Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Anexo Articulo 50 R CREG 075 2021 Circ 030

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 452
At a glance
Powered by AI
The document lists a large number of dates in YYYYMMDD format across several pages.

Many dates ranging from 2018 to 2021 are listed across the various pages.

The document seems to list dates along with some other coded information like 'Radicado' that may be identifiers or references.

Radicado Fecha

20181520001081 1/19/2018

20181520007281 2/28/2018

20181520011891 3/12/2018

20181520012381 3/15/2018

20181520013271 3/27/2018

20181520014061 4/9/2018

20181520014051 4/9/2018

20181520014981 4/16/2018

20181520016881 4/25/2018

20181520017051 4/26/2018

20181520018601 5/9/2018

20181520022121 6/7/2018

20181520025001 6/25/2018

20181520025051 6/26/2018

20181520026591 7/5/2018

20181520027261 7/9/2018
20181520028001 7/13/2018

20181520029231 7/19/2018

20181520031381 8/1/2018

20181520034091 8/17/2018

20181520034161 8/17/2018

20181520034101 8/17/2018

20181520033931 8/17/2018

20181520033941 8/17/2018

20181520033961 8/17/2018

20181520033971 8/17/2018

20181520034071 8/17/2018

20181520034081 8/17/2018

20181520034111 8/17/2018

20181520034121 8/17/2018

20181520034131 8/17/2018

20181520034901 8/27/2018
20181520035201 8/28/2018

20181520035051 8/28/2018

20181520035201 8/28/2018

20181520035201 8/28/2018

20181520035201 8/28/2018

20181520034331 9/6/2018

20181520037291 9/12/2018

20181520037251 9/12/2018

20181520037791 9/13/2018

20181520038771 9/20/2018

20181520038741 9/20/2018

20181520039131 9/24/2018

20181520039561 9/26/2018

20181520041361 10/9/2018

20181520042131 10/17/2018

20181520043501 10/24/2018

20181520043511 10/24/2018

20181520044711 10/30/2018
20181520053101 12/21/2018

20181520053051 12/21/2018

20181520053061 12/21/2018

20181520053031 12/21/2018

20181520053111 12/21/2018

20181520052981 12/21/2018

20181520053131 12/21/2018

20181520053041 12/21/2018

20181520053121 12/21/2018

20181520053071 12/21/2018

20181520053091 12/21/2018

20181520053081 12/21/2018

20181520053171 12/21/2018

20181520053141 12/21/2018

20181520053141 12/21/2018

20181520053161 12/21/2018

20181520053181 12/21/2018

20191520000681 1/14/2019
20191520000751 1/14/2019

20191520001551 1/15/2019

20191520001041 1/15/2019

20191520002161 1/18/2019

20191520002391 1/21/2019

20191520002691 1/22/2019

20191520002681 1/22/2019

20191520002971 1/23/2019

20191520003291 1/24/2019

20191520004591 1/31/2019

20191520004761 2/1/2019

20191520005851 2/7/2019

20191520005821 2/7/2019

20191520008791 2/21/2019

20191520013051 3/14/2019

20191520014921 3/27/2019

20191520017601 4/5/2019

20191520017601 4/5/2019

20191520017611 4/5/2019

20191520017631 4/5/2019
20191520020891 5/3/2019

20191520022171 5/10/2019

20191520022581 5/13/2019

20191520022591 5/13/2019

20191520022771 5/14/2019

20191520024721 5/21/2019

20191520024561 5/28/2019

20191520024731 5/28/2019

20191520024821 5/29/2019

20191520024821 5/29/2019

20191520025211 5/31/2019

20191520026011 6/7/2019

20191520025981 6/7/2019

20191520027151 6/14/2019

20191520027741 6/26/2019

20191520027981 6/27/2019
20191520027981 6/27/2019

20191520028521 7/3/2019

20191520030641 7/15/2019

20191520030611 7/15/2019

20191520030821 7/16/2019

20191520030811 7/16/2019

20191520033241 7/25/2019

20191520033301 7/26/2019

20191520033821 7/31/2019

20191520033751 7/31/2019

20191520033901 7/31/2019

20191520033911 7/31/2019

20191520033921 7/31/2019

20191520036821 8/23/2019

20191520036761 8/23/2019

20191520036801 8/23/2019

20191520037431 8/28/2019

20191520037461 8/29/2019
20191520037581 8/29/2019

20191520037761 8/30/2019

20191520037951 8/30/2019

20191520037911 8/30/2019

20191520037931 8/30/2019

20191520037891 8/30/2019

20191520037991 8/30/2019

20191520037871 8/30/2019

20191520037951 8/30/2019

20191520037951 8/30/2019

20191520037971 8/30/2019

20191520037921 8/30/2019

20191520037791 8/30/2019

20191520037941 8/30/2019

20191520038251 9/3/2019

20191520038231 9/3/2019
20191520038591 9/4/2019

20191520038621 9/4/2019

20191520038541 9/4/2019

20191520038821 9/5/2019

20191520038831 9/5/2019

20191520038831 9/5/2019

20191520038851 9/5/2019

20191520039251 9/11/2019

20191520039251 9/11/2019

20191520042371 10/7/2019

20191520042361 10/7/2019

20191520042361 10/7/2019

20191520043971 10/18/2019

20191520046661 11/5/2019

20191520046671  11/5/2019

20191520047451 11/7/2019

20191520047731 11/8/2019
20191520047701 11/8/2019

20191520047711 11/9/2019

20191520049651 11/26/2019

20191520051601 12/6/2019

20191520051631 12/6/2019

20191520051931 12/9/2019

20201520000111 1/9/2020

20201520000131 1/9/2020

20201520000101 1/9/2020

20201520016191 2/18/2020

20201520019331 3/16/2020

20201520019731 3/19/2020

20201520021041 4/8/2020

20201520021071 4/8/2020

20201520021081 4/8/2020

20201520021091 4/8/2020

20201520021051 4/8/2020
20201520021061 4/8/2020

20201520023271 4/29/2020

20201520023201 4/29/2020

20201520023421 4/30/2020

20201520023441 4/30/2020

20201520023771 5/5/2020

20201520024921 5/15/2020

20201520024901 5/15/2020

20201520024911 5/15/2020

20201520025571 5/21/2020

20201520026461 5/28/2020

20201520026541 5/29/2020

20201520026601 6/1/2020

20201520026621 6/1/2020

20201520014691 6/2/2020

20201520014691 6/2/2020

20201520027181 6/3/2020
20201520027551 6/5/2020

20201520027571 6/5/2020

20201520027541 6/5/2020

20201520028671 6/12/2020

20201520028791 6/16/2020

20201520028801 6/16/2020

20201520028811 6/16/2020

20201520030441 7/3/2020

20201520031571 7/13/2020

20201520032121 7/14/2020

20201520033721 7/29/2020

20201520033711 7/29/2020

20201520033741 7/29/2020

20201520033751 7/29/2020
20201520033731 7/29/2020

20201520034131 7/31/2020

20201520035491 8/10/2020

20201520038721 8/27/2020

20201520038801 8/27/2020

20201520038791 8/27/2020

20201520039001 8/28/2020

20201520040461 9/3/2020

20201520040621 9/4/2020

20201520042311 9/15/2020

20201520043891 9/22/2020

20201520044571 9/24/2020

20201520044601 9/24/2020

20201520046631 10/2/2020

20201520049331 10/16/2020

20201520049351 10/16/2020
20201520049361 10/16/2020

20201520052011 10/28/2020

20201520057331 11/17/2020

20201520058381 11/19/2020

20201520062881 12/2/2020

20201520062831 12/2/2020

20201520062851 12/2/2020

20201520062841 12/2/2020

20201520065951 12/11/2020

20201520065821 12/11/2020

20201520065811 12/11/2020

20201520065911 12/11/2020

20201520065921 12/11/2020

20201520065931 12/11/2020

20201520065941 12/11/2020
20201520066171 12/14/2020

20201520066801 12/15/2020

20201520066401 12/15/2020

20201520066471 12/15/2020

20201520066511 12/15/2020

20201520070331 12/24/2020

20201520070331 12/24/2020

20201520072071 12/30/2020

20211520004461 1/29/2021

20211520008141 2/9/2021

20211520014191 2/25/2021

20211520019451 3/12/2021

20211520027731 4/23/2021

20211520031571 4/23/2021

20211520033811 4/29/2021
20211520034301 4/30/2021

20211520042161 5/21/2021

20211520042151 5/21/2021

20111500038551 5/25/2011

20111500038731 5/27/2011

20111500048791 9/2/2011

20121500017441 5/28/2012

20121500019201 6/14/2012

20121500030311 9/25/2012

20121500038891 12/21/2012

20121500038901 12/21/2012

2012 12/31/2012

20131500000441 1/9/2013

20131500000401 1/9/2013

20131500000411 1/9/2013

20131500000411 1/9/2013

20131500034851 4/15/2013

20131500025241 5/6/2013

20131500041171 6/25/2013

20131500041171 6/25/2013
20131500041171 6/25/2013

20131500037441 6/26/2013

20131500050171 7/31/2013

20131500050341 9/23/2013

20131500050341 9/23/2013

20131500050341 9/23/2013

20131500050341 9/23/2013

20131500063381 10/16/2013

20131500064051 10/21/2013

20131500069741 11/5/2013

20131500069891 11/15/2013

20131500071661 12/5/2013

20141500001991 2/3/2014

20141500004881 3/3/2014

20141500005521 3/6/2014

20141500027791 3/18/2014

20141500040941 4/7/2014

20141500041691 4/9/2014

20141500046521 5/23/2014
20141500068841 8/20/2014

20141500069081 8/21/2014

20141500085911 11/5/2014

20141500086771 11/10/2014

20141500091631 12/16/2014

20141500092511 12/19/2014

20141500093441 12/26/2014

20151500003841 1/29/2015

20151500009241 3/10/2015

20151500013991 4/21/2015

20151500015111 4/28/2015

20151500015181 4/28/2015

20151500023511 7/8/2015

20151500023841 7/9/2015

20151500061291 9/16/2015

20151500064601 10/7/2015
20151500065981 10/20/2015

20151500066341 10/21/2015

20151500066781 10/27/2015

20151500067951 11/9/2015

20151500069291 11/23/2015

20151500070021 11/30/2015

20151500070141 11/30/2015

20151520071271 12/14/2015

20151520071711 12/18/2015

20151520071881 12/21/2015

20161520000311 1/7/2016

20161520003971 2/11/2016

20161520006831 2/25/2016

20161520012101 3/10/2016
20161520012211 3/11/2016

20161520012431 3/15/2016

20161520017321 4/25/2016

20161520018081 4/29/2016

20161520019441 5/6/2016

20161520022361 5/27/2016

20161520023531 6/7/2016

20161520024171 6/13/2016

20161520024211 6/13/2016

20161520024301 6/13/2016

20161520024591 6/14/2016

20161520025181 6/17/2016

20161520029831 7/1/2016

20161520035861 8/25/2016

20161520037021 9/6/2016

20161520037241 9/8/2016

20161520038701 9/19/2016

20161520038701 9/19/2016
20161520038701 9/19/2016

20161520038701 9/19/2016

20161520039671 9/26/2016

20161520040991 9/29/2016

20161520041001 9/29/2016

20161520041191 9/30/2016

20161520041181 9/30/2016

20161520041571 10/4/2016

20161520042561 10/12/2016

20161520042411 10/12/2016

20161520042721 10/14/2016

20161520042881 10/18/2016

20161520044661 11/2/2016

20161520044941 11/4/2016

20161520052181 12/22/2016

20161520052821 12/27/2016

20171520000361 1/12/2017
20171520004581 2/14/2017

20171520006081 2/27/2017

20171520013821 4/3/2017

20171520016211 4/27/2017

20171520021771 6/12/2017

20171520023801 7/6/2017

20171520028261 8/8/2017

20171520033621 9/22/2017

20171520034441 10/2/2017

20171520034671 10/3/2017

20171520035481 10/12/2017

20171520035781 10/17/2017

20171520036421 10/19/2017

20171520038561 11/1/2017

20171520040111 11/17/2017
20171520040131 11/20/2017

20171520041081 11/28/2017

20171520042321 12/5/2017

20171520043951 12/22/2017

20171520043941 12/22/2017

20171520044181 12/28/2017

20181520000421 1/15/2018

20181520000661 1/16/2018

20201520065841 12/11/2020

20181100079982 03/12/2018

03/12/2012
20121260056022

20171110037022 30/06/2017

20141260050872 07/11/2014

20181100083972 14/12/2018

20151260023212 02/06/2015

20151260038922 04/09/2015
20151260040132 10/09/2015

20171110029662 5/31/2017

20151260042262 23/09/2015

20151260042262 23/09/2015

20191100028252 30/04/2019

20171110036842 30/06/2017

20171110036842 30/06/2017

20/06/2016
20161110030312

20161110010632 07/03/2016

31/05/2017
20171110029742

20161110010632 07/03/2016

20171110058062 29/09/2017

20171110058042 29/09/2017

20171110058072 29/09/2017

20171110029932 31/05/2017

20171110029942 31/05/2017
20171110058022 29/09/2017

20171110058072 29/09/2017

20171110031862 08/06/2017

20171110058012 29/09/2017

20171110058082 29/09/2017

20171110058072 29/09/2017

20181100061442 27/09/2018

20171110037002 30/06/2017

20161110036472 21/07/2016

20171110054402 15/09/2017

20201100002432 16/01/2020

20181100061482 27/09/2018

20171110049482 25/08/2017

20171110049482 25/08/2017
20181110024722 02/05/2018
20181110024722 02/05/2018
20181110024722 02/05/2018
20171110039612 12/07/2017
20171110029882 31/05/2017
20181110022972 23/04/2018
20181110022972 23/04/2018
20181110005022 31/01/2018

20171110038332 07/07/2017

20171110038502 07/07/2017

20191100078352 12/11/2019

20171110076122 19/12/2017

20181100061692 28/09/2018

20181110017522 27/03/2018

20181110018422 03/04/2018

20181110023702 25/04/2018

20191100015152 28/02/2019

20191100003612 18/01/2019

20151260041822 21/09/2015

20191100005712 25/01/2019

20181100051672 29/08/2018

20181100064342 08/10/2018

20191100002972 17/01/2019

20191100002982 17/01/2019
20191100003712 18/01/2019

20191100064922 20/09/2019

20191100016782 06/03/2019

20191100052122 09/08/2019

20191100052092 09/08/2019

20211110034452 25/03/2021

20191100061262 11/09/2019

20191100060832 10/09/2019

20191100060712 09/09/2019

20191100061812 12/09/2019

20191100062562 12/09/2019

20191100062612 16/09/2019

20191100062612 16/09/2019

20191100062612 16/09/2019

20191100062612 16/09/2019

20191100062612 16/09/2019
20191100004642 23/01/2019

20191100003372 17/01/2019

20191100006242 29/01/2019

20191100004182 22/01/2019

20181100082222 16/10/2018

20181100082222 16/10/2018

20181100082172 16/10/2018

20191100008282 06/02/2019

20191100011132 15/02/2019

20191100015632 01/03/2019

20191100015632 01/03/2019

20191100021732 28/03/2019

20121260008452 02/02/2012

20131260032152 13/08/2013

20131260033202 20/08/2013
20201110057792 09/09/2020

20131260045542 28/10/2013

20211110006582 22/01/2021

20171110037842 05/07/2017

20181110023182 24/04/2018

20191100029952 09/05/2019

20191100040232 19/06/2019

20191100078352 12/11/2019

20191100043212 03/07/2019

20191100045592 15/07/2019

20211110033212 23/03/2021

20191100070042 09/10/2019

20191100075592 29/10/2019

20191100078342 12/11/2019
20191100075592 29/10/2019

20191100078332 12/11/2019

20191100074442 24/10/2019

20191100074442 24/10/2019

20201100009642 13/02/2020

20191100078352 12/11/2019

20111260035602 04/08/2011

20111260035602 04/08/2011

20201100005602 31/01/2020

20201110028112 22/05/2020

20191100081622 25/11/2019

20191100082812 28/11/2019

20191100089152 20/12/2019

20191100089152 20/12/2019

20201110057762 09/09/2020

20211110030882 16/03/2021
20211110032802 19/03/2021

20171110037082 30/06/2017

20201100004992 29/01/2020

20201100009612 13/02/2020

20201100009612 13/02/2020

20201100009622 13/02/2020

20201110023042 05/05/2020

20201110023042 05/05/2020

20201100009622 13/02/2020

20201100009622 13/02/2020

20201100009332 13/02/2020

20201100011612 21/02/2020

20201100013912 04/03/2020

20201100013912 04/03/2020

20201100014302 05/03/2020

20201110018752 07/04/2020

20201110019322 14/04/2020
20201110018902 08/04/2020

20201110018892 08/04/2020

20201100015262 10/03/2020

20201100015262 10/03/2020

20201520021682 27/04/2020

20211110003732 15/01/2021

20211110003762 15/01/2021

20201110024202 07/05/2020

20201110026752 19/05/2020

20201110040672 17/07/2020

20201110026752 19/05/2020

20201110025752 14/05/2020

20201520030432 05/06/2020

20201520037482 06/07/2020

20201110036572 01/07/2020
20201110036252 30/06/2020

20201110051452 26/08/2020

20201110036242 30/06/2020

20201110036192 30/06/2020

20201110029822 03/06/2020

20201110036882 02/07/2020

20201110040492 17/07/2020

20201110040492 17/07/2020

20201110039052 13/07/2020

20211110052352 30/04/2021

20201110093722 03/12/2020

20211110031862 18/03/2021

20211110031862 18/03/2021

20211110031932 18/03/2021

20211110031932 18/03/2021

20211110031942 18/03/2021
20211110031942 18/03/2021

20211110031942 18/03/2021

20211110031942 18/03/2021

20211110031942 18/03/2021

20211110032022 18/03/2021

20211110031992 18/03/2021

20211110034332 24/03/2021

20211110035052 25/03/2021

20211110034372 24/03/2021

20211110035402 26/03/2021

20211110041482 12/04/2021

20211110035482 26/03/2021

20211110036702 30/03/2021

20211110037092 30/03/2021

20211110005692 21/01/2020

20211110011862 04/02/2020
20201110088232 20/11/2020

20201110094422 04/12/2020

20211110023142 26/02/2021

20211110015252 10/02/2021

20211110026732 08/03/2021

20211110018182 17/02/2021

20211110015072 10/02/2021

20211110018132 17/02/2021

20211110018142 17/02/2021

20211110018152 17/02/2021

20211110018162 17/02/2021

20211110026342 05/03/2021

20211110026342 05/03/2021

20211110017112 15/02/2021

20211110018122 17/02/2021

20211110036192 29/03/2021
20211110016922 12/02/2021

20211110028092 10/03/2021

20211110038962 06/04/2021

20211110047662 21/04/2021

20211110041482 12/04/2021

20211110040272 08/04/2021

20211110039572 07/04/2021

20211110041522 12/04/2021

20211110041522 12/04/2021

20211110041502 12/04/2021

20211110041502 12/04/2021

20201110057802 09/09/2020

20201110057782 09/09/2020

20201110057782 09/09/2020

20201110057782 09/09/2020
20201110057782 09/09/2020

20201110057782 09/09/2020

20201110057782 09/09/2020

20201110057782 09/09/2020

20201110057772 09/09/2020

20201110038952 10/07/2020

20201110038922 10/07/2020

20201110038752 10/07/2020

20201110037912 07/07/2020

20201110037792 07/07/2020

20201110034322 19/06/2020

20201110033402 18/06/2020

20201110033402 18/06/2020

20201110033402 18/06/2020

20201110033402 18/06/2020

20201110033402 18/06/2020
20201110033402 18/06/2020

20201110033402 18/06/2020

20201110041952 24/07/2020

20201110041512 23/07/2020

20201110041482 23/07/2020

20201110038742 10/07/2020

20201110038722 10/07/2020

20201110028442 26/05/2020

20201110031132 09/06/2020

20201110045702 06/08/2020

20201110045002 04/08/2020

20201110044702 04/08/2020

20201110043082 30/07/2020

20201110042882 29/07/2020

20201110049532 21/08/2020
20201110047702 14/08/2020

20201110046222 10/08/2020

20201110047572 13/08/2020

20201110046222 10/08/2020

20201110053022 31/08/2020

20201130052372 27/08/2020

20201110052102 27/08/2020

20201110051742 26/08/2020

20201110051362 26/08/2020

20201110051392 26/08/2020

20201110066422 01/10/2020

20201110031422 10/06/2020

20201110071322 14/10/2020

20201110084792 11/11/2020

20201110084902 11/11/2020

20201110084912 11/11/2020

20201110084912 11/11/2020
20201100009622 13/02/2020

20201100009622 13/02/2020

20201100009622 13/02/2020

20201100009622 13/02/2020

20191100078032 08/11/2019

20191100078032 08/11/2019

20191100078032 08/11/2019

20191100078032 08/11/2019

20191100078032 08/11/2019

20201110057772 09/09/2020

20201110057772 09/09/2020

20201110057792 09/09/2020

20201110094592 07/12/2020

20201110094592 07/12/2020

20211110005822 21/01/2021

20201110069492 08/10/2020
20201110088462 20/11/2020

20201110087782 19/11/2020

20201110100832 18/12/2020

20201110103822 24/12/2020

20201110094972 07/12/2020

20201110081672 04/11/2020

20211110007662 26/01/2021

20211110006532 22/01/2021

20211110024802 03/03/2021

20211110030702 16/03/2021

20191100078032 08/11/2019

20201110104462 28/12/2020

20211110024802 03/03/2021

20191100062612 16/09/2019

20191100062612 16/09/2019

20201110083652 09/11/2020
20201110083412 09/11/2020

20201110083492 09/11/2020

20201110083582 09/11/2020

20201110083592 09/11/2020

20201110083672 09/11/2020

20201110084292 10/11/2020

20201110084212 10/11/2020

20201110089922 24/11/2020

20201110077402 26/10/2020

20201110077402 26/10/2020

20201110077402 26/10/2020

20201110085452 12/11/2020

20201110087762 19/11/2020

20201110084222 10/11/2020

20201110084222 10/11/2020

20201110103222 23/12/2020
20201110101132 18/12/2020

20211110000632 05/01/2021

20201110100752 18/12/2020

20201110100742 18/12/2020

20211110031032 17/03/2021

20201110038752 10/07/2020

20201110038752 10/07/2020

20201110038752 10/07/2020

20201110038752 10/07/2020

20211110031862 18/03/2021

20201110057792 09/09/2020

20201100002432 16/01/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020
20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020

20201110057762 09/09/2020
20201110058082 10/09/2020

20201110052532 28/08/2020

20201110051732 26/08/2020
20201110051682 26/08/2020

20201110053462 01/09/2020

20201100002432 16/01/2020

20211110001262 07/01/2021

20211110001262 07/01/2021

20201100002432 16/01/2020

20201130059982 15/09/2020

20201110059432 14/09/2020

20201110059212 11/09/2020

20201110061672 20/09/2020

20201110061682 20/09/2020

20201110061662 20/09/2020

20201110060782 16/09/2020

20201110066732 01/10/2020

20201110066722 01/10/2020
20201110065892 30/09/2020

20201110065832 30/09/2020

20201110065732 30/09/2020

20201110065672 30/09/2020

20201110064632 28/09/2020

20201110066892 02/10/2020

20201110077312 26/10/2020

20211110053652 04/05/2021

20211110053662 04/05/2021

20211110072132 16/06/2021

20201110077312 26/10/2020
INFORMACIÓN REPORTADA

Capacidad
Nombre Proyecto Promotor/Interesado
MW

Remisión de conexión Parque Generación Solar Fotovoltaica LOS COLORADOS


9.9
Los Colorados II 9,9 MW. SOLAR S.A.S.
PARQUE
Remisión estudio de conexión planta fotovoltaica La Sierpe
FOTOVOLTAICO LA 19.99
19,99MW
SIERPE
Estudio de conexión "Ampliación de la Capacidad de
COMPAÑÍA ELÉCTRICA
Generación de la central TERMOPAIPA IV". De 150 MW a 165 15
DE SOCHAGOTA
MW
Remisión estudio de conexión Autogeneración Nare - Argos
GRUPO ARGOS 9
hasta 9 MW para entrega de energía a la red

Solicitud avance de proyectos Bosques Solares de Bolivar 500,


501, 502 en 34,5 kV para la SE Sabanalarga de forma SOLARGREEN 59.7
independiente a los proyectos de 115 kV. Todos de 19,9 MW

Estudio de ampliación de la unidad generadora 1 de salvajina.


CELSIA COLOMBIA 30
De 95 MW a 125 MW. FPO: jul-2018.

Remisión estudio de conexión de la central de generación solar EL GUAYACAN SOLAR


8
de 8 MW "El Guayacán" a la subestación Corozal 34,5 kV SAS

Solicitud concepto aprobatorio UPME para el proyecto


denominado "Ampliación 2 MW para la conexión de la central TERMO MECHERO
2
de generación térmica Termomechero 4, 5 y 6 de 19 MW cada MORRO
una a la subestación Yopal 115 kV
Remisión de Estudio para viabilidad de ampliación de
capacidad de la central hidroelectrica Hidronare de 14 MW a GRUPO NARE 5.9
19,9 MW.

Remisión estudio de conexión Planta Solar La Ceiba 8 MW LA CEIBA SOLAR S.A:S. 8

Solicitud de conexión Parque Solar Bayunca 1 (3 MW) EGAL 3

Ampliación de la coegeneración del Ingenio Risaralda a 19,9


INGENIO RISARALDA 4.9
MW

Remisión estudio de conexión Planta Solar Morrosquillos I 19,5 LOS MORROSQUILLOS


19.9
MW SOLAR S.A.S.

Remisión estudio de conexión Planta Solar Morrosquillos II 19,5 LOS MORROSQUILLOS


19.5
MW SOLAR S.A.S.

Remisión de estudio de conexión "GR Parque Solar Tucanes"


GRENERGY COLOMBIA 9.9
antes Bayunca 1 de 9,9 MW
Concepto de aumento de capacidad de conexión Termotasajero TERMOTASAJERO
6
Dos de 165 MW a 171 MW DOS
Remisión estudio para viabilidad ampliación de capacidad PCH
EPM 8.3
Pajarito

Concepto de viabilidad técnica ampliación PCH Rio Recio VATIA 0.6

Concepto viabilidad técnica proyecto de generación


GENERSA 4.8
Termocapachos
Concepto estudio de conexión para la generación fotovoltaica
CSF SAN FELIPE
CSF CONTINUA San Felipe S.A.S. 90 MW en la subestación 90
CONTINUA
de San Felipe 230 kV

Remisión de estudio de conexión El Ahumado 50 MW. GUAJIRA EOLICA 1 50

Ratificación concexión proyectos eólicos en la Guajira. EPM


EPM 201
IPAPURE 201 MW

Proyectos eólicos de Jemeiwaa ka I: Parque eólico Irraipa 99


JEMEIWAA KA I 99
MW

Proyectos eólicos de Jemeiwaa ka I: Parque eólico Carrizal 195


JEMEIWAA KA I 195
MW

Proyectos eólicos de Jemeiwaa ka I: Parque eólico Casa


JEMEIWAA KA I 180
Eléctrica 180 MW

Proyectos eólicos de Jemeiwaa ka I: Parque eólico Apotolorru


JEMEIWAA KA I 75
75 MW

Conexión eólicos en La Guajira: Kuisa (Tumawind) ENEL GREEN POWER 200

Conexión eólicos en La Guajira: Urraichi (Chemesky) ENEL GREEN POWER 100

Manifestación de intéres de 250 MW de generación (Eólico) de


la empresa BEGONIA POWER S.A. E.S.P. Camelias. Se BEGONIA POWER 250
presentó tambien a las circulares CIRCULARES 003 Y/O 004.

Concepto conexión proyecto de generación ENR COL I de


120.36 MW a la subestación Cuestecitas 220 kV de propiedad
NEOEN 120.36
de ISA - ESTUDIO DE CONEXIÓN DEL PARQUE SOLAR ENR
COL I.
Parque Solar
Remisión estudio de Conexión para proyecto parque solar
Fotovoltaico Wimke 76
fotovoltaico Wimke (Tayrona) 76 MW
S.A.S.

Estudio de conexión generador térmico ciclo combinado


TERMO SOLO 1 S.A.S 165
Termosolo 1 - 165 MW (antes Puerto Solo 148 MW)
Remisión del estudio de conexión proyectos Celsia Solar
Chicamocha 1 19.9 MW ubicados en el municipio de Los CELSIA S.A. 19.9
Santos, Santander.

Solicitud de Conexión - Proyecto "Pétalo del Cesar" (9,9 MW). BLACK ORCHID SOLAR 9.9

Remisión del estudio de conexión proyectos Celsia Solar


Chicamocha 2 19.9 MW ubicados en el municipio de Los CELSIA S.A. 19.9
Santos, Santander.
Remisión del estudio de conexión proyectos Celsia Solar
Chicamocha 3 19.9 MW ubicados en el municipio de Los CELSIA S.A. 19.9
Santos, Santander.
Remisión del estudio de conexión proyectos Celsia Solar
Chicamocha 4 19.9 MW ubicados en el municipio de Los CELSIA S.A. 19.9
Santos, Santander.

Conexión "PCH La Libertad de 1,2 MW" EGECOL 1.2

Remisión estudio de conexión del proyecto PV Codazzi 2 19,9


MW a 110 kV de generación fotovoltaica a la subestación FONROCHE COLOMBIA 19.9
Codazzi
Remisión estudio de conexión del proyecto PV Codazzi 1 19,9
MW a 110 kV de generación fotovoltaica a la subestación FONROCHE COLOMBIA 19.9
Codazzi
Remisión Estudio de conexión Central de Generación
ISAGEN 98
Hidráulica Palagua 98 MW
CSF CARTAGO
Estudio de conexión CSF CONTINUA Cartago 99 MW 99
CONTINUA

Concepto estudio de conexión para la generación fotovoltaica


INVENERGY 200
La Sierra Solar 200 MW en la subestación La Sierra 220 kV

PARQUE SOLARA
Concepto estudio de conexión para la generación fotovoltaica
PORTÓN DEL SOL 102
Portón del Sol 102 MW en la subestación Purnio 230 kV
S.A.S
PARQUE SOLAR
Concepto de conexión del proyecto de generación Parque Solar
FOTOVOLTAICO 99.9
Fotovoltaico Fundación.
FUNDACION SAS

Estudio de conexión Ingenio Pichichi 17 MW INGENIO PICHICHI S.A. 17

Solicitud de ampliación de la conexión Incauca de 52 MW a 60


INCAUCA 8
MW al SIN
Estudio de Conexión "Proyecto Fotovoltaico Paipa I - PSR3 de
PSR3 88
88 MW".
Estudio de Conexión "Proyecto Fotovoltaico Paipa II - PSR4 de
PSR4 72
72 MW".

Concepto conexión planta de generación fotovoltaica TEPUY


EPM 83
83MW
AGUAS DE LA SANTA
Remisión estudio de conexión PCH Pocuné 1 MW 1
MARIA

Remisión estudio de conexión Parque Solar la Unión 100MW SOLARPACK 100

Remisión estudio de conexión PCH La Cascada de Granada


PCH INMAQ 2.09
2,09 MW.
Remisión estudio de conexión de los parques de generación
solar de 7x19,9 MW a 34,5 kV a la subestación Cerromatoso. SOLARGREEN 139.3
Bosques solares de Colombia.

Estudio de conexión de la central hidroelectrica Río San Juan HIDROELECTRICA RIO


117.5
de 117,5MW SAN JUAN

COLOMBIA SOLAR
Remisión estudio de conexión Parque Solar Zambrano II 15,5
CORPORATION 15.5
MW
INTERNATIONAL
Remisión concepto de viabilidad técnica para la conexión de
MASSIVE SOLAR
19,9 MW de generación fotovoltaica a la subestación Juan Mina 19.9
ENERGY COLOMBIA
a nivel de 34,5 kV (Proyecto El Colibrí 19,9 MW).
Remisión estudio de conexión Parque Solar La Cayena 19,9 LA CAYENA SOLAR
19.9
MW al barraje 110 kV en la subestación Sincé. S.A.S.
Remisión concepto de viabilidad técnica para la conexión de 30
MW de generación fotovoltaica a la subestación Juan Mina a CELSIA COLOMBIA 30
nivel de 110 kV. (Parque Solar Atlántico I)
Comentarios a "Solicitud de aclaración Planta Solar La Filigrana
CASTELLANA DE
9,9MW" emitida por la UPME bajo el número de radicado 9.9
PROYECTOS SOLARES
20181520017901

Remisión concepto de viabilidad técnica para la conexión de


FOTOVOLTAICA EL
19,9 MW de generación fotovoltaica a la subestación Baranoa a 19.9
YARUMO S.A.S.
nivel de 110 kV (Parque Solar Fotovoltaico Baranoa 19,9 MW)

Estudio de conexión para la Planta de Generación "La Mata"


SOLARPACK 80
del promotor Solarpack

Remisión estudios de PV Bosques solares de Bolivar 503 y


SOLARGREEN 39.8
504. Todos de 19,9 MW

Proyecto de generación Solar Guayepo Fase I 200 MW INGENOSTRUM 200

Proyecto de generación Solar Guayepo Fase II 200 MW INGENOSTRUM 200

PARQUE SOLAR
Parque Solar Fotovoltaico Sabanalarga FOTOVOLTAICO 200
SABANALARGA S.A.S.
Concepto conexión central generación solar Atlantico
ATLANTICO
Photovoltaic SAS, de 199,5 MW a la subestación Sabanalarga 199.5
PHOTOVOLTAIC
500 kV.
Concepto estudio de conexión del parque solar el Campano EL CAMPANO SOLAR
99.9
99,9 MW en la subestación Chinú 200 kV S.A.S.
Concepto conexión ampliación generación Termocandelaria en TERMOCANDELARIA
252.15
Candelaria 220 kV. Ampliación de 314 MW a 566,15 MW S.C.A.

Remisión Estudio de conexión Autogeneración Ayurá - EPM


EPM 16.17
hasta 16,17 MW para entrega de energía a la red.
ENERGÍAS
Estudio de conexión granja solar Palmaseca 28 MW RENOVABLES DEL 28
VALLE
Concepto estudio de conexión para el proyecto PLANTA
TW SOLAR 200
SOLAR FOTOVOLTAICA GUAYACANES 200 MW.
Concepto de Viabilidad Técnica para la conexión de la central RALOS & BLAUD
de generación Solar de 50 MW "Caracolí I" a la subestación ENERGY COLOMBIA 50
Caracolí 110 kV. (Parque Solar Caracolí) S.A.S.

Proyecto Villanueva 25 MW (antes Refocosta) SPV VILLANUEVA S.A.S 25

Solicitud de concepto aprobatorio UPME para el proyecto


INTERNATIONAL OIL
denominado "Centrales de Generación TERMOAGUAZUL 1 Y 2 39.6
GAS
- 19,8 MW CADA UNA"
Concepto técnico sobre la conexión del proyecto Generación
Solar de 28 MW Ubaté PSR1 a las redes propiedad de PSR1 28
CODENSA
Concepto técnico sobre la conexión del proyecto Planta de
generación solar Pubenza PSR2 de 50 MW, en las redes del PSR2 50
STR propiedad de CODENSA
AWARALÁ CENTRAL
Proyecto Generación AWARALA Central Eléctrica 19.9 MW 19.9
ELÉCTRICA S.A.S.
Remisión estudio de conexión Planta Solar El Trebol GRANJA SOLAR CSCI 1
20
(Zambrano I) 19,9 MW S.A.S E.S.P.
Concepto conexión planta fotovoltaica YARIGUÍES 200 MW al
YARIGUIES SOLAR 200
SIN
Concepto conexión planta fotovoltaica ANDES SOLARES 85
ANDES SOLARES 85
MW al SIN
Remsión Estudio de conexión Proyecto Hidroeléctrico
ISAGEN 4.3
Tafetanes 4,3 MW

Remisión estudio de conexión Central Hidroeléctrica


GENMAS 20
Penderisco I

Remisión estudio para la viabilidad de ampliación de capacidad


CH SAN MIGUEL 7.6
de la Central Hidroeléctrica San Miguel en 7,6 MW

Concepto conexión Pequeñas Centrales Hidroeléctricas Pacora HIDROELÉCTRICAS DE


5.1
I de 5,1 MW PÁCORA
Concepto conexión Pequeñas Centrales Hidroeléctricas Pacora HIDROELÉCTRICAS DE
8.53
II de 8,53 MW PÁCORA
Remisión estudio de conexión Parque de Generación Solar El EL TAMARINDO SOLAR
9.9
Tamarindo I 9,9 MW S.A.S.
Remisión estudio de conexión Parque de Generación Solar EL TAMARINDO SOLAR
9.9
Fotovoltaico (PV) El Tamarindo II 9.9 MW S.A.S.
Remisióin estudio de conexión planta de Autogeneración PTAR AGUAS NACIONALES
5
Bello con entrega de hasta 5 MW de energía a la red. EPM S.A. E.S.P

Concepto de viabilidad técnica Autogeneración "Celsia Solar


CELSIA COLOMBIA 9.9
Espinal" 9,9 MW
GREEN YELLOW
Remisión estudio de conexión Parque Fotovoltaico Cordobita
ENERGIA DE 9.9
9,9 MW al barraje 13.8 kV en la subestación Río Córdoba.
COLOMBIA S.A.S.
Remisión estudio de conexión Parque Solar Pétalo del Córdoba
BLACK ORCHID SOLAR 9.9
II 9.9 MW.
Remisión estudio de conexión parque solar fotovoltaico Los
TW SOLAR 19.9
Ocobos 19,9 MW
Concepto técnico sobre la ampliación en la capacidad de
BIOGÁS DOÑA JUANA
transporte asignada en la Planta de Generación Biogas Doña 3.3
S.A.S E.S.P
Juana I de 1,7 MW a 5 MW

Solicitud de Registro Proyecto Andes Solar 140 MW (Barranca) ANDES SOLAR IV 125

Remisión concepto de viabilidad ténica para la conexión de 9.9


CASTELLANA DE
MW de generación fotovoltaica a la subestación El Carmen a 9.9
PROYECTOS SOLARES
nivel de 13.8 kV. (Parque Solar Los Colorados III 9.9 MW).

Concepto viabilidad técnica para la conexión de la planta de


ECOPETROL 19.9
generación Termosuria 1 de 19,9 MW a Suria 115 kV.

Concepto viabilidad técnica para la conexión de la planta de


ECOPETROL 19.9
generación CDS TM2500 de 19,9 MW en Suria 34,5 kV

Solicitud de aprobación de la conexión de la Planta Solar


EEPEREIRA 5.06
Fotovoltaica "Granja Solar Belmonte".

PROMOENERGIA
Solicitud de conexión parque eólico Magdalena 99,9 MW 99.9
MAGDALENA

PROMOENERGIA
Solicitud de conexión parque eólico Culantral 99,9 MW 99.9
CULANTRAL

Concepto estudio de conexión para la Planta de generación


MIEL II 120
MIEL II 120 MW en la subestación San Felipe 230 kV

Concepto estudio de conexión para la generación fotovoltaica PARQUE SOLAR


300
PS Puerta de Oro 300 MW en la subestación San Felipe 230 kV PUERTA DE ORO

Estudio y concepto de conexión plantas de generación Jaguey


a la subestación Chivor II 230 kV a través de la red de conexión ODL S.A. 21.87
de Petroeléctricas de los Llanos.
Estudio y concepto de conexión plantas de generación Rubiales
a la subestación Chivor II 230 kV a través de la red de conexión ODL S.A. 21.87
de Petroeléctricas de los Llanos.

Ampliación Capacidad Efectiva Neta TEBSA de 791 MW a 815


TEBSA 24
MW

Remisión estudio de conexión del proyecto Pétalo de Córdoba GREEN YELLOW


9.9 MW a 13.8 kV de generación Fotovoltaica a la subestación ENERGIA DE 9.9
Planeta Rica. COLOMBIA S.A.S.
Estudio de conexión "Parque de Generación Solar Fotovoltaico
OICATÁ SOLAR S.A.S. 9.9
Oicatá de 9.9 MW".

Estudio De Conexión Termovalle (241,75 MW) TERMOVALLE 41.75

TERMO PUERTO SOLO


Estudio de conexión Termosolo 2 (80MW) 80
S.A.S

Autogeneración Papeles del Cauca PAPELES DEL CAUCA 0

Concepto téncio sobre la conexión del proyecto PLANTA DE


BIOGÁS DOÑA JUANA
GENERACIÖN JIREH I de 9.88 MW, a las redes del SDL 9.88
S.A.S E.S.P
propiedad de Codensa.
Remisión del Estudio de Conexión proyecto Autogeneración INVERSORA SANTA
17
Ferticol de 17 MW. MARIA S.A.S.
LATAMSOLAR
Información proyecto solar área GCM (circular 16 de marzo
FOTOVOLTAICA 99.99
2017). LATAMSOLAR Fundación. Nabusimake.
FUNDACIÓN S.A.S.
Concepto de viabilidad técnica Planta Fotovoltaica "Granja
ENINSA 9.9
Solar San Felipe 9,9 MW".
Concepto viabilidad ténica planta fotovoltaica "Flandes 19,9
CELSIA COLOMBIA 19.9
MW".
Concepto de viabilidad técnica Planta Fotovoltaica "Granja
ENINSA 9.9
Solar Lanceros 9.9 MW".

CONTINUA ENERGIAS
Remisión del estudio de conexión proyecto CSF Continua
POSITIVAS COLOMBIA 19.8
Barbosa I y II de 2x 9,9 MW.
S.A.S.

Remisión del Estudio de Conexión Proyecto Solar Cimitarra


TERMOTASAJERO 19.9
19,9 MW

Remisión del estudio de conexión proyecto de generación solar


BLACK ORCHID SOLAR 19.9
fotovoltaico Pétalo de Cesar II de 19,9 MW
Remisión concepto de viabilidad técnica para la conexión de 10
MW de generación eólica a la subestación Santa Verónica a CELSIA S.A. 10
nivel de 34.5 kV. (Parque Carreto 10 MW)
Remisión estudio de conexión proyecto Autogeneración Celsia
CELSIA S.A. 9.9
Solar El Carmelo 9,9 MW.
Remisión estudio de interconexión - Proyecto Central Térmica
AXIA ENERGIA 42
Termocaribe S.A.S. 450 MW - Mamonal Cartagena "NewGen"

Concepto de viabilidad técnica proyecto de generación Alma


SVC ESP SAS 9.8
Solar 1.

Estudio de conexión para proyectos solares en el Norte del


CELSIA COLOMBIA 9.9
Valle del Cauca - Colombia: Solar La Paila 9,9 MW
Concepto de viabilidad técnica para la conexión de 9.9 MW de
PARQUE SOLAR
generación solar a la subestación Chinú Planta a nivel de 34.5 9.99
TIERRA LINDA S.A.S.
kV (Parque Solar Tierra Linda de 9.99 MW)

Concepto de viabilidad técnica para la conexión de 19.9 MW de PARQUE


generación solar fotovoltaica a la subestación Chinú Planta a FOTOVOLTAICO LA 19.9
nivel de 34.5 kV. (Parque solar FV La Tolua 19.9 MW) TOLUA S.A.S.

Remisión estudio de conexión del proyecto Planta Fotovoltaica


XANTIA-XAMUELS
"Jumi" de 9.9 MW a 13.8 kV de generación Fotovoltaica a la 9.9
S.A.S
subestación Juan Mina.

Concepto de viabilidad técnica fotovoltaica "Cerritos 9,9 MW". PRODIEL 9.9

Remisión estudio de conexión del proyecto Central Térmica


CI MILPA S.A. 60
Palermo de 60 MW a 110 kV a la subestación El Río.

Estudio de conexión para proyectos solares en el Norte del


CELSIA COLOMBIA 39.8
Valle del Cauca - Colombia: Solar La Victoria 1 y 2 2x19.9MW

Estudio de conexión para proyectos solares en el Norte del


CELSIA COLOMBIA 9.9
Valle del Cauca - Colombia: Solar Bugalagrande 1 9,9 MW
Concepto de viabilidad técnica planta fotovoltaica "Yuma 9,9
CELSIA COLOMBIA 9.9
MW"
Remisión estudio de conexión del proyecto Pétalo de Sucre 9,9
MW a 34,5 kV de generación fotovoltaica a la subestación BLACK ORCHID SOLAR 9.9
Coveñas.
Concepto de viabilidad Técnica para la conexión de la planta de
generación Bosques Solares de los Llanos 6 de 79.6 MW en el
SOLARGREEN 79.6
corredor de la línea 115 kV Ocoa - Suria presentada por
SolarGreen.
Concepto estudio de conexión para el Proyecto de Generación EÓLICA COSTA
Eólico Costa Atlántica 168 MW a la Subestación Caracolí 220 ATLÁNTICA S.A.S. 168
kV E.S.P.
Remisión estudio de conexión del proyecto Parque de
LICA ENERGÍA
Generación Fotovoltaico Alejandría de 9.9 MW a nivel de 34,5 9.9
RENOVABLES S.A.S
kV a la subestación Planeta Rica.
Concepto Viabilidad Técnica para la conexión en la línea 34,5
kV Ocoa - Acacías de a planta de generación solar fotovoltaica DELPHI CAPITAL
16.5
DELPHI HELIOS 1 META de 16,5 MW de DELPHI CAPITAL PARTNERS S.A.S.
PARTNERS S.A.S
Manifestación de interes de conexión parque eólico Alpha de
212 MW a Sub-área GCM, en atención a la Circular Externa VIENTOS DEL NORTE 212
UPME radicado 2017154000481 del 16 de marzo de 2017.

Manifestación de interes de conexión parque eólico Beta de 280


MW a Sub-área GCM, en atención a la Circular Externa UPME EOLOS ENERGÍA 280
radicado 2017154000481 del 16 de marzo de 2017.

OPERADORA RAYO
Concepto estudio de conexiòn del parque fotovoltaico Shangrila
ENERGÍA COLOMBIA 160
160 MW, en la subestaciòn Ibaguè (Mirolindo) 230 kV
S.A.S.

Remisión concepto de viabilidad técnica para la conexión de 8.6 GREEN YELLOW


MW de generación fotovoltaica a la subestación Mamonal a ENERGIA DE 8.6
nivel de 13.8 kV. (Parque Solar Fotovoltaico Badel 1). COLOMBIA S.A.S.

Remisión concepto de viabilidad técnica para la conexión de 9,9


XANTIA-XAMUELS
MW de generación fotovoltaica PFV CRLI a la subestación 9.9
S.A.S
Caracolí a nivel de 13,8 kV.
Remisión de estudio de conexión ampliación capacidad PCH
EPM 3.75
Caracolí a 4.05 MW
Remisión estudio de conexión del proyecto BRS Solar de 60
MW a 110 kV de generación Fotovoltaica a la subestación INVENERGY 60
Sierra Flor.

Solicitud Concepto UPME para la conexión de PCH Cauquillo INMEL S.A. 19.5

Solicitud Concepto UPME para la conexión de PCH Paraíso INMEL S.A. 18

Estudio de conexión "Planta de Generación Solar Fotovoltaico PROFESIONALES EN


4.5
PEESA de 4,45 MW" ENERGIA S.A. E.S.P.

Estudio de conexión para plantas solares "Sol de Gamarrita 1 y


INVENERGY 30
2" del promotor Invenergy Renewables Colombia SAS E.S.P

Estudio de conexión para plantas solares "Sol de Gamarrita 3"


INVENERGY 15
del promotor Invenergy Renewables Colombia SAS E.S.P

Concepto conexión pequeña Central Hidroeléctrica Rio Hondo


GENSA 19.9
19,9 MW
Remisión estudio de conexión del proyecto Planta Fotovoltaica
XANTIA-XAMUELS
PN1 de 9,9 MW a 13,8 kV de generación Fotovoltaica a la 9.9
S.A.S
subestación Gambote
Remisión estudio de conexión del proyecto Planta Fotovoltaica
XANTIA-XAMUELS
"SGDE" de 9,9 MW a 13,8 kV de generación fotovoltaica a 9.9
S.A.S
subestación Sabanagrande.
Remisión del estudio de conexión proyecto Planta Solar
EPM 15
Sabana de Torres 15 MW.
Concepto de viabilidad técnica Planta Fotovoltaica " La Medina PARQUE SOLAR LA
9.9
9,9 MW". MEDINA S.A.S.
Remisión de viabilidad técnica para la conexión del proyecto
solar Pétalo del Magdalena I de 9,9 MW a la subestación BLACK ORCHID SOLAR 9.9
Zawady de 13,8 kV
Concepto de viabilidad técnica Planta Fotovoltaica "Los PARQUE SOLAR LOS
9.9
Caballeros 9,9 MW". CABALLEROS S.A.S.

PROELECTRICA DEL
Concepto conexión planta térmica el Tesorito 198,7 MW al SIN 198.7
ARCHIPIELAGO

Estudio de conexión "Parque Solar Atlántico IV 19.9 MW",


COLOMENER VI S.A.S 19.9
análisis de beneficio por demanda no atendida.
Concepto conexión Pequeña Central Hidroeléctrica Hidroarquía HIDROARQUIA S.A.S.
9.27
9,27 MW E.S.P.
Actualización Concepto de viabilidad técnica proyecto de
generación Termocapachos (Aumento de capacidad de 4.8 a GENERSA 5.1
9.9 MW)

Remisión del estudio de conexión proyecto Central Fotovoltaica


HMV 19.9
Macaregua 19,9 MW

Remisión Estudio de conexión aumento Autogeneración El


GRUPO ARGOS 3.5
Cairo - Argos hasta 10 MW para entrega de energía a la red.

Remisión del estudio de conexión proyecto Planta Solar Puerto


EPM 15
Wilches 15 MW

Estudio de conexión "Planta Autogeneración MILPA Samacá 18


C.I. MILPA S.A. 18
MW"

Concepto de viabilidad técnica proyecto de generación Alma


SVC ESP SAS 9.8
Solar 2.

Remisión Estudio de conexión Toluviejo 220 kV (150 MW) ELAWAN ENERGY 150

Remisión concepto de viabilidad técnica para la conexión de 40


MW de generación fotovoltaica PFV Tierra Alta a la subestación INVENERGY 40
Tierra Alta a nivel de 110 kV
Remisión concepto de viabilidad técnica para la conexión del
XANTIA-XAMUELS
proyecot de generación Parque Fotovoltaico OLD-T de 9.9 MW 9.9
S.A.S
a nivel de 13.8 kV a la subestación Toluviejo.
Remisión concepto de viabilidad técnica para la conexión de 8
PARQUE SOLAR
MW de generación Parque Solar fotovoltaico Mompox a la 8
MOMPOX S.A.S.
subestación Mompox a nivel de 34.5 kV.
Remisión concepto de viabilidad técnica para la conexión de 8
PARQUE SOLAR
MW de generaión Parque Solar fotovoltaico Filigrana a la 8
FILIGRANA S.A.S.
subestación Mompox a nivel de 34.5 kV.
Remisión estudio de conexión del proyecto de generación
Parque Solar Planeta
Parque Fotovoltaico Planeta Rica de 19,9 MW a nivel de 110 kV 19.9
Rica S.A.S.
a la subestación Planeta Rica.
Remisión concepto de viabilidad ténica para la conexión del
proyecto de generación Parque Solar Urrá de 19.9 MW a nivel URRÁ S.A. E.S.P. 19.9
de 110 kV a la subestación Urrá.
Concepto estudio de conexión para la generación térmica de
TERMOPALMERO 650
TERMOPALMERO 650 MW.

Estudio de conexión para las pequeñas centrales DESARROLLOS


hidroeléctricas "El Retiro 1 y 2" del promotor Desarrollos ENERGÉTICOS DE 40
Energéticos de Oriente S.A.S. E.S.P. ORIENTE S.A.S. E.S.P.

PROMOTORA Y
Remisión Concepto de favorabilidad técnica y estudio de GENERADORA DE
99.5
conexión del proyecto " Planta Solar Las Marías 99,5 MW". ENERGÍAS
SOSTENIBLES S.A.S.
GESINSO POWER &
Remisión concepto de favorabilidad técnica estudio de
ENERGY 3
conexión del proyecto "PCH Piendamó - 3 MW".
ENGINEERING S.A.S.
JP ENERGY COLOMBIA
Parque solar fotovoltaico Juana María 9,4 MW 9.4
S.A.S
Concepto de conexión Pequeña Centroal Hidroeléctrica La PCH LA FLORIDA
3.2
Florida 3,2 MW. S.A.S. E.S.P.

Remisión del Estudio de conexión Central Fotovoltaica Oiba 5


HMV 5
MW

Remisión del estudio de conexión proyecto Planta Solar


EPM 9.9
Barranquita 9,9 MW
Remisión, estudio de conexión Parque Solar Fotovoltaico
COLGEÓLICA S.A.S. 9.9
Sáchica de 9,9 MW
Remisión del Estudio de Conexión Proyecto Generación Solar SOLAR PROJECTS
40
FV La Pradera 40 MW DEVELOPERS SAS
Remisión Estudio de conexión aumento Autogeneración
Familia. Ampliación de capacidad hasta 5.8 MW para entrega FAMILIA 4.8
de Excedentes a la red.
Remisión Estudio de conexión Proyecto Hidroeléctrico Nare AMBER CAPITAL
19.8
19.8 MW ENERGY

Remisión Estudio de conexión Proyecto Hidroeléctrico Sirgua INVERSIONES


10
10 MW. PUCHARDÁ S.A.S

OBRAS E
Estudios de conexión para planta solar "Kairos I, del promotor
INTERVENTORÍA 19.9
Obras e Interventoría Colombiana OBRAINCOL SAS.
COLOMBIANA SAS
OBRAS E
Estudios de conexión para plantas solares "Kairos II y III" del
INTERVENTORÍA 39.8
promotor Obras e Interventoría Colombiana OBRAINCOL SAS.
COLOMBIANA SAS
MARTIFER MPC
Remisión estudio de conexión Parque de Generación Solar RENEWABLE
25
Mata Redonda de 25 MW. ENERGIES
DEVELOPMENT
Concepto de viabilidad técnica proyecto solar Perales 200 MW. TW SOLAR 200

Estudio de conexión Planta Solar SUNNORTE de 35 MW del


GENERSOL SAS 35
promotor GENERSOL S.A.S
Estudio de conexión para el Parque Solar Fotovoltaico
Azucenos del promotor Sociedad de Gestión Grupo TW Solar TW SOLAR 99.9
Colombia S.A.S., TW Solar S.A.S.
Remisión concepto de favorabilidad técnica y estudio de
conexión del proyecto "Planta de generación solar San Isidro AXIS JC S.A.S. 19.09
19.09 MW".
Concepto de viavilidad ténica para la conexión en la
subestación 34,5 kV San Martín (municipio de San Martín -
Parque Solar Colombia
Meta) de la planta de generación solar fotovoltaica PARQUE 9.9
III S.A.S E.S.P
DE GENERACIÓN FOTOVOLTAICA EL TROPEZÓN DE 9,9
MW

Concepto de viavilidad ténica para la conexión en la


subestación 34,5 kV San Juan de Arama (municipio de San
LICA ENERGÍA
Juan de Arama - Meta) de la planta de generación solar 9.9
RENOVABLES S.A.S
fotovoltaica PARQUE DE GENERACIÓN FOTOVOLTAICA
DINAMARCA DE 9,9 MW

Concepto de viavilidad ténica para la conexión en la


subestación 34,5 kV San Juan de Arama (municipio de San
Parque Solar Colombia
Juna de Arama - Meta) de la planta de generación solar 9.9
VII S.A.S E.S.P
fotovoltaica PARQUE DE GENERACIÓN FOTOVOLTAICA
VERSALLES DE 9,9 MW
Remisión de estudio de conexión COGENERACIÓN DEL INGENIO MARIA LUISA
1.8
INGENIO MARIA LUISA DE 4,7 MW S.A.
MARTIFER MPC
Remisión estudio de conexión Parque de Generación Solar RENEWABLE
50
Valle del Sol de 50 MW ENERGIES
DEVELOPMENT

Concepto estudio de conexión para la planta Cienaga de Oro 1


C&ENER 350
de 350 MW en la subestación Chinú 500 kV

Concepto de viabilidad técnica planta fotovoltaica Solar Escobal


CELSIA COLOMBIA 19.9
2 de 19,9 MW (antes Mirolindo 2 de 19,9 MW)

Concepto de viabilidad técnica planta Solar Escobal 1 19,9 MW


CELSIA COLOMBIA 19.9
(Antes Mirolindo 19,9 MW)

Concepto de viabilidad técnica planta Solar Escobal 4 (antes


CELSIA COLOMBIA 19.9
fotovoltaica Picaleña 19,9 MW)

Concepto de viabilidad técnica planta Solar Escobal 5 19,9 MW


CELSIA COLOMBIA 19.9
(Antes fotovoltaica Salado 19,9 MW)
Concepto de viabilidad técnica planta fotovoltaica Solar Escobal
CELSIA COLOMBIA 19.9
3 de 19,9 MW (antes Mirolindo III de 19,9 MW)

Concepto de Viabilidad técnica Planta Fotovoltaica "Dulima 19.9


CELSIA COLOMBIA 19.9
MW".
MARTIFER MPC
Estudio de conexión para el parque solar fotovoltaico Los RENEWABLE
9.5
Girasoles de 9.5 MW ENERGIES
DEVELOPMENT
Remisión estudio de conexión parque generación eólico
PROMOENERGIA 9.9
Galerazamba 9,9 MW
Remisión concepto de viabilidad técnica para la conexión de 2
PLANTA SOLAR
MW de generación fotovoltaica Parque Solar Arenal a la 2
NEHEMÍAS S.A.S.
subestación San Estanislao nivel de 13.8 kV.
Remisión estudio de conexión para la conexión de 9,9 MW de
generación Parque Solar Fotovoltaico Sincerín - Gambote a la TW SOLAR 9.9
subestación Gambote a nivel de 34,5 kV.

NAVITAS VERDES
Remisión Estudio de Conexión Central Hidroeléctrica Rio Verde 9.9
S.A.S. E.S.P. - ZOMAC

Concepto de viabilidad técnica para la conexión de 9.9MW de


PARQUE SOLAR SAN
generación fotovoltaica “Parque Solar San Francisco” a la 9.9
FRANCISCO S.A.S.
subestación Planeta Rica a nivel de 34,5kV.
CENTRAL
REMISIÓN ESTUDIO DE CONEXIÓN GENERACIÓN PCH
HIDROELÉCTRICA 9.9
ZEUS DE 9.9MW
ZEUS S.A.S. E.S.P.
ABO WIND
Remisión estudio de conexión "Planta Solar Bochica 19,9 MW" RENOVABLES 19.9
COLOMBIA S.A.S.
LATAMSOLAR
Conexión Planta Solar Sahagún 400 MW a la futura
ENERGIAS 400
subestación Sahagún 500 kV.
RENOVABLES
Estudio de conexión Parque Solar Fotovoltaico Gualanday 19,9 FOTOVOLTAICO
19.9
MW. GUALANDAY S.A.S.
Remisión de estudio de Conexión para el proyecto solar
MAINSTREAM
“ANDRÓMEDA” (100 MW) que se conectará a la subestación 100
COLOMBIA S.A.S.
Toluviejo 220 kV.
Remisión Estudio de conexión Autogeneración Gran Colombia
GRAN COLOMBIA
Gold de 8,5 MW con entrega de Excedente a la red hasta 1 8.5
GOLD
MW.
OPERADORA RAYO
Remisión Concepto Aprobatorio Parque Fotovoltaico El Piojo 1
ENERGÍA COLOMBIA 9.9
x 9,9 (Piojo 3 x 9.9 MW)
S.A.S.
OPERADORA RAYO
Remisión Concepto Aprobatorio Parque Fotovoltaico El Piojo 2
ENERGÍA COLOMBIA 9.9
(3 x 9.9 MW)
S.A.S.
OPERADORA RAYO
Remisión Concepto Aprobatorio Parque Fotovoltaico El Piojo 3
ENERGÍA COLOMBIA 9.9
(3 x 9.9 MW)
S.A.S.
COLOMBIA SOLAR
Remisión del estudio de conexión proyecto Parque Solar
CORPORATION 15.5
Zapatoca 15,5 MW
INTERNATIONAL
Concepto conexión Pequeña Central Hidroeléctrica El Bosque
E-Renovable S.A.S 6
6.0 MW
Estudio de Conexión del proyecto Sebastosol 700 MW a la
MINESA S.A. 700
subestación Primavera 500 kV.
Remisión concepto de favorabilidad técnica y estudio de
conexión del proyecto "Central de Generación Guachicono 13.6
GELEC 1.6
MW" en el municipio del Patía - Cauca. (Ampliación de 12 MW
a 13.6 MW).

Remisión estudio de conexión de la central de generación solar CASTELLANA DE


19.5
de 19,5 MW " El Roble" a la subestación Chinú 110 kV PROYECTOS SOLARES

Concepto estudio de conexión del proyecto Parque Solar Chinú LATAMSOLAR


350 MW, a la ENERGIAS 350
subestación Chinú 500 kV. RENOVABLES
Concepto estudio de conexión del proyecto Parque Solar
MAINSTREAM
Antares 150 MW, 150
COLOMBIA S.A.S.
a la subestación Chinú 220 kV

Remisión Estudio de Conexión Proyecto Alejandría 150 MW PRODIEL 150

ESTUDIO DE CONEXIÓN DE LA PEQUEÑA CENTRAL


LICA ENERGÍA
HIDROELÉCTRICA PANACEA II DE 7 MW DEL PROMOTOR 7
RENOVABLES S.A.S
ENERGÍA RESPONSABLE S.A.S. E.S.P.

Estudio de conexión a la red pequeña central hidroeléctrica ENERGÍA


9.9
Panacea 3 - Centrales Eléctricas de Norte de Santander CENS RESPONSABLE S.A.S

Concepto de viabilidad técnica de conexión para el proyecto


GRUPO ENERGÉTICO
"CENTRALES DE GENERACióON TERMOALCARAVAN 1-2-3- 79.6
S.A. E.S.P.
4 DE CAPACIDAD 19.9 MW CADA UNA".

Viabilidad técnica de Conexión Proyecto generación solar AC RENOVABLES SOL


80
Aguaclara 80 MVA. 1 S.A.S. E.S.P.S

ABO WIND
Radicación Estudio de Conexión Proyecto Fotovoltaico El
RENOVABLES 120
Gabán 2 120 MW.
COLOMBIA S.A.S.

Entrega del informe del estudio de conexión del proyecto MAINSTREAM


130
Parque Solar Orión. COLOMBIA S.A.S.
REMISION CONCEPTO DE FAVORABILIDAD TÉCNICA Y
ESTUDIO DE CONEXION DEL PROYECTO PEQUEÑA
VATIA 9
CENTRAL HIDROELÉCTRICA ALTO OVEJAS 9 MW EN EL
MUNICIPIO DEL MONDOMO - CAUCA

Estudio de conexión temporal Termoyopal Generación 2 S.A.S. TERMOYOPAL


36
E.S.P - 50 MW para las Unidades TYG1 20 MW y TYG2 30 MW GENERACIÓN

Concepto de Viabilidad técnica Planta Fotovoltaica “Parque RENERGÉTICA


8
solar Suarez de 8 MW” COLOMBIA S.A.S.

Concepto de viavilidad técnica para la conexión de planta de


VICTOR HERNANDO
generación solar fotovoltaica de 9,9 MW a la subestación Suria 9.9
RIVERA DIAZ
34,5 kV. (FV Suria)
ESTUDIO DE CONEXIÓN 3 PLANTAS SOLARES - BOSQUES
SOLARES DE LOS LLANOS - 3x100 MW - EN LA SOLARGREEN 99.9
SUBESTACION SURIA 230 KV BSL 7

Nuevo estudio para la conexión de la PCH Chorreritas 19,9 MW INGENIERÍAS ALIADAS 19.9

Nuevo estudio para la conexión de la PCH Cuerquia II (antes


INGENIERÍAS ALIADAS 19.9
Cañaduzal) 19,9 MW

Concepto técnico sobre la conexión del proyecto PLANTA DE


GENERACIÓN SOLAR PRODIEL - Barzalosa DE 100 MW, a PRODIEL 100
las redes del STR propiedad de CODENSA.
Entrega estudio de conexión parque ACSA Solar 9.8MW
SVC ESP SAS 9.8
Saravena, Arauca

Remisión Estudio de Conexión Ingenio Mayagüez MAYAGÜEZ 5

ESTUDIO DE CONEXIÓN DEL PARQUE SOLAR TERMOTASAJERO


4
TERMOTASAJERO DOS SOLAR DE 4 MW DOS

Concepto de viabilidad técnica planta fotovoltaica Escobal 6 de


CELSIA COLOMBIA 99
99 MW (Antes Salado 99 MW)

Concepto de Viabilidad Técnica Autogeneración Essentia


ESSENTIA S.A. 0
Turbina de Vapor de 3,5 MW sin entrega de excedentes.
Concepto de viabilidad técnica para la conexión de 9.9MW de
generación
fotovoltaica “Parque de Generación Solar Jacob Toluviejo” a la COLGEÓLICA S.A.S. 9.9
subestación Toluviejo a
nivel de 34.5kV

Concepto de viavilidad ténica para la conexión en la


subestación 34,5 kV Surimena (municipio de San Carlos de
LICA ENERGÍA
Guaroa - Meta) de la planta de generación solar fotovoltaica 9.9
RENOVABLES S.A.S
PARQUE DE GENERACIÓN FOTOVOLTAICA LA MENA DE
19,9 MW (Ahora 9,9 MW)
Estudio de Conexión proyecto Parque Solar CSF Continua El CSF CONTINUA EL
500
Futuro 500 MW,a la subestación La Virginia 500 kV FUTURO S.A.S. E.S.P.

Parque Solar EMCALI 1 19,9 MW EMCALI 19.9

Estudio de conexión Parque Solar EMCALI II 50 MW (Antigua


EMCALI 50
Granja Solar Mulaló 70 MW)

Conexión PCH La Tunjita 20 MW y reconfiguración de la línea


AES CHIVOR 20
Guateque - T Santa María
conexión nueva generación 163 MW en la S/E termoflores
COLINVERSIONES 163
( Flores IV)
Conexión Proyecto centrales Hidroelectricas Alto y Bajo Tulua
CELSIA COLOMBIA 38
38 MW
Estudios de Conexión al STR en la S/E Cerromatoso 110KV de
GECELCA 164
la planta GECELCA 3 con capacidad de 164MW

EMPRESAS PÚBLICAS
Conexión PCH La Cascada- Abejorral (Línea Ceja -Sonsón) 3.81
DE ABEJORRAL

Conexión PCH San Francisco 520 kW GENERPUTUMAYO 0.52

ACUEDUCTO AGUAS Y
Conexión PCH Suba 2,6MW ALCANTARILLADO DE 2.6
BOGOTA

ACUEDUCTO AGUAS Y
Estudio de conexión de la PCH Usaquén de 1.8 MW al SDL
ALCANTARILLADO DE 1.8
operado por Codensa
BOGOTA

Conexión proyecto Ituango 2400 MW EPM 2400

PCH ALEJANDRIA 15 MW EMGEA 15

Ingenio Risaralda INGENIO RISARALDA 9.5

HIDROELECTRICA RIO
PCH Mulatos 2 (8,32MW) 8.32
MULATOS
Solicitud de alcance al concepto de la UPME, para el Proyecto ENERGIA DEL
7.34
de Energía Renovable Mulatos 2. SUROESTE

Conexión TASAJERO II TERMOTASAJERO 160

Conexión Proyecto Generación Hidráulica Carlos Lleras


HIDRALPOR 78.2
Restrepo
Central colegio con un total de 150 MW (Planta Dario Valencia
Samper compuesta por La Tinta y La Junca). Pasa de 19,4 MW EMGESA 130.6
a 3 x 150 MW
Central el Salto II con un total de 35 MW. Pasa de 19,4 MW a 1
EMGESA 15.6
x 35 MW
Central Laguneta con un total de 36 MW. Pasa de 18 MW a 2 x
EMGESA 18
18 MW

Conexión PCH Coello 1,2 y 3 ENERGETICA 3.6

Conexión central hidroelectrica Barroso 20 MW HMV 20

PCH Popal 20 MW EMGESA 20

Planta San Miguel 42 MW EMGESA 42

PCH Molino 20 MW PCH LOS MOLINOS 20

PCH San Matías 20 MW EMGESA 20

Estudios de Conexión al STR en la S/E Cerromatoso 110KV de


la planta GECELCA 3.2 con capacidad de generación de 280 GECELCA 273
MW
ENERGÍAS
PCH versalles 0.7 MW PROTECTORAS DEL 0.7
AMBIENTE

Ampliación capacidad de generación PCH PROENCA 15MW CEO 19.9

Conexión Proyecto Hidroeléctrico Montañitas aumento de 19,9


CELSIA S.A. 5.1
a 25 MW

Microcentral la Naveta 5.2MW NAVETA 5.2

Estudio conexión de la PCH PUENTE GUILLERMO 3.5MW ENERCO 3.5

LUIS OLIVERIO
PCH JUAN GARCIA - ANTES SE LLAMABA LIBORINA I 4.9
CARDENAS

PCH Morro Azul 20 MW RISARALDA ENERGIA 20

ENERGÍA DE LOS
Estudio de conexión proyecto hidroeléctrico del Rio Ambeima 45
ANDES SAS ESP
GENERADORA
PCH Cantayus 4,32MW 4.32
CANTAYUS
CENTRAL
Estudio de conexión de la PCH el Eden 20 MW Municipio de
HIDROELÉCTRICA EL 20
Marquetalia - Caldas
EDÉN Y CHEC.

Plantas de generación Luzma I y II de 19,8 MW cada una GENERADORA LUZMA 39.6


Planta de generación Purificación (8MW a gas) SURENERGY 8

Conexión al STR EMSA Planta Bioenergy cogeneración


BIOENERGY 19.9
55,67MVA (SE Campo Bonito)
Aumento de capacidad Central Hidroléctrica Playas de 201 MW
EPM 6
a 207 MW
Ampliación capacidad de generación PROENCA 15MW a 19.9
PROENCA 4.9
MW

Generación Guachicono 12 MW GELEC 12

Proyecto Hidroeléctrico Sogamoso de 800 a 820 MW ISAGEN 20

VOLTAJE
Conexión planta Biogás - Tequendama 2.25
EMPRESARIAL

HIDROBARRANCAS
PCH Barrancas 4.7 MW 4.7
S.A. E.S.P
Remisión estudio de conexión generación Providencia I de 4,9
MINEROS 4.9
MW
HIDROELECTRICA RIO
PCH Mulatos 1 (9,23MW) 9.23
MULATOS

Estudio de conexión generación Riopaila de 35 MW RIOPAILA ENERGIA 16

Capacidad disponible del punto de conexión de la planta de BIOGÁS DOÑA JUANA


1.7
generación de Biogas - Doña Juana 1 de 1,7 MW S.A.S E.S.P

PCH La Frisolera 500 kW GENERSALAMINA 0.5

Remisión estudio de conexión Cogeneración INCAUCA 52 MW


INCAUCA 60
al SIN

Remisión viabilidad técnica y estudio de conexión Generación


GELEC 15.9
hidroeléctrica Patico II 15,9 MW municipio de Popayán - Cauca

Ampliación Central Hidroelectrica San Miguel de 42 MW a 44,4


CH SAN MIGUEL 2.4
MW
Remisión estudio de conexión para ampliación de cogeneración
COLTEJER 4.7
de cogeneración Planta Coltejer 9,4 MW (Ampliación 4,7 MW).

Viabilidad técnica de conexión para la ampliación de capacidad TERMOYOPAL


40
de Termoyopal en 40 MW GENERACIÓN

Estudio de conexión planta de generación a gas de 9.7 MW


GENERSA 9.7
Termo-Bolívar

Concepto de conexión. Proyecto de generación Biogás Doña BIOGÁS DOÑA JUANA


9.88
Juana II de 9,88 MW S.A.S E.S.P
GENERADORA DE
PCH Cauyá 1.514 MW 1.514
ENERGÍA CAUYÁ

Estudio de conexión provisional de la planta de generación


EPM 48
Termobarranca (48 MW)

CENTRAL
Estudio de conexión Generación PCH TZ II de 10,5 MW 10.5
HIDROELECTRICA TZ II

REMISIÓN DE ESTUDIO DE CONEXIÓN DE LA CENTRAL DE


GENERACIÓN TÉRMICA, TERMOMECHERO 4, 5, Y 6 DE 19 TERMO MECHERO
57
MW CADA UNA, EN CERCANÍAS DEL MUNICIPIO DE YOPAL MORRO
, CASANARE.
EMPRESA DE
GENERACIÓN Y
Remisión estudio de conexión aumento de capacidad de
PROMOCIÓN DE 1.6
generación San José de la Montaña hasta 1,6 MW
ENERGÍA DE
ANTIOQUIA
CENTRAL
Alcance PCH Magallo 5,7 MW HIDROELECTRICA 5.7
CINCORDIA
Remisión Estudio de conexión generación PCH Las Violetas -
PCH LAS VIOLETAS 0.945
EPM

Estudio de conexión PCH Las Palmas 3 MW GEDEN 3

Remisión estudio de conexión Central Hidroeléctrica Santo


EPM 56
Domingo de 56 MW en el oriente Antioqueño

Solicitud ampliación de capacidad de conexión de 160 a 175 TERMOTASAJERO


15
MW planta Tasajero II DOS
Copia del concepto sobre la viabilidad técnica de la conexión en
GRUPO ARGOS 10
34,5 kV de la autogeneración Argos Yumbo 10 MW

Solicitud revisión y aprobación del punto de conexión de las


centrales CAA (80 MW), CAB (36 MW), CARG (55 MW) TALASA PROJECTO
171
conexión a las subestaciones El Siete 115 kV y El Siete 2 115 SAS ESP
kV
Remisión estudio de conexión generación PCH Aures Bajo de
AURES BAJO 19.4
19,4 MW

Conexión Planta TERMONORTE 88,6 MW TERMONORTE 88.6

Remisión concepto de viabilidad técnica y estudio de conexión GOBERNACIÓN DEL


1.36
PCH El Buco 1,36 MW, municipio de Paez - Cauca CAUCA

Remisión Estudio de conexión generación Escuela de Minas 55


HIDRALPOR 55
MW
CENTRAL
Conexión de la central de generación térmica a carbón La Luna
TERMOELECTRICA LA 660
de 660 MW a la futura subestación La Loma 500 kV.
LUNA S.A.S. E.S.P.
Estudio de conexión del Sistema Fotovoltaico 9,9 MVA
POSTOBON 9.9
Termoyumbo 34,5 kV
HIDROENERGIA DE LA
Remisión de estudio de conexión PCH La Chorrera 15 MW 15
MONTAÑA

Conexión eólicos en La Guajira: Windpeshi Fase ENEL GREEN POWER 200

CENTRAL
Estudio de conexión PCH Montebonito 19.9 MW HIDROELECTRICA 19.9
MONTEBONITO

Concepto viabilidad técnica del proyecto planta aceites MANUELITA ACEITES Y


3
Manuelita - Yaguarito. Excedentes de 3 MW ENERGÍA

Parque eólico Guajira I - 20 MW propiedad de ISAGEN y


ISAGEN 32
parque eólico WESP 01 - 12 MW propiedad de Wayúu (Jouktai)

Remisión de Estudio de Conexión Proyecto PCH Hidronare 14


GRUPO NARE 14
MW
Remisión estudio de conexión de 9,9 MW a 13,8 kV de
TECHNOELITE GREEN
generación Fotovoltaica a la subestación Baranoa. Atlantico 9.9
ENERGY
Solar II Polo Nuevo

Remisión estudio de conexión parque generación Fotovoltáica


ENEL GREEN POWER 70
70 MW a nivel de 110 kV SE El Paso - Electricaribe

Proyecto hidroelectrico Oibita 20 MW en la zona sur de


ISAGEN 20
Santander

Menor San Bartolome 20 MW PCH SAN BARTOLOMÉ 20


Menor Santa Rosa 20 MW ISAGEN 20

Menor Altamira 20 MW ISAGEN 20

Aprobación para la venta de 16 MW de excedentes de la planta


ZONA FRANCA ARGOS 16
de autogeneración zona franca Argos
Remisión de ESTUDIO DE CONEXIÓN PARA LA VENTA DE
EXCEDENTES DE ENERGÍA AL SIN DE LA PLANTA DE
GRUPO ARGOS 5
AUTOGENERACIÓN SOGAMOSO, al sistema de distribución
de EBSA ESP.

Solicitud Alcance a Concepto de conexión generación San José SAN JOSE DE LA


1.1
de la montaña II. Comunicación UPME 20151520071711 MONTAÑA

Remisión estudio de conexión proyectos PV LATAM San Juan


PSF SAN JUAN 19.9
1-19,9 MW
Remisión estudio de conexión proyectos PV LATAM San Juan
PSF SAN JUAN 9.9
2-9,9 MW
Solicitud de alcance al concepto aprobatorio para la conexión
PCH LOS MOLINOS 10
de la Central Hidroeléctrica San Matias 10 MW.
Remisión Concepto de viabilidad técnica y "estudio de
Conexión para el proyecto de Cogeneración PROENCA II, PROENCA 17
municipio de Guachené - Cauca"
Concepto de Viabilidad Técnica para la conexión de 9,9 MW de
generación Fotovoltaica a la subestación Ponedera a nivel SOWITEC 9.9
34,5kV.
Remisión estudio de conexión de 19,3 MW a 34,5 kV de
TECHNOELITE GREEN
generación Fotovoltaica a la subestación Baranoa. Atlantico 19.3
ENERGY
Solar I Polo Nuevo
Remisión de conexión Autogeneración Distrito Térmico
EPM 0
Alpujarra de 1MW
Concepto estudio conexión para ampliación de capacidad de la
EMGESA 50
central Guavio de 1200 MW a 1250 MW

Planta de la empresa Incubadora Santander S.A. Egipto y Las INCUBADORA DE


4.4
Palmas SANTANDER

Solicitud de concepto de conexión proyecto autogeneración


ECOPETROL 40
GRB en subestación Magdalena medio 230 kV.

Remisión del Estudio de la Planta de Autogeneración ARGOS -


GRUPO ARGOS 5
TOLCEMENTO

Remisión de conexión PCH Ecológica Porce III 1.8MW EPM 1.8


EMPRESA DE
GENERACIÓN Y
Remisión Estudio de Conexión proyecto PCH CONDE 3,52 MW PROMOCIÓN DE 3.52
ENERGÍA DE
ANTIOQUIA
Remisión Estudio de conexión autogeneración papelsa de 6,4
PAPELSA 0
MW

HIDROELÉCTRICA DEL
Remisión de conexión generación PCH Aures Alto 19,9 MW. 19.9
RIO AURES

Remisión estudio de conexión del proyecto SOLAR LA LOMA


150 MW de generación Fotovoltaica a la futura suebstación La ENEL GREEN POWER 150
Loma 500/110 kV
Concepto técnico sobre la conexión del proyecto de
cogeneración Coca cola Femsa de 5,54 MW a las redes del COCA COLA 2.44
STR propiedad de CODENSA
Concepto Conexión planta Chili de 66 Mw a la subestación ENERGÍAS DEL RIO
66
Ibagué (Mirolindo) 230kV CHILI

Concepto de viabilidad técnica del proyecto Estudio de


Conexión de 5 Plantas Solares en la Subestación Puerto Gaitan SOLARGREEN 97.5
de Altillanura. (5 plantas) (Bosques Solares de los Llanos)

Concepto estudio conexión del Proyecto de 4 plantas menores


independientes Tequendama con una capacidad de conexión EMGESA 56.8
de 14.2 MW cada una (Aumento capacidad)

CASTELLANA DE
Remisión de conexión PV BOL002 "La Iguana" 19,5MW 19.9
PROYECTOS SOLARES

Remisión de estudio de conexión Autogeneración Nacional de COMPAÑÍA NACIONAL


2.18
Chocolates de 2,18 MW. DE CHOCOLATES

Remisión Estudio de conexión Central Hidroeléctrica San


CELSIA S.A. 19.9
Andres de Cuerquia.
Proyecto Porvenir II
Solicitud de Conexión del nuevo proyecto Hidroeléctrico CELSIA S.A. 352
Porvenir II 352 MW

Estudio de conexión de 80 MW de generación (Eólico) de la


BEGONIA POWER 80
empresa BEGONIA POWER S.A. E.S.P. Acacia 2.

Remisión de estudio de conexión PV MAG002 "Prosperidad" LA PROSPERIDAD


19.5
19,5 MW. SOLAR SAS

Remisión estudio de conexión Autogeneración familia de 6,5


FAMILIA 1
MW
Ampliación de la capacidad de la conexión de generación para
GESTIÓN ENERGETICA 5
la unidad I de la central TERMOPAIPA. De 31 MW a 36 MW

Autogeneración sin entrega de excedentes de la empresa ALPINA PRODUCTOS


0
alpina con capacidad de 2,02 MW ALIMENTICIOS

Remisión estudio de conexión de Autogeneración El Cairo -


GRUPO ARGOS 6.5
Argos.

Estudio conexión Cogeneración Manuelita 2 de 12 MW. MANUELITA 12

Concepto de Viabilidad Técnica para la conexión de 19,9MW a PARQUE


19.99
34,5kV de generación Fotovoltaica a la subestación Sincé FOTOVOLTAICO SINCE

Remisión Estudio de conexión PV Solar Bolivar 9 MW. CELSIA S.A. 9

Ampliación de la capacidad de la conexión de generación para


GESTIÓN ENERGETICA 2
la unidad II de la central TERMOPAIPA. De 70 MW a 72 MW.

Remisión de conexión autogeneración Parque Comercial El PARQUE COMERCIAL


0
Tesoro de 312 kW EL TESORO

Concepto estudio de conexión del proyecto solar HELIOS DELPHI CAPITAL


200
CESAROCAÑA de 200 MW, a la subestación Ocaña 500 kV PARTNERS S.A.S.

HIDROTURBINAS
Conexión PCH FALCON 13,5 MW 13.5
DELTA
Estudio conexión 10PCH`s ubicadas en el Dpto de Risaralda,
UNIVERSAL STREAM 110
Pueblo Rico y Mistató

Hidroeléctrica Espiritu Santo 600 MW EPM 600

EMPRESA DE
GENERACIÓN Y
PCH Urama 19.88 MW PROMOCIÓN DE 19.87999916
ENERGÍA DE
ANTIOQUIA
ENERGIA LIMPIA Y
Remisión estudio de conexión generaciones PCH San Luis I 4.199999809
SOSTENIBLE
ENERGIA LIMPIA Y
Remisión estudio de conexión generaciones PCH San Luis II 8
SOSTENIBLE
ISAGEN-Proyecto geotérmico macizo volcánico del ruiz -
ISAGEN 50
concepto estudio de conexión.
Proyecto hidroelectrico Cañafisto - Estudio de conexión (960
ISAGEN 960
MW)

Remisión estudio de conexión Planta Fotovoltaica Cuestecitas


ENEL GREEN POWER 100
100 MW la subestación Cuestecitas 110 kV.

Aprobación de la ampliacion de la cogeneración y venta de


excedentes en el circuito Industrial Sur de la SE Malambo a AXIA ENERGIA 6.5
nivel de 13.8 kV - SDL de Electricaribe (Unibol)
Concepto de conexión de las centrales de generación
Encimadas y Cañaveral - 184 MW. Ubicadas en los HIDROARMA 184
departamentos de Antioquia y Caldas
Aprobación de la conexión de 7 MW de cogeneración y venta MONOMEROS
de excedentes en la subestación Las Flores (Monomeros) a COLOMBO 7
nivel de 34,5 kV en el SDL de Electricaribe VENEZOLANOS

Remisión Estudio de conexión Proyecto PCH Virginias 19 MW PCH VIRGINIAS 19

Solicitud concepto UPME Viabilidad Conexión Nuevo proyecto


SURENERGY 1.5
de generación "La Hocha"
PLAN DE EXPANSIÓN DE CEDENAR. Solicitud de aprobación
de cargos y unidades constructivas de los proyectos
Compensación Buchely, tercer Punto de conexión al STN. CEDENAR 20
Propuesta de alternativas de conexión Generación Fotovolcaica
y PCH Rio Patía (sin estudio de
Conexión de planta de autogeneración Palagua de UTIJP en el
ESEI 8
municipio de Puerto Boyacá
LATAMSOLAR
Información proyecto solar área GCM (circular 16 de marzo
ENERGIAS 37
2017). LATAMSOLAR Copey.
RENOVABLES

Proyecto WARRATTUI 100 MW, circular UPME


TW SOLAR 100
20171540001481.

Proyecto PSF VALLEDUPAR 200 MW, circular UPME


TW SOLAR 200
20171540001481.

Proyecto PSF COPEY 200 MW, circular UPME


TW SOLAR 200
20171540001481.

Proyecto PSF URIANA 400 MW, circular UPME


TW SOLAR 400
20171540001481.

Proyecto PSF KAI 200 MW, circular UPME 20171540001481. TW SOLAR 200

Proyecto PSF MALEIWA 200 MW, circular UPME


TW SOLAR 200
20171540001481.
Proyecto PSF FUNDACIÓN 200 MW, circular UPME
TW SOLAR 200
20171540001481.

Proyecto PSF CUESTECITAS 200 MW, circular UPME


TW SOLAR 200
20171540001481.

Manifestación de interés de conexión de proyecto la Estrella. CELSIA S.A. 19.89999962

Proyecto Parque solar Fotovoltaico Algarrobo 99,9 MW,


TW SOLAR 99.90000153
circular UPME 20171540020201.

Proyecto Parque solar Fotovoltaico Providencia 99,9 MW,


TW SOLAR 99.90000153
circular UPME 20171540020201.

Proyecto Parque solar Fotovoltaico La Sierra 99,9 MW, circular


TW SOLAR 99.90000153
UPME 20171540020201.

CIRCULAR EXTERNA del 30 de mayo de 2017: Iniciativas de


TECHNOELITE GREEN
proyectos de generación en el área Guajira - Cesar - 400
ENERGY
Magdalena. (CS IV LAS CASITAS)
CIRCULAR EXTERNA del 30 de mayo de 2017: Iniciativas de
TECHNOELITE GREEN
proyectos de generación en el área Guajira - Cesar - 400
ENERGY
Magdalena. (CS IV LA LOMA)
DESARROLLOS
Proyecto Parque eólico Punta Cocos 362 MW, circular UPME
EOLICOS ALTA 362
20171540020201.
GUAJIRA

La Magdalena 180 MW TW SOLAR 180

Solicitud respuesta y validación de estudio de conexión del


proyecto "Central de generación termoeléctrica de Cucunubá - TERMOCUCUNUBA 99
Termocucunuba"
Solicitud de concepto aprobatorio UPME para el proyecto
TERMOCASANARE 9.899999619
denominado "Planta de Termocasanare Aguazul 10 MW"

Concepto Estudio de Conexión de la Central de generación CONSULTORIA


350
Termo Apolo de 350 MW al STN en el área Oriental COLOMBIANA

Solicitud de concepto aprobatorio UPME para el proyecto


GENERSA 19.79999924
denominado "Planta de generación Termoazul 2x9,9 MW"
Proyecto Atachonkat ALUPAR 200
Proyecto Ishiien ALUPAR 200
Proyecto Paraiso ALUPAR 100
Proyecto Puriatuju ALUPAR 0
Proyecto Makaritpao ALUPAR 0
Proyecto Maishipai ALUPAR 0
Proyecto Makuakito ALUPAR 0
P.S.F. El Rocio TW SOLAR 99.90000153

Estudio de conexión Parque Eólico El Morro 80 MW CELSIA COLOMBIA 80

Estudio de conexión "Proyecto Eólico Ricaurte 125 MW" al


AES CHIVOR 125
Sistema de Transmisión Regional de EBSA

Estudio de conexión Proyecto Solar Villavieja 200MW CME S.A. 200

RALOS & BLAUD


Conexión proyecto solar fotovoltaico Juan Mina 19,9 MW ENERGY COLOMBIA 19.89999962
S.A.S.
Declaración de interés para participar en la subasta de enero
2019 para la asignación de Obligaciones de Energía Firme. WERT 396
(Termojobo 4x99 MW)
Concepto estudio de conexión para la Planta de generación
TERMOPALENQUE 3 130 MW en la subestación Bolívar 220 AXIA ENERGIA 130
kV
Concepto estudio de conexión para la Planta de generación
TERMOPALENQUE 2 130 MW en la subestación Bolívar 220 AXIA ENERGIA 130
kV
Concepto estudio de conexión para la Planta de generación
TERMOPALENQUE 1 130 MW en la subestación Bolívar 220 AXIA ENERGIA 130
kV

Disponibilidad para la conexión del proyecto de generación


PLEXAPORT S.A.S. 50
"Termoplexa de 50 MW" en el departamento de Bolivar.

Entrega estudio de conexión parque solar fotovoltaico


TW SOLAR 300
Magdalena sol 300 MW

Entrega del estudio de conexión de la planta térmica


MAAESTRIA 150
MAAESTRIA I de 150 MW

TERMO SAN VICENTE /


Radicación estudio Termo San Vicente 99
ZEUZCORP

Concepto estudio de conexión para la Planta de La Orquidea de LA ORQUIDEA SOLAR


200
200 MW, en la subestación Bolivar 220 kV. S.A.S.

Concepto de viabilidad técnica para la conexión de 100 MW de


SOLAR PACK
generación fotovoltaica a la subestación Bolivar a nivel de 66 100
COLOMBIA S.A.S.
kV. (Parque Solar Santa Rosa 100 MW).
Remisión estudio de conexión del proyecto "Parque Solar
COLOMENER III S.A.S
Becharry" de 50 MW a 110 kV de generación Fotovoltaica a la 50
E.S.P.
subestación Candelaria.
Concepto estudio de conexión para el Campo Orito de 4 MW,
ECOPETROL 4
en la subestación El Yarumo 34,5 kV.
Concepto estudio de conexión para el Campo Colón de 2 MW,
ECOPETROL 2
en la subestación La Hormiga 34,5 Kv
Estado de concepto de viabilidad técnica de los proyectos de
generación fotovoltaica "Malambo 1" de 50 MW a nivel de 110 EGAL 50
kV a la SE Caracolí
Solicitud de asignación de punto de conexión para Celsia Solar
Malambo (Autogeneración Malambo Solar con entrega de CELSIA S.A. 9.899999619
excedentes)
ABO WIND
Concepto estudio de conexiòn del proyecto solar Carare 200
RENOVABLES 200
MW, en la subestaciòn Primavera 230 Kv
COLOMBIA S.A.S.

Concepto estudio de conexiòn de la planta solar fotovoltiaca El


TW SOLAR 180
Balso 180 MW, en la subestaciòn Primavera 230 Kv

Conexión de 9,9 MW del proyecto de generación “Parque Solar


TEKO 1 S.A.S E.S.P. 9.899999619
Teko 1”.

Remisión concepto de viabilidad técnica para la conexión de 9,9


GRUPO BAZ
MW de generación fotovoltaica Baz Puerta de Oro a la 9.899999619
COLOMBIA S.A.S.
subestación Puerta de Oro a nivel de 13,8 kV.
Concepto de viabilidad técnica para la conexión de 70 MW de
GENERADORA SOLAR
generación fotovoltaica a la subestación Hobo a 115 kV. (Los 70
EL HOBO S.A.S.
Cauchos Solar 70 MW)

Concepto estudio de conexión del parque solar El Zarzal 170 LICA ENERGÍA
170
MW , en la subestación Comuneros 230 kV. RENOVABLES S.A.S

Solicitud de conexión para el proyecto Solar PV Varenna 100


GRENERGY COLOMBIA 100
MW - Remitido por ISA.

Parque de generación fotovoltaica SOLAR GUACHAL 19,9 MW


CELSIA S.A. 39.70000076
y 2x9,9 (Parques Solares Celsia 5)

Remisión de estudio de conexión Parques Solares Celsia IV.


CELSIA S.A. 9.899999619
Autogenerador Solar Palo Blanco 1 - 9,9 MW

Remisión de estudio de conexión Parques Solares Celsia IV.


CELSIA S.A. 9.899999619
Solar Buga 9,9 MW

Remisión de estudio de conexión Parques Solares Celsia IV.


CELSIA S.A. 19.79999924
Solar El Lago 2x9,9 MW

Remisión de estudio de conexión Parques Solares Celsia IV.


CELSIA S.A. 9.899999619
Autogenerador Solar Levapan 9,9 MW

Parque de generación solar Celsia 1A (Cerrito) - 59,7 MW CELSIA S.A. 59.70000076


Remisión Concepto de viabilidad técnica para la conexión de 8
GRUPO BAZ
MW de generación fotovoltaica Baz Río Cordialidad a la 8
COLOMBIA S.A.S.
subestación Cordialidad a nivel de 13,8 MW

Remisión de estudio de conexión PARQUES SOLARES


CELSIA COLOMBIA 19.89999962
CELSIA 2

Remisión concepto de viabilidad técnica para la conexión de 9,9


GRUPO BAZ
MW de generación fotovoltaica Baz Las Flores a la subestación 9.899999619
COLOMBIA S.A.S.
Las Flores a nivel de 13.8 kV.

Remisión del Estudio de Conexión Proyecto Generación Solar SOLAR PROJECTS


60
FV San Silvestre 60 MW. DEVELOPERS SAS

Remisión del Estudio de Conexión Proyecto Generación Solar SOLAR PROJECTS


40
FV Lizama 40 MW DEVELOPERS SAS

Remisión física del estudio de conexión planta de generación


TW SOLAR 50
PV Tolima Norte 50 MW

Remisión de estudio de conexión PARQUES SOLARES


CELSIA COLOMBIA 19.89999962
CELSIA 7 Papeles del cauca 1 - 19,9 MW

COLOMBIA SOLAR
Remisión del Estudio de Conexión Proyecto Generación Parque
CORPORATION 35
Solar PV Sabana de Torres II 35 MW.
INTERNATIONAL

Remisión del estudio de conexión proyecto Parque Solar CIMITARRA SOLAR 1


19.89999962
Cimitarra 19,9 MW S.A.S.

Remisión de estudio de conexión Solar La Victoria 3 de 19,9


CELSIA COLOMBIA 19.89999962
MW en subestación Zarzal.

Remisión de estudio de conexión Solares La Victoria 4 y 5 de


CELSIA COLOMBIA 39.79999924
2x19,9 MW en subestación La Unión.

Remisión de estudio de conexión Solar La Victoria 6 de 19,9


CELSIA COLOMBIA 19.89999962
MW en subestación La Victoria.

Remisión del estudio de conexión proyecto de generación solar


COLGEÓLICA S.A.S. 9.899999619
fotovotaico La Fortuna 9,9 MW.

Remisión Estudio de conexión Proyecto Solar PV Compostela


GRENERGY COLOMBIA 100
100 MW.

Entrega del estudio del parque fotovoltaico Heliconia 150 MW VOLTALIA 150
Estado de concepto de viabilidad técnica para la conexión de
9.9 MW de generación fotovoltaica "Parque Fotovoltaico TW SOLAR 9.899999619
Sabanalarga" a la subestación Sabanalarga a nivel de 13.8 kV.

Remisión del estudio de conexión proyecto de generación solar WILCHES SOLAR 1


19.89999962
fotovoltaico 19,9 MW (Puerto Wilches, Santander) S.A.S.

Remisión estado de concepto de viabilidad técnica para la


conexión de 19,9 MW de generación fotovoltaica "Parque Solar
TW SOLAR 19.89999962
Fotovoltaico Campano" a la subestación Fundación a nivel de
34,5 kV.

Remisión Estudio de conexión Proyecto Solar PV Los Robles Parque Solar Los Robles
19.89999962
19,9 MW. S.A.S.

GUAYACÁN
Concepto estudio de conexión para la generación fotovoltaica
DESARROLLOS 50
PS Guayacán 50 MW en la subestación Caracolí 220 kV.
SOLARES S.A.S.
CEDRO
Concepto estudio de conexión para la generación fotovoltaica
DESARROLLOS 50
PS Cedro 50 MW en la subestación Caracolí 220 kV.
SOLARES S.A.S
PS CASCO DE VACA
Concepto estudio de conexión para generación fotovoltaica PS
DESARROLLOS 50
Casco de Vaca 50 MW en la subestación Caracolí 220 kV.
SOLARES S.A.S
Entrega del informe del estudio de conexión del proyecto
MAINSTREAM
Parque Eólico Sirius 150 MW a la subestación San Juan 220 150
COLOMBIA S.A.S.
kV.
Remisión concepto de viabilidad técnica para la conexión de 9,4
MW de generación fotovoltaica Parque Solar Marañones a la SIERGROUP S.A.S. 9.399999619
subestación Caracolí a nivel de 13.8 kV.

Remisidel estudio de conexión parque de generación SOLAR


CELSIA S.A. 19.89999962
CELSIA 1: Carmelo 1 - 19.9 MW (Total 89,5)

Remisión Estudio de conexión para concepto viabilidad técnica


para la conexión en la subestación del STN Suria 230 kV
propiedad de DELSUR (Municipio de Villavicencio - Meta) de la ELAWAN ENERGY 99
planta de generación solar fotovoltaica PARQUE SOLAR
SURIA DE 99 MW de ELAW

Remisión de estudio de conexión proyecto Planta Solar Sol


GRENERGY COLOMBIA 40
Santander 40 MW

Remisión de estudio de conexión CELSIA 5A (59,7 MW) (Solar


CELSIA S.A. 19.89999962
Termoyumbo)

Remisión de estudio de conexión CELSIA 5A (59,7 MW) (Solar


CELSIA S.A. 19.89999962
Sucromiles)
Remisión de estudio de conexión CELSIA 5A (59,7 MW) (Solar
CELSIA S.A. 19.89999962
Palmaseca)

Remisión estudios de conexión CELSIA 6 - 7 (139,3 MW)


CELSIA S.A. 19.89999962
SOLAR PALMAS (Conexión en Palmas 115 kV)

Remisión estudios de conexión CELSIA 6 - 3 (139,3 MW)


CELSIA S.A. 19.89999962
SOLAR PALMAS (Conexión en Palmas 34,5 kV)

Remisión estudios de conexión CELSIA 6 - 1 (139,3 MW)


SOLAR NUEVA VIJES 2x19,9 MW (Conexión en Nueva Vijes CELSIA S.A. 19.89999962
34,5 kV)
Concepto estudio de conexión del proyecto de generación
CELSIA S.A. 80
Eólica Atlántico 80 MW, en la subestación Caracolí 220 kV.

Remisión de estudio de conexión Proyecto Solar La Manguita


FERMINAC INT S.A.S. 40
40 MW.

Concepto estudio de conexión del proyecto de generación solar


fotovoltaica Almendro 100 MW, en la subestación Caracolí 220 GRENERGY COLOMBIA 100
kV.

ESTUDIO DE CONEXION - PARQUE SOLAR PASACABALLO


COLGEÓLICA S.A.S. 99.90000153
99,9 MW

Parque Fotovoltaico Amanecer 150 MW VOLTALIA 150

CONCEPTO TÉCNICO SOBRE LA CONEXIÓN DEL


PROYECTO PLANTA DE GENERACIÓN SOLAR LA MARTINA
TESOCOL S.A. 9.899999619
DE 9.9 MW A LAS REDES DE SDL PROPIEDAD DE
CODENSA.
REMISION CONCEPTO DE VIABILIDAD TÉCNICA PARA LA
CONEXION DE 9.9 MW DE GENERACION FOTOVOLTAICA
TW SOLAR 9.899999619
BARANOA A LA SUBESTACION BARANOA A NIVEL DE 13,8
KV
MARTIFER MPC
RENEWABLE
Estudio conexión Generación solar PACANDE 50 MW 50
ENERGIES
DEVELOPMENT

Estudio de conexión parque eólico Miramar 150 MW ENEL GREEN POWER 150

Estudio de conexión parque eólica El Velero 150 MW ENEL GREEN POWER 150

ENTREGA DEL INFORME DEL ESTUDIO DE CONEXION MAINSTREAM


150
PROYECTO PARQUE EÓLICO NEPTUNO 150 MW. COLOMBIA S.A.S.

ESTUDIO DE CONEXIÓN DE LA CENTRAL DE GENERACIÓN HZ ENERGY


9.899999619
BRISA SOLAR II DE 9,9 MW S.A.S.E.S.P
Estado de Concepto de viabilidad técnica para la conexión de
9,9 MW de generación_x000D_ HZ ENERGY
9.899999619
fotovoltaica “Prado Solar I” a la subestación Nueva Barranquilla S.A.S.E.S.P
a nivel 13,8 kV.
ABO WIND
REMISIÓN CONCEPTO APROBATORIO PARQUE SOLAR
RENOVABLES 9.899999619
FOTOVOLTAICO NUMBANA 9.9 MW
COLOMBIA S.A.S.

Estudio de Conexión Parque Solar Fotovoltaico El Guamo 9


TESOCOL S.A. 9
MW - Tesocol.

REMISIÓN ESTUDIO DE CONEXIÓN PFV CENTAURO MAINSTREAM


100
100 MW- CARTAGO 115 KV COLOMBIA S.A.S.

REMISIÓN ESTUDIO DE CONEXIÓN PFV URANO 70 MW- MAINSTREAM


70
ZARZAL 115 KV COLOMBIA S.A.S.

Concepto estudio de conexión del proyecto solar Planadas de SOLAR PROJECTS


99.90000153
99,9 MW, a la subestación Guatiguará 230 kV DEVELOPERS SAS

LATAMSOLAR
Concepto estudio de conexión del proyecto Planta Solar
ENERGIAS 300
Sabanalarga 300 MW, a la subestación Sabanalarga 500 kV.
RENOVABLES

Concepto estudio de conexión del proyecto Parque Solar MAINSTREAM


100
Mercurio 100 MW a la subestación Ibagué (Mirolindo) 230 kV. COLOMBIA S.A.S.

EMPRESA DE
REMISIÓN DEL ESTUDIO DE CONEXIÓN PROYECTO SERVICIOS PÚBLICOS
20
SOLAR PANTANO 20 MW. DOMICILIARIOS GIRÓN
S.A.S. E.S.P.

REMISIÓN CONCEPTO APROBATORIO PARQUE SOLAR RENERGÉTICA


3.200000048
FOTOVOLTAICO ROVIRA 3.2 MW COLOMBIA S.A.S.

MAINSTREAM
Remisión Estudio de Conexión Parque Solar Pegaso 100
COLOMBIA S.A.S.

PCH NUS II 17,6 MW HIDRONUS S.A.S. 17.60000038

Hidroeléctrica Nudos 60 MW MINCIVIL S.A. 60

PCH San Bartolomé 50 MW ISAGEN 50

PCH SAN ANTONIO


PCH San Antonio 15 MW 15
S.A.S.

PCH el Trapiche II 8,91 MW PRAMING S.A.S 8.909999847

PCH Hidronus 16,7 MW PRAMING S.A.S 16.70000076


AKUO ENERGY
PCH Río San Bartolomé 7,25 MW 7.25
COLOMBIA S.A.S.
AMBER CAPITAL
PCH Tahami 19,9 MW 19.89999962
ENERGY
Concepto de viabilidad técnica para la conexión de 9,9MW de
generación Parque solar_x000D_
TW SOLAR 9.899999619
fotovoltaico Ternera a la subestación Membrillal a nivel de 13.8
kV.
Solicitud de concepto estudio de conexión del Parque Eólico
MAINSTREAM
Polaris 100 MW,_x000D_ 100
COLOMBIA S.A.S.
a subestación Caracolí 220 kV.

Proyecto RenewCol 1
Concepto de la conexión del Parque Yaguaro Eólico 120 MW 120
S.A.S.

Remisión estado de concepto de viabilidad técnica para la


conexión de 19.9 MW de_x000D_
EGAL 19.89999962
generación fotovoltaica “Parque Solar Fotovoltaico Alma” a la
subestación Caracolí a nivel de 110kV.
Estado de concepto de viabilidad técnica del proyecto de
generación fotovoltaica “Don Vizo” de 4.9 MW a nivel de 110kV EGAL 4.900000095
a la SE Caracolí (Propiedad de EPSA E.S.P).

Remisión estudio de conexión Planta Fotovoltaica Los CASTELLANA DE


300
Tulipanes 300 MW. PROYECTOS SOLARES

ALMA NEGRA
Concepto estudio de conexión para la generación fotovoltaica
DESARROLLOS 50
PS Almanegra 50 MW en la subestación Caracolí 220 kV
SOLARES S.A.S.
Concepto de viabilidad técnica para la conexión de 9.9 MW de COLOMBIA SOLAR
generación fotovoltaica “Dibulla 1” a la subestación CORPORATION 9.899999619
Termoguajira a nivel de 34,5 kV. INTERNATIONAL

Remisión Estudio de Conexión Parque Solar Sahagún 200 MW. CELSIA S.A. 200

Concepto de viabilidad técnica para la conexión de 19.9MW de


generación fotovoltaica_x000D_
TW SOLAR 19.89999962
“Parque Fotovoltaico Baranoa III” a la subestación Baranoa a
nivel de 110kV.

Remisión estudio de Conexión “Proyecto Solar Duitama I de 40


EBSA 40
MW”.

REMISIÓN ESTUDIO DE CONEXIÓN PT TESORITO II - Termoeléctrica El


200
SAHAGÚN 500 Kv Tesorito S.A.S E.S.P

NODO ENERGÉTICO
ESTUDIO DE CONEXIÓN DE LOS PROYECTOS DE
DEL NORTE DE 1200
GENERACIÓN TÉRMICA NENCOL 1.200 MW
COLOMBIA S.A. E.S.P.
Remisión del estudio de conexión proyecto Galilea Solar 80 Construcciones B&R
80
MW. Ingenieria sas

Remisión estudio de conexión parque solar fotovoltaico Elawan


ELAWAN ENERGY 60
60 MW

ESTUDIO DE CONEXIÓN PARQUE SOLAR CARRETO 250


SOLANO S.A.S. 250
MW

Remisión estudio de conexión Planta fotovoltaica Campo Alegre


15.6 MW horizonte_x000D_ CleanEnergyLA S.A.S 15.60000038
2021 - 2026, municipio de Iles, departamento de Nariño.
REMISIÓN ESTUDIO DE CONEXIÓN SAHAWIND - SAHAGÚN
ENEL GREEN POWER 200
500 KV

GREEN ENERGY DS&E


Estudio de Conexión Tangara (99,9MW) 99
SAS

Remisión estudio de conexión generación Parque Solar FOTOVOLTAICO EL


99.90000153
Fotovoltaico Samanes 99.9 MW. ALCARAVAN S.A.S.

REMISIÓN ESTUDIO PARA CONEXIÓN DEL PROYECTO DE


FOTOVOLTAICO
GENERACIÓN PARQUE SOLAR FOTOVOLTAICO 99.90000153
ARRAYANES S.A.S.
MANGLARES 99.9 MW

REMISIÓN ESTUDIO PARA CONEXIÓN DEL PROYECTO DE


PROELECTRICA 9
GENERACIÓN PCH SANTA INÉS 9 MW EN ANTIOQUIA

Planta de generación solar fotovoltaica PARQUE DE


LICA ENERGÍA
GENERACION FOTOVOLTAICA LA TABLA de 9.9 MW de 9.899999619
RENOVABLES S.A.S
LICA ENERGÍA RENOVABLE S.A.S.

PARQUE DE GENERACION FOTOVOLTAICA LA MINA de 9.9 LICA ENERGÍA


9.899999619
MW de LICA ENERGÍA RENOVABLE S.A.S. RENOVABLES S.A.S

Remisión de estudio de conexión SOLAR PALMAS II (59.7


CELSIA S.A. 59.70000076
MW)

SOLAR CARMELO 1 19.9 MW CELSIA S.A. 19.89999962

SOLAR CARMELO 2 19.9 MW CELSIA S.A. 19.89999962

SOLAR CARMELO 3 19.9 MW CELSIA S.A. 19.89999962

SOLAR CARMELO 4 19.9 MW CELSIA S.A. 19.89999962


SOLAR CARMELO 5 19.9 MW CELSIA S.A. 19.89999962

SOLAR CARMELO 6 19.9 MW CELSIA S.A. 19.89999962

SOLAR CARMELO 7 19.9 MW CELSIA S.A. 19.89999962

Remisión de estudio de conexión SOLAR PALMASECA 1 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR PALMASECA 2 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR PALMASECA 3 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR TULUÁ II 1 (19,9


CELSIA S.A. 19.89999962
MW)

Remisión de estudio de conexión SOLAR TULUÁ II 2 (19,9


CELSIA S.A. 19.89999962
MW)

Remisión de estudio de conexión SOLAR TULUÁ II 3 (19,9


CELSIA S.A. 19.89999962
MW)

Remisión del estudio de conexión parque de generación solar


CELSIA S.A. 19.89999962
CELSIA 1: Carmelo 2 - 19.9 MW (Total 89,5 MW)

Remisión del estudio de conexión parque de generación solar


CELSIA S.A. 19.89999962
CELSIA 1: Carmelo 3 - 19.9 MW (Total 89,5 MW)

Remisión de estudio de conexión SOLAR PALMIRA 1 19,9 MW CELSIA S.A. 19.89999962

Remisión de estudio de conexión SOLAR PALMIRA 2 19,9 MW CELSIA S.A. 19.89999962

Remisión de estudio de conexión SOLAR PALMIRA 3 19,9 MW CELSIA S.A. 19.89999962

Remisión de estudio de conexión SOLAR PALMIRA 4 19,9 MW CELSIA S.A. 19.89999962

Remisión de estudio de conexión SOLAR PALMIRA 5 19,9 MW CELSIA S.A. 19.89999962


Remisión de estudio de conexión SOLAR PALMIRA 6 19,9 MW CELSIA S.A. 19.89999962

Remisión de estudio de conexión SOLAR PALMIRA 7 19,9 MW CELSIA S.A. 19.89999962

Remisión de estudio de conexión SOLAR PALMIRA 8 19,9 MW CELSIA S.A. 19.89999962

Remisión de estudio de conexión SOLAR PALMIRA 9 19,9 MW CELSIA S.A. 19.89999962

Remisión de estudio de conexión SOLAR PALMIRA 10 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR PALMIRA 11 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR PALMIRA 12 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR PALMIRA 13 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR PALMIRA 14 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR PALMIRA 15 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR PALMIRA 16 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR PALMIRA 17 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR PALMIRA 18 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR PALMIRA 19 19,9


CELSIA S.A. 19.89999962
MW

Remisión de estudio de conexión SOLAR PALMIRA 20 19,9


CELSIA S.A. 19.89999962
MW

GREEN YELLOW
ESTUDIO DE CONEXIÓN PARQUE SOLAR MUISCAS 9,9 MW ENERGIA DE 9.899999619
COLOMBIA S.A.S.
Remisión Estudio de Conexión ampliación TESORITO I a 200 Termoeléctrica El
1.299999952
MW Tesorito S.A.S E.S.P

Remisión Estudio de Conexión LIGUSTRO II - SAHAGÚN 500 GREEN ENERGY DS&E


99.90000153
kV SAS

Remisión Estudio de Conexión LIGUSTRO I - SAHAGÚN 500 GREEN ENERGY DS&E


99.90000153
kV SAS

Entrega estudio de conexión Parque La Ponderosa – 99,9 MW


EAGLE ENERGY S.L. 99.90000153
– SE Purnio 230/110 kV.

Remisión del estudio de conexión parque de generación solar


CELSIA S.A. 19.89999962
CELSIA 1: Carmelo 4 - 19.9 MW (Total 89,5 MW)

Remisión del estudio de conexión parque de generación solar


CELSIA S.A. 9.899999619
CELSIA 1: Costa Rica - 9.9 MW (Total 89,5 MW)

Remisión estudio de conexión PCH Las Palmas 19.9 MW ENERGÍA RENOVABLE


horizonte 2023 - 2028, DEL TAMBO - ERDELTA 19.89999962
municipio del Tambo, departamento del Cauca. S.A.S.

REMISIÓN ESTUDIO DE CONEXIÓN SOLAR MELGAR 4 -


CELSIA S.A. 19.89999962
LANCEROS 115 KV

REMISIÓN ESTUDIO DE CONEXIÓN SOLAR MELGAR 3 -


CELSIA S.A. 19.89999962
LANCEROS 115 KV

REMISIÓN ESTUDIO DE CONEXIÓN SOLAR MELGAR 5 -


CELSIA S.A. 19.89999962
LANCEROS 115 KV

AAGES DEVELOPMENT
Viabilidad técnica de conexión proyecto Generación Solar
COLOMBIA S.A.S. 17.70000076
Sikuani de 17.7 MW
E.S.P.

Remisión concepto de viabilidad técnica para la conexión de 9


MW de generación _x000D_
CELSIA S.A. 9
fotovoltaica “Celsia Solar Malambo II” a la subestación
Malambo a nivel de 13,8kV

Concepto estudio de conexión del parque solar Buenavista de


TW SOLAR 400
400 MW a la subestación Sabanalarga 500 kV

Solicitud de concepto estudio de conexión de la Planta Eólica


CELSIA S.A. 60
Atlántico II de 60 MW, a subestación Caracolí 220 kV

PARQUE SOLAR
Estudio de Conexión Flamenco 60 MW 60
FLAMENCO S.A.S.
Evaluación de conexión para el proyecto “Solar Flandes
CELSIA S.A. 19.89999962
(10x19.9 MW)”.

RENERGÉTICA
Remisión de Estudio de Conexión Zarzal 3 19,9 MW 19.89999962
COLOMBIA S.A.S.

Solicitud de concepto estudio de conexión del Proyecto de


generación Puertos de Santander Solar 500 MW, a la Andes Solar III SAS 500
subestación Primavera 500 kV.
Remisión estudio de conexión generaciones PCH Coco Hondo
EPM 19.89999962
19,9 MW
Remisión estudio de conexión generacion PCH Minavieja 13.7
EPM 13.69999981
MW.

Parque solar El Girasol de 19,9 MW a la subestación Caracolí a CASTELLANA DE


19.89999962
nivel de 110kV PROYECTOS SOLARES

Parque Solar El Tucán de 9,9 MW a la subestación Caracolí a CASTELLANA DE


9.899999619
nivel de 13.8kV. PROYECTOS SOLARES

Remisión de estudio de conexión solar LAS PALMAS (1x19.9 LICA ENERGÍA


19.89999962
MW) RENOVABLES S.A.S

LICA ENERGÍA
Remisión de estudio de conexión solar ALIANZA (1x19.9 MW) 19.89999962
RENOVABLES S.A.S

Remisión de estudio de conexión proyecto Planta Solar


EPM 99.90000153
Cimitarra 99,9MW

Remisión de estudio de conexión proyecto Planta Solar Sabana


EPM 90
de Torres 90MW

Remisión estudios de conexión CELSIA 6 - 4 (139,3 MW)


CELSIA S.A. 19.89999962
SOLAR PALMAS (Conexión en Palmas 34,5 kV)

Remisión estudios de conexión CELSIA 6 - 5 (139,3 MW)


CELSIA S.A. 19.89999962
SOLAR PALMAS (Conexión en Palmas 34,5 kV)

Remisión estudios de conexión CELSIA 6 - 6 (139,3 MW)


CELSIA S.A. 19.89999962
SOLAR PALMAS (Conexión en Palmas 34,5 kV)

Remisión estudios de conexión CELSIA 6 - 2 (139,3 MW)


SOLAR NUEVA VIJES 2x19,9 MW (Conexión en Nueva Vijes CELSIA S.A. 19.89999962
34,5 kV)

Remisión de estudio de conexión PARQUES SOLARES


CELSIA COLOMBIA 19.89999962
CELSIA 7 Papeles del cauca 2 - 19,9 MW
Remisión de estudio de conexión PARQUES SOLARES
CELSIA COLOMBIA 19.89999962
CELSIA 7 Papeles del cauca 3 - 19,9 MW

Remisión de estudio de conexión PARQUES SOLARES


CELSIA COLOMBIA 19.89999962
CELSIA 7 Papeles del cauca 4 - 19,9 MW

Remisión de estudio de conexión PARQUES SOLARES


CELSIA COLOMBIA 19.89999962
CELSIA 7 Papeles del cauca 5 - 19,9 MW

Remisión de estudio de conexión PARQUES SOLARES


CELSIA COLOMBIA 19.89999962
CELSIA 7 Papeles del cauca 6 - 19,9 MW

Remisión de estudio de conexión PARQUES SOLARES


CELSIA COLOMBIA 19.89999962
CELSIA 7 Papeles del cauca 7 - 19,9 MW

Remisión de estudio de conexión Parques Solares Celsia IV.


CELSIA S.A. 9.899999619
Solar Palo Blanco 2 - 9,9 MW

Remisión de estudio de conexión Parques Solares Celsia IV.


CELSIA S.A. 9.899999619
Solar Palo Blanco 3 - 9,9 MW

Estudio de Conexión parque fotovoltaico CSF Continua CSF CONTINUA S.A.S


5
Natagaima 5MW E.S.P

RENERGÉTICA
Estudio de Conexión “Parque solar Arenosa de 9.9 MW” 9.899999619
COLOMBIA S.A.S.

Estudio de Conexión parque solar fotovoltaico San Alejo 1


TW SOLAR 19.89999962
19.9MW

Estudio de Conexión parque solar fotovoltaico San Alejo 2


TW SOLAR 19.89999962
19.9MW

Estudio de Conexión parque solar fotovoltaico San Alejo 3 FOTOVOLTAICO


19.89999962
19.9MW MIROLINDO S.A.S

Estudio de Conexión parque fotovoltaico CSF Continua CSF CONTINUA S.A.S


2
Purificación 2MW. E.S.P

CONTINUA ENERGIAS
Estudio de Conexión Parque Fotovoltaico CSF Continua
POSITIVAS COLOMBIA 5
Ambalema 5 MW
S.A.S.

CONTINUA ENERGIAS
Estudio de Conexión Parque Fotovoltaico CSF Continua
POSITIVAS COLOMBIA 5
Guayabal 5 MW.
S.A.S.
Concepto de Viabilidad técnica Planta Fotovoltaica “Parque JE JAIMES
30
solar Castañal de 30 MW”. INGENIEROS S.A

Remisión estudio de conexión generación Central Hidroeléctrica IC Asesorías y Proyectos


52
La Esperanza 52 MW. S.A.S. E.S.P.

ABO WIND
Viabilidad técnica de conexión del proyecto Parque Solar El
RENOVABLES 80
Gabán 1 80 MW
COLOMBIA S.A.S.

Viabilidad técnica de conexión del proyecto Parque Solar AC RENOVABLES SOL


65
Yopalosa 65 MW 1 S.A.S. E.S.P.S

ABO WIND
Concepto de viabilidad técnica proyecto de generación
RENOVABLES 9.899999619
Morichal.
COLOMBIA S.A.S.

CONTINUA ENERGIAS
Remisión Estudio de Conexión Proyecto Parque Fotovoltaico
POSITIVAS COLOMBIA 5
CSF Continua Lerida 5 MW
S.A.S.

ABO WIND
Estudio de Conexión Proyecto Solar Abirá 9.9 MW. RENOVABLES 9.899999619
COLOMBIA S.A.S.

Estudio de Conexión parque fotovoltaico CSF Continua Guamo CSF CONTINUA S.A.S
5.25
5.25MW. E.S.P

Remisión estudio de conexión generación Central Hidroeléctrica CONSTRUCTORA SAN


17
El Remanso 17 MW BLAS S.A.S

CONCEPTO DE VIABILIDAD TECNICA PROYECTO SOLAR


CELSIA S.A. 9.899999619
MELGAR II 9.9 MW Y FORMATOS UPME

Remisión estudio de conexión Planta Solar Nordeste 99.9 MW EPM 99.90000153

Remisión estudio de conexión generación Central Hidroeléctrica VAS ENERGÍA S.A.S


38.75999832
El Limón 38,76 MW E.S.P
Remisión estudio de conexión generación Central Hidroeléctrica PCH LA NOQUE S.A.S
9.899999619
La Noque 9,9 MW E.S.P ZOMAC

Remisión Estudio de Conexión Proyecto Parque Solar Canoas DUE Capital and
200
200 MW Services SAS

Concepto estudio de conexión del parque eólico SAN MARTIN


SAN MARTIN ENERGY
ENERGY GREEN EÓLICO PIOJÓ de 300 MW, a la 300
GREEN S.A.S. E.S.P
subestación Sabanalarga 500 kV
Remisión estudio de conexión generación Central Hidroeléctrica
INTEGRAL S.A. 16.5
Ovejas 16,5 MW.

Radicación del Estudio de Conexión del Proyecto Fotovoltaico


PRODIEL 200
PFV MAGDALENA 200 MW
ABO WIND
Concepto de viabilidad técnica proyecto de generación
RENOVABLES 9.899999619
fotovoltaica Esteros 9.9 MW
COLOMBIA S.A.S.

Concepto de viabilidad técnica proyecto de generación Playitas LICA ENERGÍA


19.89999962
19,9 MW RENOVABLES S.A.S

Solicitud de conexión Termoorinoquia Aguazul 40 MW. TERMORINOQUIA S.A. 40

DUE Capital and


Parque Solar La Calera 10 MW 10
Services SAS

VIABILIDAD TÉCNICA ESTUDIO DE CONEXIÓN PARA LA


TERMO MECHERO
AMPLIACIÓN DE TERMO MECHERO MORRO CON DOS 29.89999962
MORRO
PLANTAS MENORES DE 19.9MW Y 10 MW.
Concepto de viabilidad técnica para la conexión de 9,9 MW de
HZ ENERGY
generación "Parque Solar PV Sándalo II" a la subestación 9.899999619
S.A.S.E.S.P
Puerto Libertador a nivel de 34,5 kV.
Concepto de viabilidad ténica para la conexión de 9,9 MW de
HZ ENERGY
generación "Brisa Solar III" a la subestación Nueva Cospique a 9.899999619
S.A.S.E.S.P
nivel de 13,8 kV.

Estudio de conexión FOTONORTE 99,5 MW a la Subestación


Etra Interandina S.A. 99.5
Tasajero 230kV

Concepto de viabilidad técnica de conexión Parque Fotovoltaico


ELAWAN ENERGY 60
Coveñas

ESTUDIO DE CONEXIÓN PARA UN PROYECTO DE


GENERACIÓN “CENTRAL DE GENERACIÓN
SOLAR BARI SAS 15
FOTOVOLTAICA 15 MW EN TIBÚ” DEL PROMOTOR
ENERGY SUN COLOMBIA. (BARI)
ESTUDIO DE CONEXIÓN PARA UNA (1) PEQUEÑA
CENTRAL HIDROELÉCTRICA “PCH DEL NORTE” DE 19.9 GENERSOL SAS 19.89999962
MW DEL PROMOTOR GENERSOL S.A.S.

ESTUDIO DE CONEXIÓN PARA UNA (1) PEQUEÑA


CENTRAL HIDROELÉCTRICA “POWER GREEN NORTE” DE GENERSOL SAS 15
15 MW DEL PROMOTOR GENERSOL S.A.S.

Remisión Estudio de Conexión Salado 6 MW – Tesocol. TESOCOL S.A. 6

Pi Épsilon proyectos de
Remisión estudio de conexión generación Central Hidroeléctrica
Ingeniería Especializada 80
San Juan 80 MW
S.A.S.

IC Asesorías y Proyectos
Parque Solar Fotovoltaico "Las Mesetas" de 50 MW. 50
S.A.S. E.S.P.

Parque Eólico Bolívar 250 MW SOLANO S.A.S. 250


Concepto técnico sobre la conexión del proyecto SOLAR VO RENOVABLES SOL
9.899999619
FOTOVOLTAICO HONDA 1 9,9 MW 1 S.A.S. E.S.P

Concepto estudio de conexión del proyecto de generación


GENERADORA
Parque Solar Buenavista de 80 MW en la subestación 80
BUENAVISTA S.A.S
Esmeralda 220 kV.

Solicitud concepto técnico para la conexión del proyecto


URRÁ S.A. E.S.P. 90
Quimarí Solar de 90 MW

GREEN ENERGY DS&E


Estudio de conexión proyecto Polyerata 9.9 MW 9.899999619
SAS

GREEN ENERGY DS&E


Estudio de conexión proyecto Acacia 19,9 MW 19.89999962
SAS

GREEN ENERGY DS&E


Estudio de conexión proyecto Amazilia 9.9 MW 9.899999619
SAS

GREEN ENERGY DS&E


Estudio de conexión proyecto Zonaris 9.9 MW 9.899999619
SAS

ABO WIND
Estudio de Conexión Yat Solar 19.9 MW RENOVABLES 19.89999962
COLOMBIA S.A.S.

Remisión concepto técnico de conexión del parque de QUALITY MECHANICAL


19
generación fotovoltaica Gualanday QMS 19 MW SOLAR S.A.S

ENERGÍA SOLAR DEL


Remisión estudio de Conexión Parque Solar Roldanillo 9.9 MW VALLE DEL CAUCA 9.899999619
S.A.S

Concepto estudio de conexión autogeneración solar Drummond


DRUMMOND LTD 240
de 240 MW a la subestación La Loma 500 kV.

Concepto técnico sobre la conexión del proyecto PARQUE SAN


SJ Renovables Wind 1 100
JUAN EÓLICO 100 MW, a la subestación San Juan 220 kV.

Concepto técnico sobre la conexión del proyecto SOLAR


FOTOVOLTAICO DOMENICA 19,9 MW, a las redes del SDL PSR5 S.A.S. 19.89999962
propiedad de Codensa.
Remisión concepto de favorabilidad técnica y estudio de
conexión del proyecto "Generación fotovoltaica El Arbolito 9,9 TESOCOL S.A. 9.899999619
MW".

Concepto estudio de conexión del proyecto Parque Solar San Parque Solar San Isidro
99
Isidro de 99 MW, a la subestación La Virginia 230 kV. S.A.S.

Concepto estudio de conexión del proyecto solar Charcos de SOLAR PROJECTS


99.90000153
99,9 MW, a la subestación Guatiguará 230 kV DEVELOPERS SAS
Concepto estudio de conexión del proyecto solar Rincón de SOLAR PROJECTS
99.90000153
99,9 MW, a la subestación Guatiguará 230 kV DEVELOPERS SAS

Concepto de viavilidad ténica para la conexión de 9,9 MW de


generación fotovoltaica "Parque fotovoltaico Montelíbano Solar" GRENERGY COLOMBIA 9.899999619
a la subestación Montelíbano a nivel de 34,5 kV

GREEN ENERGY DS&E


Estudio de conexión proyecto Tabebuia Rosea 19,9 MW. 19.89999962
SAS

Parque Eólico Jamondino 200 MW, a la subestación Jamondino


COLGEÓLICA S.A.S. 200
230 kV.
OPERADORA RAYO
Estudio de Conexión Solar Ocobo 1 - 19.9 MW ENERGÍA COLOMBIA 19.89999962
S.A.S.
OPERADORA RAYO
Estudio de Conexión Solar Ocobo 2 - 19.9 MW ENERGÍA COLOMBIA 19.89999962
S.A.S.
OPERADORA RAYO
Estudio de Conexión Solar Ocobo 3 - 19.9 MW ENERGÍA COLOMBIA 19.89999962
S.A.S.

Estudio de Conexión Solar Honda 1 -19.9 MW CELSIA S.A. 19.89999962

Estudio de Conexión Solar Honda 2 -19.9 MW CELSIA S.A. 19.89999962

Estudio de Conexión Solar Gualanday 1 -19.9 MW CELSIA S.A. 19.89999962

Estudio de Conexión Solar Gualanday 2 -19.9 MW CELSIA S.A. 19.89999962

Estudio de Conexión Solar Gualanday 3 -19.9 MW CELSIA S.A. 19.89999962

Estudio de Conexión Solar Gualanday 4 -19.9 MW CELSIA S.A. 19.89999962

Estudio de Conexión Solar Gualanday 5 -19.9 MW CELSIA S.A. 19.89999962

Estudio de Conexión Renacer 9.95 MW RTB Colombia S.A.S 19.89999962

BROOKLEAN
Concepto viabilidad Técnica Colcaribe solar V 5MW 5
HOLDINGS
COLOMBIA SOLAR
Concepto Parque Solar Camarones 1 (6 MW) CORPORATION 6
INTERNATIONAL

Remisión estudio de conexión Parque Solar Puerto Boyacá 40


EBSA 40
MW

ENERFIN SERVICIOS
Proyecto PS Girasol de 150 MW 150
S.A.S

HIDROTURBINAS
Remisión estudio de conexión PCH Renacer 16.27 MW 16.27000046
DELTA
Remisión estudio de conexión generación Central Hidroeléctrica
URRÁ S.A. E.S.P. 14
Aurrá La Sucia 14 MW
Concepto técnico sobre la conexión del proyecto SOLAR
VO RENOVABLES SOL
FOTOVOLTAICO UTICA 9,9 MW, a las redes del SDL 9.899999619
1 S.A.S. E.S.P
propiedad de Codensa.

Conexión de 9,9 MW del proyecto de generación “Parque Solar


TEKO 2 S.A.S E.S.P. 9.899999619
Teko 2”.

HIDROTURBINAS
Remisión de estudio de conexión PCH Guanes 10,3 MW 10.30000019
DELTA

Estudio de Conexión parque solar fotovoltaico Coello 19.9MW Renovables LATAM 19.89999962

Concepto estudio de conexión parque de generación eólica Andaki New Energy


250
Andakí Windfarm de 250 MW a la subestación Altamira 230 kV. S.A.S

Remisión Estudio de Conexión PFV SAHAGÚN 200 MW -


COLGEÓLICA S.A.S. 200
Colgeólica

ABO WIND
Concepto conexión Generación Solar Fotovoltaica SIATÁ 19,9
RENOVABLES 19.89999962
MW
COLOMBIA S.A.S.
ABO WIND
Estudio de conexión Parque Chitagoto 9.9. MW RENOVABLES 9.899999619
COLOMBIA S.A.S.

Parque Solar Pasacaballo I de 29,8 MW PROMOENERGIA 29.79999924

Parque Solar Pasacaballo II de 9,9 MW PROMOENERGIA 9.899999619

Parque Solar Pasacaballo III de 19,9 MW PROMOENERGIA 19.89999962

Conexión planta Alpha solar Fortul 5 MW SVC ESP SAS 5


Conexión planta Deya solar Arauquita 3MW SVC ESP SAS 3

Remisión de estudio de Conexión para el proyecto solar


“SUMMA II 200 MW” que se conectará a la subestación PROELECTRICA 200
Sahagún 500 kV
ABO WIND
Remisión estudio de conexión Proyecto Sua 60 MW RENOVABLES 60
COLOMBIA S.A.S.

Concepto de viabilidad técnica conexión proyecto PLANTA


Renovables LATAM 9.899999619
SOLAR PEÑAS BLANCAS con capacidad de 9,9 MW

INGESERTEC Ingeniería
Remisión estudio de conexión de PCH Guaico de 1,2 MW 1.200000048
y Servicios Técnicos

INGESERTEC Ingeniería
Remisión estudio de conexión de PCH Vequedo de 2,6 MW 2.599999905
y Servicios Técnicos

VO RENOVABLES SOL
Remisión Proyecto Generación Apulo I 9,9 MW 9.899999619
1 S.A.S. E.S.P

Remisión estudio de conexión generación PCH Dolores


EPM 1
Concepción de 1 MW

Remisión estudio de conexión generación Central Hidroeléctrica


CHOCHORIO S.A.S. 5
Chochorio 5 MW

PETROELECTRICA DE
Autogeneración Solar Campo Rubiales PEL - 105 MW 0
LOS LLANOS

PETROELECTRICA DE
Autogeneración Térmica Campo Rubiales PEL - 119 MW 0
LOS LLANOS
ABO WIND
Conexión Proyecto Solar La Estrella 60 MW en Victoria 115 33
RENOVABLES 60
KV
COLOMBIA S.A.S.

Solicitud de conexión Parques eólicos Azufral 60 MW VOLTALIA 60


Solicitud de conexión Parque eólico Pastor 80 MW VOLTALIA 80

Incremento Autogeneración Essentia Proyecto Solar


ESSENTIA S.A. 0
Fotovoltaico 0.276 MW

Concepto de viabilidad técnica para la conexión de 19,9 MW de


CASTELLANA DE
generación fotovoltaica Los Morrosquillos III a la subestación 19.89999962
PROYECTOS SOLARES
Toluviejo a nivel de 34,5 kV.
AAGES DEVELOPMENT
Estudio de conexión Parque Solar Nobsa I 9,9 MW COLOMBIA S.A.S. 9.899999619
E.S.P.

AAGES DEVELOPMENT
Remisión, estudio de conexión Parque Solar Nobsa II 9,9 MW. COLOMBIA S.A.S. 9.899999619
E.S.P.

Remisión estudio de conexión generación Central Hidroeléctrica CENTRAL ENERGY


1.75
Chilsa 1,75 MW S.A.S

ESTUDIO DE CONEXIÓN PLANTA SOLAR - BOSQUES


SOLARES DE LOS LLANOS EN LA SUBESTACION SURIA SOLARGREEN 99.90000153
230 KV BSL 8
ESTUDIO DE CONEXIÓN PLANTA SOLAR - BOSQUES
SOLARES DE LOS LLANOS EN LA SUBESTACION SURIA SOLARGREEN 99.90000153
230 KV BSL 9
Remisión de estudio de Conexión para el proyecto solar “LOS
TULIPANES II 300MW” que se conectará a la subestación UNIVERGY 300
Sahagún 500 kV.

Proyecto Solar Cattleya del Huila de 100 MW BLACK ORCHID SOLAR 100

DIANA CORPORACIÓN
Autogeneración térmica Diana 4.8 MW 4.800000191
S.A.S.

Concepto de viabilidad técnica para la conexión de 9,9 MW de


generación fotovoltaica Centro Solar a la subestación Centro GRENERGY COLOMBIA 9.899999619
Alegre a nivel de 34,5 kV
Concepto de viabilidad técnica para la conexión de 9,9 MW de
generación fotovoltaica Buenavista Solar a la subestación GRENERGY COLOMBIA 9.899999619
Buenavista a nivel de 34,5 Kv
Concepto de viabilidad técnica para la conexión de 9,9 MW de
generación fotovoltaica Sol del Mar II a la subestación Ayape a GRENERGY COLOMBIA 9.899999619
nivel de 34,5 Kv

Remisión estudio de conexión Generación solar Fotovoltaica XANTIA-XAMUELS


9.899999619
Urabá 1 de 9,9 MW S.A.S

Remisión estudio de conexión Generación solar Fotovoltaica XANTIA-XAMUELS


19.89999962
Urabá 2 de 19,9 MW S.A.S

Remisión estudio de conexión generación PCH Churimo 6 MW CLEAR WATER S.A.S 6

Estudio de Conexión Planta De Generación Solar Las SAN ANTONIO


50
Coloradas 50 MW BOTERO S.A.S
Concepto estudio de conexión del proyecto Parque Solar Delphi
DELPHI CAPITAL
Helios - San Marcos_x000D_ 300
PARTNERS S.A.S.
de 300 MW, a la subestación San Marcos 230 kV.
OPERADORA RAYO
Estudio de Conexión “Planta De Generación Solar Totumo 50
ENERGÍA COLOMBIA 50
MW”
S.A.S.
OPERADORA RAYO
Estudio de Conexión “Planta De Generación Solar Cóndor 9.9
ENERGÍA COLOMBIA 9.899999619
MW”
S.A.S.

Estudio de Conexión “Proyecto De Generación Riopaila 9 MW” RIOPAILA ENERGIA 9

Estudio de Conexión “Parque De Generación Solar Clip 50.82 Smart Consulting Group
50.81999969
MW” - SCG

Concepto estudio de conexión de las plantas Termo-EBR 21.87


ODL S.A. 21.87000084
MW
Concepto estudio de conexión de Termo-Proyectos 21.87 MW,
ODL S.A. 21.87000084
a la subestación Chivor 230 kV.

VO RENOVABLES SOL
Parque Solar Campo Alegre 9.9 MW 9.899999619
1 S.A.S. E.S.P

VO RENOVABLES SOL
Parque Solar Fotovoltaico Fortalecillas 9.9 MW 9.899999619
1 S.A.S. E.S.P

VO RENOVABLES SOL
Parque Solar Bateas 9.9 MW 99
1 S.A.S. E.S.P

VO RENOVABLES SOL
Parque solar fotovoltaico Puerto Salgar 9.9 MW 99
1 S.A.S. E.S.P
ACIÓN REPORTADA POR UPME

Tipo de Punto de
Recurso Responsable Subestación
Generacion Conexión

GENERACION SOL EL CARMEN ELECTRICARIBE

GENERACION SOL LA MOJANA ELECTRICARIBE

GENERACION CARBÓN PAIPA EBSA

AUTOGENERACIO
NA INMARCO EPM
N

GENERACION SOL SABANALARGA ELECTRICARIBE

GENERACION AGUA SALVAJINA CELSIA COLOMBIA

GENERACION SOL COROZO ELECTRICARIBE

GAS
GENERACION YOPAL ENERCA
NATURAL

GENERACION AGUA PLAYAS EPM

GENERACION SOL SAN ONOFRE


CARIBE MAR DE LA COSTA S.A.S. E.S.P. - AFINIA

GENERACION SOL BAYUNCA ELECTRICARIBE

COGENERACION NA VIRGINIA CHEC

GENERACION SOL TOLUVIEJO


CARIBE MAR DE LA COSTA S.A.S. E.S.P. - AFINIA

GENERACION SOL TOLUVIEJO ELECTRICARIBE

GENERACION SOL BAYUNCA ELECTRICARIBE

GENERACION CARBÓN TASAJERO DISTASA


GENERACION AGUA YARUMAL I EPM

GENERACION AGUA LERIDA ENERTOLIMA

GAS
GENERACION TAME ENELAR
NATURAL

GENERACION SOL SAN FELIPE INTERCOLOMBIA

GENERACION VIENTO RIOHACHA ELECTRICARIBE

GENERACION VIENTO COLECTORA I EPM

GENERACION VIENTO COLECTORA I JEMEIWAA KA I

GENERACION VIENTO COLECTORA I JEMEIWAA KA I

GENERACION VIENTO COLECTORA I JEMEIWAA KA I

GENERACION VIENTO COLECTORA I JEMEIWAA KA I

GENERACION VIENTO COLECTORA I ENEL GREEN POWER

GENERACION VIENTO COLECTORA I ENEL GREEN POWER

GENERACION VIENTO CUESTECITAS INTERCOLOMBIA

GENERACION SOL CUESTECITAS INTERCOLOMBIA

GENERACION SOL SAN JUAN SOWITEC

GAS SAN MARCOS


GENERACION CELSIA COLOMBIA
NATURAL (SUCRE)
GENERACION SOL MESA DEL SOL ESSA

GENERACION SOL CHIRIGUANA ELECTRICARIBE

GENERACION SOL MESA DEL SOL ESSA

GENERACION SOL MESA DEL SOL ESSA

GENERACION SOL MESA DEL SOL ESSA

TUNJA
GENERACION AGUA EBSA
(DONATO)

CODAZZI
GENERACION SOL ELECTRICARIBE
(CESAR)

CODAZZI
GENERACION SOL ELECTRICARIBE
(CESAR)

GENERACION AGUA COCORNA EPM

GENERACION SOL CARTAGO CELSIA COLOMBIA

LA SIERRA
GENERACION SOL INTERCOLOMBIA
(ANTIOQUIA)

GENERACION SOL PURNIO INTERCOLOMBIA

GENERACION SOL FUNDACION TRANSELCA

COGENERACION SOL ENLACE CELSIA COLOMBIA

COGENERACION NA PAEZ CEO

GENERACION SOL PAIPA EBSA

GENERACION SOL PAIPA EBSA

GENERACION SOL PURNIO CHEC


GENERACION AGUA LA CRUZADA EPM

NUEVA
GENERACION SOL MONTERIA 110 ELECTRICARIBE
KV

GENERACION AGUA GRANADA EPM

GENERACION SOL CERROMATOSO ELECTRICARIBE

GENERACION AGUA HISPANIA EPM

GENERACION SOL ZAMBRANO ELECTRICARIBE

GENERACION SOL JUAN MINA ELECTRICARIBE

GENERACION SOL SINCE ELECTRICARIBE

GENERACION SOL JUAN MINA ELECTRICARIBE

GENERACION SOL MOMPOX


CARIBE MAR DE LA COSTA S.A.S. E.S.P. - AFINIA

GENERACION SOL BARANOA ELECTRICARIBE

GENERACION SOL AYACUCHO CENS

GENERACION SOL SABANALARGA ELECTRICARIBE

GENERACION SOL SABANALARGA INTERCOLOMBIA

GENERACION SOL SABANALARGA INTERCOLOMBIA

GENERACION SOL SABANALARGA INTERCOLOMBIA

GENERACION SOL SABANALARGA INTERCOLOMBIA

GENERACION SOL CHINU INTERCOLOMBIA


GAS TERMOCANDELA
GENERACION GEB
NATURAL RIA

AUTOGENERACIO ANCON SUR


NA EPM
N (ISA)

GENERACION SOL PALMASECA CELSIA COLOMBIA

LA SIERRA
GENERACION SOL INTERCOLOMBIA
(ANTIOQUIA)

GENERACION SOL CARACOLI ELECTRICARIBE

GENERACION NA AGUACLARA ENERCA

GAS
GENERACION AGUAZUL ENERCA
NATURAL

GENERACION SOL UBATE CODENSA

GENERACION SOL BARZALOSA CODENSA

GENERACION SOL TOLUVIEJO ELECTRICARIBE

GENERACION SOL ZAMBRANO ELECTRICARIBE

SOGAMOSO (LA
GENERACION SOL INTERCOLOMBIA
RAMADA)
SOGAMOSO (LA
GENERACION SOL INTERCOLOMBIA
RAMADA)

GENERACION AGUA CALDERAS EPM

PUERTO
GENERACION AGUA EPM
CAICEDO

GENERACION AGUA SAN LORENZO EPM

GENERACION AGUA PACORA CHEC

GENERACION AGUA PACORA CHEC

GENERACION SOL MAGANGUE ELECTRICARIBE

GENERACION SOL MAGANGUE ELECTRICARIBE


AUTOGENERACIO
NA BELLO EPM
N

AUTOGENERACIO
SOL ESPINAL ENERTOLIMA
N

RIO CORDOBA
GENERACION SOL ELECTRICARIBE
110 KV

GENERACION SOL CHINU PLANTA ELECTRICARIBE

GENERACION SOL CALIZAS EPM

CIRCUITO
GENERACION NA TESORO DE LA CODENSA
S/E USME

GENERACION SOL BARRANCA ANDES SOLAR IV

GENERACION SOL EL CARMEN


CARIBE MAR DE LA COSTA S.A.S. E.S.P. - AFINIA

GENERACION NA SURIA EMSA

GENERACION NA SURIA EMSA

DOSQUEBRADA
GENERACION SOL EEPEREIRA
S

GENERACION VIENTO EL RIO PROMOENERGIA MAGDALENA

GENERACION VIENTO EL RIO PROMOENERGIA CULANTRAL

GENERACION AGUA SAN FELIPE INTERCOLOMBIA

GENERACION SOL SAN FELIPE INTERCOLOMBIA

GENERACION NA JAGUEY GEB


CAMPO
GENERACION NA GEB
RUBIALES

GAS
GENERACION TEBSA ELECTRICARIBE
NATURAL

CARIBE MAR DE LA COSTA S.A.S.


GENERACION SOL PLANETA RICA
E.S.P. - AFINIA

GENERACION SOL MUISCAS EBSA

GAS
GENERACION GUACHAL CELSIA COLOMBIA
NATURAL

GAS TABOR
GENERACION CELSIA COLOMBIA
NATURAL (BVENTURA)

AUTOGENERACIO
NA PAPELCAUCA PAPELES DEL CAUCA
N

GENERACION NA COLMOTORES ENEL CODENSA

AUTOGENERACIO
NA SAN SILVESTRE ESSA
N

GENERACION SOL FUNDACION ELECTRICARIBE

GENERACION SOL SAN FELIPE CELSIA COLOMBIA

GENERACION SOL FLANDES CELSIA COLOMBIA

GENERACION SOL LANCEROS CELSIA COLOMBIA

BARBOSA
GENERACION SOL ESSA
(SANTANDER)

GENERACION SOL CIMITARRA ESSA

GENERACION SOL SAN ALBERTO ESSA

SANTA
GENERACION VIENTO ELECTRICARIBE
VERONICA

AUTOGENERACIO
SOL EL CARMELO CELSIA COLOMBIA
N
GAS
GENERACION BOLIVAR 66 KV INTERCOLOMBIA
NATURAL

ZONA
GENERACION SOL INDUSTRIAL - ENELAR
CARACOL

GENERACION SOL PAILA CELSIA COLOMBIA

GENERACION SOL CHINU PLANTA ELECTRICARIBE

GENERACION SOL CHINU PLANTA ELECTRICARIBE

GENERACION SOL JUAN MINA ELECTRICARIBE

GENERACION SOL MARIQUITA CELSIA S.A.

GENERACION NA EL RIO ELECTRICARIBE

GENERACION SOL ZARZAL CELSIA COLOMBIA

GENERACION SOL ANDALUCIA CELSIA COLOMBIA

GENERACION SOL FLANDES CELSIA COLOMBIA

GENERACION SOL COVEÑAS ELECTRICARIBE

GENERACION SOL SANTA HELENA EMSA

GENERACION VIENTO CARACOLI INTERCOLOMBIA

GENERACION SOL PLANETA RICA ELECTRICARIBE

GENERACION SOL OCOA - ACACIAS EMSA


GENERACION VIENTO CUESTECITAS VIENTOS DEL NORTE SAS ESP

GENERACION VIENTO CUESTECITAS EOLOS ENERGÍA

IBAGUE
GENERACION SOL INTERCOLOMBIA
(MIROLINDO)

GENERACION SOL MAMONAL ELECTRICARIBE

GENERACION SOL CARACOLI ELECTRICARIBE

GENERACION AGUA CARACOLI EPM

GENERACION SOL SIERRA FLOR ELECTRICARIBE

GENERACION AGUA PAVAS EEPEREIRA

DOSQUEBRADA
GENERACION AGUA EEPEREIRA
S

GENERACION SOL LA RAMADA EBSA

GENERACION SOL BUTURAMA CENS

GENERACION SOL AGUACHICA CENS

GENERACION AGUA LA TULIA CHEC

GENERACION SOL GAMBOTE ELECTRICARIBE

GENERACION SOL SABANAGRANDE ELECTRICARIBE

SABANA DE
GENERACION SOL ESSA
TORRES

GENERACION SOL SAN FELIPE CELSIA TOLIMA


GENERACION SOL ZAWADY ELECTRICARIBE

GENERACION SOL SAN FELIPE CELSIA TOLIMA

GENERACION NA SAHAGUN INTERCOLOMBIA

GENERACION SOL CALAMAR COLOMENER VI S.A.S

GENERACION AGUA EL DORADO CHEC

GAS
GENERACION TAME ENELAR
NATURAL

GENERACION SOL SAN GIL ESSA

AUTOGENERACIO SANTA BARBARA


NA EPM
N (PALMIRA)

PUERTO
GENERACION SOL ESSA
WILCHES

AUTOGENERACIO
CARBÓN LOMA REDONDA EBSA
N
ZONA
GENERACION SOL INDUSTRIAL - ENELAR
CARACOL

GENERACION SOL TOLUVIEJO CELSIA COLOMBIA

GENERACION SOL TIERRALTA ELECTRICARIBE

GENERACION SOL TOLUVIEJO ELECTRICARIBE

GENERACION SOL MOMPOX


CARIBE MAR DE LA COSTA S.A.S. E.S.P. - AFINIA

GENERACION SOL MOMPOX


CARIBE MAR DE LA COSTA S.A.S. E.S.P. - AFINIA

GENERACION SOL PLANETA CARIBE


RICA MAR DE LA COSTA S.A.S. E.S.P. - AFINIA
GENERACION SOL URRA ELECTRICARIBE

GENERACION NA BOLIVAR 66 KV INTERCOLOMBIA

GENERACION AGUA DON JUANA CENS

GENERACION SOL EL ZAQUE CEO

GENERACION AGUA PIENDAMO CEO

EL HUCHE 115
GENERACION SOL EBSA
KV

GENERACION AGUA PERALONSO CHEC

GENERACION SOL OIBA ESSA

GENERACION SOL BARRANCA ESSA

GENERACION SOL ALTO RICAURTE EBSA

GENERACION SOL SAN ALBERTO ESSA

AUTOGENERACIO PUNTO P
NA EPM
N GUAYABAL

GENERACION AGUA GUATAPE EPM

GENERACION AGUA SONSON EPM

INSULA
GENERACION SOL CENS
(CHINCHINA)

INSULA
GENERACION SOL CENS
(CHINCHINA)

BAVARIA
GENERACION SOL EBSA
(PASTO)
GENERACION SOL OCAÑA TW SOLAR

GENERACION SOL OCAÑA CENS

GENERACION SOL OCAÑA CENS

GENERACION SOL PUERTO TEJADA CEO

GENERACION SOL SAN MARTIN EMSA

SAN JUAN DE
GENERACION SOL EMSA
ARAMA

SAN JUAN DE
GENERACION SOL EMSA
ARAMA

COGENERACION NA MARIA LUISA CELSIA S.A.

GENERACION SOL SUAMOX EBSA

GENERACION NA CHINU INTERCOLOMBIA

IBAGUE
GENERACION SOL CELSIA TOLIMA
(MIROLINDO)

IBAGUE
GENERACION SOL CELSIA TOLIMA
(MIROLINDO)

GENERACION SOL PICALEÑA CELSIA TOLIMA

GENERACION SOL SALADO CELSIA TOLIMA


IBAGUE
GENERACION SOL CELSIA TOLIMA
(MIROLINDO)

GENERACION SOL FLANDES CELSIA COLOMBIA

GENERACION SOL ABREGO CENS

MANZANILLO 66
GENERACION VIENTO ELECTRICARIBE
KV

SAN
GENERACION SOL ELECTRICARIBE
ESTANISLAO

GENERACION SOL GAMBOTE ELECTRICARIBE

GENERACION AGUA LAGUNAS EPM

GENERACION SOL PLANETA RICA ELECTRICARIBE

GENERACION AGUA RIOGRANDE EPM

GENERACION SOL RIO CHIQUITO EBSA

GENERACION SOL SAHAGUN LATAMSOLAR ENERGIAS RENOVABLES

GENERACION SOL GUALANDAY CELSIA S.A.

GENERACION SOL TOLUVIEJO CELSIA S.A.

AUTOGENERACIO
AGUA LA CRUZADA EPM
N

GENERACION SOL GUALANDAY CELSIA S.A.

GENERACION SOL GUALANDAY CELSIA S.A.


GENERACION SOL GUALANDAY CELSIA S.A.

GENERACION SOL ZAPATOCA ESSA

GENERACION AGUA SAMANA CHEC

GENERACION SOL PRIMAVERA INTERCOLOMBIA

GENERACION AGUA BORDO CEO

GENERACION SOL CHINU ELECTRICARIBE

GENERACION SOL CHINU INTERCOLOMBIA

GENERACION SOL CHINU INTERCOLOMBIA

GENERACION SOL SUAMOX EBSA

PANACEA -
GENERACION AGUA CENS
NUEVO PUNTO

PANACEA -
GENERACION AGUA ENERGÍA RESPONSABLE S.A.S
NUEVO PUNTO

GENERACION NA ALCARAVAN ENERCA

GENERACION SOL AGUACLARA AC RENOVABLES SOL 1 S.A.S. E.S.P.S

GENERACION SOL ALCARAVAN


ABO WIND RENOVABLES COLOMBIA S.A.S.

GENERACION SOL ALCARAVAN MAINSTREAM COLOMBIA S.A.S.


GENERACION AGUA PESCADOR CEO

GAS
GENERACION YOPAL ENERCA
NATURAL

GENERACION SOL SUAREZ CELSIA S.A.

GENERACION SOL SURIA EMSA

GENERACION SOL SURIA DELSUR

GENERACION AGUA GUARCAMA EPM

GENERACION AGUA GUARCAMA EPM

GENERACION SOL BARZALOSA CODENSA

GENERACION SOL BANADIA ENELAR

CANDELARIA
COGENERACION NA CELSIA S.A.
(VALLE)

GENERACION SOL GUADUAS CENS

GENERACION SOL SALADO CELSIA TOLIMA

AUTOGENERACIO
NA COSPIQUE ELECTRICARIBE
N

GENERACION SOL TOLUVIEJO


CARIBE MAR DE LA COSTA S.A.S. E.S.P. - AFINIA

GENERACION SOL SURIMENA EMSA


GENERACION SOL VIRGINIA INTERCOLOMBIA

GENERACION SOL MULALO EMCALI

GENERACION SOL MULALO CELSIA COLOMBIA

GENERACION AGUA SANTA MARIA EBSA

GAS
GENERACION TERMOFLORES COLINVERSIONES
NATURAL

GENERACION AGUA TULUA CELSIA COLOMBIA

GENERACION CARBÓN CERROMATOSO ELECTRICARIBE

GENERACION AGUA ABEJORAL EPM

GENERACION AGUA SIBUNDOY ENERTOLIMA

CIRCUITO
GENERACION AGUA SOTILEZA DE LA CODENSA
S/E MORATO

GENERACION AGUA USAQUEN CODENSA

GENERACION AGUA ITUANGO EPM

GENERACION AGUA EL LIMON EPM

COGENERACION NA VIRGINIA CHEC

GENERACION AGUA BOLOMBOLO EPM

GENERACION AGUA BOLOMBOLO EPM

GENERACION CARBÓN TASAJERO DISTASA

GENERACION AGUA GIRARDOTA EPM

GENERACION AGUA COLEGIO CODENSA

SALTO II
GENERACION AGUA CODENSA
(COLEGIO)
GENERACION AGUA LAGUNETA CODENSA

GENERACION AGUA ESPINAL ENERTOLIMA

GENERACION AGUA BARROSO EPM

GENERACION AGUA SAN LORENZO EPM

GENERACION AGUA SAN LORENZO EPM

GENERACION AGUA SAN LORENZO EPM

GENERACION AGUA SAN LORENZO EPM

GENERACION CARBÓN CERROMATOSO ELECTRICARIBE

CIRCUITO EL
GENERACION AGUA DOVIO-LA CELSIA COLOMBIA
ARGELIA
CABAÑA
GENERACION AGUA CEO
(CAUCA)

GENERACION AGUA RIOGRANDE EPM

LINEA
ANAPOIMA-
GENERACION AGUA EEC
APULO, A 3,5 KM
DE APULO

GENERACION AGUA GARAVITO EBSA

GENERACION AGUA LIBORINA EPM

GENERACION AGUA ANSERMA CHEC

GENERACION AGUA TULUNI ENERTOLIMA

GENERACION AGUA LA MINA EPM

GENERACION AGUA EL EDEN CHEC

GENERACION AGUA SEGOVIA EPM


GAS
GENERACION PURIFICACION ENERTOLIMA
NATURAL

COGENERACION NA CAMPOBONITO EMSA

GENERACION AGUA PLAYAS EPM

COGENERACION NA CABAÑAS CEO

GENERACION AGUA BORDO CEO

SOGAMOSO (LA
GENERACION AGUA INTERCOLOMBIA
RAMADA)
CIRCUITO 518
GENERACION NA DE LA S/E ELECTRICARIBE
FUNDACION

GENERACION AGUA DABEIBA EPM

COGENERACION NA BAGRE EPM

GENERACION AGUA BOLOMBOLO EPM

COGENERACION NA ZARZAL CELSIA COLOMBIA

CIRCUITO
GENERACION NA TESORO DE LA CODENSA
S/E USME

NODO N
CIRCUITO SAN
GENERACION AGUA CHEC
FELIX SLM23L13
(SALAMINA)

COGENERACION NA PAEZ INTERCOLOMBIA

GENERACION AGUA NORTE 110 KV CEO

GENERACION AGUA SAN LORENZO EPM


COGENERACION NA COLTEJER EPM

GAS
GENERACION YOPAL ENERCA
NATURAL

GAS NUEVA SE
GENERACION EBSA
NATURAL TERMOBOLIVAR

GENERACION NA USME CODENSA

CIRCUITO W DEL
GENERACION AGUA CHEC
HORNO

GENERACION OTROS BARRANCA ESSA

GENERACION AGUA TARAZA EPM

GAS
GENERACION YOPAL ENERCA
NATURAL

SAN JOSE DE LA
GENERACION AGUA EPM
MONTAÑA

GENERACION AGUA BOLOMBOLO EPM

GENERACION AGUA SAN ROQUE EPM

SANTA ROSA
GENERACION AGUA EPM
(ANTIOQUIA)

GENERACION AGUA SAN LORENZO EPM

GENERACION CARBÓN TASAJERO TERMOTASAJERO DOS


CIRCUITO
COGENERACION NA CEMENTOS- EMCALI
TERMOYUMBO

GENERACION AGUA EL SIETE DISPAC

GENERACION AGUA SONSON EPM

GENERACION OTROS TERMOCOL INTERCOLOMBIA

GENERACION AGUA GUADALUEJO CEO

GENERACION AGUA RIONEGRO EPM

GENERACION CARBÓN LA LOMA GEB

AUTOGENERACIO
SOL TERMOYUMBO CELSIA COLOMBIA
N

GENERACION AGUA YARUMAL II EPM

GENERACION VIENTO CUESTECITAS ENEL GREEN POWER

MANZANARES
GENERACION AGUA CHEC - GRUPO ELEMENTAL
(CALDAS)

AUTOGENERACIO T ENTRE SURIA


NA EMSA
N Y SURIMENA

GENERACION VIENTO CUESTECITAS TRANSELCA

GENERACION AGUA LAS PLAYAS EPM

GENERACION SOL BARANOA ELECTRICARIBE

GENERACION SOL EL PASO ELECTRICARIBE

GENERACION AGUA OIBA ESSA

GENERACION AGUA OIBA ESSA


GENERACION AGUA SUAITA ESSA

GENERACION AGUA SUAITA ESSA

AUTOGENERACIO
NA ARGOS ELECTRICARIBE
N

AUTOGENERACIO SAN ANTONIO


NA CELSIA COLOMBIA
N (BOYACA)

SAN JOSE DE LA
GENERACION AGUA EPM
MONTAÑA

GENERACION SOL SAN JUAN ELECTRICARIBE

GENERACION SOL SAN JUAN ELECTRICARIBE

GENERACION AGUA SAN LORENZO EPM

GENERACION NA GUADALUEJO CEO

GENERACION SOL PONEDERA ELECTRICARIBE

GENERACION SOL BARANOA ELECTRICARIBE

AUTOGENERACIO
NA SAN DIEGO EPM
N

GENERACION AGUA GUAVIO GEB

DERIVACION EN
T CIRCUITO
AUTOGENERACIO
NA SANTANDER- CEO
N
PUERTO
TEJADA.

AUTOGENERACIO
NA COMUNEROS INTERCOLOMBIA
N

AUTOGENERACIO
NA TOLUVIEJO ELECTRICARIBE
N

GENERACION AGUA BRISAS EPM


GENERACION AGUA VALPARAISO EPM

AUTOGENERACIO BARBOSA
NA EPM
N (SANTANDER)

GENERACION AGUA SONSON EPM

GENERACION SOL LA LOMA ELECTRICARIBE

AUTOGENERACIO
NA FEMSA CODENSA
N

IBAGUE
GENERACION AGUA INTERCOLOMBIA
(MIROLINDO)

GENERACION SOL PUERTO GAITAN EMSA

SALTO I
GENERACION AGUA CODENSA
(BOGOTA)

GENERACION SOL GAMBOTE ELECTRICARIBE

GENERACION SOL RIONEGRO EPM

GENERACION AGUA YARUMAL II EPM

SAN CARLOS
GENERACION AGUA INTERCOLOMBIA
(BOGOTA)

GENERACION VIENTO CUESTECITAS TRANSELCA

SALAMINA
GENERACION SOL ELECTRICARIBE
(CALDAS)

AUTOGENERACIO PUNTO P
NA EPM
N GUAYABAL
GENERACION CARBÓN PAIPA EBSA

AUTOGENERACIO
NA TERMOZIPA CODENSA
N

AUTOGENERACIO SANTA BARBARA


NA EPM
N (PALMIRA)

COGENERACION NA PALMAS CELSIA COLOMBIA

GENERACION SOL SINCE ELECTRICARIBE

GENERACION SOL BOLIVAR 66 KV ELECTRICARIBE

GENERACION CARBÓN PAIPA EBSA

AUTOGENERACIO
NA POBLADO EPM
N

GENERACION SOL OCAÑA INTERCOLOMBIA

HIDROELE MINAS DEL


GENERACION EPM
CTRICA VAPOR
HIDROELE
GENERACION VITERBO UNIVERSAL STREAM
CTRICA

CIRCUITO
ITUANGO-
HIDROELE CERROMATOSO
GENERACION EPM
CTRICA A 16 KM DE LA
SE ESPIRITU
SANTO

HIDROELE CHORODO
GENERACION EPM
CTRICA (FRONTINO)

HIDROELE
GENERACION FLORIDA EPM
CTRICA
HIDROELE
GENERACION FLORIDA EPM
CTRICA
GEOTÉRM
GENERACION LA ENEA ISAGEN
ICO
HIDROELE
GENERACION CAÑAFISTO ISAGEN
CTRICA
SOLAR
GENERACION FOTOVOL CUESTECITAS ELECTRICARIBE
TAICA

COGENERACION No Define MALAMBO ELECTRICARIBE

HIDROELE SALAMINA
GENERACION CHEC
CTRICA (CALDAS)

COGENERACION No Define LAS FLORES ELECTRICARIBE

HIDROELE
GENERACION MALENA EPM
CTRICA

GENERACION TÉRMICA T QUIMBO SURENERGY SAS ESP

SOLAR
GENERACION FOTOVOL BUCHELY CEDENAR
TAICA

AUTOGENERACIO
No Define PALAGUA EBSA
N
SOLAR
LATAMSOLAR ENERGIAS
GENERACION FOTOVOL EL COPEY
RENOVABLES
TAICA
SOLAR
GENERACION FOTOVOL POR DEFINIR TW SOLAR
TAICA
SOLAR
GENERACION FOTOVOL VALLEDUPAR TW SOLAR
TAICA
SOLAR
GENERACION FOTOVOL EL COPEY TW SOLAR
TAICA
SOLAR
GENERACION FOTOVOL CUESTECITAS TW SOLAR
TAICA
SOLAR
GENERACION FOTOVOL POR DEFINIR TW SOLAR
TAICA
SOLAR
GENERACION FOTOVOL POR DEFINIR TW SOLAR
TAICA
SOLAR
GENERACION FOTOVOL FUNDACION TW SOLAR
TAICA
SOLAR
GENERACION FOTOVOL CUESTECITAS TW SOLAR
TAICA
SOLAR
GENERACION FOTOVOL BONDA CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL EL COPEY TW SOLAR
TAICA
SOLAR
GENERACION FOTOVOL FUNDACION TW SOLAR
TAICA
SOLAR
GENERACION FOTOVOL CUESTECITAS TW SOLAR
TAICA
SOLAR
GENERACION FOTOVOL VALLEDUPAR TECHNOELITE GREEN ENERGY
TAICA
SOLAR
GENERACION FOTOVOL LA LOMA TECHNOELITE GREEN ENERGY
TAICA

DESARROLLOS EOLICOS ALTA


GENERACION EÓLICA POR DEFINIR
GUAJIRA

SOLAR
GENERACION FOTOVOL NUEVO PUNTO TW SOLAR
TAICA

LINEA NORTE -
GENERACION TÉRMICA CODENSA
UBATE

GENERACION TÉRMICA AGUAZUL ENERCA

GENERACION TÉRMICA NORTE 110 KV GRUPO DE ENERGIA DE BOGOTA

GENERACION TÉRMICA AGUAZUL ENERCA


GENERACION EÓLICA POR DEFINIR ALUPAR
GENERACION EÓLICA POR DEFINIR ALUPAR
GENERACION EÓLICA POR DEFINIR ALUPAR
GENERACION EÓLICA POR DEFINIR ALUPAR
GENERACION EÓLICA POR DEFINIR ALUPAR
GENERACION EÓLICA POR DEFINIR ALUPAR
GENERACION EÓLICA POR DEFINIR ALUPAR
SOLAR
GENERACION FOTOVOL VALLEDUPAR TW SOLAR
TAICA
GENERACION EÓLICA CARACOLI CELSIA COLOMBIA
EOLICA
GENERACION EÓLICA RICAURTE - EBSA
NUEVO PUNTO
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL SAN JOSE DE LA MONTAÑA
HUILA
TAICA
SOLAR
RALOS & BLAUD ENERGY
GENERACION FOTOVOL JUAN MINA
COLOMBIA S.A.S.
TAICA

GENERACION TÉRMICA N.A. WERT

GENERACION TÉRMICA BOLIVAR 66 KV INTERCOLOMBIA

GENERACION TÉRMICA BOLIVAR 66 KV INTERCOLOMBIA

GENERACION TÉRMICA BOLIVAR 66 KV INTERCOLOMBIA

TURBACO
GENERACION TÉRMICA ELECTRICARIBE
/PASACABALLO

SOLAR
MAGDALENA
GENERACION FOTOVOL TW SOLAR
SOL
TAICA

GENERACION TÉRMICA NUEVO PUNTO IEB

GENERACION TÉRMICA GUANTIGUARA TERMO SAN VICENTE / ZEUZCORP

SOLAR
GENERACION FOTOVOL BOLIVAR 66 KV INTERCOLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL BOLIVAR 66 KV ELECTRICARIBE
TAICA
SOLAR
CANDELARIA
GENERACION FOTOVOL ELECTRICARIBE
(VALLE)
TAICA

GENERACION TÉRMICA EL YARUMO EEBP


GENERACION TÉRMICA LA HORMIGA EEBP

SOLAR
GENERACION FOTOVOL CARACOLI ELECTRICARIBE
TAICA
SOLAR
AUTOGENERACIO
FOTOVOL MALAMBO CELSIA COLOMBIA
N
TAICA
SOLAR
GENERACION FOTOVOL PRIMAVERA INTERCOLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL PRIMAVERA INTERCOLOMBIA
TAICA
SOLAR
NUEVA CARIBE SOL DE LA COSTA S.A.S.
GENERACION FOTOVOL
BARRANQUILLA E.S.P. - AIR - E
TAICA
SOLAR
GENERACION FOTOVOL PUERTA DE ORO ELECTRICARIBE
TAICA
SOLAR
GENERACION FOTOVOL HOBO ELECTROHUILA
TAICA
SOLAR
GENERACION FOTOVOL COMUNEROS INTERCOLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL PRIMAVERA GRENERGY COLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL GUACHAL CELSIA S.A.
TAICA
SOLAR
AUTOGENERACIO
FOTOVOL PALOBLANCO CELSIA S.A.
N
TAICA
SOLAR
GENERACION FOTOVOL BUGA CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL EL LAGO CELSIA S.A.
TAICA
SOLAR
AUTOGENERACIO
FOTOVOL LEVAPAN CELSIA S.A.
N
TAICA
SOLAR
GENERACION FOTOVOL CERRITO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CORDIALIDAD ELECTRICARIBE
TAICA
SOLAR
GENERACION FOTOVOL JAMUNDI 115 KV CELSIA COLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL LAS FLORES ELECTRICARIBE
TAICA
SOLAR
BUENAVISTA 115
GENERACION FOTOVOL ESSA
KV
TAICA
SOLAR
GENERACION FOTOVOL LIZAMA ESSA
TAICA
SOLAR
GENERACION FOTOVOL SAN FELIPE CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PAPELCAUCA CELSIA COLOMBIA
TAICA
SOLAR
SABANA DE
GENERACION FOTOVOL ESSA
TORRES
TAICA
SOLAR
GENERACION FOTOVOL CIMITARRA ESSA
TAICA
SOLAR
GENERACION FOTOVOL ZARZAL CELSIA COLOMBIA
TAICA
SOLAR LA UNIÓN
GENERACION FOTOVOL (VALLE DEL CELSIA COLOMBIA
TAICA CAUCA)
SOLAR
VICTORIA
GENERACION FOTOVOL CELSIA COLOMBIA
(CALDAS)
TAICA
SOLAR
GENERACION FOTOVOL LIZAMA ESSA
TAICA
SOLAR
GENERACION FOTOVOL MALENA EPM
TAICA
SOLAR
GENERACION FOTOVOL SAN FELIPE VOLTALIA
TAICA
SOLAR
GENERACION FOTOVOL SABANALARGA ELECTRICARIBE
TAICA

SOLAR
PUERTO
GENERACION FOTOVOL ESSA
WILCHES
TAICA

SOLAR
GENERACION FOTOVOL FUNDACION ELECTRICARIBE
TAICA

SOLAR
GENERACION FOTOVOL MALENA EPM
TAICA
SOLAR
GENERACION FOTOVOL CARACOLI INTERCOLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL CARACOLI INTERCOLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL CARACOLI INTERCOLOMBIA
TAICA

GENERACION EÓLICA SAN JUAN MAINSTREAM COLOMBIA S.A.S.

SOLAR
GENERACION FOTOVOL CARACOLI ELECTRICARIBE
TAICA
SOLAR
GENERACION FOTOVOL COSTA RICA CELSIA S.A.
TAICA

SOLAR
GENERACION FOTOVOL SANTA HELENA EMSA
TAICA

SOLAR
GENERACION FOTOVOL LIZAMA ESSA
TAICA
SOLAR
GENERACION FOTOVOL TERMOYUMBO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL SUCROMILES CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PALMASECA CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PALMAS CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PALMAS CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL NUEVA VIJES CELSIA S.A.
TAICA

GENERACION EÓLICA CARACOLI INTERCOLOMBIA

SOLAR
PUERTO
GENERACION FOTOVOL ESSA
WILCHES
TAICA
SOLAR
GENERACION FOTOVOL CARACOLI INTERCOLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL PASACABALLOS COLGEÓLICA S.A.S.
TAICA
SOLAR
GENERACION FOTOVOL PURNIO VOLTALIA
TAICA

SOLAR
GENERACION FOTOVOL GUACAVIA CODENSA
TAICA

SOLAR
GENERACION FOTOVOL BARANOA ELECTRICARIBE
TAICA

SOLAR
GENERACION FOTOVOL NATAGAIMA CELSIA S.A.
TAICA

GENERACION EÓLICA CARACOLI ENEL GREEN POWER

NUEVA
GENERACION EÓLICA ENEL GREEN POWER
BARRANQUILLA

GENERACION EÓLICA SAN JUAN MAINSTREAM COLOMBIA S.A.S.

SOLAR
NUEVA CARIBE SOL DE LA COSTA S.A.S.
GENERACION FOTOVOL
BARRANQUILLA E.S.P. - AIR - E
TAICA
SOLAR
NUEVA CARIBE SOL DE LA COSTA S.A.S.
GENERACION FOTOVOL
BARRANQUILLA E.S.P. - AIR - E
TAICA

SOLAR
GENERACION FOTOVOL GUAMO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL GUAMO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CARTAGO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL ZARZAL CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL GUATIGUARA INTERCOLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL SABANALARGA INTERCOLOMBIA
TAICA
SOLAR
IBAGUE
GENERACION FOTOVOL INTERCOLOMBIA
(MIROLINDO)
TAICA

SOLAR
GENERACION FOTOVOL CANEYES ESSA
TAICA

SOLAR
GENERACION FOTOVOL ROVIRA CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PURNIO MAINSTREAM COLOMBIA S.A.S.
TAICA
HIDROELE
GENERACION NOROESTE EPM
CTRICA
HIDROELE
GENERACION NOROESTE EPM
CTRICA
HIDROELE
GENERACION NOROESTE EPM
CTRICA
HIDROELE
GENERACION EL TIGRE EPM
CTRICA
HIDROELE
GENERACION YOLOMBO EPM
CTRICA
HIDROELE
GENERACION NOROESTE EPM
CTRICA
HIDROELE
GENERACION YALI EPM
CTRICA
HIDROELE
GENERACION AMALFI 110 KV EPM
CTRICA

SOLAR
GENERACION FOTOVOL MEMBRILLAL ELECTRICARIBE
TAICA

GENERACION EÓLICA CARACOLI INTERCOLOMBIA

NUEVO PUNTO -
CARACOLI -
GENERACION EÓLICA Proyecto RenewCol 1 S.A.S.
TERMOFLORES
220 kV

SOLAR
GENERACION FOTOVOL CARACOLI ELECTRICARIBE
TAICA

SOLAR
GENERACION FOTOVOL CARACOLI ELECTRICARIBE
TAICA
SOLAR
CASTELLANA DE PROYECTOS
GENERACION FOTOVOL SAHAGUN
SOLARES
TAICA
SOLAR
GENERACION FOTOVOL CARACOLI INTERCOLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL TERMOGUAJIRA ELECTRICARIBE
TAICA
SOLAR
GENERACION FOTOVOL SAHAGUN CELSIA S.A.
TAICA

SOLAR
GENERACION FOTOVOL BARANOA ELECTRICARIBE
TAICA

SOLAR
GENERACION FOTOVOL HIGUERAS EBSA
TAICA

GENERACION TÉRMICA SAHAGUN CELSIA S.A.

NUEVO PUNTO - NODO ENERGÉTICO DEL NORTE


GENERACION TÉRMICA
NENCOL DE COLOMBIA S.A. E.S.P.
SOLAR
GENERACION FOTOVOL BARRANCA ESSA
TAICA
SOLAR
PUERTO
GENERACION FOTOVOL ESSA
WILCHES
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL SOLANO S.A.S.
CARRETO
TAICA
SOLAR
CORDOVA
GENERACION FOTOVOL CEDENAR
(ANTIOQUIA)
TAICA

GENERACION EÓLICA SAHAGUN CELSIA S.A.

SOLAR
GENERACION FOTOVOL SAHAGUN CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CAUCASIA EPM
TAICA
SOLAR
GENERACION FOTOVOL URABA EPM
TAICA

HIDROELE
GENERACION GUARCAMA EPM
CTRICA

SOLAR
GENERACION FOTOVOL CASETABLA EMSA
TAICA
SOLAR
GENERACION FOTOVOL FUENTE DE ORO EMSA
TAICA
SOLAR
GENERACION FOTOVOL PALMAS CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CARMELO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CARMELO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CARMELO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CARMELO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CARMELO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CARMELO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CARMELO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PALMASECA CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PALMASECA CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PALMASECA CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL TULUA II CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL TULUA II CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL TULUA II CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CARMELO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CARMELO CELSIA S.A.
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL CELSIA S.A.
PALMIRA
TAICA
SOLAR
GENERACION FOTOVOL MUISCAS EBSA
TAICA
GENERACION TÉRMICA SAHAGUN CELSIA S.A.

SOLAR
GENERACION FOTOVOL SAHAGUN CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL SAHAGUN CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PURNIO EAGLE ENERGY S.L.
TAICA
SOLAR
GENERACION FOTOVOL CARMELO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL COSTA RICA CELSIA S.A.
TAICA

HIDROELE SAN
GENERACION CEDENAR
CTRICA BERNARDINO

SOLAR
GENERACION FOTOVOL LANCEROS CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL LANCEROS CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL LANCEROS CELSIA S.A.
TAICA

SOLAR
GENERACION FOTOVOL PIÑALITO ENERCA
TAICA

SOLAR
GENERACION FOTOVOL MALAMBO ELECTRICARIBE
TAICA

SOLAR
GENERACION FOTOVOL SABANALARGA INTERCOLOMBIA
TAICA

GENERACION EÓLICA CARACOLI INTERCOLOMBIA

SOLAR
GENERACION FOTOVOL SAN FELIPE CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL FLANDES CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL ZARZAL CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PRIMAVERA INTERCOLOMBIA
TAICA
HIDROELE SALTO II
GENERACION EPM
CTRICA (COLEGIO)
HIDROELE SALTO II
GENERACION EPM
CTRICA (COLEGIO)
SOLAR
GENERACION FOTOVOL CARACOLI ELECTRICARIBE
TAICA
SOLAR
GENERACION FOTOVOL CARACOLI ELECTRICARIBE
TAICA
SOLAR
SANTA BARBARA
GENERACION FOTOVOL CELSIA S.A.
(PALMIRA)
TAICA
SOLAR
CANDELARIA
GENERACION FOTOVOL CELSIA S.A.
(VALLE)
TAICA
SOLAR
COGENERACION FOTOVOL CIMITARRA ESSA
TAICA
SOLAR
SABANA DE
GENERACION FOTOVOL ESSA
TORRES
TAICA
SOLAR
GENERACION FOTOVOL PALMAS CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PALMAS CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PALMAS CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL NUEVA VIJES CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PAPELCAUCA CELSIA COLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL PAPELCAUCA CELSIA COLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL PAPELCAUCA CELSIA COLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL PAPELCAUCA CELSIA COLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL PAPELCAUCA CELSIA COLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL PAPELCAUCA CELSIA COLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL PALOBLANCO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL PALOBLANCO CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL NATAGAIMA CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL CHENCHE CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL FLANDES CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL FLANDES CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL FLANDES CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL PURIFICACION CELSIA TOLIMA
TAICA

SOLAR
GENERACION FOTOVOL AMBALEMA CELSIA TOLIMA
TAICA

SOLAR
GENERACION FOTOVOL GUAYABAL CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL TULUNI CELSIA TOLIMA
TAICA

HIDROELE
GENERACION HISPANIA EPM
CTRICA

SOLAR
GENERACION FOTOVOL ALCARAVAN ENERCA
TAICA
SOLAR
PAZ DE
GENERACION FOTOVOL ENERCA
ARIPORO
TAICA
SOLAR
GENERACION FOTOVOL TAME ENELAR
TAICA

SOLAR
GENERACION FOTOVOL LERIDA CELSIA TOLIMA
TAICA

SOLAR
GENERACION FOTOVOL GUAYABAL CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL GUAMO CELSIA S.A.
TAICA
HIDROELE CHORODO
GENERACION EPM
CTRICA (FRONTINO)
SOLAR
GENERACION FOTOVOL LANCEROS CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL NORDESTE EPM
TAICA
HIDROELE
GENERACION ANDES EPM
CTRICA
HIDROELE Santa Fe de
GENERACION EPM
CTRICA Antioquia
SOLAR NUEVA
GENERACION FOTOVOL ESPERANZA 115 CODENSA
TAICA KV

GENERACION EÓLICA SABANALARGA INTERCOLOMBIA

HIDROELE BARBOSA
GENERACION EPM
CTRICA (ANTIOQUIA)
SOLAR
GENERACION FOTOVOL NATAGAIMA PRODIEL
TAICA
SOLAR
GENERACION FOTOVOL SARAVENA ENELAR
TAICA
SOLAR
GENERACION FOTOVOL ARAUCA ENELAR
TAICA

GENERACION TÉRMICA AGUAZUL ENERCA

SOLAR
NODO
GENERACION FOTOVOL ENEL CODENSA
N_PAG_70785
TAICA

GENERACION TÉRMICA MORRO 115 KV ENERCA

SOLAR
PUERTO CARIBE MAR DE LA COSTA S.A.S.
GENERACION FOTOVOL
LIBERTADOR E.S.P. - AFINIA
TAICA
SOLAR
NUEVA CARIBE MAR DE LA COSTA S.A.S.
GENERACION FOTOVOL
COSPIQUE E.S.P. - AFINIA
TAICA
SOLAR
GENERACION FOTOVOL TASAJERO DISTASA
TAICA
SOLAR
CARIBE MAR DE LA COSTA S.A.S.
GENERACION FOTOVOL COVEÑAS
E.S.P. - AFINIA
TAICA

SOLAR
GENERACION FOTOVOL TIBU CENS
TAICA

HIDROELE
GENERACION DON JUANA CENS
CTRICA

HIDROELE
GENERACION SALAZAR CENS
CTRICA

SOLAR
GENERACION FOTOVOL SALADO CELSIA S.A.
TAICA

HIDROELE
GENERACION CARRIELES EPM
CTRICA

SOLAR
GENERACION FOTOVOL SUR ELECTROHUILA
TAICA
GENERACION EÓLICA BOLIVAR 66 KV INTERCOLOMBIA
SOLAR
GENERACION FOTOVOL VILLETA CODENSA
TAICA
SOLAR
ESMERALDA
GENERACION FOTOVOL INTERCOLOMBIA
(CHEC)
TAICA
SOLAR
GENERACION FOTOVOL URRA URRÁ S.A. E.S.P.
TAICA
SOLAR
GENERACION FOTOVOL ESCOBAL CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL ESCOBAL CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL ESCOBAL CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL ESCOBAL CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL ESCOBAL CELSIA S.A.
TAICA
SOLAR
QUALITY MECHANICAL SOLAR
GENERACION FOTOVOL GUALANDAY
S.A.S
TAICA
SOLAR
GENERACION FOTOVOL ROLDANILLO CELSIA S.A.
TAICA
SOLAR
AUTOGENERACIO
FOTOVOL LA LOMA GEB
N
TAICA

GENERACION EÓLICA SAN JUAN SAMPI JDP S.A.S E.S.P.

SOLAR
GENERACION FOTOVOL BARZALOSA ENEL CODENSA
TAICA
SOLAR
GENERACION FOTOVOL MERCADERES CEO
TAICA
SOLAR
GENERACION FOTOVOL VIRGINIA INTERCOLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL GUATIGUARA INTERCOLOMBIA
TAICA
SOLAR
GENERACION FOTOVOL GUATIGUARA INTERCOLOMBIA
TAICA

SOLAR
CARIBE MAR DE LA COSTA S.A.S.
GENERACION FOTOVOL MONTELIBANO
E.S.P. - AFINIA
TAICA

SOLAR
IBAGUE
GENERACION FOTOVOL CELSIA TOLIMA
(MIROLINDO)
TAICA

GENERACION EÓLICA JAMONDINO INTERCOLOMBIA

SOLAR
GENERACION FOTOVOL PERALES CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL PERALES CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL PERALES CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL HONDA CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL HONDA CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL GUALANDAY CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL GUALANDAY CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL GUALANDAY CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL GUALANDAY CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL GUALANDAY CELSIA TOLIMA
TAICA
SOLAR
GENERACION FOTOVOL LERIDA CELSIA TOLIMA
TAICA
SOLAR
CARIBE SOL DE LA COSTA S.A.S.
GENERACION FOTOVOL RIOHACHA
E.S.P. - AIR - E
TAICA
SOLAR
CARIBE SOL DE LA COSTA S.A.S.
GENERACION FOTOVOL CAMARONES
E.S.P. - AIR - E
TAICA
SOLAR
PUERTO
GENERACION FOTOVOL EBSA
BOYACA
TAICA
SOLAR
GENERACION FOTOVOL PASACABALLOS ENERFIN SERVICIOS S.A.S
TAICA
HIDROELE
GENERACION CABRERA ESSA
CTRICA
HIDROELE
GENERACION SAN JERONIMO EPM
CTRICA
SOLAR
GENERACION FOTOVOL Circuito La Palma CODENSA
TAICA
SOLAR
NUEVA CARIBE SOL DE LA COSTA S.A.S.
GENERACION FOTOVOL
BARRANQUILLA E.S.P. - AIR - E
TAICA
HIDROELE
GENERACION OIBA ESSA
CTRICA
SOLAR
COELLO
GENERACION FOTOVOL CELSIA TOLIMA
(TOLIMA)
TAICA

GENERACION EÓLICA ALTAMIRA GEB

SOLAR
GENERACION FOTOVOL SAHAGUN CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL DORADA CHEC
TAICA
SOLAR
GENERACION FOTOVOL BELEN (CUCUTA) EBSA
TAICA
SOLAR
CARIBE MAR DE LA COSTA S.A.S.
GENERACION FOTOVOL PASACABALLOS
E.S.P. - AFINIA
TAICA
SOLAR
CARIBE MAR DE LA COSTA S.A.S.
GENERACION FOTOVOL PASACABALLOS
E.S.P. - AFINIA
TAICA
SOLAR
CARIBE MAR DE LA COSTA S.A.S.
GENERACION FOTOVOL PASACABALLOS
E.S.P. - AFINIA
TAICA
SOLAR
GENERACION FOTOVOL FORTUL ENELAR
TAICA
SOLAR
LA ESMERALDA
GENERACION FOTOVOL ENELAR
(ARAUCA)
TAICA
SOLAR
GENERACION FOTOVOL SAHAGUN CELSIA S.A.
TAICA
SOLAR
BAVARIA
GENERACION FOTOVOL EBSA
(BOYACÁ)
TAICA
SOLAR
GENERACION FOTOVOL PEÑAS BLANCAS ELECTROHUILA
TAICA

HIDROELE
GENERACION VALPARAISO EPM
CTRICA

HIDROELE
GENERACION VALPARAISO EPM
CTRICA

SOLAR
Circuito
GENERACION FOTOVOL CODENSA
Anapoima 34,5 kV
TAICA

CIRCUITO R51-02
HIDROELE
GENERACION PROVENIENTE EPM
CTRICA
DE SE EL SALTO

HIDROELE
GENERACION GUADALUPE IV EPM
CTRICA
SOLAR
AUTOGENERACIO
FOTOVOL CHIVOR INTERCOLOMBIA
N
TAICA
AUTOGENERACIO
TÉRMICA CHIVOR INTERCOLOMBIA
N
SOLAR
VICTORIA
GENERACION FOTOVOL CHEC
(CALDAS)
TAICA
JARDINERA 115
GENERACION EÓLICA CEDENAR
KV
GENERACION EÓLICA JAMONDINO CEDENAR
SOLAR
AUTOGENERACIO NUEVA CARIBE MAR DE LA COSTA S.A.S.
FOTOVOL
N COSPIQUE E.S.P. - AFINIA
TAICA
SOLAR
CARIBE MAR DE LA COSTA S.A.S.
GENERACION FOTOVOL TOLUVIEJO
E.S.P. - AFINIA
TAICA
SOLAR
GENERACION FOTOVOL HOLCIM EBSA
TAICA

SOLAR
GENERACION FOTOVOL HOLCIM EBSA
TAICA

LA
HIDROELE
GENERACION UNIÓN(ANTIOQUI EPM
CTRICA
A)
SOLAR
GENERACION FOTOVOL SURIA DELSUR
TAICA
SOLAR
GENERACION FOTOVOL SURIA DELSUR
TAICA
SOLAR
GENERACION FOTOVOL SAHAGUN CELSIA COLOMBIA
TAICA
SOLAR
NUEVO PUNTO -
GENERACION FOTOVOL BLACK ORCHID SOLAR
HUILA
TAICA

AUTOGENERACIO
TÉRMICA DIANA DIANA CORPORACIÓN S.A.S.
N

SOLAR
CENTRO CARIBE MAR DE LA COSTA S.A.S.
GENERACION FOTOVOL
ALEGRE E.S.P. - AFINIA
TAICA
SOLAR
CARIBE MAR DE LA COSTA S.A.S.
GENERACION FOTOVOL BUENAVISTA
E.S.P. - AFINIA
TAICA
SOLAR
CARIBE MAR DE LA COSTA S.A.S.
GENERACION FOTOVOL AYAPEL
E.S.P. - AFINIA
TAICA
SOLAR
GENERACION FOTOVOL URABA EPM
TAICA
SOLAR
GENERACION FOTOVOL URABA EPM
TAICA
HIDROELE
GENERACION GUATAPE EPM
CTRICA
SOLAR
GENERACION FOTOVOL ZARZAL II CELSIA S.A.
TAICA
SOLAR
SAN MARCOS
GENERACION FOTOVOL INTERCOLOMBIA
(VALLE)
TAICA
SOLAR
GENERACION FOTOVOL BUGA CELSIA S.A.
TAICA
SOLAR LA UNIÓN
GENERACION FOTOVOL (VALLE DEL CELSIA S.A.
TAICA CAUCA)
SOLAR
GENERACION FOTOVOL LA PAILA CELSIA S.A.
TAICA
SOLAR
GENERACION FOTOVOL YOTOCO CELSIA S.A.
TAICA

GENERACION TÉRMICA CHIVOR INTERCOLOMBIA

GENERACION TÉRMICA CHIVOR INTERCOLOMBIA

SOLAR
GENERACION FOTOVOL RIVERA ELECTROHUILA
TAICA

SOLAR NUEVO PUNTO -


GENERACION FOTOVOL FORTALECILLAS ELECTROHUILA
TAICA SOLAR 34.5 kV

SOLAR
GENERACION FOTOVOL FORTALECILLAS ELECTROHUILA
TAICA
SOLAR Circuito Dorada -
GENERACION FOTOVOL Pto. Salgar - ENEL CODENSA
TAICA Rionegrito
INFORMACIÓN REPORTA

Fecha de
FPO Estado Subestado Garantía
Otorgamiento

6/30/2022 CONCEPTO APROBADO N.A SI 9/17/2020

CONCEPTO SUPEDITADO
9/30/2021 N.A SI 2/15/2021
A EXPANSIÓN

12/1/2018 CONCEPTO APROBADO N.A NO

5/31/2018 CONCEPTO APROBADO N.A NO

12/31/2022 CONCEPTO APROBADO N.A SI 4/14/2021

7/31/2018 CONCEPTO APROBADO N.A NO

12/31/2022 CONCEPTO APROBADO N.A SI 9/17/2020

CONCEPTO SUPEDITADO
7/1/2018 N.A NO
A EXPANSIÓN

12/31/2023 CONCEPTO APROBADO N.A NO

6/30/2022 CONCEPTO APROBADO N.A SI 6/3/2021

9/30/2020 CONCEPTO APROBADO N.A NO

12/22/2019 CONCEPTO APROBADO N.A NO

CONCEPTO SUPEDITADO
1/31/2022 N.A NO
A EXPANSIÓN

CONCEPTO SUPEDITADO
1/31/2022 N.A NO
A EXPANSIÓN

12/31/2021 CONCEPTO APROBADO N.A SI 5/24/2021

7/9/2018 CONCEPTO APROBADO N.A NO


9/30/2018 CONCEPTO APROBADO N.A NO

9/30/2020 CONCEPTO APROBADO N.A NO

9/30/2018 CONCEPTO APROBADO N.A NO

1/1/2022 CONCEPTO APROBADO N.A SI 8/11/2020

CONCEPTO SUPEDITADO
12/31/2022 N.A SI 1/26/2021
A EXPANSIÓN

CONCEPTO SUPEDITADO
2/23/2023 N.A NO
A EXPANSIÓN

CONCEPTO SUPEDITADO
2/28/2023 N.A SI 12/24/2019
A EXPANSIÓN

CONCEPTO SUPEDITADO
2/28/2023 N.A SI 12/24/2019
A EXPANSIÓN

CONCEPTO SUPEDITADO
2/28/2023 N.A SI 1/18/2020
A EXPANSIÓN

CONCEPTO SUPEDITADO
2/28/2023 N.A SI 12/24/2019
A EXPANSIÓN

CONCEPTO SUPEDITADO
2/28/2023 N.A SI 3/4/2020
A EXPANSIÓN

CONCEPTO SUPEDITADO
2/28/2023 N.A SI 3/4/2020
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/1/2023 N.A SI 1/29/2019
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/1/2023 N.A NO
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/1/2023 N.A NO
A EXPANSIÓN

CONCEPTO SUPEDITADO
11/30/2022 N.A NO
A EXPANSIÓN
CONCEPTO SUPEDITADO
12/31/2022 N.A SI 11/20/2020
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/31/2022 N.A SI 3/9/2021
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/31/2022 N.A SI 11/20/2020
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/31/2022 N.A SI 11/20/2020
A EXPANSIÓN

CONCEPTO SUPEDITADO
1/31/2024 N.A SI 11/20/2020
A EXPANSIÓN

12/1/2018 CONCEPTO APROBADO N.A NO

12/1/2020 CONCEPTO APROBADO N.A NO

12/1/2020 CONCEPTO APROBADO N.A NO

11/30/2022 CONCEPTO APROBADO N.A NO

10/1/2022 CONCEPTO APROBADO N.A SI 8/11/2020

12/1/2022 CONCEPTO APROBADO N.A SI 1/29/2021

12/31/2022 CONCEPTO APROBADO N.A SI 5/14/2021

12/1/2020 CONCEPTO APROBADO N.A NO

7/31/2021 CONCEPTO APROBADO N.A NO

7/31/2021 CONCEPTO APROBADO N.A SI 12/28/2020

12/31/2021 CONCEPTO APROBADO N.A SI 8/1/2019

12/31/2021 CONCEPTO APROBADO N.A SI 8/1/2019

CONCEPTO SUPEDITADO
12/31/2022 N.A SI 12/16/2020
A EXPANSIÓN
2/28/2019 CONCEPTO APROBADO N.A NO

12/1/2020 CONCEPTO APROBADO N.A NO

3/31/2021 CONCEPTO APROBADO N.A NO

CONCEPTO SUPEDITADO
6/30/2021 N.A NO
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/1/2021 N.A NO
A EXPANSIÓN

12/31/2021 CONCEPTO APROBADO N.A SI 1/21/2021

12/31/2021 CONCEPTO APROBADO N.A NO

6/30/2022 CONCEPTO APROBADO N.A NO

12/1/2022 CONCEPTO APROBADO N.A SI 4/27/2021

12/31/2022 CONCEPTO APROBADO N.A NO

12/31/2022 CONCEPTO APROBADO N.A SI 1/10/2020

CONCEPTO SUPEDITADO
12/31/2022 N.A SI 2/12/2021
A EXPANSIÓN

12/31/2022 CONCEPTO APROBADO N.A SI 4/14/2021

2/1/2023 CONCEPTO APROBADO N.A NO

5/1/2023 CONCEPTO APROBADO N.A SI 5/11/2020

12/31/2023 CONCEPTO APROBADO N.A SI 3/10/2021

12/31/2023 CONCEPTO APROBADO N.A SI 6/24/2021

12/31/2021 CONCEPTO APROBADO N.A SI 7/21/2020


CONCEPTO SUPEDITADO
11/30/2022 N.A SI 12/17/2020
A EXPANSIÓN

12/1/2018 CONCEPTO APROBADO N.A NO

9/30/2021 CONCEPTO APROBADO N.A SI 2/2/2021

12/31/2022 CONCEPTO APROBADO N.A NO

10/31/2022 CONCEPTO APROBADO N.A SI 6/18/2021

12/1/2021 CONCEPTO APROBADO N.A NO

12/1/2021 CONCEPTO APROBADO N.A NO

12/31/2022 CONCEPTO APROBADO N.A SI 12/3/2020

CONCEPTO SUPEDITADO
12/31/2022 N.A SI 12/1/2020
A EXPANSIÓN

9/30/2020 CONCEPTO APROBADO N.A NO

12/31/2021 CONCEPTO APROBADO N.A NO

12/1/2022 CONCEPTO APROBADO N.A NO

12/1/2022 CONCEPTO APROBADO N.A NO

12/31/2022 CONCEPTO APROBADO N.A NO

CONCEPTO SUPEDITADO
4/30/2022 N.A SI 5/23/2019
A EXPANSIÓN

3/1/2019 CONCEPTO APROBADO N.A NO

12/1/2022 CONCEPTO APROBADO N.A NO

12/1/2022 CONCEPTO APROBADO N.A NO

12/31/2022 CONCEPTO APROBADO N.A NO

12/31/2022 CONCEPTO APROBADO N.A NO


8/31/2020 CONCEPTO APROBADO N.A NO

12/31/2020 CONCEPTO APROBADO N.A NO

12/31/2021 CONCEPTO APROBADO N.A NO

9/30/2022 CONCEPTO APROBADO N.A SI 3/9/2021

6/30/2022 CONCEPTO APROBADO N.A NO

8/1/2019 CONCEPTO APROBADO N.A NO

12/31/2021 CONCEPTO APROBADO N.A NO

6/30/2022 CONCEPTO APROBADO N.A No

8/1/2019 CONCEPTO APROBADO N.A NO

8/1/2020 CONCEPTO APROBADO N.A NO

4/30/2021 CONCEPTO APROBADO N.A NO

CONCEPTO SUPEDITADO
9/30/2022 N.A SI 5/12/2020
A EXPANSIÓN

CONCEPTO SUPEDITADO
9/30/2022 N.A SI 5/12/2020
A EXPANSIÓN

12/31/2024 CONCEPTO APROBADO N.A SI 12/14/2020

12/1/2021 CONCEPTO APROBADO N.A NO

10/12/2020 CONCEPTO APROBADO N.A NO


10/12/2020 CONCEPTO APROBADO N.A NO

CONCEPTO SUPEDITADO
9/30/2018 N.A NO
A EXPANSIÓN

10/31/2021 CONCEPTO APROBADO N.A SI 1/29/2021

12/31/2021 CONCEPTO APROBADO N.A SI 2/15/2021

CONCEPTO SUPEDITADO
7/31/2019 N.A NO
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/31/2021 N.A NO
A EXPANSIÓN

9/30/2019 CONCEPTO APROBADO N.A NO

4/30/2020 CONCEPTO APROBADO N.A NO

2/29/2020 CONCEPTO APROBADO N.A NO

CONCEPTO SUPEDITADO
12/31/2021 N.A NO
A EXPANSIÓN

6/30/2022 CONCEPTO APROBADO N.A SI 2/11/2021

6/30/2022 CONCEPTO APROBADO N.A SI 4/20/2021

6/30/2022 CONCEPTO APROBADO N.A SI 2/11/2021

CONCEPTO SUPEDITADO
10/1/2022 N.A SI 9/17/2020
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/31/2022 N.A NO
A EXPANSIÓN

12/31/2023 CONCEPTO APROBADO N.A SI 3/9/2021

12/31/2019 CONCEPTO APROBADO N.A NO

1/31/2021 CONCEPTO APROBADO N.A NO


CONCEPTO SUPEDITADO
11/1/2021 N.A NO
A EXPANSIÓN

12/31/2021 CONCEPTO APROBADO N.A SI 10/20/2020

12/31/2021 CONCEPTO APROBADO N.A SI 5/29/2020

12/31/2021 CONCEPTO APROBADO N.A SI 4/13/2021

12/31/2021 CONCEPTO APROBADO N.A Si 4/13/2021

12/31/2021 CONCEPTO APROBADO N.A Si 11/7/2020

12/31/2021 CONCEPTO APROBADO N.A Si 1/25/2021

CONCEPTO SUPEDITADO
12/31/2021 N.A No
A EXPANSIÓN

12/31/2021 CONCEPTO APROBADO N.A Si 5/29/2020

12/31/2021 CONCEPTO APROBADO N.A Si 5/29/2020

6/30/2022 CONCEPTO APROBADO N.A Si 4/20/2021

9/30/2022 CONCEPTO APROBADO N.A Si 3/9/2021

CONCEPTO SUPEDITADO
12/12/2022 N.A No
A EXPANSIÓN

6/30/2023 CONCEPTO APROBADO N.A Si 6/26/2020

12/31/2021 CONCEPTO APROBADO N.A Si 4/6/2021

6/30/2022 CONCEPTO APROBADO N.A No


CONCEPTO SUPEDITADO
11/30/2023 N.A Si 7/13/2020
A EXPANSIÓN

CONCEPTO SUPEDITADO
11/30/2023 N.A Si 7/13/2020
A EXPANSIÓN

12/31/2023 CONCEPTO APROBADO N.A Si 3/9/2021

12/31/2021 CONCEPTO APROBADO N.A No

12/31/2021 CONCEPTO APROBADO N.A Si 11/7/2020

12/31/2022 CONCEPTO APROBADO N.A Si 4/6/2021

12/31/2023 CONCEPTO APROBADO N.A No

12/1/2022 CONCEPTO APROBADO N.A No

12/1/2022 CONCEPTO APROBADO N.A No

12/31/2021 CONCEPTO APROBADO N.A Si 5/12/2021

CONCEPTO SUPEDITADO
12/1/2021 N.A Si 9/21/2020
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/1/2021 N.A Si 9/21/2020
A EXPANSIÓN

12/31/2022 CONCEPTO APROBADO N.A No

12/31/2021 CONCEPTO APROBADO N.A Si 11/7/2020

12/31/2021 CONCEPTO APROBADO N.A Si 11/7/2020

12/31/2025 CONCEPTO APROBADO N.A Si 4/23/2021

12/31/2021 CONCEPTO APROBADO N.A Si 5/27/2021


12/31/2022 CONCEPTO APROBADO N.A Si 6/16/2021

12/31/2021 CONCEPTO APROBADO N.A Si 5/27/2021

CONCEPTO SUPEDITADO
9/30/2023 N.A Si 8/20/2020
A EXPANSIÓN

12/31/2022 CONCEPTO APROBADO N.A Si 1/21/2021

1/31/2023 CONCEPTO APROBADO N.A No

3/31/2020 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
12/1/2022 N.A No
A EXPANSIÓN

12/1/2023 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
12/31/2023 N.A Si 4/23/2021
A EXPANSIÓN

12/31/2022 CONCEPTO APROBADO N.A Si 10/23/2020

CONCEPTO SUPEDITADO
12/31/2023 N.A Si 10/22/2020
A EXPANSIÓN

7/30/2022 CONCEPTO APROBADO N.A Si 3/4/2021

12/31/2020 CONCEPTO APROBADO N.A No

12/31/2020 CONCEPTO APROBADO N.A Si 11/7/2020

6/30/2022 CONCEPTO APROBADO N.A No

6/30/2022 CONCEPTO APROBADO N.A No

6/30/2022 CONCEPTO APROBADO N.A Si 5/20/2021


7/31/2022 CONCEPTO APROBADO N.A No

12/31/2024 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
12/31/2024 N.A No
A EXPANSIÓN

5/31/2021 CONCEPTO APROBADO N.A No

12/31/2022 CONCEPTO APROBADO N.A No

12/15/2021 CONCEPTO APROBADO N.A Si 11/23/2020

12/29/2020 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
12/1/2021 N.A No
A EXPANSIÓN

12/31/2023 CONCEPTO APROBADO N.A Si 4/23/2021

12/31/2021 CONCEPTO APROBADO N.A No

12/30/2023 CONCEPTO APROBADO N.A No

7/31/2020 CONCEPTO APROBADO N.A No

12/31/2023 CONCEPTO APROBADO N.A Si 6/11/2021

CONCEPTO SUPEDITADO
12/31/2024 N.A No
A EXPANSIÓN

12/31/2021 CONCEPTO APROBADO N.A No

12/31/2021 CONCEPTO APROBADO N.A No

12/31/2022 CONCEPTO APROBADO N.A Si 3/9/2021


12/31/2022 CONCEPTO APROBADO N.A No

12/31/2022 CONCEPTO APROBADO N.A No

1/31/2023 CONCEPTO APROBADO N.A No

10/31/2021 CONCEPTO APROBADO N.A No

12/31/2023 CONCEPTO APROBADO N.A Si 5/28/2021

12/31/2023 CONCEPTO APROBADO N.A Si 5/28/2021

12/31/2023 CONCEPTO APROBADO N.A Si 5/28/2021

12/31/2020 CONCEPTO APROBADO N.A No

12/31/2022 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
1/30/2025 N.A No
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/31/2022 N.A Si 4/20/2021
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/31/2022 N.A Si 4/20/2021
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/31/2022 N.A Si 4/20/2021
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/31/2022 N.A Si 4/20/2021
A EXPANSIÓN
CONCEPTO SUPEDITADO
12/31/2022 N.A Si 4/20/2021
A EXPANSIÓN

12/31/2021 CONCEPTO APROBADO N.A Si 4/20/2021

12/31/2022 CONCEPTO APROBADO N.A Si 11/15/2020

12/31/2021 CONCEPTO APROBADO N.A No

1/31/2022 CONCEPTO APROBADO N.A No

12/31/2022 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
6/30/2025 N.A Si 4/14/2021
A EXPANSIÓN

12/31/2021 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
5/31/2022 N.A No
A EXPANSIÓN

12/31/2022 CONCEPTO APROBADO N.A No

12/31/2024 CONCEPTO APROBADO N.A No

12/31/2021 CONCEPTO APROBADO N.A No

12/31/2023 CONCEPTO APROBADO N.A No

12/31/2021 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
12/31/2023 N.A No
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/31/2023 N.A No
A EXPANSIÓN
CONCEPTO SUPEDITADO
12/31/2023 N.A No
A EXPANSIÓN

12/31/2022 CONCEPTO APROBADO N.A No

12/31/2024 CONCEPTO APROBADO N.A No

12/31/2023 CONCEPTO APROBADO N.A No

12/31/2021 CONCEPTO APROBADO N.A No

6/30/2022 CONCEPTO APROBADO N.A No

12/31/2023 CONCEPTO APROBADO N.A No

12/31/2024 CONCEPTO APROBADO N.A No

12/31/2022 CONCEPTO APROBADO N.A No

12/31/2024 CONCEPTO APROBADO N.A No

12/31/2024 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
6/30/2025 N.A No
A EXPANSIÓN

CONCEPTO SUPEDITADO
6/30/2025 N.A No
A EXPANSIÓN

CONCEPTO SUPEDITADO
10/31/2026 N.A No
A EXPANSIÓN

CONCEPTO SUPEDITADO
10/31/2026 N.A No
A EXPANSIÓN
12/31/2021 CONCEPTO APROBADO N.A No

12/31/2020 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
12/31/2021 N.A Si 6/21/2021
A EXPANSIÓN

12/31/2022 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
12/31/2022 N.A No
A EXPANSIÓN

CONCEPTO SUPEDITADO
1/31/2025 N.A No
A EXPANSIÓN

CONCEPTO SUPEDITADO
7/31/2026 N.A No
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/31/2022 N.A No
A EXPANSIÓN

12/31/2025 CONCEPTO APROBADO N.A Si 3/24/2021

12/31/2021 CONCEPTO APROBADO N.A Si 3/31/2021

6/30/2021 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
12/31/2024 N.A Si 5/5/2021
A EXPANSIÓN

12/31/2020 CONCEPTO APROBADO N.A No

8/31/2022 CONCEPTO APROBADO N.A No

12/31/2023 CONCEPTO APROBADO N.A No


12/31/2023 CONCEPTO APROBADO N.A No

CONCEPTO SUPEDITADO
12/31/2021 N.A No
A EXPANSIÓN

CONCEPTO SUPEDITADO
12/31/2023 N.A No
A EXPANSIÓN

12/1/2013 CONCEPTO APROBADO N.A no

8/30/2011 CONCEPTO APROBADO N.A no

12/1/2011 CONCEPTO APROBADO N.A no

9/17/2015 CONCEPTO APROBADO N.A no

12/1/2012 CONCEPTO APROBADO N.A no

9/30/2012 CONCEPTO APROBADO N.A no

12/1/2012 CONCEPTO APROBADO N.A no

1/31/2013 CONCEPTO APROBADO N.A no

6/30/2022 CONCEPTO APROBADO N.A no

12/1/2015 CONCEPTO APROBADO N.A no

12/1/2015 CONCEPTO APROBADO N.A no

12/1/2015 CONCEPTO APROBADO N.A no

12/15/2018 CONCEPTO APROBADO N.A no

12/1/2015 CONCEPTO APROBADO N.A no

12/1/2015 CONCEPTO APROBADO N.A no

2/28/2014 CONCEPTO APROBADO N.A no

4/30/2014 CONCEPTO APROBADO N.A no


12/1/2014 CONCEPTO APROBADO N.A no

12/1/2015 CONCEPTO APROBADO N.A si 1/17/2020

1/31/2014 CONCEPTO APROBADO N.A no

10/31/2013 CONCEPTO APROBADO N.A no

12/1/2015 CONCEPTO APROBADO N.A no

12/1/2017 CONCEPTO APROBADO N.A no

12/1/2018 CONCEPTO APROBADO N.A no

7/31/2016 CONCEPTO APROBADO N.A no

4/30/2016 CONCEPTO APROBADO N.A no

5/1/2014 CONCEPTO APROBADO N.A no

12/1/2015 CONCEPTO APROBADO N.A no

3/31/2014 CONCEPTO APROBADO N.A no

4/30/2014 CONCEPTO APROBADO N.A no

1/1/2017 CONCEPTO APROBADO N.A no

12/1/2015 CONCEPTO APROBADO N.A no

12/1/2016 CONCEPTO APROBADO N.A no

12/1/2014 CONCEPTO APROBADO N.A no

1/1/2016 CONCEPTO APROBADO N.A no

9/30/2017 CONCEPTO APROBADO N.A no


9/30/2014 CONCEPTO APROBADO N.A no

11/30/2019 CONCEPTO APROBADO N.A no

12/1/2014 CONCEPTO APROBADO N.A no

12/1/2014 CONCEPTO APROBADO N.A no

9/30/2020 CONCEPTO APROBADO N.A no

12/1/2014 CONCEPTO APROBADO N.A no

12/1/2015 CONCEPTO APROBADO N.A no

12/1/2015 CONCEPTO APROBADO N.A no

8/30/2015 CONCEPTO APROBADO N.A no

12/1/2021 CONCEPTO APROBADO N.A no

6/30/2015 CONCEPTO APROBADO N.A no

9/30/2015 CONCEPTO APROBADO N.A no

7/17/2015 CONCEPTO APROBADO N.A no

12/1/2019 CONCEPTO APROBADO N.A si 12/28/2020

9/30/2020 CONCEPTO APROBADO N.A no

10/31/2015 CONCEPTO APROBADO N.A no


10/30/2015 CONCEPTO APROBADO N.A no

CONCEPTO SUPEDITADO
5/15/2020 N.A no
A EXPANSIÓN

12/1/2015 CONCEPTO APROBADO N.A no

4/30/2020 CONCEPTO APROBADO N.A si 5/4/2020

4/30/2016 CONCEPTO APROBADO N.A no

12/1/2015 CONCEPTO APROBADO N.A no

3/31/2022 CONCEPTO APROBADO N.A si 4/22/2020

CONCEPTO SUPEDITADO
7/1/2018 N.A no
A EXPANSIÓN

4/30/2016 CONCEPTO APROBADO N.A no

6/30/2016 CONCEPTO APROBADO N.A no

8/31/2021 CONCEPTO APROBADO N.A no

12/1/2016 CONCEPTO APROBADO N.A no

CONCEPTO SUPEDITADO
8/1/2021 N.A si 11/27/2020
A EXPANSIÓN

3/10/2016 CONCEPTO APROBADO N.A no


12/1/2015 CONCEPTO APROBADO N.A no

CONCEPTO SUPEDITADO
11/30/2020 N.A no
A EXPANSIÓN

12/1/2017 CONCEPTO APROBADO N.A no

12/1/2017 CONCEPTO APROBADO N.A no

1/31/2018 CONCEPTO APROBADO N.A no

7/31/2019 CONCEPTO APROBADO N.A no

CONCEPTO SUPEDITADO
12/1/2022 N.A no
A EXPANSIÓN

10/31/2016 CONCEPTO APROBADO N.A no

12/31/2021 CONCEPTO APROBADO N.A si 12/28/2020

CONCEPTO SUPEDITADO
6/30/2022 N.A si 9/5/2019
A EXPANSIÓN

12/1/2018 CONCEPTO APROBADO N.A no

3/22/2016 CONCEPTO APROBADO N.A no

3/31/2020 CONCEPTO APROBADO N.A si 6/17/2021

12/1/2018 CONCEPTO APROBADO N.A no

12/31/2021 CONCEPTO APROBADO N.A si 1/10/2020

11/30/2022 CONCEPTO APROBADO N.A si 1/29/2021

8/31/2022 CONCEPTO APROBADO N.A no

8/31/2022 CONCEPTO APROBADO N.A no


6/30/2023 CONCEPTO APROBADO N.A no

7/31/2023 CONCEPTO APROBADO N.A no

9/26/2016 CONCEPTO APROBADO N.A no

10/31/2016 CONCEPTO APROBADO N.A no

12/1/2016 CONCEPTO APROBADO N.A no

9/30/2018 CONCEPTO APROBADO N.A no

12/1/2018 CONCEPTO APROBADO N.A no

12/1/2017 CONCEPTO APROBADO N.A no

3/31/2017 CONCEPTO APROBADO N.A no

3/31/2018 CONCEPTO APROBADO N.A no

12/31/2021 CONCEPTO APROBADO N.A no

12/1/2016 CONCEPTO APROBADO N.A no

12/1/2016 CONCEPTO APROBADO N.A no

9/30/2020 CONCEPTO APROBADO N.A no

2/1/2017 CONCEPTO APROBADO N.A no

12/1/2016 CONCEPTO APROBADO N.A no

4/25/2016 CONCEPTO APROBADO N.A no


12/31/2024 CONCEPTO APROBADO N.A si 12/20/2019

6/30/2016 CONCEPTO APROBADO N.A no

CONCEPTO SUPEDITADO
12/31/2025 N.A si 1/21/2021
A EXPANSIÓN

CONCEPTO SUPEDITADO
5/31/2021 N.A si 1/29/2021
A EXPANSIÓN

6/30/2018 CONCEPTO APROBADO N.A no

12/1/2022 CONCEPTO APROBADO N.A no

12/1/2021 CONCEPTO APROBADO N.A si 7/23/2020

3/31/2017 CONCEPTO APROBADO N.A no

6/30/2021 CONCEPTO APROBADO N.A si 9/17/2020

10/31/2017 CONCEPTO APROBADO N.A no

12/1/2020 CONCEPTO APROBADO N.A no

3/30/2022 CONCEPTO APROBADO N.A no

CONCEPTO SUPEDITADO
12/1/2022 N.A si 4/4/2019
A EXPANSIÓN

12/31/2021 CONCEPTO APROBADO N.A no

6/1/2016 CONCEPTO APROBADO N.A no


12/1/2017 CONCEPTO APROBADO N.A no

1/31/2018 CONCEPTO APROBADO N.A no

6/30/2018 CONCEPTO APROBADO N.A no

3/31/2018 CONCEPTO APROBADO N.A no

12/31/2021 CONCEPTO APROBADO N.A si 1/5/2021

11/30/2018 CONCEPTO APROBADO N.A no

12/1/2018 CONCEPTO APROBADO N.A no

2/28/2018 CONCEPTO APROBADO N.A no

CONCEPTO SUPEDITADO
12/31/2023 N.A Por verificar Por verificar
A EXPANSIÓN

12/1/2015 En trámite En aclaraciones Por verificar Por verificar

12/1/2021 En trámite En aclaraciones Por verificar Por verificar

12/1/2023 En trámite En aclaraciones Por verificar Por verificar

12/1/2017 En trámite En aclaraciones Por verificar Por verificar

12/1/2017 En trámite En aclaraciones Por verificar Por verificar

12/1/2017 En trámite En aclaraciones Por verificar Por verificar

12/1/2020 En trámite En aclaraciones Por verificar Por verificar


3/31/2023 En trámite En aclaraciones Por verificar Por verificar

12/1/2020 En trámite En aclaraciones Por verificar Por verificar

12/1/2016 En trámite En aclaraciones Por verificar Por verificar

4/30/2020 En trámite En aclaraciones Por verificar Por verificar

12/31/2019 En trámite En análisis Por verificar Por verificar

12/1/2018 En trámite En aclaraciones Por verificar Por verificar

7/11/2016 En trámite En aclaraciones Por verificar Por verificar

12/1/2019 En trámite En análisis Por verificar Por verificar

12/1/2016 En trámite En aclaraciones Por verificar Por verificar

12/1/2020 En trámite En aclaraciones Por verificar Por verificar

6/30/2022 En trámite En aclaraciones Por verificar Por verificar

6/30/2022 En trámite En aclaraciones Por verificar Por verificar

6/30/2022 En trámite En aclaraciones Por verificar Por verificar

6/30/2022 En trámite En aclaraciones Por verificar Por verificar

6/30/2022 En trámite En aclaraciones Por verificar Por verificar

6/30/2022 En trámite En aclaraciones Por verificar Por verificar


6/30/2022 En trámite En aclaraciones Por verificar Por verificar

6/30/2019 En trámite En aclaraciones Por verificar Por verificar

12/1/2018 En trámite En aclaraciones Por verificar Por verificar

6/30/2022 En trámite En aclaraciones Por verificar Por verificar

6/30/2022 En trámite En aclaraciones Por verificar Por verificar

6/30/2022 En trámite En aclaraciones Por verificar Por verificar

12/1/2020 En trámite En aclaraciones Por verificar Por verificar

12/1/2020 En trámite En aclaraciones Por verificar Por verificar

12/1/2022 En trámite En aclaraciones Por verificar Por verificar

12/1/2021 En trámite En aclaraciones Por verificar Por verificar

12/1/2018 En trámite En aclaraciones Por verificar Por verificar

8/31/2018 En trámite En análisis Por verificar Por verificar

1/8/2023 En trámite En aclaraciones Por verificar Por verificar

8/31/2018 En trámite En análisis Por verificar Por verificar


12/1/2021 En trámite En aclaraciones Por verificar Por verificar
12/1/2022 En trámite En aclaraciones Por verificar Por verificar
12/31/2024 En trámite En aclaraciones Por verificar Por verificar
12/1/2021 En trámite En aclaraciones Por verificar Por verificar
12/1/2021 En trámite En aclaraciones Por verificar Por verificar
12/1/2021 En trámite En aclaraciones Por verificar Por verificar
12/1/2021 En trámite En aclaraciones Por verificar Por verificar
6/30/2022 En trámite En aclaraciones Por verificar Por verificar

12/1/2019 En trámite En aclaraciones Por verificar Por verificar

12/1/2021 En trámite En aclaraciones Por verificar Por verificar

12/1/2021 En trámite En análisis Por verificar Por verificar

12/1/2022 En trámite En análisis Por verificar Por verificar

12/1/2022 En trámite En aclaraciones Por verificar Por verificar

12/1/2021 En trámite En aclaraciones Por verificar Por verificar

12/1/2021 En trámite En aclaraciones Por verificar Por verificar

12/1/2021 En trámite En aclaraciones Por verificar Por verificar

12/1/2021 En trámite En análisis Por verificar Por verificar

9/30/2023 En trámite En aclaraciones Por verificar Por verificar

12/31/2022 En trámite En aclaraciones Por verificar Por verificar

12/31/2022 En trámite En aclaraciones Por verificar Por verificar

12/31/2020 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2020 En trámite En análisis Por verificar Por verificar

5/23/2019 En trámite En aclaraciones Por verificar Por verificar


5/23/2019 En trámite En aclaraciones Por verificar Por verificar

12/31/2020 En trámite En análisis Por verificar Por verificar

11/1/2019 En trámite En análisis Por verificar Por verificar

12/1/2022 En trámite En análisis Por verificar Por verificar

12/1/2021 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2020 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En aclaraciones Por verificar Por verificar


12/31/2020 En trámite En análisis Por verificar Por verificar

12/31/2020 En trámite En aclaraciones Por verificar Por verificar

12/31/2020 En trámite En análisis Por verificar Por verificar

6/30/2021 En trámite En análisis Por verificar Por verificar

12/31/2020 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En aclaraciones Por verificar Por verificar

3/31/2020 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

9/30/2021 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar


12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2020 En trámite En análisis Por verificar Por verificar

5/31/2022 En trámite En análisis Por verificar Por verificar

1/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2020 En trámite En aclaraciones Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2020 En trámite En aclaraciones Por verificar Por verificar

12/31/2020 En trámite En aclaraciones Por verificar Por verificar


12/31/2020 En trámite En aclaraciones Por verificar Por verificar

12/31/2024 En trámite En aclaraciones Por verificar Por verificar

12/31/2024 En trámite En aclaraciones Por verificar Por verificar

12/31/2024 En trámite En aclaraciones Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

6/30/2021 En trámite En aclaraciones Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

3/31/2024 En trámite En aclaraciones Por verificar Por verificar

12/31/2024 En trámite En aclaraciones Por verificar Por verificar

1/1/2019 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar


12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

6/30/2021 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar


12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En aclaraciones Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar


12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

5/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar


12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2020 En trámite En aclaraciones Por verificar Por verificar

12/31/2020 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar


12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

12/31/2025 En trámite En aclaraciones Por verificar Por verificar

6/30/2021 En trámite En análisis Por verificar Por verificar


12/31/2022 En trámite En aclaraciones Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2020 En trámite En aclaraciones Por verificar Por verificar

12/31/2020 En trámite En aclaraciones Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar


12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

3/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

1/31/2022 En trámite En análisis Por verificar Por verificar

1/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En aclaraciones Por verificar Por verificar

12/31/2024 En trámite En aclaraciones Por verificar Por verificar

12/31/2024 En trámite En aclaraciones Por verificar Por verificar

12/31/2024 En trámite En aclaraciones Por verificar Por verificar

12/31/2021 En trámite En aclaraciones Por verificar Por verificar


12/31/2021 En trámite En aclaraciones Por verificar Por verificar

12/31/2020 En trámite En aclaraciones Por verificar Por verificar

12/31/2020 En trámite En aclaraciones Por verificar Por verificar

12/31/2021 En trámite En aclaraciones Por verificar Por verificar

12/31/2021 En trámite En aclaraciones Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

9/30/2022 En trámite En análisis Por verificar Por verificar


1/30/2021 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

6/30/2022 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

6/30/2025 En trámite En análisis Por verificar Por verificar

10/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

10/30/2023 En trámite En análisis Por verificar Por verificar

7/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar


12/31/2023 En trámite En análisis Por verificar Por verificar

6/30/2024 En trámite En análisis Por verificar Por verificar

6/30/2021 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

7/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En aclaraciones Por verificar Por verificar

12/31/2024 En trámite En aclaraciones Por verificar Por verificar

12/31/2023 En trámite En aclaraciones Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar


12/31/2022 En trámite En análisis Por verificar Por verificar

7/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

7/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar


12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

1/31/2025 En trámite En análisis Por verificar Por verificar


12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

6/30/2023 En trámite En análisis Por verificar Por verificar

1/31/2024 En trámite En análisis Por verificar Por verificar

1/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar


12/31/2027 En trámite En análisis Por verificar Por verificar

8/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

7/31/2024 En trámite En análisis Por verificar Por verificar

8/31/2022 En trámite En análisis Por verificar Por verificar

8/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

7/31/2026 En trámite En análisis Por verificar Por verificar


1/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/3/2022 En trámite En análisis Por verificar Por verificar


12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar

12/31/2027 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

3/30/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

12/31/2023 En trámite En análisis Por verificar Por verificar

7/31/2024 En trámite En análisis Por verificar Por verificar

7/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2026 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar


12/31/2024 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2025 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2021 En trámite En análisis Por verificar Por verificar

12/31/2022 En trámite En aclaraciones Por verificar Por verificar

12/31/2022 En trámite En aclaraciones Por verificar Por verificar

12/31/2022 En trámite En aclaraciones Por verificar Por verificar

12/31/2022 En trámite En análisis Por verificar Por verificar


INFORMACIÓN REPORTADA POR XM

Contrato de Fecha de En operación


FPO de Garantía
conexión Suscripción SI/NO

SI 8/28/2020 6/30/2021

SI 1/23/2020 6/30/2021

NO Si

NO Si

SI 3/18/2021 12/31/2022

NO Si

SI 9/28/2020 12/31/2021

NO Si

NO

SI 6/1/2021 6/30/2022

NO Si

NO Si

NO

NO

SI 5/11/2021 12/31/2021

NO Si
NO Si

NO

NO Si

SI 7/28/2020 1/1/2022

SI 11/1/2018 4/30/2022

NO

SI 11/25/2019 2/28/2023

SI 11/25/2019 2/28/2023

SI 11/25/2019 2/28/2023

SI 11/25/2019 2/28/2023

SI 12/3/2019 2/28/2023

SI 12/3/2019 2/28/2023

SI 11/13/2018 12/31/2023

NO

NO

NO
SI 11/6/2020 12/31/2022

SI 5/2/2019 12/31/2022

SI 11/6/2020 12/31/2022

SI 11/6/2020 12/31/2022

SI 11/6/2020 12/31/2022

NO Si

NO

NO

NO

SI 7/23/2020 1/1/2022

SI 10/5/2020 12/31/2022

SI 3/30/2021 12/31/2022

NO

NO

SI 10/22/2020 7/30/2021

SI 2/25/2019 12/1/2021

SI 2/25/2019 12/1/2021

SI 12/14/2018 12/31/2022
NO Si

NO

NO

NO

NO

SI 3/3/2019 12/31/2021

NO

NO

SI 9/30/2020 12/31/2022

NO

SI 12/27/2017 12/30/2021

SI 12/30/2019 12/31/2021

SI 3/18/2021 12/31/2022

NO

SI 12/9/2019 5/31/2023

SI 2/23/2021 12/31/2023

SI 4/23/2021 1/1/2023

NO 12/31/2021
SI 4/2/2020 11/30/2022

NO Si

SI 2/11/2020 9/30/2021

NO

SI 6/10/2021 10/27/2022

NO

NO

SI 7/9/2019 12/31/2022

SI 9/21/2020 12/31/2022

NO

NO

NO

NO

NO

SI 7/26/2019 4/30/2022

NO Si

NO

NO

NO

NO
NO Si

NO Si

NO

SI 6/18/2020 9/30/2022

NO

NO

NO

No 6/30/2021

Entró en
operación en
NO 2019. Salió de
operación en
2020

Entró en
operación en
NO 2019. Salió de
operación en
2021

NO Si

SI 5/13/2020 9/30/2022

SI 5/13/2020 9/30/2022

SI 11/19/2020 12/31/2024

NO

NO
NO

NO

SI 6/30/2019 5/30/2021

SI 11/15/2019 12/31/2021

NO Si

NO

NO

NO

NO Si

NO

SI 10/21/2019 6/30/2022

SI 4/15/2021 6/30/2022

SI 10/21/2019 6/30/2022

SI 6/1/2020 1/31/2022

NO

SI 3/4/2021 12/31/2023

NO

NO Si
NO

SI 6/5/2020 12/31/2021

SI 3/19/2020 12/31/2021

SI 12/24/2020 12/30/2021

Si 9/30/2020 12/31/2021

Si 9/30/2020 12/31/2021

Si 9/29/2020 12/31/2021

No

Si 3/19/2020 12/31/2021

Si 3/19/2020 12/31/2021

Si 4/15/2021 6/30/2022

Si 6/16/2020 9/30/2022

No

Si 6/24/2020 6/30/2023

Si 3/16/2021 12/31/2021

No
Si 6/26/2020 11/30/2023

Si 6/26/2020 11/30/2023

Si 2/16/2021 12/31/2023

No

Si 9/30/2020 12/31/2021

Si 4/5/2021 12/1/2022

No

No

No

Si 4/21/2021 12/31/2021

Si 5/5/2020 12/15/2021

Si 5/5/2020 12/15/2021

No

Si 8/6/2020 12/30/2021

Si 9/30/2020 12/31/2021

Si 4/22/2021 12/31/2025

Si 1/14/2021 12/31/2021
Si 5/14/2021 12/31/2022

Si 1/14/2021 12/31/2021

Si 7/1/2020 9/30/2023

Si 9/30/2020 12/31/2022

No

No Si

No

No

Si 4/22/2021 12/31/2023

Si 7/15/2020 12/31/2022

Si 6/5/2020 12/30/2023

Si 2/22/2021 7/31/2022

No

Si 9/16/2020 12/30/2021

No

No

Si 5/6/2021 6/30/2022
No

No

No

No

No

Si 11/3/2020 12/31/2021

No

No

Si 4/22/2021 12/31/2023

No

No

No

Si 3/3/2021 12/31/2023

No

No

No

Si 1/20/2021 12/31/2022
No

No

No

No

Si 2/4/2021 12/31/2023

Si 2/4/2021 12/31/2023

Si 2/4/2021 12/31/2023

No Si

No

No

Si 4/15/2021 12/31/2022

Si 4/14/2021 12/31/2022

Si 4/15/2021 12/31/2022

Si 4/15/2021 12/31/2022
Si 4/15/2021 12/31/2022

Si 4/15/2021 12/31/2021

Si 10/13/2020 3/31/2022

No

No

No

Si 3/19/2021 6/30/2025

No

No

No

No

No

No

No

No

No
No

No

No

No

No

No

No

No

No

No

No

No

No

No

No
No

No Si

Si 5/5/2021 12/31/2021

No

No

No

No

No

Si 3/23/2021 12/31/2025

Si 3/5/2021 12/31/2021

No

Si 4/27/2021 12/31/2024

No

No

No
No

No

No

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI
SI

En operación
si 12/10/2019 solo la unidad 1 12/31/2025
(1,2 MW)

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI
Entró en
operación en
2014. Salió de
operación en
2018

SI

SI

SI

SI

SI

SI

SI

SI

SI

SI

si 10/22/2020 7/30/2021

SI
Entró en
operación en
2013, la
ampliación fue
en 2016. Salió
de operación
en 2021

SI

SI

si 4/11/2019 4/1/2021

Entró en
operación en
2016. Salió de
operación este
mismo año

si 12/29/2020 3/30/2022

NO SI

SI

SI

SI

si 4/28/2016 1/31/2025

SI
SI

SI

SI

SI

SI

si 5/21/2020 6/30/2021

si 8/20/2019 11/30/2021

SI es de 1,6
MW

si 10/1/2018 1/31/2022

NO

si 12/27/2017 12/30/2021

si 5/29/2020 1/29/2021
SI

SI

SI

SI

SI

SI

SI

SI
si 4/17/2017 12/31/2024

si 7/24/2017 12/30/2025

si 12/17/2020 5/31/2021

SI

TRINA-VATIA 2021-08-03
si 5/15/2020 1 y 2 en Depende de la
operación planta

SI

NO 6/30/2021

SI

si 3/6/2019 12/31/2021

Entró en
operación en
2019. Salió de
operación en
2021
SI

SI

SI

si 7/27/2020 12/31/2021

SI

SI

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar
Por verificar Por verificar Por verificar Por verificar
Por verificar Por verificar Por verificar Por verificar
Por verificar Por verificar Por verificar Por verificar
Por verificar Por verificar Por verificar Por verificar
Por verificar Por verificar Por verificar Por verificar
Por verificar Por verificar Por verificar Por verificar
Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar

Por verificar Por verificar Por verificar Por verificar


15/03/20
###
22

Soli

No No
Codig modificar, modificar,
Nombre Proyecto Tipo Interconexión
o no no
diligenciar diligenciar

2 Parque Solar Bayunca #2 S.A.S. GENERACIÓN MENOR


2 PARQUE SOLAR MOKANA S.A.S GENERACIÓN MENOR

2 Celsia Solar Pasacaballos GENERACIÓN MAYOR

2 PLANTA SOLAR SAMUEL GENERACIÓN MENOR


2 PLANTA SOLAR JUAN GENERACIÓN MENOR
2 PLANTA SOLAR EL BONGO GENERACIÓN MENOR
2 PARQUE SOLAR SAN ORO GENERACIÓN MENOR
2 PARQUE SOLAR SAN PELAYO GENERACIÓN MENOR
2 PARQUE SOLAR SAN SERAPIO GENERACIÓN MENOR

2 PLANTA SOLAR HAGEO VALENCIA DE JESUS GENERACIÓN MENOR

2 PLANTA SOLAR HAGEO CHIRIGUANA GENERACIÓN MENOR

2 PLANTA SOLAR HAGEO EL PASO GENERACIÓN MENOR

2 PARQUE SOLAR CURUMANÍ 1 GENERACIÓN MENOR

2 PARQUE SOLAR EL LIMBO GENERACIÓN MENOR


2 PARQUE SOLAR BONANZA GENERACIÓN MENOR
2 PARQUE SOLAR MEMBRILLAL GENERACIÓN MENOR

2 MANZANILLO 2 GENERACIÓN MENOR

2 PARQUE SOLAR CONVECTIVA GENERACIÓN MENOR


2 PARQUE SOLAR EL NUCLEO GENERACIÓN MENOR
2 PARQUE SOLAR RADIANTE GENERACIÓN MENOR
2 PARQUE SOLAR FOTOSFERA GENERACIÓN MENOR
2 PARQUE DE GENERACION SOLAR GUATAPURI GENERACIÓN MAYOR

2 Cogeneración Cabot Energy System GENERACIÓN MENOR

2 Distrito Térmico Serena del Mar CARGA


2 Parque de generación fotovoltaica RioFrio 9.9 MW GENERACIÓN MAYOR
2 Parque de generación fotovoltaica Florida 9.9 MW GENERACIÓN MAYOR
2 Parque de generación fotovoltaica Real Minas 9.9 MW GENERACIÓN MAYOR
2 Parque de generación fotovoltaica Palenque 9.9 MW GENERACIÓN MAYOR
2 Proyecto Solar RioFrio 9,9 MW GENERACIÓN MAYOR
ESTUDIO DE CONEXIÓN
2 GENERACIÓN MENOR
PARQUE SOLAR MULALÓ 9.9 MW

2 ESTUDIO DE CONEXIÓN QUESADAS GENERACIÓN MENOR

2 ESTUDIO DE CONEXIÓN LA ESPERANZA 1 GENERACIÓN MENOR

En proceso de entrega de estudio y definición de Fecha de


2 GENERACIÓN MAYOR
Puesta en Operación, al igual que el nombre del proyecto

En proceso de entrega de estudio y definición de Fecha de


2 GENERACIÓN MAYOR
Puesta en Operación, al igual que el nombre del proyecto

En proceso de entrega de estudio y definición de Fecha de


2 GENERACIÓN MENOR
Puesta en Operación, al igual que el nombre del proyecto

En proceso de entrega de estudio y definición de Fecha de


2 GENERACIÓN MENOR
Puesta en Operación, al igual que el nombre del proyecto

En proceso de entrega de estudio y definición de Fecha de


2 GENERACIÓN MENOR
Puesta en Operación, al igual que el nombre del proyecto

En proceso de entrega de estudio y definición de Fecha de


2 GENERACIÓN MENOR
Puesta en Operación, al igual que el nombre del proyecto

En proceso de entrega de estudio y definición de Fecha de


2 GENERACIÓN MENOR
Puesta en Operación, al igual que el nombre del proyecto

2 PARQUE DE GENERACIÓN FOTOVOLTAICA LA PRIMAVERA - 60 MW


GENERACIÓN MAYOR

2 La Garita GENERACIÓN MENOR

2 Astillero GENERACIÓN MAYOR

2 Oriente GENERACIÓN MAYOR

Derivación Virginia ISA – Cértegui – Viterbo 115 kV y segundo


2 AMPLIACIÓN
transformador 115/33 kV en la subestación Viterbo

2 Duitama I GENERACIÓN MAYOR


2 Puerto Boyacá GENERACIÓN MAYOR
2 Boavita GENERACIÓN MENOR
2 Sua GENERACIÓN MAYOR
2 El Dorado GENERACIÓN MENOR
2 Firavisol GENERACIÓN MENOR
2 Chitagoto GENERACIÓN MENOR

2 Nobsa I GENERACIÓN MENOR

2 Nobsa II GENERACIÓN MENOR

2 Ampliacion Autogeneración Argos AMPLIACIÓN

2 Eolico Ricaurte GENERACIÓN MAYOR


2 Muiscas GENERACIÓN MENOR
2 Sochagota GENERACIÓN MAYOR
2 Firavitoba GENERACIÓN MENOR
2 Mila GENERACIÓN MENOR

2 Sol Naciente GENERACIÓN MAYOR

2 PCH Salitre GENERACIÓN MENOR

2 PCH Palmar GENERACIÓN MENOR

2 PCH Planada GENERACIÓN MENOR

2 Topaga I GENERACIÓN MAYOR


2 Topaga II GENERACIÓN MAYOR
2 Topaga III GENERACIÓN MAYOR
2 Paipa GENERACIÓN MAYOR
2 Mongua GENERACIÓN MENOR
2 Vientos de Boyaca I GENERACIÓN MENOR
2 Parque generador Andino 5 GENERACIÓN MENOR

2 Summa III GENERACIÓN MENOR

2 Summa IV GENERACIÓN MENOR

2 Puerto Boyacá GENERACIÓN MAYOR

2 PSB3 GENERACIÓN MAYOR


2 PSB4 GENERACIÓN MAYOR
2 PSB5 GENERACIÓN MENOR
2 Belmonte II GENERACIÓN MAYOR
2 Belmonte III GENERACIÓN MAYOR
2 Las Brujas GENERACIÓN MAYOR
2 Katay_Cerritos GENERACIÓN MAYOR
2 Tunez_Sanin GENERACIÓN MAYOR
2 Parque Santa Rosa Solar 200 MW GENERACIÓN MAYOR
2 EQUINOCCIO I GENERACIÓN MAYOR
2 EQUINOCCIO II GENERACIÓN MAYOR
2 EQUINOCCIO III GENERACIÓN MAYOR

2 ABO TINGUA GENERACIÓN MENOR

2 ABO COLIMA GENERACIÓN MENOR

2 ABO CONDOR GENERACIÓN MENOR

2 ARCADIA GENERACIÓN MENOR

2 HATOGRANDE SOLAR GENERACIÓN MENOR


2 PALMERAS SOLAR I GENERACIÓN MAYOR
2 MINERO SOLAR GENERACIÓN MENOR

2 ABO JEQUES GENERACIÓN MENOR

2 BELTRAN SOLAR GENERACIÓN MAYOR


2 BAVARIA TIBITOC GENERACIÓN MENOR
2 SER1
2 SER2
2 SER3
2 TIBITOC
2 AMPLIACIÓN PELDAR
2 SUE 1 GENERACIÓN MENOR
2 PGC3_EO20 GENERACIÓN MENOR
2 TEQUENDAMA 1 GENERACIÓN MENOR
2 DVP SOLAR II GENERACIÓN MAYOR
2 SAN ANDRES GENERACIÓN MENOR
2 PALMERAS SOLAR II GENERACIÓN MAYOR

2 ABO JEQUES GENERACIÓN MENOR

2 MONTE REY GENERACIÓN MENOR


2 NOVILLERO GENERACIÓN MENOR
2 LAGUNA GENERACIÓN MENOR

2 REGIOTRAM CORZO

2 REGIOTRAM MONTEVIDEO

2 APULO II GENERACIÓN MENOR


2 HONDA II GENERACIÓN MENOR

ESTACIONES MONTERREY - PORVENIR AL SISTEMA


2 AMPLIACIÓN
ELÉCTRICO DE ENERCA 115 KV - PROYECTO DE DEMANDA

2 Caldas Gold
2 Nuevo Puente GENERACIÓN MENOR

2 Salamina GENERACIÓN MENOR

2 Caldas Solar 1 GENERACIÓN MENOR

2 Caldas Solar 2 GENERACIÓN MENOR

2 Juntas GENERACIÓN MENOR

2 Parque generacion fotovoltaica Chinchina GENERACIÓN MENOR

2 Conexión a la Dorada subestaciones La Ceiba y Magdalena 115 kV


2 Solar Camelia GENERACIÓN MENOR
2 Solar Dalia GENERACIÓN MENOR
2 Campoalegre A GENERACIÓN MENOR
2 Campoalegre B GENERACIÓN MENOR
2 Risaralda A GENERACIÓN MENOR
2 Arribato GENERACIÓN MENOR
2 Citabara GENERACIÓN MENOR
2 Albania GENERACIÓN MENOR
2 Risaralda B GENERACIÓN MENOR
2 Quinchia C GENERACIÓN MENOR
2 Quinchia A GENERACIÓN MENOR
2 Primavera GENERACIÓN MENOR
2 Peñas Blancas GENERACIÓN MENOR
2 Mapa A GENERACIÓN MENOR
2 Esparta GENERACIÓN MENOR
2 Rico Medio GENERACIÓN MENOR
2 Parque Solar Victoria GENERACIÓN MAYOR
2 Parque Solar el Nevado GENERACIÓN MENOR

2 Parque Fotovoltaico Balboa GENERACIÓN MAYOR

2 Paloma GENERACIÓN MAYOR

2 La Estrella Solar GENERACIÓN MENOR


2 Enerland Viterbo GENERACIÓN MAYOR

2 Siberia I GENERACIÓN MENOR

2 Quimbaya GENERACIÓN MAYOR

2 Siberia II GENERACIÓN MENOR

2 Granja Solar La Playa GENERACIÓN MENOR


2 PLC 19-9 - ECOLOGIC GENERACIÓN MENOR
2 Palma Dulce GENERACIÓN MENOR
2 Palma Negra GENERACIÓN MENOR
2 Quinchia GENERACIÓN MENOR

2 Parque de Generacion Fotovoltáica Poporo GENERACIÓN MENOR

2 Jalones GENERACIÓN MENOR

2 PGU5 GENERACIÓN MENOR


2 Ampliación Guavio AMPLIACIÓN
2 Ampliación Gauca y Paraíso AMPLIACIÓN

2 El Darién I GENERACIÓN MAYOR

2 El Darién II GENERACIÓN MAYOR

2 El Darién III GENERACIÓN MAYOR

2 El Darién IV GENERACIÓN MAYOR

2 El Darién V GENERACIÓN MAYOR

2 El Darién VI GENERACIÓN MAYOR

2 La Tatacoa I GENERACIÓN MAYOR

2 La Tatacoa II GENERACIÓN MAYOR

2 La Tatacoa III GENERACIÓN MAYOR

2 La Tatacoa IV GENERACIÓN MAYOR

2 Pijao I GENERACIÓN MAYOR

2 Pijao II GENERACIÓN MAYOR

2 Pijao III GENERACIÓN MAYOR

2 Pijao IV GENERACIÓN MAYOR

2 CARMELITA GENERACIÓN MENOR


2 COGENERACIÓN MAYAGÜEZ GENERACIÓN MENOR
2 Semilla del Valle del Cauca A GENERACIÓN MAYOR
2 PGF Unión I GENERACIÓN MENOR
2 PGF Valle III GENERACIÓN MENOR
2 PGF Jamundí GENERACIÓN MENOR
2 PGF Rozo GENERACIÓN MENOR
2 PARQUE SOLAR PACIFICO 20MW GENERACIÓN MAYOR
2 Atogenerador Solar Palmira II GENERACIÓN MENOR
2 Atogenerador Solar Palmira III GENERACIÓN MENOR
2 Parque Fotovoltaico Macao GENERACIÓN MAYOR
2 Cogeneración Castilla GENERACIÓN MENOR
2 Navarro GENERACIÓN MAYOR
2 Planta W2E Yotoco GENERACIÓN MAYOR
2 Granja Solar Fotovoltaica El Danubio GENERACIÓN MENOR
2 CSF CONTINUA SALDAÑA GENERACIÓN MENOR

2 PROYECTO SOLAR ALVARADO GENERACIÓN MENOR


2 SOLAR SAN FELIPE GENERACIÓN MAYOR

2 PARQUE EOLICO ALPUJARRA GENERACIÓN MAYOR

2 Cuerquia I GENERACIÓN MENOR

2 Santa Catalina GENERACIÓN MENOR

2 Colibrí GENERACIÓN MENOR

2 Hidrolimón GENERACIÓN MENOR

2 Ampliación autogeneración PAPELSA AMPLIACIÓN

2 La Hundida GENERACIÓN MENOR

2 Ampliación PCH Alejandria AMPLIACIÓN

2 Rio Sucio 1 GENERACIÓN MENOR

2 Rio Sucio 2 GENERACIÓN MENOR

2 Rio Sucio 3 GENERACIÓN MENOR

2 Rio Verde Bajo GENERACIÓN MENOR

2 Nobogá GENERACIÓN MENOR

2 Parque Solar Botero GENERACIÓN MENOR

2 Solar WITOTO I GENERACIÓN MAYOR

2 Solar WITOTO II GENERACIÓN MAYOR


2 Solar Farallones I GENERACIÓN MAYOR

2 Solar Farallones II GENERACIÓN MAYOR

2 Solar Farallones III GENERACIÓN MAYOR

2 Solar Farallones IV GENERACIÓN MAYOR

2 BAZ SANTA MARTA GENERACIÓN MENOR

2 BAZ NUEVA BARRANQUILLA GENERACIÓN MENOR

2 PARQUE SOLAR DIBULLA 1 GENERACIÓN MENOR

2 Parque Eólico Noé GENERACIÓN MENOR


2 Parque Eólico Jehová GENERACIÓN MENOR
2 Parque Eólico El Ahumado 2 GENERACIÓN MENOR
2 Parque Fotovoltaico Colcaribe IX GENERACIÓN MENOR

2 COLCARIBE SOLAR X GENERACIÓN MENOR

2 Parque Solar Mujupay GENERACIÓN MENOR


2 PARQUE MUSAISHA SUN P5 GENERACIÓN MENOR

2 PARQUE SOLAR EL BOSQUE GENERACIÓN MENOR

2 Parque Solar Neguanje 1 GENERACIÓN MENOR


2 Parque Solar Neguanje 2 GENERACIÓN MENOR

2 Eólico Barranquilla 1 GENERACIÓN MENOR

2 Eólico Barranquilla 2 GENERACIÓN MENOR

2 Parque Solar Colcaribe XX GENERACIÓN MENOR


2 Parque Solar R-R SUN GENERACIÓN MENOR
2 Parque Eólico Abraham V GENERACIÓN MENOR
2 PARQUE SOLAR BONDA 1 GENERACIÓN MENOR
2 PARQUE SOLAR HATONUEVO 1 GENERACIÓN MENOR
2 PARQUE SOLAR BARRANCAS 1 GENERACIÓN MENOR
2 UNIDAD DE GENERACIÓN TB05 180 MW AMPLIACIÓN
2 Termocapachos GENERACIÓN MENOR
2 Parque Alma solar 1 GENERACIÓN MENOR
2 Parque Alma solar 2 GENERACIÓN MENOR
2 ACSA SOLAR GENERACIÓN MENOR

2 Proyecto solar Morichal GENERACIÓN MENOR


2 Proyecto solar Estereos GENERACIÓN MENOR

2 Parque de generación Fotovoltaica Playitas GENERACIÓN MENOR

2 ALPHA SOLAR GENERACIÓN MENOR


2 DEYA SOLAR GENERACIÓN MENOR

2 Proyecto Solar Corocora GENERACIÓN MENOR

2 PARQUE SOLAR ZUBA 1, 19.9MW GENERACIÓN MENOR


2 PARQUE SOLAR ZUBA 2, 60MW GENERACIÓN MAYOR

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

2
2

558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
Solicitudes de conexión a cargo de transportadores
Información reportada por los t

¿Viabilidad dueño del Punto de


Tipo de Generacion No modificar, no diligenciar Departamento
punto de conexión? conexión

GENERACIÓN SI Bolívar MANZANILLO


GENERACIÓN SI Bolívar MANZANILLO

GENERACIÓN SI Bolívar PASACABALLO

GENERACIÓN No Cesar VALENCIA


GENERACIÓN SI Cesar LA PAZ
GENERACIÓN No Córdoba COTORRA
GENERACIÓN No Córdoba CIENAGA DE ORO
GENERACIÓN No Córdoba SAN PELAYO
GENERACIÓN No Córdoba TIERRALTA

GENERACIÓN No Cesar VALENCIA

GENERACIÓN No Cesar CHIRIGUANA

GENERACIÓN No Cesar EL PASO

GENERACIÓN No Cesar CURUMANI

GENERACIÓN No Bolívar MANZANILLO


GENERACIÓN No Bolívar MANZANILLO
GENERACIÓN No Bolívar MEMBRILLAL

GENERACIÓN No Bolívar MANZANILLO

GENERACIÓN No Bolívar MANZANILLO


GENERACIÓN No Bolívar MANZANILLO
GENERACIÓN No Bolívar MANZANILLO
GENERACIÓN No Bolívar MANZANILLO
GENERACIÓN No Cesar GUATAPURI

AUTOGENERACIÓN SI Bolívar MAMONAL

CARGA SI Bolívar MANZANILLO


GENERACIÓN No Santander SE RioFrio
GENERACIÓN No Santander SE RioFrio
GENERACIÓN No Santander SE Minas
GENERACIÓN No Santander SE Palenque
GENERACIÓN No Santander SE RioFrio
GENERACIÓN SI Valle Argos

Nueva Sub
EMCALI
Quesadas
GENERACIÓN Valle
(Concepto
Upme
Pendiente)

Nueva Sub
EMCALI
Quesadas
GENERACIÓN Valle
(Concepto
Upme
Pendiente)

GENERACIÓN Valle Aguablanca

GENERACIÓN Valle Aguablanca

GENERACIÓN Valle Aguablanca

GENERACIÓN Valle Aguablanca

GENERACIÓN Valle Por definir

GENERACIÓN Valle Aguablanca

GENERACIÓN Valle Alferez I

GENERACIÓN No CAQUETA N 1° 41' 5.45'' W 75° 16' 43.88''

GENERACIÓN NO Norte de Santander S/E La Garita

GENERACIÓN NO Norte de Santander S/E Tonchala

GENERACIÓN NO Norte de Santander S/E San Mateo

Reconfiguració
n línea de
subtransmisió
Caldas
SI n eléctrica
Risaralda
Virginia –
Cértegui 115
kV

GENERACIÓN SI Boyacá S/E HIGUERAS


GENERACIÓN SI Boyacá S/E PUERTO BOYACÁ
GENERACIÓN No Boyacá S/EBOAVITA
GENERACIÓN SI Boyacá S/E NUEVA BAVARIA
GENERACIÓN No Boyacá S/E JENESANO
GENERACIÓN No Boyacá S/E SIRATA
GENERACIÓN SI Boyacá S/E BELEN

AUTOGENERACIÓN SI Boyacá S/E HOLCIM

AUTOGENERACIÓN SI Boyacá S/E HOLCIM

AUTOGENERACIÓN SI Boyacá S/E SAN ANTONIO

GENERACIÓN SI Boyacá NUEVA S/E COLECTORA


GENERACIÓN SI Boyacá S/E MUISCAS
GENERACIÓN No Boyacá S/E SOCHAGOTA
GENERACIÓN No Boyacá S/E FIRAVITOBA
GENERACIÓN No Boyacá S/E TOPAGA

GENERACIÓN No Boyacá S/E SOCHAGOTA

NUEVA S/E
GENERACIÓN SI Boyacá COLECTORA
SUAREZ

NUEVA S/E
GENERACIÓN SI Boyacá COLECTORA
SUAREZ

NUEVA S/E
GENERACIÓN SI Boyacá COLECTORA
SUAREZ

GENERACIÓN No Boyacá S/E SAN ANTONIO


GENERACIÓN No Boyacá S/E SAN ANTONIO
GENERACIÓN No Boyacá S/E SAN ANTONIO
GENERACIÓN No Boyacá S/E SOCHAGOTA
GENERACIÓN No Boyacá S/E TOPAGA
GENERACIÓN No Boyacá S/E SAMACA
GENERACIÓN No Boyacá S/E BOAVITA

GENERACIÓN No Boyacá S/E MUISCAS

GENERACIÓN No Boyacá S/E BOAVITA

GENERACIÓN No Boyacá S/E PUERTO BOYACÁ

GENERACIÓN No Boyacá S/E MUISCAS


GENERACIÓN No Boyacá S/E PUERTO BOYACÁ
GENERACIÓN No Boyacá S/E BOAVITA
GENERACIÓN SI Risaralda SE Pavas 33kV
GENERACIÓN SI Risaralda SE Dosquebradas 33kV
GENERACIÓN SI Risaralda SE Pavas 33kV
GENERACIÓN SI Risaralda SE Pavas 33kV
GENERACIÓN SI Risaralda SE Pavas 33kV
GENERACIÓN No Magdalena Fundacion
GENERACIÓN Cundinamarca Nueva La Ceiba 115kV
GENERACIÓN Cundinamarca Nueva La Ceiba 115kV
GENERACIÓN Cundinamarca Nueva La Ceiba 115kV

GENERACIÓN Cundinamarca Ubate 115kV

GENERACIÓN Cundinamarca Ubate 115kV

GENERACIÓN Cundinamarca Ubate 115kV

GENERACIÓN Cundinamarca Viani 34,5kV

GENERACIÓN Cundinamarca Villapinzon 34,5kV


GENERACIÓN Cundinamarca Barzalosa 115kV
GENERACIÓN Cundinamarca Rabanal 34,5kV

GENERACIÓN Cundinamarca Ubate 115kV

GENERACIÓN Cundinamarca Beltran 34,5kV


AUTOGENERACIÓN Cundinamarca Termozipa 115kV
Cundinamarca Nueva Chicala 115kV
Cundinamarca Calle_1 115kV
Cundinamarca Nueva Calle_67 115kV
Cundinamarca Tibitoc 115kV
Cundinamarca Peldar 115kV
GENERACIÓN Cundinamarca Guaca 115kV
GENERACIÓN Cundinamarca Noroeste 115kV
GENERACIÓN Cundinamarca Guacheta 34,5kV
GENERACIÓN Cundinamarca Carbone 115kV
GENERACIÓN Cundinamarca Calera 115kV
GENERACIÓN Cundinamarca Barzalosa 115kV

GENERACIÓN Cundinamarca Ubate 115kV

GENERACIÓN Cundinamarca Guataqui 34,5kV


GENERACIÓN Cundinamarca Sauces 34,5kV
GENERACIÓN Cundinamarca Capellania 34,5kV

Cundinamarca Nueva Regiotram_Occ 115kV

Cundinamarca Nueva Montevideo 115kV

GENERACIÓN Cundinamarca Tamarindo 34,5kV


GENERACIÓN Cundinamarca Guaduas 34,5kV

SI CASANARE 15847

SI CALDAS Sub. IRRA


GENERACIÓN SI CALDAS Sub. BOLIVIA

GENERACIÓN SI CALDAS Sub. SALAMINA

GENERACIÓN SI CALDAS Sub. VITERBO

GENERACIÓN SI CALDAS Sub. VITERBO

GENERACIÓN SI CALDAS Sub. IRRA

GENERACIÓN SI CALDAS Sub. CHINCHINA

SI CALDAS Sub. Dorada


GENERACIÓN CALDAS Sub. DORADA
GENERACIÓN CALDAS Sub. DORADA
GENERACIÓN RISARALDA Sub. HERMOSA
GENERACIÓN RISARALDA Sub. HERMOSA
GENERACIÓN CALDAS Sub. MISTRATO
GENERACIÓN CALDAS Sub. MISTRATO
GENERACIÓN CALDAS Sub. MISTRATO
GENERACIÓN CALDAS Sub. MISTRATO
GENERACIÓN CALDAS Sub. ANSERMA
GENERACIÓN RISARALDA Sub. QUINCHIA
GENERACIÓN RISARALDA Sub. QUINCHIA
GENERACIÓN CALDAS Sub. ANSERMA
GENERACIÓN RISARALDA Sub. SANTUARIO
GENERACIÓN RISARALDA Sub. SANTUARIO
GENERACIÓN RISARALDA Sub. BALBOA
GENERACIÓN RISARALDA Sub. PUEBLO RICO
GENERACIÓN CALDAS Sub. VICTORIA
GENERACIÓN CALDAS Sub. IRRA

GENERACIÓN RISARALDA Sub. VIRGINIA

GENERACIÓN CALDAS Sub. INSULA

GENERACIÓN CALDAS Sub. IRRA


GENERACIÓN CALDAS Sub. VITERBO

GENERACIÓN CALDAS Sub. VITERBO

GENERACIÓN CALDAS Sub. VICTORIA

GENERACIÓN CALDAS Sub. VITERBO

GENERACIÓN CALDAS Sub. VITERBO


GENERACIÓN RISARALDA Sub. VIRGINIA
GENERACIÓN CALDAS Sub. PENSILVANIA
GENERACIÓN CALDAS Sub. PENSILVANIA
GENERACIÓN RISARALDA Sub. QUINCHIA

GENERACIÓN CALDAS Sub. MANIZALES

GENERACIÓN CALDAS Sub. DORADA NORTE

GENERACIÓN CALDAS Sub. ALTAMAR


GENERACIÓN Cundinamarca Guavio
GENERACIÓN Cundinamarca Guaca y Paraíso

GENERACIÓN Valle del Cauca Alférez

GENERACIÓN Valle del Cauca Alférez

GENERACIÓN Valle del Cauca Alférez

GENERACIÓN Valle del Cauca Alférez

GENERACIÓN Valle del Cauca Alférez

GENERACIÓN Valle del Cauca Alférez

GENERACIÓN Huila Altamira

GENERACIÓN Huila Altamira

GENERACIÓN Huila Altamira

GENERACIÓN Huila Altamira

GENERACIÓN Huila Tesalia

GENERACIÓN Huila Tesalia

GENERACIÓN Huila Tesalia

GENERACIÓN Huila Tesalia

Generador Si Valle Del Cauca PANORAMA


Generador Estudio en revisión Valle Del Cauca CANDELARIA
Generador Si Valle Del Cauca CARTAGO
Generador Estudio en revisión Valle Del Cauca La Union
Generador Estudio en revisión Valle Del Cauca ANDALUCIA
Generador Estudio en revisión Valle Del Cauca Jamundi
Generador Estudio en revisión Valle Del Cauca Rozo
Generador Estudio en revisión Valle Del Cauca EL PAILON
Autogenerador a gran escala Si Valle Del Cauca Bonlam
Autogenerador a gran escala Si Valle Del Cauca Amcor
Generador Si Valle Del Cauca Palmaseca
Cogenerador Estudio en revisión Valle Del Cauca
Nueva SE elace en cto Florida-Candelaria
Generador Estudio en revisión Valle Del Cauca ALFEREZ II 115 KV
Generador Estudio en revisión Valle Del Cauca YOTOCO
Generador Estudio en revisión Valle Del Cauca Cartago
GENERACIÓN Estudio en revisión Tolima Subestación Saldaña

GENERACIÓN Estudio en revisión Tolima Subestación Alvarado


GENERACIÓN Estudio en revisión Tolima Subestacion San Felipe

GENERACIÓN Estudio en revisión Tolima Subestación Alpujarra

Futura
Subestación
GENERACIÓN Si Antioquia
Guárcama 110
KV
GENERACIÓN No Antioquia 203-15

Futura
Subestación
GENERACIÓN Si Antioquia
San Lorenzo
II a 44 KV

Subestación El
GENERACIÓN No Antioquia
Limón 13,2 kV

AUTOGENERACIÓN Si Antioquia R13-49


Pendiente por
GENERACIÓN No Antioquia
definir

Subestación El
GENERACIÓN No Antioquia
Limón 44 kV

Pendiente por
GENERACIÓN No Antioquia
definir

Pendiente por
GENERACIÓN No Antioquia
definir

Pendiente por
GENERACIÓN No Antioquia
definir

Futura
Subestación
GENERACIÓN No Antioquia
Lagunas a 110
KV

Futura
Subestación
GENERACIÓN No Antioquia
Lagunas a 44
KV
GENERACIÓN No Antioquia Subestación Caucasia 44 kV

GENERACIÓN No Santander Sogamoso

GENERACIÓN No Santander Sogamoso


GENERACIÓN No Valle del Cauca San Marcos

GENERACIÓN No Valle del Cauca San Marcos

GENERACIÓN No Valle del Cauca San Marcos

GENERACIÓN No Valle del Cauca San Marcos

GENERACIÓN No Magdalena Santa Marta


Nueva
GENERACIÓN SI Atlántico
Barranquilla

GENERACIÓN No Guajira Termoguajira

GENERACIÓN No La Guajira Maicao


GENERACIÓN No La Guajira Maicao
GENERACIÓN No Guajira Riohacha
GENERACIÓN No La Guajira Maicao

GENERACIÓN No Guajira Cuestecitas

GENERACIÓN No La Guajira Maicao


GENERACIÓN No Guajira Cuestecitas

GENERACIÓN No Guajira Termoguajira

GENERACIÓN No Magdalena Bonda


GENERACIÓN No Magdalena Bonda
Nueva
GENERACIÓN No Atlántico
Barranquilla
Nueva
GENERACIÓN No Atlántico
Barranquilla
GENERACIÓN No Atlántico Juan Mina
GENERACIÓN No Atlántico Rotinet
GENERACIÓN No La Guajira Fonseca
GENERACIÓN No Magdalena Bonda
GENERACIÓN No La Guajira Hato Nuevo
GENERACIÓN No La Guajira Barrancas
GENERACIÓN SI Atlántico TEBSA
GENERACIÓN SI Arauca Tame
GENERACIÓN SI Arauca Zona industrial - Caracol
GENERACIÓN SI Arauca Zona industrial - Caracol
GENERACIÓN SI Arauca Banadia - Saravena

GENERACIÓN SI Arauca Tame


GENERACIÓN SI Arauca Saravena

GENERACIÓN SI Arauca Arauca

GENERACIÓN SI Arauca Fortul


GENERACIÓN SI Arauca La Esmeralda (Arauquita)

La Esmeralda
GENERACIÓN Arauca
(Arauquita)

GENERACIÓN META Violetas


GENERACIÓN META Violetas
transportadores Art 50 Resolución CREG 075 de 2021
eportada por los transportadores

Capacidad
Tensión FPO Tecnologia/Fuente Promotor
MW

13,8kV 9.90 31/12/2021 SOLAR FOTOVOLTAICA EGAL S.A.S.


13,8kV 9.90 31/12/2021 SOLAR FOTOVOLTAICA EGAL S.A.S.

Empresa de Energía del


110kV 20.00 31/12/2024 SOLAR FOTOVOLTAICA
Pacifico EPSA S.A. E.P.S.

13,8kV 2.00 31/12/2023 SOLAR FOTOVOLTAICA NATURENERGY SAS


13,8kV 2.00 31/12/2023 SOLAR FOTOVOLTAICA NATURENERGY SAS
13,8kV 2.50 1/31/2024 SOLAR FOTOVOLTAICA COLGEOLICA SAS
13,8kV 2.50 1/31/2024 SOLAR FOTOVOLTAICA COLGEOLICA SAS
13,8kV 2.50 1/31/2024 SOLAR FOTOVOLTAICA COLGEOLICA SAS
13,8kV 2.50 1/31/2024 SOLAR FOTOVOLTAICA COLGEOLICA SAS
PLANTA SOLAR HAGEO
13,8kV 2.00 12/31/2025 SOLAR FOTOVOLTAICA
SAS
PLANTA SOLAR HAGEO
13,8kV 2.00 12/31/2025 SOLAR FOTOVOLTAICA
SAS
PLANTA SOLAR HAGEO
13,8kV 2.00 12/31/2025 SOLAR FOTOVOLTAICA
SAS

Colombia Solar Corporación


34,5kV 6.00 1/31/2024 SOLAR FOTOVOLTAICA
Internacional

13,8kV 3.00 12/31/2022 SOLAR FOTOVOLTAICA EGAL S.A.S.


13,8kV 9.90 31/12/2022 SOLAR FOTOVOLTAICA EGAL S.A.S.
66kV 9.90 31/12/2022 SOLAR FOTOVOLTAICA EGAL S.A.S.

Colombia Solar Corporación


66kV 19.00 31/12/2025 SOLAR FOTOVOLTAICA
Internacional

66kV 9.90 31/12/2022 SOLAR FOTOVOLTAICA EGAL S.A.S.


13,8kV 3.00 31/12/2022 SOLAR FOTOVOLTAICA EGAL S.A.S.
13,8kV 5.00 31/12/2022 SOLAR FOTOVOLTAICA EGAL S.A.S.
66kV 9.90 31/12/2022 SOLAR FOTOVOLTAICA EGAL S.A.S.
110kV 40.00 31/12/2024 SOLAR FOTOVOLTAICA Enel Green Power

13,8kV
5.00 6/30/2025 TÉRMICA (GAS) CABOT COLOMBIANA
(Mamonal 1)

66Kv 6,5 MVA 5/31/2021 CELSIA


34.5 9.90 12/30/2024 SOLAR FOTOVOLTAICA Lica Renovables
34.5 9.90 12/30/2024 SOLAR FOTOVOLTAICA Lica Renovables
34.5 9.90 12/30/2024 SOLAR FOTOVOLTAICA Lica Renovables
34.5 9.90 12/30/2024 SOLAR FOTOVOLTAICA Lica Renovables
34.5 9.90 12/30/2023 SOLAR FOTOVOLTAICA Ferminac
34.5 kV 9.90 SOLAR FOTOVOLTAICA CELSIA S.A.

34.5 kV 19.80 SOLAR FOTOVOLTAICA AXIS JC

34.5 kV 19.80 SOLAR FOTOVOLTAICA AXIS JC

LICA
99.90 SOLAR FOTOVOLTAICA
Energía Renovable S.A.S

80.00 SOLAR FOTOVOLTAICA Alpine Capital Group Ltd

Convenio Municipio
19.90 SOLAR FOTOVOLTAICA
Santiago Cali y EMCALI

Convenio Municipio
19.90 SOLAR FOTOVOLTAICA
Santiago Cali y EMCALI

Convenio Energy33 y
9.90 BIOMASA
EMCALI

GreenYellow
9.90 SOLAR FOTOVOLTAICA
Energía de Colombia S.A.S.

GreenYellow
9.90 SOLAR FOTOVOLTAICA
Energía de Colombia S.A.S.

LICA ENERGIA
115 KV 60.00 6/1/2024 SOLAR FOTOVOLTAICA
RENOVABLE S.A.S
34.50 5.00 12/31/2023 SOLAR FOTOVOLTAICA Genersol S.A.S.

220.00 180.00 12/31/2026 EÓLICA Voltalia Colombia S.A.S.

220.00 220.00 7/31/2023 SOLAR FOTOVOLTAICAGlobal Energy Group S.A.S.

Central Hidroelectrica de
115.00 75.00 12/31/2024
Caldas CHEC S.A E.S.P

115 kV 40 12/31/2022 SOLAR FOTOVOLTAICA EBSA


110 kV 40 12/31/2025 SOLAR FOTOVOLTAICA EBSA
34,5 kV 10 12/31/2025 SOLAR FOTOVOLTAICA EBSA
115 kV 60 12/31/2023 SOLAR FOTOVOLTAICA ABOWIND
34,5 kV 9.9 12/31/2023 SOLAR FOTOVOLTAICA ABOWIND
34,5 kV 8 12/31/2022 SOLAR FOTOVOLTAICA ABOWIND
34,5 kV 9.9 12/31/2023 SOLAR FOTOVOLTAICA ABOWIND

AAGES DEVELOPMENT
13.8 kV 9.9 2/15/2022 SOLAR FOTOVOLTAICA
COLOMBIA SAS

AAGES DEVELOPMENT
13.8 kV 9.9 2/15/2022 SOLAR FOTOVOLTAICA
COLOMBIA SAS

GRUPO LUZ Y FUERZA


115 kV 15 12/31/2021 TÉRMICA (CARBÓN)
COLOMBIA SAS
115 kV 125 12/1/2024 EÓLICA AES CHIVOR
34,5 kV 9.9 6/30/2021 SOLAR FOTOVOLTAICA GREENYELLOW
115 kV 69.9 9/30/2022 SOLAR FOTOVOLTAICA VERANO CAPITAL
34,5 kV 9.9 7/31/2021 SOLAR FOTOVOLTAICA VERANO CAPITAL
34,5 kV 6 12/20/2022 SOLAR FOTOVOLTAICA VERANO CAPITAL

115 kV 140 12/31/2023 SOLAR FOTOVOLTAICA GAIA RENOVABLES SAS

ESPACIO PRODUCTIVO
115 kV 19 7/31/2021 HIDROELECTRICA
SAS

ESPACIO PRODUCTIVO
115 kV 17 7/31/2021 HIDROELECTRICA
SAS

ESPACIO PRODUCTIVO
115 kV 18 7/31/2021 HIDROELECTRICA
SAS

115 kV 19.9 6/30/2024 EÓLICA CELSIA


115 kV 19.9 6/30/2024 EÓLICA CELSIA
115 kV 19.9 6/30/2024 EÓLICA CELSIA
115 kV 2X 19,9 6/30/2024 EÓLICA CELSIA
34,5 kV 9.9 6/30/2024 EÓLICA CELSIA
34,5 kV 19.9 12/31/2024 EÓLICA NOTUS ENERGY
13,8 kV 9.9 1/1/2023 SOLAR FOTOVOLTAICA NOTUS ENERGY
PROMOTORADEENERGIA
34,5 kV 9.9 12/31/2021 SOLAR FOTOVOLTAICA ELECTRICADECARTAGEN
ASASESP

PROMOTORADEENERGIA
34,5 kV 9.9 2/26/2021 SOLAR FOTOVOLTAICA ELECTRICADECARTAGEN
ASASESP

ENERLAND 2007
FOTOVOLTAICA
110 kV 99.9 12/31/2024 SOLAR FOTOVOLTAICA
SUCURSAL
COLOMBIANA
115 kV 50 12/1/2024 SOLAR FOTOVOLTAICA ColgeolicaSAS
115 kV 50 12/1/2024 SOLAR FOTOVOLTAICA ColgeolicaSAS
34,5 kV 10 6/1/2023 SOLAR FOTOVOLTAICA ColgeolicaSAS
33kV 9.90 12/31/2023 SOLAR FOTOVOLTAICA EEP
33kV 19.90 12/31/2023 SOLAR FOTOVOLTAICA EEP
33kV 9.90 12/31/2024 SOLAR FOTOVOLTAICA ENERSOLAX
33kV 9.90 12/31/2024 SOLAR FOTOVOLTAICA ECON
33kV 9.90 12/31/2024 SOLAR FOTOVOLTAICA ECON
220 kV 200.00 12/31/2024 SOLAR FOTOVOLTAICA Lader Energy
115.00 50.00 12/1/2025 SOLAR FOTOVOLTAICA VIRIDI
115.00 50.00 12/1/2025 SOLAR FOTOVOLTAICA VIRIDI
115.00 50.00 12/1/2025 SOLAR FOTOVOLTAICA VIRIDI

ABO WIND RENOVABLES


34.50 9.90 12/1/2022 SOLAR FOTOVOLTAICA
COLOMBIA S.A.S.

ABO WIND RENOVABLES


34.50 9.90 12/1/2022 SOLAR FOTOVOLTAICA
COLOMBIA S.A.S.

ABO WIND RENOVABLES


34.50 9.90 12/1/2022 SOLAR FOTOVOLTAICA
COLOMBIA S.A.S.

DESARROLLOS
34.50 9.90 12/1/2023 SOLAR FOTOVOLTAICA
ENERGÉTICOS
34.50 9.90 12/1/2024 SOLAR FOTOVOLTAICA VIRIDI
115.00 50.00 12/1/2025 SOLAR FOTOVOLTAICA VIRIDI
34.50 9.90 12/1/2024 SOLAR FOTOVOLTAICA VIRIDI

ABO WIND RENOVABLES


34.50 9.90 12/1/2022 SOLAR FOTOVOLTAICA
COLOMBIA S.A.S.

34.50 19.90 12/1/2026 SOLAR FOTOVOLTAICA VALOREM ENERGY


34.50 7.50 12/1/2022 SOLAR FOTOVOLTAICA BAVARIA
115.00 65.00 6/1/2025 Metro Bogotá
115.00 65.00 6/1/2025 Metro Bogotá
115.00 65.00 6/1/2025 Metro Bogotá
115.00 30.00 12/1/2024 EAAB
115.00 26.00 12/1/2022 Peldar
34.50 9.90 12/1/2024 SOLAR FOTOVOLTAICA Notus
34.50 19.90 12/1/2024 EÓLICA Notus
34.50 19.90 12/1/2024 SOLAR FOTOVOLTAICA Notus
115.00 140.00 12/1/2025 SOLAR FOTOVOLTAICA DVP
11.40 4.00 12/1/2022 SOLAR FOTOVOLTAICA Clean Energy
115.00 50.00 12/1/2025 SOLAR FOTOVOLTAICA VIRIDI

ABO WIND RENOVABLES


34.50 9.90 12/1/2023 SOLAR FOTOVOLTAICA
COLOMBIA S.A.S.

34.50 9.90 12/1/2024 SOLAR FOTOVOLTAICA VIRIDI


34.50 9.90 12/1/2024 SOLAR FOTOVOLTAICA VIRIDI
34.50 9.90 12/1/2024 SOLAR FOTOVOLTAICA VIRIDI

115.00 25.00 12/1/2024 Empresa ferrea regional

115.00 25.00 12/1/2024 Empresa ferrea regional

34.50 9.90 12/1/2022 SOLAR FOTOVOLTAICA VENTUS


34.50 9.90 12/1/2022 SOLAR FOTOVOLTAICA VENTUS

115.00 42.00 12/31/2024 ECOPETROL

115 40.00 1/1/2024 CALDAS GOLD


ARQUITETURA Y
33 15.00 12/31/2026 HIDROELDCTRICA
CONCRETO
115 19.9 12/31/2026 HIDROELDCTRICA PCH SALAMINA SAS
VO RENOVABLES SOL 1
115 19.9 31-12-2024 SOLAR FOTOVOLTAICA
S.A.S. E.S.P.
VO RENOVABLES SOL 1
115 19.9 12/31/2024 SOLAR FOTOVOLTAICA
S.A.S. E.S.P.
CONSULTORA
33 9.9 8/20/2023 SOLAR FOTOVOLTAICA
ENDEMICA SAS
LICA ENERGIA
33 19.9 12/31/2024 SOLAR FOTOVOLTAICA
RENOVABLES SAS
115 ENEL-CODENSA
33 9.9 SOLAR FOTOVOLTAICA Green Energy DSE SAS
33 9.9 SOLAR FOTOVOLTAICA Green Energy DSE SAS
33 3.58 HIDROELDCTRICA e-lectrica SAS
33 4.22 HIDROELDCTRICA e-lectrica SAS
33 4.04 HIDROELDCTRICA e-lectrica SAS
33 6.68 HIDROELDCTRICA e-lectrica SAS
33 9.85 HIDROELDCTRICA e-lectrica SAS
33 4.46 HIDROELDCTRICA e-lectrica SAS
33 6.83 HIDROELDCTRICA e-lectrica SAS
33 2.57 HIDROELDCTRICA e-lectrica SAS
33 2.92 HIDROELDCTRICA e-lectrica SAS
33 4.03 HIDROELDCTRICA e-lectrica SAS
33 2.56 HIDROELDCTRICA e-lectrica SAS
33 3.34 HIDROELDCTRICA e-lectrica SAS
33 3.74 HIDROELDCTRICA e-lectrica SAS
33 13.75 HIDROELDCTRICA e-lectrica SAS
115 80.00 SOLAR FOTOVOLTAICA AKUO ENERGY
33 9.9 SOLAR FOTOVOLTAICA ENERTRADE SAS
HELIOSOLAR COLOMBIA
115 99.00 SOLAR FOTOVOLTAICA
S.A.S
LICA ENERGIA
115 40.00 SOLAR FOTOVOLTAICA
RENOVABLES SAS
33 9.9 SOLAR FOTOVOLTAICA HZ ENERGY SAS ESP
115 99.99 SOLAR FOTOVOLTAICA ENERLAND GROUP
LICA ENERGIA
33 19.9 SOLAR FOTOVOLTAICA
RENOVABLES SAS
LICA ENERGIA
115 40.00 SOLAR FOTOVOLTAICA
RENOVABLES SAS
LICA ENERGIA
33 19.9 SOLAR FOTOVOLTAICA
RENOVABLES SAS
33 19.9 SOLAR FOTOVOLTAICA ENERSOLAX
33 12 SOLAR FOTOVOLTAICA ECOLOGIC
33 14.00 HIDROELDCTRICA ENDEMICA
33 12.00 HIDROELDCTRICA ENDEMICA
33 2,4 HIDROELDCTRICA ENERQ SAS
LICA ENERGIA
33 19.9 SOLAR FOTOVOLTAICA
RENOVABLES SAS
COX ENERGY COLOMBIA
33 19.9 SOLAR FOTOVOLTAICA
SAS
33 9.5 HIDROELDCTRICA CHEC
230.00 1.00 12/31/2023 HIDROELECTRICA ENEL GREEN POWER
230.00 15.00 12/31/2022 HIDROELECTRICA ENEL GREEN POWER
Viridi Energías Renovables
230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia
Viridi Energías Renovables
230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia
Viridi Energías Renovables
230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia
Viridi Energías Renovables
230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia
Viridi Energías Renovables
230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia
Viridi Energías Renovables
230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia

Viridi Energías Renovables


230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia

Viridi Energías Renovables


230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia

Viridi Energías Renovables


230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia

Viridi Energías Renovables


230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia
Viridi Energías Renovables
230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia
Viridi Energías Renovables
230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia
Viridi Energías Renovables
230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia
Viridi Energías Renovables
230.00 50.00 12/31/2023 SOLAR FOTOVOLTAICA
Colombia
34.5 8 Dec-23 Termicas - Biomasa INGENIO CARMELITA
115 19.9 Dec-25 Termicas - Biomasa ING MAYAGÜEZ
230 99 Dec-25 Otro Black Orchid Solar Management
34.5 19.9 Dec-25 solar LICA ENERGIA RENOVABLE S.A.S.
34.5 9.9 Dec-25 solar LICA ENERGIA RENOVABLE S.A.S.
34.5 9.9 Dec-25 solar LICA ENERGIA RENOVABLE S.A.S.
34.5 19.9 Dec-25 solar LICA ENERGIA RENOVABLE S.A.S.
13.2 20 Dec-22 solar
PARQUE INDUSTRIAL DEL PACIFICO S.A.S E.S.P
34.5 9.9 Dec-26 solar CELSIA COLOMBIA S.A. E.S.P.
34.5 9.9 Dec-26 solar CELSIA COLOMBIA S.A. E.S.P.
115 35 Dec-25 Solar SYSCON LIMITADA
34.5 19.9 Dec-23 Termicas - Biomasa RIOPAILA ENERGÍA SAS E.S.P.
115 80 Dec-22 Solar NEW WORLD ENERGY GROUP LTD
115 50 Dec-23 Termicas - Biomasa INN-CO GROUP S.A.S.
34.5 19.9 Dec-23 Solar Enersolax S.A.S.
CONTINUA ENERGIAS
34.5 4 Dec-21 SOLAR FOTOVOLTAICA POSITIVAS COLOMBIA
S.A.S.

34.5 4 Dec-22 SOLAR FOTOVOLTAICA TESOCOL


115 60 Dec-22 SOLAR FOTOVOLTAICA TESOCOL
MUNICIPIO DE
34.5 20 Jan-25 EÓLICA
ALPUJARRA TOLIMA

110 kV 19.99 30-12-2027 HIDROELECTRICAGeneradora San Andrés SAS ESP

13,2 kV 0.75 20-12-2024 HIDROELECTRICA Steel Works SAS

44 kV 13.69 31-12-2026 HIDROELECTRICA ENERGIA NACIONAL SAS ESP

13,2 kV 1.60 30-06-2026 HIDROELECTRICA Hidrolimon SAS ESP

44 kV 7.00 31-03-2023 TÉRMICA (GAS)PAPELES Y CARTONES SA-PAPELSA

44 kV 8.00 01-12-2026 HIDROELECTRICAEliberto De Jesus Ramirez Ramirez

44 kV 17.00 31-01-2027 HIDROELECTRICA Generadora Alejandria SAS ESP

Empresa de Proyectos
44 kV 5.44 15-03-2026 HIDROELECTRICA
Ambientales y Civiles SAS

Empresa de Proyectos
44 kV 6.58 15-07-2026 HIDROELECTRICA
Ambientales y Civiles SAS

Empresa de Proyectos
44 kV 5.63 15-11-2026 HIDROELECTRICA
Ambientales y Civiles SAS

110 kV 19.9 31-12-2027 HIDROELECTRICA FA GRUPO SAN AGUSTIN

44 kV 6.12 31-12-2027 HIDROELECTRICA


HIDROELECTRICAS DE NOBOGA SAS ESP

44 kV 9.9 30-12-2024 SOLAR FOTOVOLTAICA Positive Energy SAS

SOLAR VIRIDI Energias


230 kV 50 12/31/2023
FOTOVOLTAICA Renovables Colombia SAS

SOLAR VIRIDI Energias


230 kV 50 12/31/2023
FOTOVOLTAICA Renovables Colombia SAS
SOLAR VIRIDI Energias
230 kV 50 12/31/2023
FOTOVOLTAICA Renovables Colombia SAS

SOLAR VIRIDI Energias


230 kV 50 7/31/2024
FOTOVOLTAICA Renovables Colombia SAS

SOLAR VIRIDI Energias


230 kV 50 12/31/2024
FOTOVOLTAICA Renovables Colombia SAS

SOLAR VIRIDI Energias


230 kV 50 7/31/2025
FOTOVOLTAICA Renovables Colombia SAS

13,8 kV 9.9 12/1/2020 SOLAR FOTOVOLTAICA GRUPO BAZ

13,8 kV 9.9 12/1/2020 SOLAR FOTOVOLTAICA GRUPO BAZ

Colombia Solar Corporación


34,5 kV 9.9 12/1/2023 SOLAR FOTOVOLTAICA
Internacional

13,8 kV 9.99 12/1/2023 EÓLICA Colgeolica S.A.S.


13,8 kV 9.9 12/1/2023 EÓLICA Colgeolica S.A.S.
110 kV 9.9 1/1/2023 EÓLICA COLGEOLICA SAS
13,8 kV 9.9 12/1/2024 SOLAR FOTOVOLTAICA Brooklean Holdings

34,5 kV 9.9 12/1/2024 SOLAR FOTOVOLTAICA BROOKLEAN HOLDINGS

13,8 kV 9.9 12/1/2023 SOLAR FOTOVOLTAICA Bonaria Tate LLC


34,5 kV 9.9 12/1/2023 SOLAR FOTOVOLTAICA Bonaria Tate LLC

34,5 kV 9 12/1/2023 SOLAR FOTOVOLTAICA Bonaria Tate LLC

13,8 kV 5 2/1/2024 SOLAR FOTOVOLTAICA


Colombia Solar Corporación Internacional
13,8 kV 5 2/1/2024 SOLAR FOTOVOLTAICA
Colombia Solar Corporación Internacional

110 kV 19.9 12/1/2023 EÓLICA Celsia

110 kV 19.9 12/1/2023 EÓLICA Celsia

13,8 kV 4.99 12/1/2025 SOLAR FOTOVOLTAICA Brooklean Holdings


13,8 kV 5 1/1/2024 SOLAR FOTOVOLTAICAGrupo Fairmont S.A.S. E.S.P.
13,8 kV 4.5 3/1/2025 EÓLICA Wattiner S.A.S.
34,5 kV 9.9 12/1/2024 SOLAR FOTOVOLTAICA
Colombia Solar Corporación Internacional
34,5 kV 3 12/1/2024 SOLAR FOTOVOLTAICA
Colombia Solar Corporación Internacional
34,5 kV 3 12/1/2024 SOLAR FOTOVOLTAICA
Colombia Solar Corporación Internacional
110 kV 60 01/21/2023 TÉRMICA (GAS) Tebsa
34.50 9.90 3/31/2020 TÉRMICA (GAS) GENERSA
34.50 9.80 12/31/2021 SOLAR FOTOVOLTAICA SVC E.S.P S.A.S
34.50 9.80 12/31/2023 SOLAR FOTOVOLTAICA SVC E.S.P S.A.S
34.50 9.80 12/31/2025 SOLAR FOTOVOLTAICA SVC E.S.P S.A.S

ABO WIND RENOVABLES


13.80 9.90 12/31/2023 SOLAR FOTOVOLTAICA
COLOMBIA S.A.S
ABO WIND RENOVABLES
34.50 9.90 12/31/2023 SOLAR FOTOVOLTAICA
COLOMBIA S.A.S

LICA ENERGÍA
34.50 19.90 12/31/2024 SOLAR FOTOVOLTAICA
RENOVABLES S.A.S
34.50 5.00 12/31/2026 SOLAR FOTOVOLTAICA SVC E.S.P S.A.S
34.50 3.00 12/31/2027 SOLAR FOTOVOLTAICA SVC E.S.P S.A.S

ABO WIND RENOVABLES


34.5 kV 9.90 12/31/2024 SOLAR FOTOVOLTAICA
COLOMBIA S.A.S

34.50 19.9 12/30/2024 SOLAR FOTOVOLTAICA ABO WIND


115.00 60 12/30/2024 SOLAR FOTOVOLTAICA ABO WIND
G 075 de 2021

No modificar, no No modificar, no No modificar, no


Remitente / Destinatario
diligenciar diligenciar diligenciar

CaribeMar de la Costa S.A.S. E.S.P


CaribeMar de la Costa S.A.S. E.S.P

CaribeMar de la Costa S.A.S. E.S.P

CaribeMar de la Costa S.A.S. E.S.P


CaribeMar de la Costa S.A.S. E.S.P
CaribeMar de la Costa S.A.S. E.S.P
CaribeMar de la Costa S.A.S. E.S.P
CaribeMar de la Costa S.A.S. E.S.P
CaribeMar de la Costa S.A.S. E.S.P

CaribeMar de la Costa S.A.S. E.S.P

CaribeMar de la Costa S.A.S. E.S.P

CaribeMar de la Costa S.A.S. E.S.P

CaribeMar de la Costa S.A.S. E.S.P

CaribeMar de la Costa S.A.S. E.S.P


CaribeMar de la Costa S.A.S. E.S.P
CaribeMar de la Costa S.A.S. E.S.P

CaribeMar de la Costa S.A.S. E.S.P

CaribeMar de la Costa S.A.S. E.S.P


CaribeMar de la Costa S.A.S. E.S.P
CaribeMar de la Costa S.A.S. E.S.P
CaribeMar de la Costa S.A.S. E.S.P
CaribeMar de la Costa S.A.S. E.S.P

CaribeMar de la Costa S.A.S. E.S.P

CaribeMar de la Costa S.A.S. E.S.P


ESSA
ESSA
ESSA
ESSA
ESSA
EMCALI

CEO - EMCALI

CEO - EMCALI

CELSIA - EMCALI

CELSIA - EMCALI

EMCALI

EMCALI

EMCALI

EMCALI

EMCALI

ELECTROCAQUETA SA ESP

CENS

CENS

CENS

Dispac S.A. E.S.P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P


EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P


EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P


EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P

EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P


EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
EMPRESA DE ENERGIA DE BOYACÁ S.A E.S,P
Empresa de Energía de Pereira
Empresa de Energía de Pereira
Empresa de Energía de Pereira
Empresa de Energía de Pereira
Empresa de Energía de Pereira
TRANSELCA
Enel - Codensa
Enel - Codensa
Enel - Codensa

Enel - Codensa

Enel - Codensa

Enel - Codensa

Enel - Codensa

Enel - Codensa
Enel - Codensa
Enel - Codensa

Enel - Codensa

Enel - Codensa
Enel - Codensa
Enel - Codensa
Enel - Codensa
Enel - Codensa
Enel - Codensa
Enel - Codensa
Enel - Codensa
Enel - Codensa
Enel - Codensa
Enel - Codensa
Enel - Codensa
Enel - Codensa

Enel - Codensa

Enel - Codensa
Enel - Codensa
Enel - Codensa

Enel - Codensa

Enel - Codensa

Enel - Codensa
Enel - Codensa

ENERCA S.A. E.S.P.

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC


Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC


Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC


Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC


Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC
Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC

Central Hidroeléctrica de Caldas S.A. E.S.P. CHEC


GEB
GEB

GEB

GEB

GEB

GEB

GEB

GEB

GEB

GEB

GEB

GEB

GEB

GEB

GEB

GEB

CELSIA COLOMBIA S.A. E.S.P.


CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
CELSIA COLOMBIA S.A. E.S.P.
Celsia Colombia S.A. E.S.P.

Celsia Colombia S.A. E.S.P.


Celsia Colombia S.A. E.S.P.

Celsia Colombia S.A. E.S.P.

Empresas Públicas de Medellín E.S.P.

Empresas Públicas de Medellín E.S.P.

Empresas Públicas de Medellín E.S.P.

Empresas Públicas de Medellín E.S.P.

Empresas Públicas de Medellín E.S.P.

Empresas Públicas de Medellín E.S.P.

Empresas Públicas de Medellín E.S.P.

Empresas Públicas de Medellín E.S.P.

Empresas Públicas de Medellín E.S.P.

Empresas Públicas de Medellín E.S.P.

Empresas Públicas de Medellín E.S.P.

Empresas Públicas de Medellín E.S.P.

Empresas Públicas de Medellín E.S.P.

INTERCOLOMBIA

INTERCOLOMBIA
INTERCOLOMBIA

INTERCOLOMBIA

INTERCOLOMBIA

INTERCOLOMBIA

Air-e

Air-e

Air-e

Air-e
Air-e
Air-e
Air-e

Air-e

Air-e
Air-e

Air-e

Air-e
Air-e

Air-e

Air-e

Air-e
Air-e
Air-e
Air-e
Air-e
Air-e
Air-e
ENELAR E.S.P.
ENELAR E.S.P.
ENELAR E.S.P.
ENELAR E.S.P.

ENELAR E.S.P.
ENELAR E.S.P.

ENELAR E.S.P.

ENELAR E.S.P.
ENELAR E.S.P.

ENELAR E.S.P.

Electrificadora del Meta S.A. ESP


Electrificadora del Meta S.A. ESP
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional

Nombre del:
Transportador Nacional
Operador de Red
Transmisor Regional
Radicado
No modificar, no No modificar, no Transmisor Nacional
No modificar, no diligenciar
diligenciar diligenciar Operador de Red
Transmisor Regional

P92222017070039
P92222017100009

P92222019120044

P93112020010003
P31112020010002
P94202020010022
P41212020010016
P41202020010031
P87112020010010

P93112020020009

P77322020020008

P77312020020017

P31502020030013

P92222020060005
P92222020060006
P22202020060041

P22102020070035

P92222020080007
P92222020080008
P92222020080009
P92222020080011
P31102021020089

P22202020080051

P22102020080034
20200320054359
20200320054898
20210320000061
20210320001278
20210320006369
En su búsqueda

En su búsqueda

En su búsqueda

En su búsqueda

En su búsqueda

En su búsqueda

En su búsqueda

En su búsqueda

En su búsqueda

En su búsqueda

202114237

20201020027517

20211020020387

20201020029234

20216000042512

SAL-TUN-01686-2020
SAL-TUN-00640-2021
ENT-TUN-04264-2021
SAL-TUN-00774-2021
ENT-TUN-04008-2021
ENT-TUN-04008-2021
SAL-TUN-00845-2021

SAL-TUN-00768-2021

SAL-TUN-00769-2021

SAL-TUN-01240-2021

SAL-TUN-02808-2019
SAL-TUN-01926-2020
SAL-TUN-01380-2021
SAL-TUN-01382-2021
SAL-TUN-01382-2021

SAL-TUN-01385-2021

SAL-TUN-00117-2020

SAL-TUN-00117-2020

SAL-TUN-00117-2020

SAL-TUN-00977-2021
SAL-TUN-00977-2021
SAL-TUN-00977-2021
SAL-TUN-01014-2021
SAL-TUN-01015-2021
ENT-TUN-03134-2021

SAL-TUN-00950-2021

SAL-TUN-00953-2021

ENT-TUN-03722-2021

6569515
6569454
E-mail
3489-2021
3543-2021
000816-03-2021
1402448180
1402448181
1402448183

1402445534

1402445344

1402445348

169741662

1402450621
1402450756
1402450624

1402448599

1402444307
1402438231
1402447016
1402447025
1402447014
47126809
1402439335
1402449622
1402449627
1402449635
1402449428
1402438267
1402450758

1402448599

1402450794
1402450796
1402450620

50130656

50130656

1402445607
1402445806

20210105818

Rad x correo electrónico recibido directamente por el área de planeación y comercial


20-GS001

20-GS033

20200220049037

20200220049037

20-GS053

20-GS059

Rad x correo electrónico recibido directamente por el área de planeación y comercial


20-GS023
20-GS024
20-GS034
20-GS035
20-GS036
20-GS037
20-GS038
20-GS039
20-GS040
20-GS041
20-GS042
20-GS043
20-GS044
20-GS045
20-GS046
20-GS047
20-GS050
20-GS066

20-GS067

20-GS072

20-GS073
20-GS074

21-GS003

21-GS004

21-GS005

21-GS008
21-GS009
21-GS010
21-GS011
21-GS012

21-GS013

21-GS016

21-GS017
GEB-0174-01779-2021-E
GEB-0174-01788-2021-E

GEB-0510-03354-2021-E

GEB-0510-03354-2021-E

GEB-0510-03354-2021-E

GEB-0510-03354-2021-E

GEB-0510-03354-2021-E

GEB-0510-03354-2021-E

GEB-0510-03361-2021-
E
GEB-0174-06618-2021-
E

GEB-0510-03361-2021-
E
GEB-0174-06646-2021-
E

GEB-0510-03361-2021-
E
GEB-0174-06649-2021-
E

GEB-0510-03361-2021-E

GEB-0510-03362-2021-E

GEB-0510-03362-2021-E

GEB-0510-03362-2021-E

GEB-0510-03362-2021-E

202100011690
202100011691
202100011692
202100011687
202100011686
202100011689
202100011688
202100011693
202100000429
202100011694
202100011695
202100011696
202100011697
202100011698
202100011699
201900043245

202000033581
202000027521

202100011672

20210120117255

20210120074107

20210120178697

20210120188919

20210120192382

20210120178694

20210120179003

20210120112939

20210120112939

20210120112939

20210120021116

20210120021121

20210120111925

202177001736-3 y
Correo electrónico

202177001737-3 y
Correo electrónico
202177001732-3 y
Correo electrónico

202177001733-3 y
Correo electrónico

202177001734-3 y
Correo electrónico

202177001735-3 y
Correo electrónico

P34102018020028

P11102018030113

P93302019030005

P93322019050027
P93322019110014
P33102019110009
P93322019110030

P93312019110005

P93322020020013
P93312020020010

P77512020020005

P93432020110002
P93432020110004

P11502020110017

P11502020110018

P95302020110003
P75422020110007
P33302020110008
P93432020110005
P77522020110001
P93312020110004
P11802021040089
10018116
10018103
#FMT
#FMT

#FMT
#FMT

#FMT

#FMT
#FMT

Se encuentra en analisis
por parte del OR

20207410101392
20207410101392
Fecha Hora
Transmisor Nacional Transmisor Nacional
Operador de Red Operador de Red
Transmisor Regional Transmisor Regional

5/21/2021 -
5/21/2021 -

11/4/2020 -

11/27/2020 -
12/10/2020 -
6/25/2021 -
6/3/2021 -
6/25/2021 -
6/3/2021 -

1/15/2021 -

1/15/2021 -

1/15/2021 -

5/3/2021 -

7/5/2021 -
7/5/2021 -
7/5/2021 -

6/28/2021 -

7/5/2021 -
7/5/2021 -
7/5/2021 -
7/5/2021 -
6/18/2021 -

5/5/2021 -

6/21/2021 -
12/10/2020 10:57 AM
12/14/2020 9:52 AM
1/4/2021 10:51 AM
1/14/2021 1:13 PM
2/17/2021 3:49 PM
En su búsqueda En su búsqueda

En su búsqueda En su búsqueda

En su búsqueda En su búsqueda

En su búsqueda En su búsqueda

En su búsqueda En su búsqueda

En su búsqueda En su búsqueda

En su búsqueda En su búsqueda

En su búsqueda En su búsqueda

En su búsqueda En su búsqueda

En su búsqueda En su búsqueda

6/18/2021 16:07:05

10/5/2020 03:15 p.m.

7/13/2021 10:10 a.m.

10/20/2020 12:30 p.m.

6/22/2021 11:11

8/19/2020 5:27 PM
3/25/2021 5:18 PM
7/13/2021 4:33 PM
4/15/2021 11:29 AM
7/1/2021 6:14 PM
7/1/2021 6:14 PM
4/27/2021 4:02 PM

4/14/2021 2:02 PM

4/14/2021 3:09 PM

6/22/2021 2:00 PM

10/22/2019 4:56 PM
9/9/2020 2:10 PM
7/9/2021 4:46 PM
7/9/2021 4:57 PM
7/9/2021 4:57 PM

7/9/2021 5:33 PM

1/21/2020 3:07 PM

1/21/2020 3:07 PM

1/21/2020 3:07 PM

5/19/2021 5:17 PM
5/19/2021 5:17 PM
5/19/2021 5:17 PM
5/24/2021 5:39 PM
5/24/2021 5:43 PM
5/21/2021 5:21 PM

5/14/2021 3:15 PM

5/14/2021 4:46 PM

6/21/2021 9:02 AM

1/21/2021 15:27
1/21/2021 15:27
5/13/2021 21:12
6/23/2021 10:38
6/29/2021 14:58
6/10/2021 11:58
1/29/2021
1/29/2021
1/29/2021

9/21/2020

9/11/2020

9/11/2020

6/18/2021

4/29/2021
5/18/2021
4/29/2021

2/12/2021

7/28/2020
8/28/2019
1/22/2021
1/22/2021
1/22/2021
9/7/2020
10/11/2019
3/18/2021
3/18/2021
3/18/2021
3/9/2021
8/30/2019
5/7/2021

2/12/2021

5/10/2021
5/10/2021
4/29/2021

10/23/2020

10/23/2020

9/23/2020
9/30/2020

7/12/2021 17:04:56

29-Dec-20
3-Jan-20

27-Aug-20

1-Oct-20

1-Oct-20

6-Aug-20

28-Aug-20

7-Apr-20
27-Feb-20
27-Feb-20
24-Apr-20
24-Apr-20
24-Apr-20
24-Apr-20
24-Apr-20
24-Apr-20
24-Apr-20
24-Apr-20
24-Apr-20
24-Apr-20
24-Apr-20
24-Apr-20
24-Apr-20
24-Apr-20
29-May-20
10-Sep-20

14-Oct-20

1-Dec-20

9-Dec-20
24-Dec-20

15-Feb-21

15-Feb-21

15-Feb-21

11-Mar-21
12-Mar-21
16-Mar-21
16-Mar-21
5-Apr-21

14-May-21

20-May-21

1-Jun-21
3/2/2021 11:55:39
3/3/2021 9:27:23

4/21/2021 9:17:56

4/21/2021 9:17:56

4/21/2021 9:17:56

4/21/2021 9:17:56

4/21/2021 9:17:56

4/21/2021 9:17:56

21/04/2021 14:05:58
07/07/2021 16:31:07

21/04/2021 14:05:58
08/07/2021 15:23:14

21/04/2021 14:05:58
08/07/2021 17:54:04

4/21/2021 14:05:58

4/21/2021 14:08:55

4/21/2021 14:08:55

4/21/2021 14:08:55

4/21/2021 14:08:55

7/9/2020 14:48
8/26/2020 16:48
8/28/2020 19:56
8/28/2020 19:56
8/28/2020 19:56
8/28/2020 19:56
8/28/2020 19:56
1/26/2021 7:44
2/25/2021 11:49
2/25/2021 11:49
3/26/2021 15:52
3/26/2021 16:00
7/7/2021 17:25
7/7/2021 17:30
6/11/2021 8:51
12/27/2019 11:47

12/23/2020 14:06
10/20/2020 10:12

7/12/2021 16:25

27-04-2021 4:36 PM

15-03-2021 3:22 PM

24-06-2021 11:24 AM

01-07-2021 7:30 PM

07-07-2021 8:45 AM

24-06-2021 11:23 AM

24-06-2021 1:29 PM

23-04-2021 3:16 PM

23-04-2021 3:16 PM

23-04-2021 3:16 PM

27-01-2021 12:12 PM

27-01-2021 12:13 PM

23-04-2021 6:49 AM

26/04/2021 (radicado) 16:03 (radicado) y


3/06/2021 (correo 11:55:00 a. m. (correo
electrónico) electrónico)

26/04/2021 (radicado) 16:05 (radicado) y


3/06/2021 (correo 11:55:00 a. m (correo
electrónico) eletrónico
26/04/2021 (radicado) 15:51 (radicado) y
3/06/2021 (correo 11:55:00 a. m.(correo
electrónico) eletrónico)

26/04/2021 (radicado) 15:55 (radicado) y


3/06/2021 (correo 11:55:00 a.m.(correo
electrónico) electrónico)

26/04/2021 (radicado) 15:57(radicado) y


3/06/2021 (correo 11:55:00 a. m.(correo
electrónico) eletrónico)

26/04/2021 (radicado) 16:00(radicado) y


3/06/2021 (correo 11:55:00 a. m.(correo
electrónico) electrónico)

2/9/2018 8:00

3/23/2018 8:00

3/13/2019 8:00

5/29/2019 8:00
11/12/2019 8:00
11/12/2019 8:00
11/29/2019 8:00

11/29/2019 8:00

2/15/2020 8:00
2/17/2020 8:00

2/17/2020 8:00

11/12/2020 8:00
11/12/2020 8:00

11/12/2020 8:00

11/12/2020 8:00

11/12/2020 8:00
11/12/2020 8:00
11/12/2020 8:00
11/12/2020 8:00
11/12/2020 8:00
11/12/2020 8:00
4/29/2021 8:00
7/5/2018
7/4/2019
11/5/2019
8/3/2020

9/29/2020
11/18/2020

12/16/2020

4/22/2021
4/22/2021

Se encuentra en analisis Se encuentra en analisis


por parte del OR por parte del OR

7/22/2020
7/22/2020

You might also like