1st Module Assessment

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Dashboard / My courses / IT Project Management (CSIT224)-Semester IV / "Module 1 : Introduction to Project Management "

/ 1st Module Assessment

Question 1

Not yet answered

Marked out of 1.00

the scope statement should address all of the following issues EXCEPT: Select one:

a. project constraints.
b. project assumptions.
c. project exclusions.
d. code of conduct for the team members working on the project.

Clear my choice

Question 2

Not yet answered

Marked out of 1.00

The person who ensures that systems are developed on time, within budget, and with acceptable quality is a

a. project manager
b. systems designer
c. systems owner
d. systems builder

Clear my choice
Question 3

Not yet answered

Marked out of 1.00

A task of developing a technical blueprint and specifications for a solution that fulfills the business requirements is
undertaken in the following phase of the system development process

a. system design
b. system initiation
c. system implementation
d. feasibility analysis
Clear my choice

Question 4

Not yet answered

Marked out of 1.00

What does project management ensure?

a. system is developed at minimum cost


b. project’s risk is assessed
c. project’s feasibility is assessed
d. none of the above

Clear my choice

Question 5

Not yet answered

Marked out of 1.00

What does OFD stand for?

a. Data Flow Diagram


b. Data File Diagram
c. Data Flow Document
d. None of the above

Clear my choice
Question 6

Not yet answered

Marked out of 1.00

Which of the following is the last phase of the Systems Construction phase?

a. write and test new programs


b. prepare conversion plan
c. build and test networks
d. none of the above

Clear my choice

Question 7

Not yet answered

Marked out of 1.00

Which of the following is a deliverable of the system implementation phase in a formal system development process?

a. technical hardware and software solution for the business problem


b. none of the above
c. business problem statement
d. statement of the system users’ business requirements

Clear my choice

Question 8

Not yet answered

Marked out of 1.00

According to the Project Management Institute (PMI), project management is defined as “the application of knowledge,
_____, _____, and techniques to project activities to meet the project requirements”. Select one:

a. skills, analysis
b. tools, analysis
c. analysis, theories
d. skills, tools

Clear my choice
Question 9

Not yet answered

Marked out of 1.00

Which of the tests is a final system test performed by end users using real data over an extended period of time?

a. systems acceptance test


b. complete test
c. parallel test
d. none of the above

Clear my choice

Question 10

Not yet answered

Marked out of 1.00

Which one is NOT a common fact-finding technique?

a. reverse engineering
b. interviews
c. research and site visits
d. sampling of existing documents, forms, databases

Clear my choice

Question 11

Not yet answered

Marked out of 2.00

Complete the following statement. As a project manager, Darrell is excited that he is assigned to be in charge of the
most important project this year. After being chartered for the project, he analyzes the information in the project charter
and the stakeholder register to: Select one:

a. decide how to draft a scope statement.


b. start to define and develop the stakeholder needs and requirements.
c. prepare for the template to monitor project progress.
d. estimate the entire project budget.

Clear my choice
Question 12

Not yet answered

Marked out of 2.00

Which of the following statements about achieving a common understanding of the project purpose is true? Select one:

a. A common understanding means building a consensus and disagreement regarding a project’s purpose is often
fatal to project execution.
b. Developing a common understanding involves defining project success, determining potential barriers to
success, establishing milestones, and identifying decision-makers.
c. The methods and processes employed to develop a common understanding depend on the duration of the
project.
d. Irrespective of the complexity of the project, developing a common understanding usually involves informal
discussions that last a few hours.
Clear my choice

Question 13

Not yet answered

Marked out of 2.00

After Ling finished drafting a new project charter, she sent a copy of the charter to all key project parties including the
project sponsor, senior management and key stakeholders, and scheduled a kick-off meeting with them. What will be the
most important goal for Ling to complete the project charter? Select one:

a. Make a professional looking project charter to impress the key project parties.
b. Get confirmation from the key parties that they have read the charter.
c. Invite the key parties for a nice lunch to establish a friendly relationship.
d. . Obtain officially signed project charters from the key parties.

Clear my choice

Question 14

Not yet answered

Marked out of 2.00

As a project manager, Tyler is so happy that all expected project deliverable have been accomplished by his project
team. What is the next step for his project to proceed in order to verify the project scope by his project client? Select one:

a. Ask his client to pay for the completed project deliverables.


b. Award all of his project team members for such a great accomplishment.
c. Offer a party for his project team and client to celebrate the success of the project.
d. Ask his client to conduct an inspection on all of the completed project deliverables.

Clear my choice
Question 15

Not yet answered

Marked out of 4.00

Following are the phases of Project Management Life Cycle. Arrange them in correct order

1. Design,
2. Marketing,
3. Analysis and evaluation,
4. Inspection, testing and delivery

a. 3-2-1-4
b. 1-2-3-4
c. 2-3-1-4c
d. 4-3-2-1

Clear my choice

Question 16

Not yet answered

Marked out of 4.00

Which of the following is an advantage of including the project manager in the project evaluation process? Select one:

a. It enables the project manager to have an understanding of the selection criteria that can be used when making
decisions about the project during later phases.
b. It may indicate a need for project manager skills and experiences that are different from the project manager
who is involved in the evaluation.
c. It allows the parent organization to select a project manager whose abilities match the complexity profile of the
project.
d. It improves the project manager’s level of understanding about the project and ensures that the chosen project
manager is the most suitable individual for executing the project.
Clear my choice
Question 17

Not yet answered

Marked out of 4.00

Five dimensions that must be managed on a project

a. Constraint, Quality, Cost, Schedule, Staff


b. Features, Quality, Cost, Schedule, Staff
c. Features, priority, Cost, Schedule, Staff
d. Features, Quality, Cost, Schedule, customer

Clear my choice

← 1.3.8 Factors for Success and Failures of Project

Jump to...

Module 1 Feedback Form →