Task Risk Assessment For Sandblasting and Painting of Sheets Spools
Task Risk Assessment For Sandblasting and Painting of Sheets Spools
Task Risk Assessment For Sandblasting and Painting of Sheets Spools
Equipment roll
Unsafe placement SPA: Sand
over, Hit Safe placement of Place the equipment at plane location,
of compressor with Blasting,
4. people, G 4 5 equipment, Barricaded. area barricaded. G 2 3 Yes
sand blasting Supervisor,
equipment
equipment Safety Watch
damage,
SPA: Sand
High Noise Poor audibility > Ear protection > Ensure use of ear plugs / ear muff. Blasting,
5.
Supervisor,
Safety Watch
Equipment roll
Unsafe placement Place the equipment at plane location, SPA: Sand
over, Hit Safe placement of
of compressor with area barricaded. Blasting,
6. people, G 4 5 equipment, Barricaded. G 2 3 Yes
sand blasting Supervisor,
equipment
equipment Safety Watch
damage,
Painting & Coating.
1. MSDS shall be provided for epoxy and
1. Personal other than their contents.
specific job restricted. 2. Concerned workforce to wear
Certified
Dizziness 2.Tool Box talk to be respiratory or dust mask
Painter
1. Vapor Inhalation lungs effected conducted prior to start 3. Drinking/eating in coating area is G 2 3 Yes
G 8 9 Safety
Suffocation of activity prohibited.
Supervisor
3. MSDS available on site 4. Use of cartridge Mask mandatory.
and clearly understood. 5. Ventilation plan cleared to person
prior start of job.
1. Use Rubber gloves 1. Use of suitable Gloves mandatory.
Separation 2. In case of skin contact, rinse affected
Thinner/Paint Storage areas with clean water and wash gently
Painting
Contact with body, 2. Tool Box Briefing to be with soap.
2. Injury Sup(SPA) G 2 3 Yes
Eye, Skin G 8 9 conducted before 3. Eye protection, appropriate safety
Safety Watch
starting activity. goggles.
3. Immediate rinsing in 4. Follow the instruction as mentioned in
area. the MSDS.
1. Area prohibited near 1. Fire extinguisher available in painting Painting
Hot Work activity area. area. Sup(SPA)
3. Fire Serious Injury E 6 9 E 2 5 Yes
2. Epoxy storage not 2. Fire watch deputed in area of job. Safety /Fire
onsite work location. 3. Housekeeping before and after job. Watch
GENERAL COMMENTS:
1. TBT will be conducted prior to start.
2. Unauthorized person are not allowed in work premises.
3. Safety watch man does his designated job.
4. Proper PPE is a must for sand blasting and painting crew.
5. Stand by vehicle with driver must be present at the site in case of emergency.
6. First Aid Box must be in place near the activity.
7. Housekeeping of the area must be done on prior basis.
RISK ASSISMENT APPROVAL
NAME OF TEAM MEMBERS I’m satisfied that the safeguard put in place will reduce the level of Risk to an acceptable level
(Project Manager) and the Task/Action is permitted to proceed.
(Sand Blasting ) Reviewed by: _________________________
HITRA ( HSE Engineer)
Date: ________________________ Time: ____________________
Authorizing
S = Severity; P = Probability, R = Risk
Signatory: _______________ DATE: ________________