT Jobs in the socio-economic condition


b. Lack of requirements change requests from customers
c. Complaints about CASE tools
d. Organisational gossip

The correct answer is: Lack of requirements change requests from customers
Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2919&cmid=151 4/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 12

Correct

Mark 1.00 out of 1.00

The component-based development model is______

a. Not able to support the development of reusable components.


b. Only appropriate for computer hardware design.
c. Not cost effective by known quantifiable software metrics.
d. Works best when object technologies are available for support.

The correct answer is: Works best when object technologies are available for support.

Correct
Marks for this submission: 1.00/1.00.

Question 13
Correct

Mark 1.00 out of 1.00

Which one is the international standard of SDLC?

a. ISO/IEC 12206
b. ISO/IEC 12207
c. ISO/IEC 12208
d. ISO/IEC 12209

The correct answer is: ISO/IEC 12207

Correct
Marks for this submission: 1.00/1.00.

Question 14
Correct

Mark 0.00 out of 1.00

Open Closed Principle (OCP) states

a. An entity allow to be extended without modifying its source code


b. All the options are true
c. Open for both extension and modification
d. Open for modification but closed for extension

The correct answer is: An entity allow to be extended without modifying its source code
Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2919&cmid=151 5/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 15

Correct

Mark 1.00 out of 1.00

Single Responsibility Principle (SRP) features are

a. All the answer options are OK


b. Maintainability
c. Flexibility and extensibility
d. Testability

The correct answer is: All the answer options are OK

Correct
Marks for this submission: 1.00/1.00.

Question 16
Correct

Mark 1.00 out of 1.00

Scrum model Consists how many Role?

a. Five
b. Seven
c. Nine
d. Three

The correct answer is: Three

Correct
Marks for this submission: 1.00/1.00.

Question 17
Correct

Mark 1.00 out of 1.00

In which principle software entities should be open for extension but closed for modification.

a. Liskov Substitution Principle


b. Interface Segregation Principle
c. Open Closed Principle
d. Single Responsibility Principle

The correct answer is: Open Closed Principle


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2919&cmid=151 6/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 18

Correct

Mark 0.67 out of 1.00

Which of the following is not a Major type of Risk for IT projects?

a. Under-estimation of product size, cost and time


b. Un-availability of Required Training for Staff
c. Sickness of Key Staff
d. Over-estimation of product size, cost and time

The correct answer is: Over-estimation of product size, cost and time

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 19
Correct

Mark 0.33 out of 1.00

What will be the correct option of the following Java code snippet: interface ICust{} class RegularCustomer implements ICust{} class
OneTimeCustomer implements ICust{}

a. OneTimeCustomer can be replaced with RegularCustomer


b. We can instantiate objects of ICust
c. RegularCustomer can be replaced with OneTimeCustomer
d. ICust can be replaced with RegularCustomer

The correct answer is: ICust can be replaced with RegularCustomer

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2919&cmid=151 7/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 20

Correct

Mark 0.33 out of 1.00

Which statement is true for Spiral Model?

a. Suitable for all projects having low-to-high risks


b. Small number of intermediate stages
c. All of options are true
d. Requirements may be complex and ambigous

The correct answer is: Requirements may be complex and ambigous

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2919&cmid=151 8/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:07 AM


State Finished
Completed on Friday, 11 February 2022, 10:56 AM
Time taken 48 mins 40 secs
Marks 16.33/20.00
Grade 8.17 out of 10.00 (82%)

Question 1
Correct

Mark 1.00 out of 1.00

Build & Fix Model is suitable for programming exercises of ___________ LOC (Line of Code).

a. 400-1000
b. 200-400
c. above 1000
d. 100-200

The correct answer is: 100-200

Correct
Marks for this submission: 1.00/1.00.

Question 2
Correct

Mark 1.00 out of 1.00

SOLID principle consists

a. Interface Segregation Principle (ISP)


b. Dependency – Inversion Principle (DIP)
c. Liskov Substitute Principle (LSP)
d. Single Responsibility Principle (SRP)
e. Open Closed Principle (OCP)
f. All of the options are true

The correct answer is: All of the options are true

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2912&cmid=151 1/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 0.33 out of 1.00

What are the disadvantages of SOILD principles?

a. SOLID leads to simple code


b. SOLID is a marketing Gimmick
c. SOLID principles are unambiguous
d. SOLID is too realistic

The correct answer is: SOLID is a marketing Gimmick

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

In the spiral model, at what phase do customers evaluate the project?

a. Risk Analysis Phase


b. Evaluation Phase
c. Planning Phase
d. Customer Feedback Phase

The correct answer is: Evaluation Phase

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 1.00 out of 1.00

The Software program that is outdated or obsolete is termed as

a. engineering application
b. legacy application
c. open source application
d. embedded application

The correct answer is: legacy application


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2912&cmid=151 2/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6

Correct

Mark 1.00 out of 1.00

Which one true about SOLID principles?

a. SPR should have only one responsibility


b. A class should have only one reason to change
c. Describe certain properties that a class should have
d. All the answer options are OK

The correct answer is: All the answer options are OK

Correct
Marks for this submission: 1.00/1.00.

Question 7
Correct

Mark 0.00 out of 1.00

Which state identifies the risk association of the project?

a. Requirement Analysis
b. Designing the product
c. Building the product
d. Defining requirement

The correct answer is: Requirement Analysis

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 8
Correct

Mark 1.00 out of 1.00

Software entities should be open for extension but closed for____?

a. ModifY
b. Development
c. Correction
d. Modification

The correct answer is: Modification


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2912&cmid=151 3/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 9

Correct

Mark 1.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Monitoring plan
b. Quality plan
c. Validation plan
d. Maintenance plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00.

Question 10
Correct

Mark 0.67 out of 1.00

The milestone document related to Prototype Development is ________

a. NONE of the answer options is true


b. Architectural design
c. System requirements
d. Evaluation report

The correct answer is: Evaluation report

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 11
Correct

Mark 1.00 out of 1.00

In RAD model at what phase the attributes of all data sets are identified and defined

a. Business modeling
b. Data modeling
c. Process modelling
d. Application generation

The correct answer is: Data modeling


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2912&cmid=151 4/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 12

Correct

Mark 1.00 out of 1.00

Which model is most popular process model for the developer now a days?

a. Agile
b. Big Bang
c. Waterfall
d. RAD

The correct answer is: Agile

Correct
Marks for this submission: 1.00/1.00.

Question 13
Correct

Mark 0.00 out of 1.00

Which of the following is not a Component of the Project Plan Structure?

a. Hardware and software resource requirements


b. Project organisation
c. Schedule breakdown
d. Introduction

The correct answer is: Schedule breakdown

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 14
Correct

Mark 0.33 out of 1.00

The milestone document related to Requirements Specification is ________

a. NONE of the answer options is true


b. User requirements
c. Evaluation report
d. Architectural design

The correct answer is: NONE of the answer options is true


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2912&cmid=151 5/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 15

Correct

Mark 1.00 out of 1.00

Consider the following Steps: (i) Interface Segregation Principle (ii) Open Closed Principle (iii) Dependency-Inversion Principle (iv)
Parsimonious Complexity Principle. Which of the following is not one of the four principles used to guide component-level design?

a. None of the answer options are correct


b. ii.
c. iv.
d. i.
e. iii.

The correct answer is: iv.

Correct
Marks for this submission: 1.00/1.00.

Question 16
Correct

Mark 1.00 out of 1.00

Which of the following is not a Major Component of the Project Plan Structure?

a. Resource monitoring and reporting


b. Introduction
c. Work breakdown
d. Project organisation

The correct answer is: Resource monitoring and reporting


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2912&cmid=151 6/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 17

Correct

Mark 1.00 out of 1.00

Methodology in which project management processes were step-by step.

a. Incremental
b. Prototyping
c. Spiral
d. Waterfall

The correct answer is: Waterfall

Correct
Marks for this submission: 1.00/1.00.

Question 18
Correct

Mark 1.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. critical time-consuming
b. moderately time-consuming
c. least time-consuming
d. most time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2912&cmid=151 7/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 19

Correct

Mark 1.00 out of 1.00

Typically the Probability that Customers fail to understand the impact of requirements changes is ________ and its impact on the ongoing IT
project is _________

a. moderate, tolerable
b. moderate, insignificant
c. high, tolerable
d. high, catastrophic

The correct answer is: moderate, tolerable


Correct
Marks for this submission: 1.00/1.00.

Question 20
Correct

Mark 1.00 out of 1.00

In which principle we can split the interface.

a. Liskov Substitution Principle


b. Interface Segregation Principle
c. Open Closed Principle
d. Single Responsibility Principle

The correct answer is: Interface Segregation Principle

Correct
Marks for this submission: 1.00/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2912&cmid=151 8/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:06 AM


State Finished
Completed on Friday, 11 February 2022, 10:56 AM
Time taken 50 mins
Marks 14.67/20.00
Grade 7.33 out of 10.00 (73%)

Question 1
Correct

Mark 1.00 out of 1.00

A well design agile process may ______ the cost of change curve.

a. Flatten.
b. make uneven
c. roughen.
d. All of them.

The correct answer is: Flatten.

Correct
Marks for this submission: 1.00/1.00.

Question 2
Correct

Mark 0.33 out of 1.00

Scrum framework develop in _________

a. Early 2000
b. Early 1995
c. Early 1985
d. Early 1990

The correct answer is: Early 1990

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2900&cmid=151#question-2912-8 1/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 0.67 out of 1.00

Open Closed Principle (OCP) states

a. Open for both extension and modification


b. An entity allow to be extended without modifying its source code
c. All the options are true
d. Open for modification but closed for extension

The correct answer is: An entity allow to be extended without modifying its source code

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

RAD model is mainly based on

a. incremental development
b. Agile development
c. Iterative development
d. Sequential development

The correct answer is: Iterative development

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 1.00 out of 1.00

SOLID stands for ________ basic principles of object oriented programming and design.

a. Three
b. Six
c. Five
d. Four

The correct answer is: Five


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2900&cmid=151#question-2912-8 2/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6

Correct

Mark 0.67 out of 1.00

Which process model is applicable to only large and bulky software development projects.

a. Spiral Model
b. Iterative Model
c. V Model
d. Waterfall Model

The correct answer is: Iterative Model

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 7
Correct

Mark 0.33 out of 1.00

Which of the following is not a Major type of project plan?

a. Maintenance plan
b. Monitoring plan
c. Validation plan
d. Quality plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 8
Correct

Mark 1.00 out of 1.00

Usually the Probability of defects in reusable software components is ________ and its impact on the ongoing IT project is _________

a. low, insignificant
b. moderate, serious
c. high, tolerable
d. low, catastrophic

The correct answer is: moderate, serious


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2900&cmid=151#question-2912-8 3/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 9

Correct

Mark 0.00 out of 1.00

Reorganizastion of teams with more joins and intersections could be a possible strategy to deal with _______

a. Underestimated development time


b. Recruitment problems
c. Organisational financial problems
d. Staff sickness

The correct answer is: Staff sickness

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 10
Correct

Mark 1.00 out of 1.00

In dependency inversion principle _________ should not depend on details.

a. Abstructions
b. Modules
c. None of them
d. Details

The correct answer is: Abstructions

Correct
Marks for this submission: 1.00/1.00.

Question 11
Correct

Mark 1.00 out of 1.00

In which principle software entities should be open for extension but closed for modification.

a. Open Closed Principle


b. Interface Segregation Principle
c. Liskov Substitution Principle
d. Single Responsibility Principle

The correct answer is: Open Closed Principle


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2900&cmid=151#question-2912-8 4/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 12

Correct

Mark 1.00 out of 1.00

Which of the following is not set out by the project plan?

a. The work breakdown


b. A schedule for the work
c. The validation procedure
d. The resources available to the project

The correct answer is: The validation procedure

Correct
Marks for this submission: 1.00/1.00.

Question 13
Not answered

Mark 0.00 out of 1.00

Which option is true for prototyping model?

a. Follows an evolutionary and iterative approach.


b. Work flow is in a linear fashion.
c. Iterative in nature; focuses on an operational product with each increment.
d. The activities may be linear, incremental or evolutionary.

The correct answer is: Follows an evolutionary and iterative approach.

Question 14
Correct

Mark 1.00 out of 1.00

High level and low level modules both should be dependent on ___________

a. Abstractions
b. Classes
c. All of them
d. Interface

The correct answer is: Abstractions


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2900&cmid=151#question-2912-8 5/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 15

Correct

Mark 1.00 out of 1.00

Which of the following is a Component of the Project Plan Structure?

a. Requirements analysis procedure


b. Work breakdown
c. Validation procedure
d. Conclusion

The correct answer is: Work breakdown

Correct
Marks for this submission: 1.00/1.00.

Question 16
Correct

Mark 1.00 out of 1.00

In Scrum model Sprint Review events means?

a. Work that to be performed in a Sprint


b. Inspection
c. A time box with in which a releasable
d. An opportunity for the scrum

The correct answer is: Inspection

Correct
Marks for this submission: 1.00/1.00.

Question 17
Correct

Mark 1.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. moderately time-consuming
b. critical time-consuming
c. least time-consuming
d. most time-consuming

The correct answer is: most time-consuming


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2900&cmid=151#question-2912-8 6/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 18

Correct

Mark 1.00 out of 1.00

'Agility' means-

a. effective response to change.


b. effective communication.
c. emphasize an incremental delivery strategy.
d. All of them

The correct answer is: All of them

Correct
Marks for this submission: 1.00/1.00.

Question 19
Correct

Mark 0.00 out of 1.00

By following the SOLID principles a programmer will create a system that is easy to _________ and extend over time.

a. Create
b. Maintain
c. Code
d. Design

The correct answer is: Maintain

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 20
Correct

Mark 0.67 out of 1.00

In a typical IT project, the Probability that the cost and size of the software are under-estimated is usually ______ and its impact is _________

a. low, catastrophic
b. moderate, serious
c. low, insignificant
d. high, tolerable

The correct answer is: high, tolerable


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2900&cmid=151#question-2912-8 7/8
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2900&cmid=151#question-2912-8 8/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:07 AM


State Finished
Completed on Friday, 11 February 2022, 10:44 AM
Time taken 36 mins 51 secs
Marks 12.00/20.00
Grade 6.00 out of 10.00 (60%)

Question 1
Correct

Mark 0.67 out of 1.00

Scrum framework develop in _________

a. Early 1990
b. Early 1995
c. Early 1985
d. Early 2000

The correct answer is: Early 1990

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 2
Correct

Mark 0.00 out of 1.00

Product Owner Is?

a. Company
b. None of options are true
c. Particular Person
d. Community People

The correct answer is: Community People

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2909&cmid=151 1/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 0.67 out of 1.00

In a typical IT project, the Probability that the cost and size of the software are under-estimated is usually ______ and its impact is _________

a. low, catastrophic
b. low, insignificant
c. high, tolerable
d. moderate, serious

The correct answer is: high, tolerable

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Monitoring plan
b. Quality plan
c. Maintenance plan
d. Validation plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 1.00 out of 1.00

Which model has a higher emphasis on Risk Analysis?

a. Waterfall Model
b. Spiral Model
c. Increment Model
d. V-model

The correct answer is: Spiral Model


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2909&cmid=151 2/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6

Correct

Mark 1.00 out of 1.00

Which are true about OCP, LSP and ISP?

a. OCP is about class design and feature extensions


b. All of the options are true
c. ISP is about business logic to clients communication
d. LSP is about subtyping and inheritance

The correct answer is: All of the options are true

Correct
Marks for this submission: 1.00/1.00.

Question 7
Correct

Mark 0.00 out of 1.00

Which one of the following is the drawback of Iterative and Incremental SDLC Model?

a. Testing and debugging during smaller iteration is difficult.


b. High amounts of risk and uncertainty.
c. Development is hard to be measured.
d. Additional Management care is required.

The correct answer is: Additional Management care is required.

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2909&cmid=151 3/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 8

Correct

Mark 0.67 out of 1.00

Which statement is not explain waterfall model

a. Management is easy resultant model have rigidity functionality. Each phase has specific region of working, deliverables and review
process.
b. Very well understood the requirements for smaller projects.
c. Functional additional capability to enhance the product performance at any phase
d. Phases are processed and completed one at a time

The correct answer is: Functional additional capability to enhance the product performance at any phase

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 9
Correct

Mark 0.00 out of 1.00

Reorganizastion of teams with more joins and intersections could be a possible strategy to deal with _______

a. Organisational financial problems


b. Underestimated development time
c. Recruitment problems
d. Staff sickness

The correct answer is: Staff sickness


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2909&cmid=151 4/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 10

Correct

Mark 1.00 out of 1.00

Usually the Probability of defects in reusable software components is ________ and its impact on the ongoing IT project is _________

a. moderate, serious
b. low, insignificant
c. high, tolerable
d. low, catastrophic

The correct answer is: moderate, serious

Correct
Marks for this submission: 1.00/1.00.

Question 11
Correct

Mark 0.33 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. critical time-consuming
b. least time-consuming
c. moderately time-consuming
d. most time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 12
Correct

Mark 0.67 out of 1.00

What does Liskov substitution principle specify?

a. Child class can be substituted by parent class


b. Parent class cannot be substituted by child class
c. Parent class can be substituted by child class
d. No classes can be replaced by each other

The correct answer is: Parent class can be substituted by child class
Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2909&cmid=151 5/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 13

Correct

Mark 1.00 out of 1.00

The milestone document related to Requirements Specification is ________

a. Architectural design
b. Evaluation report
c. User requirements
d. NONE of the answer options is true

The correct answer is: NONE of the answer options is true

Correct
Marks for this submission: 1.00/1.00.

Question 14
Correct

Mark 1.00 out of 1.00

How many phases of ASD in Agile Model?

a. 5
b. 2
c. 4
d. 3

The correct answer is: 3

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2909&cmid=151 6/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 15

Correct

Mark 1.00 out of 1.00

Which term is best defined by the text? "A class should not force any client to implement an interface that is irrelevant to them."

a. Interface Segregation Principle


b. Open-Closed Principle
c. Single-Responsibility Principle
d. Dependency Inversion Principle
e. Liskov Substitution Principle

The correct answer is: Interface Segregation Principle

Correct
Marks for this submission: 1.00/1.00.

Question 16
Correct

Mark 0.00 out of 1.00

Why SOLID Principles are important in Software Development?

a. Increases dependencies in software development


b. Creates a complex system
c. Makes the code more extendable,logical & easier
d. Makes the code more complicated

The correct answer is: Makes the code more extendable,logical & easier
Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2909&cmid=151 7/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 17

Correct

Mark 0.67 out of 1.00

Which of the following is not set out by the project plan?

a. The work breakdown


b. The resources available to the project
c. A schedule for the work
d. The validation procedure

The correct answer is: The validation procedure

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 18
Correct

Mark 0.00 out of 1.00

Which model an extension of the waterfall model and is based on the association of a testing phase for each corresponding development
stage?

a. Agile Model
b. V Model
c. Spiral Model
d. Prototype Model

The correct answer is: V Model

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2909&cmid=151 8/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 19

Correct

Mark 0.33 out of 1.00

Consider the following Steps: (i) Interface Segregation Principle (ii) Open Closed Principle (iii) Dependency-Inversion Principle (iv)
Parsimonious Complexity Principle. Which of the following is not one of the four principles used to guide component-level design?

a. None of the answer options are correct


b. iii.
c. ii.
d. i.
e. iv.

The correct answer is: iv.

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 20
Correct

Mark 1.00 out of 1.00

Software entities should be open for extension but closed for____?

a. Correction
b. Development
c. Modification
d. ModifY

The correct answer is: Modification


Correct
Marks for this submission: 1.00/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2909&cmid=151 9/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:08 AM


State Finished
Completed on Friday, 11 February 2022, 10:55 AM
Time taken 46 mins 47 secs
Marks 17.33/20.00
Grade 8.67 out of 10.00 (87%)

Question 1
Correct

Mark 1.00 out of 1.00

Agile model is the combination of ____ and ____ process models.

a. Spiral and Incremental


b. Waterfall and Incremental
c. Iterative and Incremental
d. Big Bang and Incremental

The correct answer is: Iterative and Incremental

Correct
Marks for this submission: 1.00/1.00.

Question 2
Correct

Mark 1.00 out of 1.00

Agile model advantage are__?

a. Gives flexibility to developers


b. Functionality can be developed rapidly and demonstrated
c. Little or no planning required
d. All of the answer options are correct

The correct answer is: All of the answer options are correct

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2916&cmid=151 1/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 1.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Validation plan
b. Maintenance plan
c. Monitoring plan
d. Quality plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

Which of the following is a Component of the Project Plan Structure?

a. Schedule breakdown
b. Verification requirements
c. Introduction
d. Validation procedure

The correct answer is: Introduction

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 1.00 out of 1.00

Class design principle is used to be known as ________

a. SRP
b. Abstraction
c. SOLID
d. Modeling

The correct answer is: SOLID


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2916&cmid=151 2/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6

Correct

Mark 1.00 out of 1.00

Which of the following is a Component of the Project Plan Structure?

a. Work breakdown
b. Validation procedure
c. Requirements analysis procedure
d. Conclusion

The correct answer is: Work breakdown

Correct
Marks for this submission: 1.00/1.00.

Question 7
Correct

Mark 1.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. most time-consuming
b. least time-consuming
c. critical time-consuming
d. moderately time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00.

Question 8
Correct

Mark 0.33 out of 1.00

RAD projects have _ teams comprising developers & other resources

a. Separate
b. Large
c. All options are ok
d. Small

The correct answer is: Small


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2916&cmid=151 3/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 9

Correct

Mark 1.00 out of 1.00

Which model an extension of the waterfall model and is based on the association of a testing phase for each corresponding development
stage?

a. Spiral Model
b. V Model
c. Prototype Model
d. Agile Model

The correct answer is: V Model


Correct
Marks for this submission: 1.00/1.00.

Question 10
Correct

Mark 1.00 out of 1.00

Phone call dial up or send SMS is an example of _________

a. Interface segregation principle


b. Single responsibility principle
c. Liskov Substitution Principle
d. Open Closed principle

The correct answer is: Single responsibility principle

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2916&cmid=151 4/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 11

Correct

Mark 1.00 out of 1.00

Which one is the first or preliminary form of Evolutionary Process Model?

a. Spiral Model
b. Discontinuous Model
c. Waterfall Model
d. Prototyping Model

The correct answer is: Prototyping Model

Correct
Marks for this submission: 1.00/1.00.

Question 12
Correct

Mark 1.00 out of 1.00

Which of the following is not a Major Management Activity?

a. Proposal writing
b. Project Validation
c. Personnel selection and evaluation
d. Project costing

The correct answer is: Project Validation

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2916&cmid=151 5/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 13

Correct

Mark 0.00 out of 1.00

Which term is best defined by the text? "A class should not force any client to implement an interface that is irrelevant to them."

a. Dependency Inversion Principle


b. Open-Closed Principle
c. Interface Segregation Principle
d. Single-Responsibility Principle
e. Liskov Substitution Principle

The correct answer is: Interface Segregation Principle

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 14
Correct

Mark 1.00 out of 1.00

_________ is Probably the most time-consuming activity of project management.

a. Project monitoring and reviews


b. Project Verification and Validation
c. Project Planning
d. Personnel selection and evaluation

The correct answer is: Project Planning


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2916&cmid=151 6/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 15

Correct

Mark 1.00 out of 1.00

Open Closed Principle (OCP) states

a. All the options are true


b. Open for both extension and modification
c. Open for modification but closed for extension
d. An entity allow to be extended without modifying its source code

The correct answer is: An entity allow to be extended without modifying its source code

Correct
Marks for this submission: 1.00/1.00.

Question 16
Correct

Mark 1.00 out of 1.00

Compared to RAD, the changes in software in traditional SDLC is

a. None of the options are ok


b. Frequent
c. Rigid
d. Easy

The correct answer is: Rigid

Correct
Marks for this submission: 1.00/1.00.

Question 17
Correct

Mark 0.67 out of 1.00

In RAD model at what phase the attributes of all data sets are identified and defined

a. Data modeling
b. Business modeling
c. Process modelling
d. Application generation

The correct answer is: Data modeling


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2916&cmid=151 7/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 18

Correct

Mark 0.33 out of 1.00

Which of the following are benefits of using Single Responsibility Principle ?

a. Difficult for other developers to understand the class or function


b. Software entities are open for extension
c. Reduced coupling & understandable codes
d. Difficult for other developers to change the class or function

The correct answer is: Reduced coupling & understandable codes

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 19
Correct

Mark 1.00 out of 1.00

SOLID principle consists

a. All of the options are true


b. Liskov Substitute Principle (LSP)
c. Open Closed Principle (OCP)
d. Dependency – Inversion Principle (DIP)
e. Interface Segregation Principle (ISP)
f. Single Responsibility Principle (SRP)

The correct answer is: All of the options are true

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2916&cmid=151 8/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 20

Correct

Mark 1.00 out of 1.00

Which of the following is not a Component of the Project Plan Structure?

a. Schedule breakdown
b. Project organisation
c. Introduction
d. Hardware and software resource requirements

The correct answer is: Schedule breakdown

Correct
Marks for this submission: 1.00/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2916&cmid=151 9/9
2/11/22, 5:01 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 4:06 PM


State Finished
Completed on Friday, 11 February 2022, 4:56 PM
Time taken 49 mins 59 secs
Marks 14.67/20.00
Grade 7.33 out of 10.00 (73%)

Question 1
Incorrect

Mark 0.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Monitoring plan
b. Maintenance plan
c. Quality plan
d. Validation plan 

The correct answer is: Monitoring plan

Incorrect
Marks for this submission: 0.00/1.00.

Question 2
Correct

Mark 1.00 out of 1.00

Method that focuses primarily on people and their interactions when working on a project rather than on processes and tools is____

a. Dynamic Systems Development Method


b. Scrum Method
c. Feature Driven Development Method
d. Unified Process Method
e. Crystal Method

The correct answer is: Crystal Method


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2896&cmid=151 1/9
2/11/22, 5:01 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 1.00 out of 1.00

Phone call dial up or send SMS is an example of _________

a. Liskov Substitution Principle


b. Single responsibility principle
c. Interface segregation principle
d. Open Closed principle

The correct answer is: Single responsibility principle

Correct
Marks for this submission: 1.00/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

Which one is the most popular Agile model framework?

a. Extreme Programming
b. Unified Rational Process
c. Kanban
d. Scrum

The correct answer is: Scrum

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 0.67 out of 1.00

We call Prescriptive Process Model 'prescriptive' because they prescribe a set of process_______.

a. Single framework activity


b. Design framework activity
c. Launch framework activity
d. Element framework activities

The correct answer is: Element framework activities


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2896&cmid=151 2/9
2/11/22, 5:01 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6

Correct

Mark 0.33 out of 1.00

Which of the following is NOT an indicator of Risk for an IT Project?

a. Organisational gossip
b. Complaints about CASE tools
c. Good availability of IT Jobs in the socio-economic condition
d. Lack of requirements change requests from customers

The correct answer is: Lack of requirements change requests from customers

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 7
Correct

Mark 1.00 out of 1.00

Which of the following activities of a Generic Process framework provides a feedback report?

a. Planning
b. Deployment
c. Modeling & Construction
d. Communication

The correct answer is: Deployment

Correct
Marks for this submission: 1.00/1.00.

Question 8
Correct

Mark 0.67 out of 1.00

Which of the following is not a Major type of Risk for IT projects?

a. Case tools' inefficiency


b. Recruitment problems
c. Verification and validation problems
d. Organizational restructuring

The correct answer is: Verification and validation problems


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2896&cmid=151 3/9
2/11/22, 5:01 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 9

Correct

Mark 1.00 out of 1.00

Open Closed Principle (OCP) states

a. Open for both extension and modification


b. Open for modification but closed for extension
c. An entity allow to be extended without modifying its source code
d. All the options are true

The correct answer is: An entity allow to be extended without modifying its source code

Correct
Marks for this submission: 1.00/1.00.

Question 10
Incorrect

Mark 0.00 out of 1.00

Who is bound to assessing the Project’s achievement?

a. The Scrum Master


b. The Development Team
c. The Product Owner
d. The Scrum Team 
e. The Delivery Manager

The correct answer is: The Product Owner


Incorrect
Marks for this submission: 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2896&cmid=151 4/9
2/11/22, 5:01 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 11

Correct

Mark 1.00 out of 1.00

Which of the following is not a Component of the Project Plan Structure?

a. Schedule breakdown
b. Hardware and software resource requirements
c. Introduction
d. Project organisation

The correct answer is: Schedule breakdown

Correct
Marks for this submission: 1.00/1.00.

Question 12
Correct

Mark 0.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. most time-consuming
b. least time-consuming
c. moderately time-consuming
d. critical time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 13
Correct

Mark 1.00 out of 1.00

High level and low level modules both should be dependent on ___________

a. Classes
b. Abstractions
c. All of them
d. Interface

The correct answer is: Abstractions


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2896&cmid=151 5/9
2/11/22, 5:01 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 14

Correct

Mark 1.00 out of 1.00

What will be the correct option of the following Java code snippet: interface ICust{} class RegularCustomer implements ICust{} class
OneTimeCustomer implements ICust{}

a. RegularCustomer can be replaced with OneTimeCustomer


b. ICust can be replaced with RegularCustomer
c. OneTimeCustomer can be replaced with RegularCustomer
d. We can instantiate objects of ICust

The correct answer is: ICust can be replaced with RegularCustomer


Correct
Marks for this submission: 1.00/1.00.

Question 15
Correct

Mark 1.00 out of 1.00

Which of the following is not unique characteristics of Software Projects?

a. Often the software project is one-time project


b. The end product is not tangible
c. Many aspects of the software development process is not standardized
d. It usually requires diverse risk managgement strategies

The correct answer is: It usually requires diverse risk managgement strategies

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2896&cmid=151 6/9
2/11/22, 5:01 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 16

Correct

Mark 1.00 out of 1.00

In the web development domain which software prototyping is used in the industry?

a. Incremental Prototyping
b. Evolutionary Prototyping
c. Throwaway/Rapid Prototyping
d. Extreme Prototyping

The correct answer is: Extreme Prototyping

Correct
Marks for this submission: 1.00/1.00.

Question 17
Correct

Mark 0.00 out of 1.00

Which one true about SOLID principles?

a. SPR should have only one responsibility


b. A class should have only one reason to change
c. Describe certain properties that a class should have
d. All the answer options are OK

The correct answer is: All the answer options are OK

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2896&cmid=151 7/9
2/11/22, 5:01 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 18

Correct

Mark 1.00 out of 1.00

Typically the Probability that Customers fail to understand the impact of requirements changes is ________ and its impact on the ongoing IT
project is _________

a. moderate, insignificant
b. high, tolerable
c. high, catastrophic
d. moderate, tolerable

The correct answer is: moderate, tolerable


Correct
Marks for this submission: 1.00/1.00.

Question 19
Correct

Mark 1.00 out of 1.00

In the spiral model ‘Risk Analysis’ is performed __

a. in the third loop


b. in the first loop
c. in every loop
d. none of these

The correct answer is: in every loop

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2896&cmid=151 8/9
2/11/22, 5:01 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 20

Correct

Mark 1.00 out of 1.00

In dependency inversion principle _________ should not depend on details.

a. Abstructions
b. Modules
c. None of them
d. Details

The correct answer is: Abstructions

Correct
Marks for this submission: 1.00/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2896&cmid=151 9/9
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:06 AM


State Finished
Completed on Friday, 11 February 2022, 10:56 AM
Time taken 49 mins 40 secs
Marks 13.33/20.00
Grade 6.67 out of 10.00 (67%)

Question 1 High level module should not depend on low level modules in_____
Correct

Mark 1.00 out of a. Liskov Substitution Principle (LSP)


1.00
b. Dependency-Inversion Principle (DIP) 
c. Open Closed Principle (OCP)
d. Interface Segregation Principle (ISP)

The correct answer is: Dependency-Inversion Principle (DIP)

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2907&cmid=151 1/11
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 2 What dose "O" means in SOLID?


Correct

Mark 1.00 out of a. Open Correct Principle


1.00
b. Open Open Principle
c. Open Close Principle
d. Open Extend Principle

The correct answer is: Open Close Principle


Correct
Marks for this submission: 1.00/1.00.

Question 3 Which of these is not one of the phase names defined by the Unified Process model for software development?
Correct

Mark 1.00 out of a. Elaboration phase


1.00
b. Inception phase
c. Construction phase
d. Validation phase

The correct answer is: Validation phase

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2907&cmid=151 2/11
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 4 _________ is Probably the most time-consuming activity of project management.


Correct

Mark 0.67 out of a. Project Verification and Validation


1.00
b. Project Planning
c. Project monitoring and reviews
d. Personnel selection and evaluation

The correct answer is: Project Planning


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 5 _________ is an established guideline to develop any software.


Correct

Mark 0.67 out of a. Process Model


1.00
b. Waterfall Model
c. Architecture
d. Agile

The correct answer is: Process Model

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2907&cmid=151 3/11
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6 Which term is best defined by the text? "A class should not force any client to implement an interface that is irrelevant to
Correct them."
Mark 0.00 out of
1.00
a. Open-Closed Principle
b. Single-Responsibility Principle
c. Dependency Inversion Principle
d. Liskov Substitution Principle
e. Interface Segregation Principle

The correct answer is: Interface Segregation Principle


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 7 Which of the following is not a Component of the Project Plan Structure?
Correct

Mark 0.33 out of a. Project organisation


1.00
b. Schedule breakdown
c. Hardware and software resource requirements
d. Introduction

The correct answer is: Schedule breakdown

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2907&cmid=151 4/11
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 8 Which one true about SOLID principles?


Correct

Mark 1.00 out of a. Describe certain properties that a class should have
1.00
b. SPR should have only one responsibility
c. A class should have only one reason to change
d. All the answer options are OK

The correct answer is: All the answer options are OK


Correct
Marks for this submission: 1.00/1.00.

Question 9 Which of the following is not a Major type of project plan?


Correct

Mark 1.00 out of a. Validation plan


1.00
b. Monitoring plan
c. Quality plan
d. Maintenance plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2907&cmid=151 5/11
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 10 Who is bound to assessing the Project’s achievement?


Correct

Mark 1.00 out of a. The Development Team


1.00
b. The Product Owner
c. The Delivery Manager
d. The Scrum Team
e. The Scrum Master

The correct answer is: The Product Owner

Correct
Marks for this submission: 1.00/1.00.

Question 11 Usually Project Planning is ___________ activity of project management.


Correct

Mark 1.00 out of a. least time-consuming


1.00
b. most time-consuming
c. critical time-consuming
d. moderately time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2907&cmid=151 6/11
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 12 Which statement best describes the Sprint Review?


Correct

Mark 0.33 out of a. It is when the Scrum Team and stakeholders inspect the outcome of the Sprint and figure out what to do in 
1.00
the upcoming Sprint
b. It is used to congratulate the Development Team if it did what it committed to doing,or to punish the
Development Team if it failed to meet its commitments
c. It is a demo at the end of the Sprint for everyone in the organization to providefeedback on the work done
d. It is a review of the team's activities during the Sprint

The correct answer is: It is when the Scrum Team and stakeholders inspect the outcome of the Sprint and figure out what
to do in the upcoming Sprint

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 13 Agile Software Development is based on_________________?


Correct

Mark 0.67 out of a. Iterative Development


1.00
b. Linear Development
c. Incremental and Iterative Development
d. Incremental Development

The correct answer is: Incremental and Iterative Development

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2907&cmid=151 7/11
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 14 The milestone document related to Prototype Development is ________


Correct

Mark 0.00 out of a. NONE of the answer options is true


1.00
b. Architectural design
c. System requirements
d. Evaluation report

The correct answer is: Evaluation report


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 15 Which of the following is not a Major Management Activity?


Correct

Mark 0.00 out of a. Proposal writing


1.00
b. Personnel selection and evaluation
c. Project costing
d. Project Validation

The correct answer is: Project Validation

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2907&cmid=151 8/11
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 16 The ___________ model is an SDLC model where we do not follow any specific process and the development just starts with
Correct the required money and efforts.
Mark 0.67 out of
1.00
a. Waterfall
b. Big Bang
c. Prototype
d. None of them

The correct answer is: Big Bang

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 17 Which of the following are benefits of using Single Responsibility Principle ?
Correct

Mark 1.00 out of a. Difficult for other developers to understand the class or function
1.00
b. Difficult for other developers to change the class or function
c. Software entities are open for extension
d. Reduced coupling & understandable codes

The correct answer is: Reduced coupling & understandable codes


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2907&cmid=151 9/11
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 18 In dependency inversion principle _________ should not depend on details.


Correct

Mark 1.00 out of a. Details


1.00
b. None of them
c. Modules
d. Abstructions

The correct answer is: Abstructions


Correct
Marks for this submission: 1.00/1.00.

Question 19 Usually the Probability of defects in reusable software components is ________ and its impact on the ongoing IT project is
Correct _________
Mark 0.00 out of
1.00
a. moderate, serious
b. low, insignificant
c. high, tolerable
d. low, catastrophic

The correct answer is: moderate, serious


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2907&cmid=151 10/11
2/11/22, 4:57 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 20 The linear sequential model of software development is also known as the
Correct

Mark 1.00 out of a. Spiral model


1.00
b. Build & Fix Model
c. Incremental Model
d. Classical life cycle model

The correct answer is: Classical life cycle model


Correct
Marks for this submission: 1.00/1.00.

Practice MCQ Test (10 Questions, 20


◄ Announcements Jump to...
minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2907&cmid=151 11/11
2/11/22, 4:54 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:07 AM


State Finished
Completed on Friday, 11 February 2022, 10:54 AM
Time taken 46 mins 26 secs
Marks 12.00/20.00
Grade 6.00 out of 10.00 (60%)

Question 1
Correct

Mark 1.00 out of 1.00

The main reason behind the use of V-model in the medical development field is _______

a. Technology is not dynamic


b. Ambiguous or undefined requirements
c. The project is short
d. Strictly a disciplined domain

The correct answer is: Strictly a disciplined domain

Correct
Marks for this submission: 1.00/1.00.

Question 2
Correct

Mark 1.00 out of 1.00

What dose "O" means in SOLID?

a. Open Close Principle


b. Open Correct Principle
c. Open Open Principle
d. Open Extend Principle

The correct answer is: Open Close Principle

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2911&cmid=151 1/9
2/11/22, 4:54 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 0.33 out of 1.00

Investigation on buying-in components could be a possible strategy to deal with _______

a. Risk management
b. Requirements changes
c. Recruitment problems
d. Staff illness

The correct answer is: Recruitment problems

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 4
Correct

Mark 0.67 out of 1.00

In a typical IT project, the Probability that Computer-Aided Software Engineering (CASE) tools cannot be integrated is usually ______ and its
effects are _________

a. low, insignificant
b. low, catastrophic
c. moderate, serious
d. high, tolerable

The correct answer is: high, tolerable

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2911&cmid=151 2/9
2/11/22, 4:54 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 5

Correct

Mark 1.00 out of 1.00

The milestone document related to Requirements Specification is ________

a. User requirements
b. Architectural design
c. NONE of the answer options is true
d. Evaluation report

The correct answer is: NONE of the answer options is true

Correct
Marks for this submission: 1.00/1.00.

Question 6
Correct

Mark 0.00 out of 1.00

Open Closed Principle (OCP) states

a. All the options are true


b. Open for modification but closed for extension
c. An entity allow to be extended without modifying its source code
d. Open for both extension and modification

The correct answer is: An entity allow to be extended without modifying its source code

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2911&cmid=151 3/9
2/11/22, 4:54 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 7

Correct

Mark 0.67 out of 1.00

Method that focuses primarily on people and their interactions when working on a project rather than on processes and tools is____

a. Crystal Method
b. Dynamic Systems Development Method
c. Feature Driven Development Method
d. Unified Process Method
e. Scrum Method

The correct answer is: Crystal Method

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 8
Correct

Mark 0.00 out of 1.00

Which one is not exist among the people on an agile team __________

a. competence
b. inclination
c. common focus
d. collaboration

The correct answer is: inclination


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2911&cmid=151 4/9
2/11/22, 4:54 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 9

Correct

Mark 0.00 out of 1.00

Phone call dial up or send SMS is an example of _________

a. Interface segregation principle


b. Liskov Substitution Principle
c. Single responsibility principle
d. Open Closed principle

The correct answer is: Single responsibility principle

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 10
Correct

Mark 1.00 out of 1.00

What does Liskov substitution principle specify?

a. Parent class cannot be substituted by child class


b. No classes can be replaced by each other
c. Child class can be substituted by parent class
d. Parent class can be substituted by child class

The correct answer is: Parent class can be substituted by child class

Correct
Marks for this submission: 1.00/1.00.

Question 11
Correct

Mark 0.67 out of 1.00

Which principle allows high level module should not depend on low-level modules.

a. Open closed principle


b. Liskov Substitution Principle
c. Single Responsibility Principle
d. Dependency Inversion Principle

The correct answer is: Dependency Inversion Principle


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2911&cmid=151 5/9
2/11/22, 4:54 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 12

Correct

Mark 0.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. critical time-consuming
b. most time-consuming
c. moderately time-consuming
d. least time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 13
Correct

Mark 0.67 out of 1.00

Which of the following is not a Major type of project plan?

a. Validation plan
b. Maintenance plan
c. Monitoring plan
d. Quality plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 14
Correct

Mark 0.33 out of 1.00

Why the transfer of technology to new team members may be quite challenging in Agile method?

a. Lack of documentation
b. Suitable for dynamic changing
c. Depends heavily on customer interaction
d. Adaptive model

The correct answer is: Lack of documentation


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2911&cmid=151 6/9
2/11/22, 4:54 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 15

Correct

Mark 0.33 out of 1.00

How long does each iteration typically last for Agile Model?

a. About two to three weeks


b. About one to three weeks
c. About one to Four weeks
d. About two to six weeks

The correct answer is: About one to three weeks

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 16
Correct

Mark 1.00 out of 1.00

In dependency inversion principle _________ should not depend on details.

a. Abstructions
b. Details
c. Modules
d. None of them

The correct answer is: Abstructions

Correct
Marks for this submission: 1.00/1.00.

Question 17
Correct

Mark 0.67 out of 1.00

Which of the following is not unique characteristics of Software Projects?

a. It usually requires diverse risk managgement strategies


b. The end product is not tangible
c. Often the software project is one-time project
d. Many aspects of the software development process is not standardized

The correct answer is: It usually requires diverse risk managgement strategies
Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2911&cmid=151 7/9
2/11/22, 4:54 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 18

Correct

Mark 0.67 out of 1.00

In RAD model, which one of the following is true in term of prototyping?

a. Porotypes developed are reusable


b. No prototyping required
c. Prototype is developed for once only
d. Prototypes developed are not reusable

The correct answer is: Porotypes developed are reusable

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 19
Correct

Mark 1.00 out of 1.00

Which one is the international standard of SDLC?

a. ISO/IEC 12208
b. ISO/IEC 12209
c. ISO/IEC 12207
d. ISO/IEC 12206

The correct answer is: ISO/IEC 12207

Correct
Marks for this submission: 1.00/1.00.

Question 20
Correct

Mark 1.00 out of 1.00

Which of the following is not a Component of the Project Plan Structure?

a. Project organisation
b. Introduction
c. Schedule breakdown
d. Hardware and software resource requirements

The correct answer is: Schedule breakdown


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2911&cmid=151 8/9
2/11/22, 4:54 PM MCSE583-----Quiz #1 on ISM: Attempt review

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2911&cmid=151 9/9
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:09 AM


State Finished
Completed on Friday, 11 February 2022, 10:59 AM
Time taken 49 mins 21 secs
Marks 13.67/20.00
Grade 6.83 out of 10.00 (68%)

Question 1
Correct

Mark 0.00 out of 1.00

In which principle software entities should be open for extension but closed for modification.

a. Single Responsibility Principle


b. Liskov Substitution Principle
c. Interface Segregation Principle
d. Open Closed Principle

The correct answer is: Open Closed Principle

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 2
Correct

Mark 0.00 out of 1.00

Which statement is true for Spiral Model?

a. All of options are true


b. Small number of intermediate stages
c. Suitable for all projects having low-to-high risks
d. Requirements may be complex and ambigous

The correct answer is: Requirements may be complex and ambigous

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2918&cmid=151 1/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 1.00 out of 1.00

Which of the following is not set out by the project plan?

a. The resources available to the project


b. The validation procedure
c. The work breakdown
d. A schedule for the work

The correct answer is: The validation procedure

Correct
Marks for this submission: 1.00/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

By following the SOLID principles a programmer will create a system that is easy to _________ and extend over time.

a. Create
b. Code
c. Design
d. Maintain

The correct answer is: Maintain

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 1.00 out of 1.00

Which of the following is a Component of the Project Plan Structure?

a. Conclusion
b. Work breakdown
c. Validation procedure
d. Requirements analysis procedure

The correct answer is: Work breakdown


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2918&cmid=151 2/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6

Correct

Mark 0.00 out of 1.00

The output of development phase will be input of which phase in waterfall model?

a. Testing
b. Implementation
c. Maintenance
d. Design

The correct answer is: Testing

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 7
Correct

Mark 1.00 out of 1.00

What are the advantages of maintaining consistent iteration (timebox) lengths throughout the project?

a. They provide a consistent means of measuring team velocity


b. They help to establish a consistent pattern of delivery
c. All the options are true
d. They help the team to objectively measure progress

The correct answer is: All the options are true

Correct
Marks for this submission: 1.00/1.00.

Question 8
Correct

Mark 1.00 out of 1.00

What is the advantage of the Agile Model?

a. Easy to transfer of technology to new team members


b. Gives flexibility to developers
c. Depends less on customer interaction
d. Very low individual dependency

The correct answer is: Gives flexibility to developers


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2918&cmid=151 3/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 9

Correct

Mark 1.00 out of 1.00

Which of the following is not a Major type of Risk for IT projects?

a. Case tools' inefficiency


b. Recruitment problems
c. Verification and validation problems
d. Organizational restructuring

The correct answer is: Verification and validation problems

Correct
Marks for this submission: 1.00/1.00.

Question 10
Correct

Mark 1.00 out of 1.00

Component-base development model consists of process steps____

a. Available component-based products are researched and evaluated for the application domain in question
b. All the options are true
c. Comprehensive testing is conducted to ensure proper functionality
d. A software architecture is designed to accommodate the components

The correct answer is: All the options are true

Correct
Marks for this submission: 1.00/1.00.

Question 11
Correct

Mark 0.67 out of 1.00

Which of the following are incorrect needs for Component Based Software Development?

a. Less reliable components


b. All of the answer options are correct
c. More extensible system
d. More changeable system

The correct answer is: Less reliable components


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2918&cmid=151 4/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 12

Correct

Mark 0.00 out of 1.00

The milestone document related to Prototype Development is ________

a. Evaluation report
b. System requirements
c. Architectural design
d. NONE of the answer options is true

The correct answer is: Evaluation report

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 13
Correct

Mark 0.33 out of 1.00

Typically the Probability that Customers fail to understand the impact of requirements changes is ________ and its impact on the ongoing IT
project is _________

a. moderate, insignificant
b. high, tolerable
c. moderate, tolerable
d. high, catastrophic

The correct answer is: moderate, tolerable

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2918&cmid=151 5/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 14

Correct

Mark 1.00 out of 1.00

Which principle allows high level module should not depend on low-level modules.

a. Open closed principle


b. Dependency Inversion Principle
c. Liskov Substitution Principle
d. Single Responsibility Principle

The correct answer is: Dependency Inversion Principle

Correct
Marks for this submission: 1.00/1.00.

Question 15
Correct

Mark 0.00 out of 1.00

Consider the following Steps: (i) Interface Segregation Principle (ii) Open Closed Principle (iii) Dependency-Inversion Principle (iv)
Parsimonious Complexity Principle. Which of the following is not one of the four principles used to guide component-level design?

a. ii.
b. i.
c. iii.
d. None of the answer options are correct
e. iv.

The correct answer is: iv.


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2918&cmid=151 6/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 16

Correct

Mark 0.67 out of 1.00

In which principle we can split the interface.

a. Liskov Substitution Principle


b. Single Responsibility Principle
c. Interface Segregation Principle
d. Open Closed Principle

The correct answer is: Interface Segregation Principle

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 17
Correct

Mark 1.00 out of 1.00

Dependency-Inversion Principle follows _______

a. High-level module should depend on low-level modules. Both should depend on abstractions
b. Details should depend on abstractions.
c. Abstractions should be depend on details. Details should depend on abstractions
d. Abstractions should not depend on details. Details should depend on abstractions

The correct answer is: Abstractions should not depend on details. Details should depend on abstractions

Correct
Marks for this submission: 1.00/1.00.

Question 18
Correct

Mark 1.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Quality plan
b. Validation plan
c. Maintenance plan
d. Monitoring plan

The correct answer is: Monitoring plan


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2918&cmid=151 7/8
2/11/22, 5:00 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 19

Correct

Mark 1.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. moderately time-consuming
b. least time-consuming
c. most time-consuming
d. critical time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00.

Question 20
Correct

Mark 1.00 out of 1.00

Which term is best defined by the text? "A class should not force any client to implement an interface that is irrelevant to them."

a. Single-Responsibility Principle
b. Dependency Inversion Principle
c. Liskov Substitution Principle
d. Interface Segregation Principle
e. Open-Closed Principle

The correct answer is: Interface Segregation Principle


Correct
Marks for this submission: 1.00/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2918&cmid=151 8/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:09 AM


State Finished
Completed on Friday, 11 February 2022, 10:58 AM
Time taken 48 mins 27 secs
Marks 15.33/20.00
Grade 7.67 out of 10.00 (77%)

Question 1
Correct

Mark 1.00 out of 1.00

Prototyping Model is used when the requirements are_________

a. well understood.
b. well understood by upper management.
c. not well understood.
d. well understood and risks are high.

The correct answer is: not well understood.

Correct
Marks for this submission: 1.00/1.00.

Question 2
Correct

Mark 0.33 out of 1.00

Which of the following are benefits of using Single Responsibility Principle ?

a. Difficult for other developers to change the class or function


b. Difficult for other developers to understand the class or function
c. Software entities are open for extension
d. Reduced coupling & understandable codes

The correct answer is: Reduced coupling & understandable codes

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 1/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 1.00 out of 1.00

Which Agile methodology advocates the use of problem domain?

a. Feature-Driven Development (FDD.


b. Extreme programming (XP)
c. Evo
d. Scrum

The correct answer is: Feature-Driven Development (FDD.

Correct
Marks for this submission: 1.00/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. critical time-consuming
b. most time-consuming
c. least time-consuming
d. moderately time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 1.00 out of 1.00

For every iteration which step are not involve in agile SDLC model?

a. Integration Testing
b. Unit and Acceptance Testing
c. Planning and Requirements Analysis
d. Design and Coding

The correct answer is: Integration Testing


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 2/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6

Correct

Mark 0.67 out of 1.00

Which of the following is NOT an indicator of Risk for an IT Project?

a. Lack of requirements change requests from customers


b. Organisational gossip
c. Complaints about CASE tools
d. Good availability of IT Jobs in the socio-economic condition

The correct answer is: Lack of requirements change requests from customers

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 7
Correct

Mark 0.67 out of 1.00

The intention principles applied together programmer will create a system _________

a. Not Easy to Maintain and Extend Over Time


b. Easy to Maintain and Not Extend Over Time
c. Not Easy to Maintain and Not Extend Over Time
d. Easy to Maintain and Extend Over Time

The correct answer is: Easy to Maintain and Extend Over Time

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 8
Correct

Mark 1.00 out of 1.00

Which of the following is not a Major Management Activity?

a. Project monitoring and reviews


b. Report writing and presentations
c. Project planning and scheduling
d. Project Verification and Validation

The correct answer is: Project Verification and Validation


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 3/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 9

Correct

Mark 1.00 out of 1.00

Why SOLID Principles are important in Software Development?

a. Increases dependencies in software development


b. Makes the code more complicated
c. Makes the code more extendable,logical & easier
d. Creates a complex system

The correct answer is: Makes the code more extendable,logical & easier

Correct
Marks for this submission: 1.00/1.00.

Question 10
Correct

Mark 0.67 out of 1.00

Which of the following is not a Major type of project plan?

a. Quality plan
b. Monitoring plan
c. Maintenance plan
d. Validation plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 11
Correct

Mark 1.00 out of 1.00

Why we use SOLID principles?

a. For flexible coding


b. To avoid bad design
c. Small changes result in bugs
d. All of the options are true

The correct answer is: All of the options are true


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 4/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 12

Correct

Mark 1.00 out of 1.00

High level and low level modules both should be dependent on ___________

a. Classes
b. All of them
c. Interface
d. Abstractions

The correct answer is: Abstractions

Correct
Marks for this submission: 1.00/1.00.

Question 13
Correct

Mark 1.00 out of 1.00

The milestone document related to Requirements Analysis is ________

a. System requirements
b. Architectural design
c. Evaluation report
d. NONE of the answer options is true

The correct answer is: NONE of the answer options is true

Correct
Marks for this submission: 1.00/1.00.

Question 14
Correct

Mark 0.00 out of 1.00

By following the SOLID principles a programmer will create a system that is easy to _________ and extend over time.

a. Design
b. Code
c. Create
d. Maintain

The correct answer is: Maintain


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 5/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 15

Correct

Mark 0.33 out of 1.00

The milestone document related to Prototype Development is ________

a. NONE of the answer options is true


b. Architectural design
c. System requirements
d. Evaluation report

The correct answer is: Evaluation report

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 16
Correct

Mark 0.00 out of 1.00

In the waterfall model, in what phase is the project team most likely to spend a lot of time?

a. Implementation Phase
b. Deployment Phase
c. Requirements Phase
d. Verification Phase

The correct answer is: Requirements Phase

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 17
Correct

Mark 1.00 out of 1.00

'Agility' means-

a. effective response to change.


b. emphasize an incremental delivery strategy.
c. All of them
d. effective communication.

The correct answer is: All of them


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 6/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 18

Correct

Mark 0.67 out of 1.00

Which of the following is not set out by the project plan?

a. The validation procedure


b. A schedule for the work
c. The resources available to the project
d. The work breakdown

The correct answer is: The validation procedure

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 19
Correct

Mark 1.00 out of 1.00

Who is originator of the term Single Responsibility Principle(SRP)?

a. Konrad Zuse
b. Dennis Ritchie
c. Robert C. Martin
d. John Backus

The correct answer is: Robert C. Martin

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 7/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 20

Correct

Mark 1.00 out of 1.00

______________ does not always hold the exact logic used in the actual software application and is an extra effort to be considered under effort
estimation.

a. Prototype
b. Agile
c. RAD
d. Waterfall

The correct answer is: Prototype


Correct
Marks for this submission: 1.00/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 8/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:09 AM


State Finished
Completed on Friday, 11 February 2022, 10:58 AM
Time taken 48 mins 27 secs
Marks 15.33/20.00
Grade 7.67 out of 10.00 (77%)

Question 1
Correct

Mark 1.00 out of 1.00

Prototyping Model is used when the requirements are_________

a. well understood.
b. well understood by upper management.
c. not well understood.
d. well understood and risks are high.

The correct answer is: not well understood.

Correct
Marks for this submission: 1.00/1.00.

Question 2
Correct

Mark 0.33 out of 1.00

Which of the following are benefits of using Single Responsibility Principle ?

a. Difficult for other developers to change the class or function


b. Difficult for other developers to understand the class or function
c. Software entities are open for extension
d. Reduced coupling & understandable codes

The correct answer is: Reduced coupling & understandable codes

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 1/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 1.00 out of 1.00

Which Agile methodology advocates the use of problem domain?

a. Feature-Driven Development (FDD.


b. Extreme programming (XP)
c. Evo
d. Scrum

The correct answer is: Feature-Driven Development (FDD.

Correct
Marks for this submission: 1.00/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. critical time-consuming
b. most time-consuming
c. least time-consuming
d. moderately time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 1.00 out of 1.00

For every iteration which step are not involve in agile SDLC model?

a. Integration Testing
b. Unit and Acceptance Testing
c. Planning and Requirements Analysis
d. Design and Coding

The correct answer is: Integration Testing


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 2/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6

Correct

Mark 0.67 out of 1.00

Which of the following is NOT an indicator of Risk for an IT Project?

a. Lack of requirements change requests from customers


b. Organisational gossip
c. Complaints about CASE tools
d. Good availability of IT Jobs in the socio-economic condition

The correct answer is: Lack of requirements change requests from customers

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 7
Correct

Mark 0.67 out of 1.00

The intention principles applied together programmer will create a system _________

a. Not Easy to Maintain and Extend Over Time


b. Easy to Maintain and Not Extend Over Time
c. Not Easy to Maintain and Not Extend Over Time
d. Easy to Maintain and Extend Over Time

The correct answer is: Easy to Maintain and Extend Over Time

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 8
Correct

Mark 1.00 out of 1.00

Which of the following is not a Major Management Activity?

a. Project monitoring and reviews


b. Report writing and presentations
c. Project planning and scheduling
d. Project Verification and Validation

The correct answer is: Project Verification and Validation


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 3/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 9

Correct

Mark 1.00 out of 1.00

Why SOLID Principles are important in Software Development?

a. Increases dependencies in software development


b. Makes the code more complicated
c. Makes the code more extendable,logical & easier
d. Creates a complex system

The correct answer is: Makes the code more extendable,logical & easier

Correct
Marks for this submission: 1.00/1.00.

Question 10
Correct

Mark 0.67 out of 1.00

Which of the following is not a Major type of project plan?

a. Quality plan
b. Monitoring plan
c. Maintenance plan
d. Validation plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 11
Correct

Mark 1.00 out of 1.00

Why we use SOLID principles?

a. For flexible coding


b. To avoid bad design
c. Small changes result in bugs
d. All of the options are true

The correct answer is: All of the options are true


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 4/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 12

Correct

Mark 1.00 out of 1.00

High level and low level modules both should be dependent on ___________

a. Classes
b. All of them
c. Interface
d. Abstractions

The correct answer is: Abstractions

Correct
Marks for this submission: 1.00/1.00.

Question 13
Correct

Mark 1.00 out of 1.00

The milestone document related to Requirements Analysis is ________

a. System requirements
b. Architectural design
c. Evaluation report
d. NONE of the answer options is true

The correct answer is: NONE of the answer options is true

Correct
Marks for this submission: 1.00/1.00.

Question 14
Correct

Mark 0.00 out of 1.00

By following the SOLID principles a programmer will create a system that is easy to _________ and extend over time.

a. Design
b. Code
c. Create
d. Maintain

The correct answer is: Maintain


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 5/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 15

Correct

Mark 0.33 out of 1.00

The milestone document related to Prototype Development is ________

a. NONE of the answer options is true


b. Architectural design
c. System requirements
d. Evaluation report

The correct answer is: Evaluation report

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 16
Correct

Mark 0.00 out of 1.00

In the waterfall model, in what phase is the project team most likely to spend a lot of time?

a. Implementation Phase
b. Deployment Phase
c. Requirements Phase
d. Verification Phase

The correct answer is: Requirements Phase

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 17
Correct

Mark 1.00 out of 1.00

'Agility' means-

a. effective response to change.


b. emphasize an incremental delivery strategy.
c. All of them
d. effective communication.

The correct answer is: All of them


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 6/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 18

Correct

Mark 0.67 out of 1.00

Which of the following is not set out by the project plan?

a. The validation procedure


b. A schedule for the work
c. The resources available to the project
d. The work breakdown

The correct answer is: The validation procedure

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 19
Correct

Mark 1.00 out of 1.00

Who is originator of the term Single Responsibility Principle(SRP)?

a. Konrad Zuse
b. Dennis Ritchie
c. Robert C. Martin
d. John Backus

The correct answer is: Robert C. Martin

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 7/8
2/11/22, 5:06 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 20

Correct

Mark 1.00 out of 1.00

______________ does not always hold the exact logic used in the actual software application and is an extra effort to be considered under effort
estimation.

a. Prototype
b. Agile
c. RAD
d. Waterfall

The correct answer is: Prototype


Correct
Marks for this submission: 1.00/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2917&cmid=151 8/8
2/11/22, 4:58 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:06 AM


State Finished
Completed on Friday, 11 February 2022, 10:56 AM
Time taken 49 mins 47 secs
Marks 15.33/20.00
Grade 7.67 out of 10.00 (77%)

Question 1
Correct

Mark 0.33 out of 1.00

Which of the following is not a Major Management Activity?

a. Personnel selection and evaluation


b. Project Validation
c. Project costing
d. Proposal writing

The correct answer is: Project Validation

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 2
Correct

Mark 0.00 out of 1.00

By following the SOLID principles a programmer will create a system that is easy to _________ and extend over time.

a. Code
b. Design
c. Create
d. Maintain

The correct answer is: Maintain

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2897&cmid=151 1/8
2/11/22, 4:58 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 1.00 out of 1.00

Which phase of Prototype Model focuses on a representation of those aspects of software that will be visible to end user?

a. Deployment
b. Quick design
c. Communication
d. Construction of Prototype

The correct answer is: Quick design

Correct
Marks for this submission: 1.00/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

Open Closed Principle (OCP) states

a. Open for both extension and modification


b. An entity allow to be extended without modifying its source code
c. Open for modification but closed for extension
d. All the options are true

The correct answer is: An entity allow to be extended without modifying its source code

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 1.00 out of 1.00

High level and low level modules both should be dependent on ___________

a. Classes
b. Abstractions
c. Interface
d. All of them

The correct answer is: Abstractions


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2897&cmid=151 2/8
2/11/22, 4:58 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6

Correct

Mark 1.00 out of 1.00

In which process of software development the requirements are broken down into multiple standalone modules of software development
cycle?

a. Waterfall Model
b. Incremental Process Model
c. RAD Model
d. Evolutionary Process Model

The correct answer is: Incremental Process Model


Correct
Marks for this submission: 1.00/1.00.

Question 7
Correct

Mark 1.00 out of 1.00

In which principle software entities should be open for extension but closed for modification.

a. Liskov Substitution Principle


b. Single Responsibility Principle
c. Open Closed Principle
d. Interface Segregation Principle

The correct answer is: Open Closed Principle

Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2897&cmid=151 3/8
2/11/22, 4:58 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 8

Correct

Mark 0.33 out of 1.00

Which of the following is not a Major type of project plan?

a. Maintenance plan
b. Monitoring plan
c. Validation plan
d. Quality plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 9
Correct

Mark 1.00 out of 1.00

Which are true about OCP, LSP and ISP?

a. ISP is about business logic to clients communication


b. LSP is about subtyping and inheritance
c. All of the options are true
d. OCP is about class design and feature extensions

The correct answer is: All of the options are true

Correct
Marks for this submission: 1.00/1.00.

Question 10
Correct

Mark 1.00 out of 1.00

According to Agile manifesto what carries more value?

a. Individuals and interactions over projects and tools.


b. Individuals and interactions over processes and tools.
c. Individuals and interactions over products and tools.
d. Individuals and interactions over people and technique.

The correct answer is: Individuals and interactions over processes and tools.
Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2897&cmid=151 4/8
2/11/22, 4:58 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 11

Correct

Mark 0.67 out of 1.00

Which is not a characteristic of Waterfall Model?

a. Difficult to measure progress within stages


b. Process and results are well documented
c. Requires early user involvement in the system development effort
d. Each phase has specific deliverables and a review process

The correct answer is: Requires early user involvement in the system development effort

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 12
Correct

Mark 1.00 out of 1.00

Scrum Master is a "management" position.

a. True
b. False

The correct answer is: True

Correct
Marks for this submission: 1.00/1.00.

Question 13
Correct

Mark 1.00 out of 1.00

In a typical IT project, the Probability that Computer-Aided Software Engineering (CASE) tools cannot be integrated is usually ______ and its
effects are _________

a. low, catastrophic
b. high, tolerable
c. low, insignificant
d. moderate, serious

The correct answer is: high, tolerable


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2897&cmid=151 5/8
2/11/22, 4:58 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 14

Correct

Mark 1.00 out of 1.00

What dose "O" means in SOLID?

a. Open Extend Principle


b. Open Close Principle
c. Open Open Principle
d. Open Correct Principle

The correct answer is: Open Close Principle

Correct
Marks for this submission: 1.00/1.00.

Question 15
Correct

Mark 1.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Monitoring plan
b. Quality plan
c. Validation plan
d. Maintenance plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00.

Question 16
Correct

Mark 1.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. moderately time-consuming
b. least time-consuming
c. most time-consuming
d. critical time-consuming

The correct answer is: most time-consuming


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2897&cmid=151 6/8
2/11/22, 4:58 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 17

Correct

Mark 1.00 out of 1.00

_________ is Probably the most time-consuming activity of project management.

a. Personnel selection and evaluation


b. Project Verification and Validation
c. Project Planning
d. Project monitoring and reviews

The correct answer is: Project Planning

Correct
Marks for this submission: 1.00/1.00.

Question 18
Correct

Mark 0.67 out of 1.00

Identify the disadvantage of the Spiral Model.

a. Management is more complex.


b. Spiral may go on indefinitely.
c. Doesn’t work well for smaller projects.
d. All are correct.

The correct answer is: All are correct.

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 19
Correct

Mark 0.00 out of 1.00

Prototyping model follows an ______ and ______ approach.

a. Evolutionary, iterative.
b. Inefficient, evolutionary.
c. None of above.
d. iterative, inefficient.

The correct answer is: Evolutionary, iterative.


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2897&cmid=151 7/8
2/11/22, 4:58 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 20

Correct

Mark 0.33 out of 1.00

Which of the following is not set out by the project plan?

a. The resources available to the project


b. The validation procedure
c. A schedule for the work
d. The work breakdown

The correct answer is: The validation procedure

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2897&cmid=151 8/8
Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:06 AM


State Finished
Completed on Friday, 11 February 2022, 10:31 AM
Time taken 25 mins 19 secs
Marks 13.00/20.00
Grade 6.50 out of 10.00 (65%)

Question 1
Incorrect

Mark 0.00 out of 1.00

Which phase of waterfall model take maximum time?

a. Design phase
b. Development phase
c. Requirement gathering and analysis phase
d. Testing phase 

The correct answer is: Design phase

Incorrect
Marks for this submission: 0.00/1.00.

Question 2
Incorrect

Mark 0.00 out of 1.00

Which of the following are benefits of using Single Responsibility Principle ?

a. Difficult for other developers to understand the class or function


b. Software entities are open for extension 
c. Reduced coupling & understandable codes
d. Difficult for other developers to change the class or function

The correct answer is: Reduced coupling & understandable codes

Incorrect
Marks for this submission: 0.00/1.00.
Question 3

Incorrect

Mark 0.00 out of 1.00

The milestone document related to Requirements Specification is ________

a. User requirements 
b. NONE of the answer options is true
c. Evaluation report
d. Architectural design

The correct answer is: NONE of the answer options is true

Incorrect
Marks for this submission: 0.00/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. most time-consuming
b. least time-consuming
c. moderately time-consuming
d. critical time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 1.00 out of 1.00

Which of the following is not unique characteristics of Software Projects?

a. Often the software project is one-time project


b. Many aspects of the software development process is not standardized
c. It usually requires diverse risk managgement strategies
d. The end product is not tangible

The correct answer is: It usually requires diverse risk managgement strategies
Correct
Marks for this submission: 1.00/1.00.
Question 6

Incorrect

Mark 0.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Maintenance plan
b. Monitoring plan
c. Validation plan 
d. Quality plan

The correct answer is: Monitoring plan

Incorrect
Marks for this submission: 0.00/1.00.

Question 7
Correct

Mark 1.00 out of 1.00

Scrum Master is a "management" position.

a. False
b. True

The correct answer is: True

Correct
Marks for this submission: 1.00/1.00.

Question 8
Correct

Mark 1.00 out of 1.00

What two things should be completed before moving on to the next iteration planning begins?

a. an iteration demo and a retrospective


b. a retrospective and the commitment ceremony
c. emergency request and an iteration demo
d. the commitment ceremony and an iteration demo

The correct answer is: an iteration demo and a retrospective


Correct
Marks for this submission: 1.00/1.00.
Question 9

Correct

Mark 1.00 out of 1.00

Which phase of Prototype Model focuses on a representation of those aspects of software that will be visible to end user?

a. Construction of Prototype
b. Deployment
c. Quick design
d. Communication

The correct answer is: Quick design

Correct
Marks for this submission: 1.00/1.00.

Question 10
Correct

Mark 1.00 out of 1.00

Which one true about SOLID principles?

a. Describe certain properties that a class should have


b. SPR should have only one responsibility
c. A class should have only one reason to change
d. All the answer options are OK

The correct answer is: All the answer options are OK

Correct
Marks for this submission: 1.00/1.00.
Question 11

Correct

Mark 1.00 out of 1.00

Consider the following Steps: (i) Interface Segregation Principle (ii) Open Closed Principle (iii) Dependency-Inversion Principle (iv)
Parsimonious Complexity Principle. Which of the following is not one of the four principles used to guide component-level design?

a. None of the answer options are correct


b. iii.
c. ii.
d. i.
e. iv.

The correct answer is: iv.

Correct
Marks for this submission: 1.00/1.00.

Question 12
Correct

Mark 1.00 out of 1.00

Developers often make implementation compromises to get the software running quickly. For example:

a. Operating system choice.


b. All of them
c. User interface.
d. Language choice.

The correct answer is: All of them


Correct
Marks for this submission: 1.00/1.00.
Question 13

Incorrect

Mark 0.00 out of 1.00

Typically the Probability that Customers fail to understand the impact of requirements changes is ________ and its impact on the ongoing IT
project is _________

a. high, catastrophic
b. high, tolerable
c. moderate, tolerable
d. moderate, insignificant 

The correct answer is: moderate, tolerable


Incorrect
Marks for this submission: 0.00/1.00.

Question 14
Correct

Mark 1.00 out of 1.00

Single Responsibility Principle (SRP) features are

a. Testability
b. Maintainability
c. Flexibility and extensibility
d. All the answer options are OK

The correct answer is: All the answer options are OK

Correct
Marks for this submission: 1.00/1.00.
Question 15

Incorrect

Mark 0.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Validation plan 
b. Quality plan
c. Monitoring plan
d. Maintenance plan

The correct answer is: Monitoring plan

Incorrect
Marks for this submission: 0.00/1.00.

Question 16
Incorrect

Mark 0.00 out of 1.00

Which of the following life cycle model can be chosen if the development team has less experience on similar projects?

a. Waterfall Model
b. Iterative Enhancement Model
c. RAD Model 
d. Spiral Model

The correct answer is: Spiral Model

Incorrect
Marks for this submission: 0.00/1.00.

Question 17
Correct

Mark 1.00 out of 1.00

Which of the following is not a Valid type of project plan?

a. Quality plan
b. Maintenance plan
c. Verification plan
d. Staff development plan

The correct answer is: Verification plan


Correct
Marks for this submission: 1.00/1.00.
Question 18

Correct

Mark 1.00 out of 1.00

What are the disadvantages of SOILD principles?

a. SOLID principles are unambiguous


b. SOLID is a marketing Gimmick
c. SOLID is too realistic
d. SOLID leads to simple code

The correct answer is: SOLID is a marketing Gimmick

Correct
Marks for this submission: 1.00/1.00.

Question 19
Correct

Mark 1.00 out of 1.00

Client-specific interfaces are better than one general-purpose interface in____

a. Interface Segregation Principle


b. Dependency Inversion Principle
c. Open-Closed Principle
d. Single-Responsibility Principle
e. Liskov Substitution Principle

The correct answer is: Interface Segregation Principle


Correct
Marks for this submission: 1.00/1.00.
Question 20

Correct

Mark 1.00 out of 1.00

"Maintaining the integrity of the system architecture" is the key issue of____

a. Inception phase
b. Elaboration phase
c. Transition phase
d. Construction phase

The correct answer is: Construction phase

Correct
Marks for this submission: 1.00/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►


MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2902&cm...

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:06 AM


State Finished
Completed on Friday, 11 February 2022, 10:45 AM
Time taken 38 mins 21 secs
Marks 14.67/20.00
Grade 7.33 out of 10.00 (73%)

Question 1

Correct

Mark 1.00 out of 1.00

Single Responsibility Principle (SRP) features are

a. Flexibility and extensibility


b. All the answer options are OK
c. Testability
d. Maintainability

The correct answer is: All the answer options are OK


Correct
Marks for this submission: 1.00/1.00.

Question 2

Correct

Mark 1.00 out of 1.00

Which models are iterative and incremental?

a. Formal methods, Waterfall


b. Waterfall, Agile
c. Agile, Unified Process
d. Waterfall, Unified Process

The correct answer is: Agile, Unified Process


Correct
Marks for this submission: 1.00/1.00.

1 of 8 2/11/2022, 4:45 PM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2902&cm...

Question 3

Correct

Mark 0.67 out of 1.00

The milestone document related to Prototype Development is ________

a. Evaluation report
b. Architectural design
c. System requirements
d. NONE of the answer options is true

The correct answer is: Evaluation report


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 4

Correct

Mark 1.00 out of 1.00

In which principle software entities should be open for extension but closed for modification.

a. Single Responsibility Principle


b. Liskov Substitution Principle
c. Interface Segregation Principle
d. Open Closed Principle

The correct answer is: Open Closed Principle


Correct
Marks for this submission: 1.00/1.00.

Question 5

Correct

Mark 0.00 out of 1.00

Open Closed Principle (OCP) states

a. An entity allow to be extended without modifying its source code


b. Open for modification but closed for extension
c. All the options are true
d. Open for both extension and modification

The correct answer is: An entity allow to be extended without modifying its source code
Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

2 of 8 2/11/2022, 4:45 PM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2902&cm...

Question 6

Correct

Mark 1.00 out of 1.00

____________ testing is the testing at code level and helps eliminate bugs at an early stage.

a. Unit test
b. System test
c. Integration testing
d. Acceptance testing

The correct answer is: Unit test


Correct
Marks for this submission: 1.00/1.00.

Question 7

Correct

Mark 0.67 out of 1.00

How long does each iteration typically last for Agile Model?

a. About two to six weeks


b. About one to three weeks
c. About one to Four weeks
d. About two to three weeks

The correct answer is: About one to three weeks


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 8

Correct

Mark 0.33 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. least time-consuming
b. moderately time-consuming
c. most time-consuming
d. critical time-consuming

The correct answer is: most time-consuming


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

3 of 8 2/11/2022, 4:45 PM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2902&cm...

Question 9

Correct

Mark 0.33 out of 1.00

Phone call dial up or send SMS is an example of _________

a. Interface segregation principle


b. Single responsibility principle
c. Open Closed principle
d. Liskov Substitution Principle

The correct answer is: Single responsibility principle


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 10

Correct

Mark 0.67 out of 1.00

Usually the Probability of defects in reusable software components is ________ and its impact on the ongoing IT project is _________

a. high, tolerable
b. moderate, serious
c. low, insignificant
d. low, catastrophic

The correct answer is: moderate, serious


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 11

Correct

Mark 0.33 out of 1.00

Investigation on buying-in components could be a possible strategy to deal with _______

a. Requirements changes
b. Risk management
c. Recruitment problems
d. Staff illness

The correct answer is: Recruitment problems


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

4 of 8 2/11/2022, 4:45 PM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2902&cm...

Question 12

Correct

Mark 0.00 out of 1.00

Which of the following is not a Major type of project plan?

a. Validation plan
b. Monitoring plan
c. Quality plan
d. Maintenance plan

The correct answer is: Monitoring plan


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 13

Correct

Mark 1.00 out of 1.00

What is the advantage of the Agile Model?

a. Gives flexibility to developers


b. Very low individual dependency
c. Depends less on customer interaction
d. Easy to transfer of technology to new team members

The correct answer is: Gives flexibility to developers


Correct
Marks for this submission: 1.00/1.00.

5 of 8 2/11/2022, 4:45 PM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2902&cm...

Question 14

Correct

Mark 1.00 out of 1.00

Which term is best defined by the text? "A class should not force any client to implement an interface that is irrelevant to them."

a. Interface Segregation Principle


b. Dependency Inversion Principle
c. Liskov Substitution Principle
d. Single-Responsibility Principle
e. Open-Closed Principle

The correct answer is: Interface Segregation Principle


Correct
Marks for this submission: 1.00/1.00.

Question 15

Correct

Mark 1.00 out of 1.00

Which of the following is NOT an indicator of Risk for an IT Project?

a. Good availability of IT Jobs in the socio-economic condition


b. Complaints about CASE tools
c. Lack of requirements change requests from customers
d. Organisational gossip

The correct answer is: Lack of requirements change requests from customers
Correct
Marks for this submission: 1.00/1.00.

6 of 8 2/11/2022, 4:45 PM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2902&cm...

Question 16

Correct

Mark 1.00 out of 1.00

Which stage is usually a subset of all the stages as in the modern SDLC models?

a. Testing the product


b. Designing the product
c. Defining requirement
d. Building the product

The correct answer is: Testing the product


Correct
Marks for this submission: 1.00/1.00.

Question 17

Correct

Mark 1.00 out of 1.00

What is the simplest model of software development paradigm?

a. V-model
b. Spiral model
c. Big Bang model
d. Waterfall model

The correct answer is: Waterfall model


Correct
Marks for this submission: 1.00/1.00.

Question 18

Correct

Mark 0.67 out of 1.00

By following the SOLID principles a programmer will create a system that is easy to _________ and extend over time.

a. Design
b. Code
c. Create
d. Maintain

The correct answer is: Maintain


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

7 of 8 2/11/2022, 4:45 PM
MCSE583-----Quiz #1 on ISM: Attempt review https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2902&cm...

Question 19

Correct

Mark 1.00 out of 1.00

For agile model, the only really work product is an operational _______ that is delivered.

a. All of them
b. communication
c. software increment
d. construction

The correct answer is: software increment


Correct
Marks for this submission: 1.00/1.00.

Question 20

Correct

Mark 1.00 out of 1.00

_________ is Probably the most time-consuming activity of project management.

a. Personnel selection and evaluation


b. Project monitoring and reviews
c. Project Planning
d. Project Verification and Validation

The correct answer is: Project Planning


Correct
Marks for this submission: 1.00/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

8 of 8 2/11/2022, 4:45 PM
Prototyping model follows an ______ and ______ approach.

a.
None of above.

b.
Inefficient, evolutionary.

c.
iterative, inefficient.

d.
Evolutionary, iterative.
Feedback
The correct answer is: Evolutionary, iterative.
Incorrect
Marks for this submission: 0.00/1.00.

Question 2
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
_________ is Probably the most time-consuming activity of project management.

a.
Project Planning

b.
Project monitoring and reviews

c.
Personnel selection and evaluation

d.
Project Verification and Validation
Feedback
The correct answer is: Project Planning
Correct
Marks for this submission: 1.00/1.00.

Question 3
Incorrect
Mark 0.00 out of 1.00

Remove flag

Question text
The milestone document related to Requirements Analysis is ________

a.
System requirements

b.
Evaluation report

c.
Architectural design

d.
NONE of the answer options is true
Feedback
The correct answer is: NONE of the answer options is true
Incorrect
Marks for this submission: 0.00/1.00.

Question 4
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
Which of the following is not a Valid type of project plan?

a.
Verification plan

b.
Maintenance plan

c.
Quality plan

d.
Staff development plan
Feedback
The correct answer is: Verification plan
Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
What are the advantages of maintaining consistent iteration (timebox) lengths throughout
the project?

a.
They help to establish a consistent pattern of delivery

b.
They provide a consistent means of measuring team velocity

c.
All the options are true

d.
They help the team to objectively measure progress
Feedback
The correct answer is: All the options are true
Correct
Marks for this submission: 1.00/1.00.

Question 6
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
Which principle allows high level module should not depend on low-level modules.

a.
Single Responsibility Principle

b.
Liskov Substitution Principle

c.
Open closed principle

d.
Dependency Inversion Principle
Feedback
The correct answer is: Dependency Inversion Principle
Correct
Marks for this submission: 1.00/1.00.

Question 7
Incorrect
Mark 0.00 out of 1.00

Remove flag

Question text
Which of the following is NOT an indicator of Risk for an IT Project?

a.
Many requirements change requests from customers

b.
Good availability of IT Jobs in the socio-economic condition

c.
Demands for higher-powered workstations

d.
No report on technology problems from the developers
Feedback
The correct answer is: No report on technology problems from the developers
Incorrect
Marks for this submission: 0.00/1.00.

Question 8
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
Scrum Master is a "management" position.

a.
False

b.
True
Feedback
The correct answer is: True
Correct
Marks for this submission: 1.00/1.00.

Question 9
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
Usually Project Planning is ___________ activity of project management.

a.
moderately time-consuming

b.
critical time-consuming

c.
most time-consuming

d.
least time-consuming
Feedback
The correct answer is: most time-consuming
Correct
Marks for this submission: 1.00/1.00.

Question 10
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
Which of the following is not a Major type of project plan?

a.
Quality plan

b.
Maintenance plan

c.
Validation plan

d.
Monitoring plan
Feedback
The correct answer is: Monitoring plan
Correct
Marks for this submission: 1.00/1.00.

Question 11
Incorrect
Mark 0.00 out of 1.00

Remove flag

Question text
Which of the following is NOT an indicator of Risk for an IT Project?

a.
Good availability of IT Jobs in the socio-economic condition

b.
Complaints about CASE tools

c.
Organisational gossip

d.
Lack of requirements change requests from customers
Feedback
The correct answer is: Lack of requirements change requests from customers
Incorrect
Marks for this submission: 0.00/1.00.

Question 12
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
Which design deals with the implemention part in which it shows a system & it's sub-
systems in the previous two designs?

a.
Architectural Design

b.
Architectural Design & High-level Design

c.
High-level Design

d.
Detailed Design
Feedback
The correct answer is: Detailed Design
Correct
Marks for this submission: 1.00/1.00.

Question 13
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
Which model is most popular process model for the developer now a days?

a.
Agile
b.
RAD

c.
Waterfall

d.
Big Bang
Feedback
The correct answer is: Agile
Correct
Marks for this submission: 1.00/1.00.

Question 14
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
Client-specific interfaces are better than one general-purpose interface in____

a.
Liskov Substitution Principle

b.
Single-Responsibility Principle

c.
Dependency Inversion Principle

d.
Interface Segregation Principle

e.
Open-Closed Principle
Feedback
The correct answer is: Interface Segregation Principle
Correct
Marks for this submission: 1.00/1.00.

Question 15
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
In which principle we can split the interface.

a.
Open Closed Principle

b.
Liskov Substitution Principle

c.
Single Responsibility Principle

d.
Interface Segregation Principle
Feedback
The correct answer is: Interface Segregation Principle
Correct
Marks for this submission: 1.00/1.00.

Question 16
Incorrect
Mark 0.00 out of 1.00

Remove flag

Question text
Agile Software Development is based on_________________?

a.
Iterative Development

b.
Incremental Development

c.
Linear Development

d.
Incremental and Iterative Development
Feedback
The correct answer is: Incremental and Iterative Development
Incorrect
Marks for this submission: 0.00/1.00.

Question 17
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
Methodology in which project management processes were step-by step.

a.
Spiral

b.
Incremental

c.
Prototyping

d.
Waterfall
Feedback
The correct answer is: Waterfall
Correct
Marks for this submission: 1.00/1.00.
Question 18
Correct
Mark 1.00 out of 1.00

Remove flag

Question text
Which of the following are benefits of using Single Responsibility Principle ?

a.
Reduced coupling & understandable codes

b.
Difficult for other developers to understand the class or function

c.
Software entities are open for extension

d.
Difficult for other developers to change the class or function
Feedback
The correct answer is: Reduced coupling & understandable codes
Correct
Marks for this submission: 1.00/1.00.

Question 19
Correct
Mark 0.67 out of 1.00

Remove flag

Question text
Single Responsibility Principle (SRP) features are

a.
Maintainability
b.
All the answer options are OK

c.
Testability

d.
Flexibility and extensibility
Feedback
The correct answer is: All the answer options are OK
Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 20
Correct
Mark 0.67 out of 1.00

Remove flag

Question text
What does Liskov substitution principle specify?

a.
Child class can be substituted by parent class

b.
No classes can be replaced by each other

c.
Parent class cannot be substituted by child class

d.
Parent class can be substituted by child class
Feedback
The correct answer is: Parent class can be substituted by child class
Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.
2/11/22, 4:56 PM MCSE583-----Quiz #1 on ISM: Attempt review

Dashboard / My courses / ITM / MCSE 583: Information System Management (Spring 2022) / MCSE583-----Quiz #1 on ISM

Started on Friday, 11 February 2022, 10:05 AM


State Finished
Completed on Friday, 11 February 2022, 10:55 AM
Time taken 50 mins
Marks 10.00/20.00
Grade 5.00 out of 10.00 (50%)

Question 1
Correct

Mark 0.00 out of 1.00

Which of the SDLC model is too close to Iterative process model?

a. All of them.
b. Prototype Model
c. Agile Model
d. RAD Model

The correct answer is: Agile Model

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 2
Correct

Mark 0.33 out of 1.00

Which of the following is not unique characteristics of Software Projects?

a. Often the software project is one-time project


b. The end product is not tangible
c. It usually requires diverse risk managgement strategies
d. Many aspects of the software development process is not standardized

The correct answer is: It usually requires diverse risk managgement strategies

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2893&cmid=151 1/8
2/11/22, 4:56 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 3

Correct

Mark 0.00 out of 1.00

According to Agile manifesto what carries more value?

a. Individuals and interactions over people and technique.


b. Individuals and interactions over processes and tools.
c. Individuals and interactions over projects and tools.
d. Individuals and interactions over products and tools.

The correct answer is: Individuals and interactions over processes and tools.

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 4
Correct

Mark 1.00 out of 1.00

Usually Project Planning is ___________ activity of project management.

a. least time-consuming
b. most time-consuming
c. critical time-consuming
d. moderately time-consuming

The correct answer is: most time-consuming

Correct
Marks for this submission: 1.00/1.00.

Question 5
Correct

Mark 1.00 out of 1.00

Why we use SOLID principles?

a. To avoid bad design


b. For flexible coding
c. Small changes result in bugs
d. All of the options are true

The correct answer is: All of the options are true


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2893&cmid=151 2/8
2/11/22, 4:56 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 6

Correct

Mark 0.00 out of 1.00

What are the Strengths of Spiral model?

a. Spiral may go on sequentially.


b. Management is more easier.
c. Changing requirements can be accommodated.
d. All of these.

The correct answer is: Changing requirements can be accommodated.

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 7
Correct

Mark 1.00 out of 1.00

Class design principle is used to be known as ________

a. SOLID
b. Modeling
c. Abstraction
d. SRP

The correct answer is: SOLID

Correct
Marks for this submission: 1.00/1.00.

Question 8
Correct

Mark 1.00 out of 1.00

Which of these is not one of the phase names defined by the Unified Process model for software development?

a. Inception phase
b. Elaboration phase
c. Validation phase
d. Construction phase

The correct answer is: Validation phase


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2893&cmid=151 3/8
2/11/22, 4:56 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 9

Correct

Mark 0.33 out of 1.00

Which of the following is not a Major type of project plan?

a. Monitoring plan
b. Quality plan
c. Validation plan
d. Maintenance plan

The correct answer is: Monitoring plan

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.33/1.00.

Question 10
Correct

Mark 0.00 out of 1.00

In which process of software development the requirements are broken down into multiple standalone modules of software development
cycle?

a. Waterfall Model
b. Evolutionary Process Model
c. RAD Model
d. Incremental Process Model

The correct answer is: Incremental Process Model

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2893&cmid=151 4/8
2/11/22, 4:56 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 11

Correct

Mark 1.00 out of 1.00

Who is bound to assessing the Project’s achievement?

a. The Development Team


b. The Delivery Manager
c. The Scrum Master
d. The Product Owner
e. The Scrum Team

The correct answer is: The Product Owner

Correct
Marks for this submission: 1.00/1.00.

Question 12
Correct

Mark 1.00 out of 1.00

Which of the following is a Component of the Project Plan Structure?

a. Validation procedure
b. Work breakdown
c. Requirements analysis procedure
d. Conclusion

The correct answer is: Work breakdown


Correct
Marks for this submission: 1.00/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2893&cmid=151 5/8
2/11/22, 4:56 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 13

Correct

Mark 0.00 out of 1.00

The milestone document related to Requirements Analysis is ________

a. NONE of the answer options is true


b. System requirements
c. Architectural design
d. Evaluation report

The correct answer is: NONE of the answer options is true

Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.00/1.00.

Question 14
Not answered

Mark 0.00 out of 1.00

Who is originator of the term Single Responsibility Principle(SRP)?

a. Robert C. Martin
b. Dennis Ritchie
c. Konrad Zuse
d. John Backus

The correct answer is: Robert C. Martin

Question 15
Correct

Mark 0.67 out of 1.00

In a typical IT project, the Probability that Computer-Aided Software Engineering (CASE) tools cannot be integrated is usually ______ and its
effects are _________

a. low, catastrophic
b. moderate, serious
c. low, insignificant
d. high, tolerable

The correct answer is: high, tolerable


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2893&cmid=151 6/8
2/11/22, 4:56 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 16

Correct

Mark 1.00 out of 1.00

Which one true about SOLID principles?

a. A class should have only one reason to change


b. Describe certain properties that a class should have
c. SPR should have only one responsibility
d. All the answer options are OK

The correct answer is: All the answer options are OK

Correct
Marks for this submission: 1.00/1.00.

Question 17
Not answered

Mark 0.00 out of 1.00

Single Responsibility Principle (SRP) features are

a. Maintainability
b. Testability
c. All the answer options are OK
d. Flexibility and extensibility

The correct answer is: All the answer options are OK

Question 18
Not answered

Mark 0.00 out of 1.00

Which of the following is not a Major Management Activity?

a. Project planning and scheduling


b. Project Verification and Validation
c. Report writing and presentations
d. Project monitoring and reviews

The correct answer is: Project Verification and Validation

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2893&cmid=151 7/8
2/11/22, 4:56 PM MCSE583-----Quiz #1 on ISM: Attempt review

Question 19

Correct

Mark 0.67 out of 1.00

In RAD model, information gathered in the business modeling phase is reviewed and analyzed to form sets of data objects vital for the
business in________

a. Deployment Modeling
b. Data Modeling
c. Business Modeling
d. Process Modeling

The correct answer is: Data Modeling


Correct
Marks for this submission: 1.00/1.00. Accounting for previous tries, this gives 0.67/1.00.

Question 20
Correct

Mark 1.00 out of 1.00

Which are true about OCP, LSP and ISP?

a. All of the options are true


b. LSP is about subtyping and inheritance
c. ISP is about business logic to clients communication
d. OCP is about class design and feature extensions

The correct answer is: All of the options are true

Correct
Marks for this submission: 1.00/1.00.

◄ Announcements

Jump to...

Practice MCQ Test (10 Questions, 20 minutes) ►

https://mscourses.gnomio.com/mod/quiz/review.php?attempt=2893&cmid=151 8/8