GRID A = GRID H
GRID A Tributary Slab Beam
THRU Area(Sq.m) thickness Weight (kN/m) Roof Deck 3rd Floor 2nd Floor Roof Deck 3rd Floor 2nd Floor
Roof Deck 2&3 Floor (meters) Roof Deck 2&3 Floor Area(Sq.m) Area(Sq.m) Area(Sq.m) W(kN/m) W(kN/m) W(kN/m)
(1-2) 3.33 3.33 0.12 2.58 2.58 0.135 0.175 0.24 3.18 4.12 5.65
(2-3) 1.27 1.27 0.12 1.59 1.59 0.135 0.175 0.24 3.18 4.12 5.65
(3-4) 3.42 3.42 0.12 2.61 2.61 0.135 0.175 0.24 3.18 4.12 5.65
(4-5) 1.27 1.27 0.12 1.59 1.59 0.135 0.175 0.24 3.18 4.12 5.65
(5-6) 3.33 3.33 0.12 2.58 2.58 0.135 0.175 0.24 3.18 4.12 5.65
GRID D =GRID E
GRID D Tributary Slab Beam
THRU Area(Sq.m) thickness Weight (kN/m) Roof Deck 3rd Floor 2nd Floor Roof Deck 3rd Floor 2nd Floor
Roof Deck 2&3 Floor (meters) Roof Deck 2&3 Floor Area(Sq.m) Area(Sq.m) Area(Sq.m) W(kN/m) W(kN/m) W(kN/m)
(1-2) 3.33 6.66 0.12 2.58 5.15 0.135 0.175 0.24 3.18 4.12 5.65
(2-3) 2.53 2.53 0.12 3.18 3.18 0.135 0.175 0.24 3.18 4.12 5.65
(3-4) 6.85 6.85 0.12 5.23 5.23 0.135 0.175 0.24 3.18 4.12 5.65
(4-5) 2.53 2.53 0.12 3.18 3.18 0.135 0.175 0.24 3.18 4.12 5.65
(5-6) 3.33 6.66 0.12 2.58 5.15 0.135 0.175 0.24 3.18 4.12 5.65
GRID 1 =GRID 6
GRID 1 Tributary Slab Beam
THRU Area(Sq.m) thickness Weight (kN/m) Roof Deck 3rd Floor 2nd Floor Roof Deck 3rd Floor 2nd Floor
Roof Deck 2&3 Floor (meters) Roof Deck 2&3 Floor Area(Sq.m) Area(Sq.m) Area(Sq.m) W(kN/m) W(kN/m) W(kN/m)
(A-B) 5.79 5.79 0.12 3.27 3.27 0.135 0.175 0.24 3.18 4.12 5.65
(B-C) 4.33 4.33 0.12 2.91 2.91 0.135 0.175 0.24 3.18 4.12 5.65
(C-D) 3.97 3.97 0.12 2.80 2.80 0.135 0.175 0.24 3.18 4.12 5.65
(D-E) 0 0 0.12 0.00 0.00 0.135 0.175 0.24 3.18 4.12 5.65
(E-F) 3.97 3.97 0.12 2.80 2.80 0.135 0.175 0.24 3.18 4.12 5.65
(F-G) 4.33 4.33 0.12 2.91 2.91 0.135 0.175 0.24 3.18 4.12 5.65
(G-H) 5.79 5.79 0.12 3.27 3.27 0.135 0.175 0.24 3.18 4.12 5.65
GRID 2 =GRID 5
GRID 2 Tributary Slab Beam
THRU Area(Sq.m) thickness Weight (kN/m) Roof Deck 3rd Floor 2nd Floor Roof Deck 3rd Floor 2nd Floor
Roof Deck 2&3 Floor (meters) Roof Deck 2&3 Floor Area(Sq.m) Area(Sq.m) Area(Sq.m) W(kN/m) W(kN/m) W(kN/m)
(A-B) 10.15 10.15 0.12 5.73 5.73 0.135 0.175 0.24 3.18 4.12 5.65
(B-C) 7.79 7.79 0.12 5.24 5.24 0.135 0.175 0.24 3.18 4.12 5.65
(C-D) 7.2 7.2 0.12 5.08 5.08 0.135 0.175 0.24 3.18 4.12 5.65
(D-E) 2.22 2.22 0.12 2.02 2.02 0.135 0.175 0.24 3.18 4.12 5.65
(E-F) 7.2 7.2 0.12 5.08 5.08 0.135 0.175 0.24 3.18 4.12 5.65
(F-G) 7.79 7.79 0.12 5.24 5.24 0.135 0.175 0.24 3.18 4.12 5.65
(G-H) 10.15 10.15 0.12 5.73 5.73 0.135 0.175 0.24 3.18 4.12 5.65
GRID 3 =GRID 4
GRID 3 Tributary Slab Beam
THRU Area(Sq.m) thickness Weight (kN/m) Roof Deck 3rd Floor 2nd Floor Roof Deck 3rd Floor 2nd Floor
Roof Deck 2&3 Floor (meters) Roof Deck 2&3 Floor Area(Sq.m) Area(Sq.m) Area(Sq.m) W(kN/m) W(kN/m) W(kN/m)
(A-B) 10.19 10.19 0.12 5.76 5.76 0.135 0.175 0.24 3.18 4.12 5.65
(B-C) 7.81 7.81 0.12 5.25 5.25 0.135 0.175 0.24 3.18 4.12 5.65
(C-D) 7.21 7.21 0.12 5.09 5.09 0.135 0.175 0.24 3.18 4.12 5.65
(D-E) 4.62 2.22 0.12 4.21 2.02 0.135 0.175 0.24 3.18 4.12 5.65
(E-F) 7.21 7.21 0.12 5.09 5.09 0.135 0.175 0.24 3.18 4.12 5.65
(F-G) 7.81 7.81 0.12 5.25 5.25 0.135 0.175 0.24 3.18 4.12 5.65
(G-H) 10.19 10.15 0.12 5.76 5.73 0.135 0.175 0.24 3.18 4.12 5.65