Pressure Vessel Repair Procedure
Pressure Vessel Repair Procedure
Pressure Vessel Repair Procedure
PROCEDURE AUTHORIZATION
This procedure have been generated and implemented Department Authorization Date:
to identify the control that shall be applied by members of
staff in the department when carrying out their duties
Signed:
This confirms that this procedure has been approved for Corporate Authorization Date:
official issue and that members of staff shall complete the (Company Director)
tasks assigned in accordance with the mechanisms
defined herein
Signed:
The procedure forms part of a formal system within the Quality Authorization Date:
company which ensure that this document is handled in a (Quality Managements Rep’s)
controlled manner in accordance with documented
procedures.
This procedure will be subject to audit as part of the
company policy towards quality Signed:
PROCEDURE REVISION
STATEMENT OF CONFIDENTIALITY
This procedure is for controlled circulation unless stamped "Uncontrolled Copy”. The documents or
extracts from documents must nor be passed or copied to other companies, agents or persons without
the permission of the relevant Company Directors.
TITLE
TABLE OF CONTENT
Page
1.0 PURPOSE 3
2.0 SCOPE 3
3.0 DEFINITIONS 3
5.0 REFERENCES 4
6.0 RESPONSIBILITIES 5
7.1 INTRODUCTION 5
7.5 REPORTING 7
TITLE
1.0 PURPOSE
a. The purpose of this document is to ensure that the after repairs, alteration,
and modification of pressure vessel are in safe condition.
2.0 SCOPE
a. This procedure shall be applied for Pressure Vessels and Heat Exchanger
that have been placed and repaired by a repair organization.
3.0 DEFINITIONS
5.0 REFERENCES
The following minimum reference for Pressure Vessel construction, but not
limited to :
a. SNI 13-3498-2002 : Inspeksi Bejana Tekan
b. SNI 07-3032-2002 : Kualifikasi Pengelasan
c. SNI 13-3563-1994 : Bejana tekan 1-A
d. ASME Sect.VIII Div.1 : Rules For Construction of Pressure Vessels
TITLE
6.0 RESPONSIBILITIES
7.0 PROCEDURES
7.1 INTRODUCTION
7.5 REPORTING
Arrange all inspection result on document form to submit to Direktur Teknik
Pertambangan Minyak dan Gas Bumi to evaluate for issued SKPP.