Retrofitting Works at Khurja Dehat (Zone-1 Nehrupur, Zone-2 Qila Mawai) Village Water Supply Scheme
Retrofitting Works at Khurja Dehat (Zone-1 Nehrupur, Zone-2 Qila Mawai) Village Water Supply Scheme
Retrofitting Works at Khurja Dehat (Zone-1 Nehrupur, Zone-2 Qila Mawai) Village Water Supply Scheme
supply scheme
BOQ for (E/M) works
Note:
1 The rate should be FOR respective site inclusive of all taxes, duties, freight, insurance etc as per
BOQ/Tender document. No concessional form will be issued.
2 Before tendering the contractor are advise to visit tube well site of work and ascertain to local condition
nature of soil and all geographical, geological condition etc.
3 Running means contractor have to depute one person at site to watch & ward for safety of whole plant.
Retrofitting works at Sikandrabad Dehat village water supply scheme
BOQ for (E/M) works
(i) Lowering of 300mm dia pipe from GL to 42m deep BGL. Mtr. 42 370.00 15540.00
(ii) Lowering of 200mm dia pipe from 42 to 100m deep BGL. Mtr. 58 250.00 14500.00
(iii) Lowering of 200mm dia pipe from 100 to 120m deep BGL. Mtr. 20 310.00 6200.00
4 Development of Tubewell by compressor
(i) Transportation, Installation and Dismantling of 250 PSI
Compressor Job 1 28320.00 28320.00
(ii) Development of Tubewell by Air compressor Hrs. 50 2900.00 145000.00
5 Development of Tubewell by O.P. Unit
(i) Transportation, Installation and Dismantling of 03 Cusec
Job 1 44880.00 44880.00
O.P. Unit & Yield Test.
(ii) Development of Tubewell by by O.P. Unit Hrs. 100 780.00 78000.00
(iii) Chemical and Bacterological test of water sample from
depaprtmental/ approved lab. Job 1 2500.00 2500.00
6 Miscellaneous works / item required at site for proper
completion of work. Such as-
6.1 Baricading of the work place Job 1 30000.00 30000.00
6.2 Water disposal at proper place during development of the
tubewell by Air Compressure through trolly pumping diesel Job 1 50000.00 50000.00
set including material, labour complete in all respect.
(ii) SITC of suitable dia and size of main piping and valves of
suitable dia and size column pipe, power wiring, earthing,
painting, tool set, M.S. cross for reducer, Chain pulley block
and gauges complete in all respect with all required Set 1 220380.00 220380.00
material, T&P and labour.