ABSTRACT
Shape and Type of Tank:- Reactangular with flat top slab
Capacity of SBC Earthquake Total Cost
Sr. No. Rate Rs. Per litr
CWR (KL) (T/sqm) Zone (in Rs.)
1 100 KL 10 Zone II 711248.770542 7.12 100
2 150 KL 10 Zone II 897180.530926 5.99 150
3 200 KL 10 Zone II 1128936.83614 5.65 200
4 250 KL 10 Zone II 1374622.31518 5.5 250
5 300 KL 10 Zone II 1610354.40969 5.37 300
6 400 KL 10 Zone II 1999315.46492 5.00 400
7 500 KL 10 Zone II 2390247.32784 4.79 500
8 600 KL 10 Zone II 2768808.26054 4.62 600
9 100 KL 10 Zone III 754749.531597 7.55 100
10 150 KL 10 Zone III 954111.696143 6.37 150
11 200 KL 10 Zone III 1202840.05175 6.02 200
12 250 KL 10 Zone III 1466014.89882 5.87 250
13 300 KL 10 Zone III 1718676.91465 5.73 300
14 400 KL 10 Zone III 2133159.44791 5.34 400
15 500 KL 10 Zone III 2552635.22112 5.11 500
16 600 KL 10 Zone III 2957550.04809 4.93 600
17 100 KL 10 Zone IV 798274.442547 7.99 100
18 150 KL 10 Zone IV 1029260.83423 6.87 150
19 200 KL 10 Zone IV 1300392.29636 6.51 200
20 250 KL 10 Zone IV 1586653.10923 6.35 250
21 300 KL 10 Zone IV 1831295.13021 6.11 300
22 400 KL 10 Zone IV 2309833.50546 5.78 400
23 500 KL 10 Zone IV 2766987.24026 5.54 500
24 600 KL 10 Zone IV 3206689.20767 5.35 600
25 100 KL 7 Zone II 801333.27801 8.02 100
26 150 KL 7 Zone II 1017043.53821 6.79 150
27 200 KL 7 Zone II 1300339.60472 6.51 200
28 250 KL 7 Zone II 1586027.93074 6.35 250
29 300 KL 7 Zone II 1872276.96527 6.25 300
30 400 KL 7 Zone II 2335275.03957 5.84 400
31 500 KL 7 Zone II 2809875.88635 5.62 500
32 600 KL 7 Zone II 3264739.4616 5.45 600
33 100 KL 7 Zone III 853226.374003 8.54 100
34 150 KL 7 Zone III 1085961.00415 7.24 150
35 200 KL 7 Zone III 1391383.09719 6.96 200
36 250 KL 7 Zone III 1698561.07593 6.8 250
37 300 KL 7 Zone III 1993293.45054 6.65 300
38 400 KL 7 Zone III 2502714.98003 6.26 400
39 500 KL 7 Zone III 3014226.63548 6.03 500
40 600 KL 7 Zone III 3503074.36926 5.84 600
41 100 KL 7 Zone IV 922464.599683 9.23 100
42 150 KL 7 Zone IV 1176932.0592 7.85 150
43 200 KL 7 Zone IV 1511560.50726 7.56 200
44 250 KL 7 Zone IV 1847104.8276 7.39 250
45 300 KL 7 Zone IV 2152949.47139 7.18 300
46 400 KL 7 Zone IV 2723735.70143 6.81 400
47 500 KL 7 Zone IV 3287957.02642 6.58 500
48 600 KL 7 Zone IV 3817676.44737 6.37 600
49 100 KL 18 Zone II 682879.040048 6.83 100
50 150 KL 18 Zone II 868198.42984 5.79 150
51 200 KL 18 Zone II 1082488.51458 5.42 200
6.709957
12.64045
0.29 4.245974
BOQ for Construction of CWR at-------------------
- -
(a) PCC 19.96 m³ 4280 85421.952
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 52.32 m³ 7500 392416.2188
(b) Nominal slab 17.48 m³ 7500 131130
(iii) Columns 2.13 m³ 7500 15949.60829
(iv) Top slab 28.23 m³ 7700 217359.45
(v) Vertical walls 57.23 m³ 7700 440676.4824
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.039598
BOQ for Construction of CWR at-------------------
- -
(a) PCC 19.96 m³ 4280 85421.952
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 43.36 m³ 7500 325193.022
(b) Nominal slab 13.67 m³ 7500 102555
(iii) Columns 2.13 m³ 7500 15949.60829
(iv) Top slab 23.29 m³ 7700 179313.75
(v) Vertical walls 50.05 m³ 7700 385394.4864
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.00296
BOQ for Construction of CWR at-------------------
- -
(a) PCC 16.63 m³ 4280 71184.96
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 33.70 m³ 7500 252783.1776
(b) Nominal slab 10.43 m³ 7500 78255
(iii) Columns 2.13 m³ 7500 15949.60829
(iv) Top slab 19.00 m³ 7700 146326.95
(v) Vertical walls 43.12 m³ 7700 332042.9728
(vi) Stair case 4.00 m³ 7700 30800
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.04492
BOQ for Construction of CWR at-------------------
- -
(a) PCC 13.31 m³ 4280 56947.968
[3] Providing and casting in situ C.C in
grade M30 for container part
columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 25.88 m³ 7500 194117.3128
(b) Nominal slab 7.41 m³ 7500 55586.25
(iii) Columns 1.42 m³ 7500 10633.07219
(iv) Top slab 14.26 m³ 7700 109771.2
(v) Vertical walls 36.81 m³ 7700 283429.916
(vi) Stair case 3.00 m³ 7700 23100
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.126866
BOQ for Construction of CWR at-------------------
- -
(a) PCC 8.87 m³ 4280 37965.312
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 20.22 m³ 7500 151614.3668
(b) Nominal slab 5.90 m³ 7500 44237.8125
(iii) Columns 1.42 m³ 7500 10633.07219
(iv) Top slab 12.14 m³ 7700 93442.3875
(v) Vertical walls 31.91 m³ 7700 245697.76
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.157747
BOQ for Construction of CWR at-------------------
- -
(a) PCC 8.87 m³ 4280 37965.312
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 16.17 m³ 7500 121270.2183
(b) Nominal slab 4.39 m³ 7500 32906.25
(iii) Columns 0.86 m³ 7500 6418.799317
(iv) Top slab 9.45 m³ 7700 72765
(v) Vertical walls 25.95 m³ 7700 199851.8861
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.188365
BOQ for Construction of CWR at-------------------
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ for Construction of CWR at-------------------
- -
(a) PCC 5.54 m³ 4280 23728.32
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 7.51 m³ 7500 56334.67686
(b) Nominal slab 1.48 m³ 7500 11126.25
(iii) Columns 0.86 m³ 7500 6418.799317
(iv) Top slab 4.90 m³ 7700 37699.2
(v) Vertical walls 16.99 m³ 7700 130855.4016
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
0.037975
45074.33 N-m
337.3782
0.0305
580.7871
BOQ for Construction of CWR at-------------------
- -
(a) PCC 17.82 m³ 4280 76269.6
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 46.72 m³ 7500 350371.6239
(b) Nominal slab 17.48 m³ 7500 131130
(iii) Columns 1.90 m³ 7500 14240.72169
(iv) Top slab 28.23 m³ 7700 217359.45
(v) Vertical walls 51.10 m³ 7700 393461.145
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.107496
BOQ for Construction of CWR at-------------------
- -
(a) PCC 17.82 m³ 4280 76269.6
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 38.71 m³ 7500 290350.9125
(b) Nominal slab 13.67 m³ 7500 102555
(iii) Columns 1.90 m³ 7500 14240.72169
(iv) Top slab 23.29 m³ 7700 179313.75
(v) Vertical walls 44.69 m³ 7700 344102.22
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.073706
BOQ for Construction of CWR at-------------------
- -
(a) PCC 14.85 m³ 4280 63558
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 30.09 m³ 7500 225699.2657
(b) Nominal slab 10.43 m³ 7500 78255
(iii) Columns 1.90 m³ 7500 14240.72169
(iv) Top slab 19.00 m³ 7700 146326.95
(v) Vertical walls 38.50 m³ 7700 296466.94
(vi) Stair case 4.00 m³ 7700 30800
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.028627
BOQ for Construction of CWR at-------------------
- -
(a) PCC 11.88 m³ 4280 50846.4
[3] Providing and casting in situ C.C in
grade M30 for container part
columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 23.11 m³ 7500 173319.0293
(b) Nominal slab 7.41 m³ 7500 55586.25
(iii) Columns 1.27 m³ 7500 9493.814459
(iv) Top slab 14.26 m³ 7700 109771.2
(v) Vertical walls 32.87 m³ 7700 253062.425
(vi) Stair case 3.00 m³ 7700 23100
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.046455
BOQ for Construction of CWR at-------------------
- -
(a) PCC 7.92 m³ 4280 33897.6
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 18.05 m³ 7500 135369.9703
(b) Nominal slab 5.90 m³ 7500 44237.8125
(iii) Columns 1.27 m³ 7500 9493.814459
(iv) Top slab 12.14 m³ 7700 93442.3875
(v) Vertical walls 28.49 m³ 7700 219373
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.075676
BOQ for Construction of CWR at-------------------
- -
(a) PCC 7.92 m³ 4280 33897.6
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 14.44 m³ 7500 108276.9806
(b) Nominal slab 4.39 m³ 7500 32906.25
(iii) Columns 0.76 m³ 7500 5731.070819
(iv) Top slab 9.45 m³ 7700 72765
(v) Vertical walls 23.17 m³ 7700 178439.184
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.104954
BOQ for Construction of CWR at-------------------
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ for Construction of CWR at-------------------
- -
(a) PCC 4.95 m³ 4280 21186
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 6.71 m³ 7500 50298.81863
(b) Nominal slab 1.48 m³ 7500 11126.25
(iii) Columns 0.76 m³ 7500 5731.070819
(iv) Top slab 4.90 m³ 7700 37699.2
(v) Vertical walls 15.17 m³ 7700 116835.18
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
0.037975
45074.33 N-m
337.3782
0.0305
518.5599
BOQ for Construction of CWR at-------------------
- -
(a) PCC 16.20 m³ 4280 69336
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 42.47 m³ 7500 318519.6581
(b) Nominal slab 17.48 m³ 7500 131130
(iii) Columns 1.73 m³ 7500 12946.11063
(iv) Top slab 28.23 m³ 7700 217359.45
(v) Vertical walls 46.45 m³ 7700 357691.95
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.158934
BOQ for Construction of CWR at-------------------
- -
(a) PCC 16.20 m³ 4280 69336
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 35.19 m³ 7500 263955.375
(b) Nominal slab 13.67 m³ 7500 102555
(iii) Columns 1.73 m³ 7500 12946.11063
(iv) Top slab 23.29 m³ 7700 179313.75
(v) Vertical walls 40.63 m³ 7700 312820.2
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.127301
BOQ for Construction of CWR at-------------------
- -
(a) PCC 13.50 m³ 4280 57780
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 27.36 m³ 7500 205181.1506
(b) Nominal slab 10.43 m³ 7500 78255
(iii) Columns 1.73 m³ 7500 12946.11063
(iv) Top slab 19.00 m³ 7700 146326.95
(v) Vertical walls 35.00 m³ 7700 269515.4
(vi) Stair case 4.00 m³ 7700 30800
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.084345
BOQ for Construction of CWR at-------------------
- -
(a) PCC 10.80 m³ 4280 46224
[3] Providing and casting in situ C.C in
grade M30 for container part
columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 21.01 m³ 7500 157562.7539
(b) Nominal slab 7.41 m³ 7500 55586.25
(iii) Columns 1.15 m³ 7500 8630.740418
(iv) Top slab 14.26 m³ 7700 109771.2
(v) Vertical walls 29.88 m³ 7700 230056.75
(vi) Stair case 3.00 m³ 7700 23100
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.014463
BOQ for Construction of CWR at-------------------
- -
(a) PCC 7.20 m³ 4280 30816
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 16.41 m³ 7500 123063.6094
(b) Nominal slab 5.90 m³ 7500 44237.8125
(iii) Columns 1.15 m³ 7500 8630.740418
(iv) Top slab 12.14 m³ 7700 93442.3875
(v) Vertical walls 25.90 m³ 7700 199430
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.013501
BOQ for Construction of CWR at-------------------
- -
(a) PCC 7.20 m³ 4280 30816
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 13.12 m³ 7500 98433.61875
(b) Nominal slab 4.39 m³ 7500 32906.25
(iii) Columns 0.69 m³ 7500 5210.064381
(iv) Top slab 9.45 m³ 7700 72765
(v) Vertical walls 21.07 m³ 7700 162217.44
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.041763
BOQ for Construction of CWR at-------------------
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ for Construction of CWR at-------------------
- -
(a) PCC 4.50 m³ 4280 19260
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 6.10 m³ 7500 45726.19875
(b) Nominal slab 1.48 m³ 7500 11126.25
(iii) Columns 0.69 m³ 7500 5210.064381
(iv) Top slab 4.90 m³ 7700 37699.2
(v) Vertical walls 13.79 m³ 7700 106213.8
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
0.037975
45074.33 N-m
337.3782
0.0305
471.4181
BOQ for Construction of CWR at-------------------
- -
(a) PCC 33.26 m³ 4280 142369.92
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 104.64 m³ 7500 784832.4376
(b) Nominal slab 32.31 m³ 7500 242328.24
(iii) Columns 2.13 m³ 7500 15949.60829
(iv) Top slab 28.23 m³ 7700 217359.45
(v) Vertical walls 57.23 m³ 7700 440676.4824
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.224683
BOQ for Construction of CWR at-------------------
- -
(a) PCC 33.26 m³ 4280 142369.92
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 86.72 m³ 7500 650386.044
(b) Nominal slab 25.27 m³ 7500 189521.64
(iii) Columns 2.66 m³ 7500 19937.01036
(iv) Top slab 23.29 m³ 7700 179313.75
(v) Vertical walls 50.05 m³ 7700 385394.4864
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.265703
BOQ for Construction of CWR at-------------------
- -
(a) PCC 27.72 m³ 4280 118641.6
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 67.41 m³ 7500 505566.3551
(b) Nominal slab 19.28 m³ 7500 144615.24
(iii) Columns 2.13 m³ 7500 15949.60829
(iv) Top slab 19.00 m³ 7700 146326.95
(v) Vertical walls 43.12 m³ 7700 332042.9728
(vi) Stair case 4.00 m³ 7700 30800
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.310632
BOQ for Construction of CWR at-------------------
- -
(a) PCC 22.18 m³ 4280 94913.28
[3] Providing and casting in situ C.C in
grade M30 for container part
columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 51.76 m³ 7500 388234.6256
(b) Nominal slab 13.70 m³ 7500 102723.39
(iii) Columns 1.18 m³ 7500 8812.770579
(iv) Top slab 14.26 m³ 7700 109771.2
(v) Vertical walls 32.98 m³ 7700 253934.219
(vi) Stair case 3.00 m³ 7700 23100
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.381301
BOQ for Construction of CWR at-------------------
- -
(a) PCC 14.78 m³ 4280 63275.52
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 40.43 m³ 7500 303228.7335
(b) Nominal slab 10.90 m³ 7500 81751.4775
(iii) Columns 1.42 m³ 7500 10633.07219
(iv) Top slab 12.14 m³ 7700 93442.3875
(v) Vertical walls 31.91 m³ 7700 245697.76
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.42209
BOQ for Construction of CWR at-------------------
- -
(a) PCC 14.78 m³ 4280 63275.52
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 32.34 m³ 7500 242540.4366
(b) Nominal slab 8.11 m³ 7500 60810.75
(iii) Columns 0.86 m³ 7500 6418.799317
(iv) Top slab 9.45 m³ 7700 72765
(v) Vertical walls 25.95 m³ 7700 199851.8861
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.454693
BOQ for Construction of CWR at-------------------
- -
(a) PCC 11.09 m³ 4280 47456.64
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 19.48 m³ 7500 146123.7278
(b) Nominal slab 5.46 m³ 7500 40961.4975
(iii) Columns 0.86 m³ 7500 6418.799317
(iv) Top slab 7.31 m³ 7700 56251.3875
(v) Vertical walls 22.12 m³ 7700 170328.312
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ for Construction of CWR at-------------------
- -
(a) PCC 9.24 m³ 4280 39547.2
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 15.02 m³ 7500 112669.3537
(b) Nominal slab 2.74 m³ 7500 20561.31
(iii) Columns 0.86 m³ 7500 6418.799317
(iv) Top slab 4.90 m³ 7700 37699.2
(v) Vertical walls 16.99 m³ 7700 130855.4016
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ for Construction of CWR at-------------------
- -
(a) PCC 29.70 m³ 4280 127116
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 93.43 m³ 7500 700743.2479
(b) Nominal slab 28.85 m³ 7500 216364.5
(iii) Columns 1.90 m³ 7500 14240.72169
(iv) Top slab 28.23 m³ 7700 217359.45
(v) Vertical walls 51.10 m³ 7700 393461.145
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.123761
BOQ for Construction of CWR at-------------------
- -
(a) PCC 29.70 m³ 4280 127116
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 77.43 m³ 7500 580701.825
(b) Nominal slab 22.56 m³ 7500 169215.75
(iii) Columns 1.90 m³ 7500 14240.72169
(iv) Top slab 23.29 m³ 7700 179313.75
(v) Vertical walls 44.69 m³ 7700 344102.22
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.16033
BOQ for Construction of CWR at-------------------
- -
(a) PCC 24.75 m³ 4280 105930
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 60.19 m³ 7500 451398.5314
(b) Nominal slab 17.22 m³ 7500 129120.75
(iii) Columns 1.90 m³ 7500 14240.72169
(iv) Top slab 19.00 m³ 7700 146326.95
(v) Vertical walls 38.50 m³ 7700 296466.94
(vi) Stair case 4.00 m³ 7700 30800
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.204279
BOQ for Construction of CWR at-------------------
- -
(a) PCC 19.80 m³ 4280 84744
[3] Providing and casting in situ C.C in
grade M30 for container part
columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 46.22 m³ 7500 346638.0586
(b) Nominal slab 12.23 m³ 7500 91717.3125
(iii) Columns 1.16 m³ 7500 8709.201694
(iv) Top slab 14.26 m³ 7700 109771.2
(v) Vertical walls 31.21 m³ 7700 240348.7625
(vi) Stair case 3.00 m³ 7700 23100
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.278868
BOQ for Construction of CWR at-------------------
- -
(a) PCC 13.20 m³ 4280 56496
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 36.10 m³ 7500 270739.9406
(b) Nominal slab 9.73 m³ 7500 72992.39063
(iii) Columns 1.27 m³ 7500 9493.814459
(iv) Top slab 12.14 m³ 7700 93442.3875
(v) Vertical walls 28.49 m³ 7700 219373
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.307726
BOQ for Construction of CWR at-------------------
- -
(a) PCC 13.20 m³ 4280 56496
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 28.87 m³ 7500 216553.9613
(b) Nominal slab 7.24 m³ 7500 54295.3125
(iii) Columns 0.76 m³ 7500 5731.070819
(iv) Top slab 9.45 m³ 7700 72765
(v) Vertical walls 23.17 m³ 7700 178439.184
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.339036
BOQ for Construction of CWR at-------------------
- -
(a) PCC 9.90 m³ 4280 42372
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 17.40 m³ 7500 130467.6141
(b) Nominal slab 4.88 m³ 7500 36572.76563
(iii) Columns 0.76 m³ 7500 5731.070819
(iv) Top slab 7.31 m³ 7700 56251.3875
(v) Vertical walls 19.75 m³ 7700 152078.85
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ for Construction of CWR at-------------------
- -
(a) PCC 8.25 m³ 4280 35310
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 13.41 m³ 7500 100597.6373
(b) Nominal slab 2.45 m³ 7500 18358.3125
(iii) Columns 0.76 m³ 7500 5731.070819
(iv) Top slab 4.90 m³ 7700 37699.2
(v) Vertical walls 15.17 m³ 7700 116835.18
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ for Construction of CWR at-------------------
- -
(a) PCC 27.00 m³ 4280 115560
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 84.94 m³ 7500 637039.3163
(b) Nominal slab 26.23 m³ 7500 196695
(iii) Columns 1.73 m³ 7500 12946.11063
(iv) Top slab 28.23 m³ 7700 217359.45
(v) Vertical walls 46.45 m³ 7700 357691.95
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.047304
BOQ for Construction of CWR at-------------------
- -
(a) PCC 27.00 m³ 4280 115560
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 70.39 m³ 7500 527910.75
(b) Nominal slab 20.51 m³ 7500 153832.5
(iii) Columns 1.73 m³ 7500 12946.11063
(iv) Top slab 23.29 m³ 7700 179313.75
(v) Vertical walls 40.63 m³ 7700 312820.2
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.081665
BOQ for Construction of CWR at-------------------
- -
(a) PCC 22.50 m³ 4280 96300
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 54.71 m³ 7500 410362.3013
(b) Nominal slab 15.65 m³ 7500 117382.5
(iii) Columns 1.73 m³ 7500 12946.11063
(iv) Top slab 19.00 m³ 7700 146326.95
(v) Vertical walls 35.00 m³ 7700 269515.4
(vi) Stair case 4.00 m³ 7700 30800
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.123709
BOQ for Construction of CWR at-------------------
- -
(a) PCC 18.00 m³ 4280 77040
[3] Providing and casting in situ C.C in
grade M30 for container part
columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 42.02 m³ 7500 315125.5078
(b) Nominal slab 11.12 m³ 7500 83379.375
(iii) Columns 1.15 m³ 7500 8630.740418
(iv) Top slab 14.26 m³ 7700 109771.2
(v) Vertical walls 29.88 m³ 7700 230056.75
(vi) Stair case 3.00 m³ 7700 23100
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.201225
BOQ for Construction of CWR at-------------------
- -
(a) PCC 12.00 m³ 4280 51360
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 32.82 m³ 7500 246127.2188
(b) Nominal slab 8.85 m³ 7500 66356.71875
(iii) Columns 1.15 m³ 7500 8630.740418
(iv) Top slab 12.14 m³ 7700 93442.3875
(v) Vertical walls 25.90 m³ 7700 199430
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.221087
BOQ for Construction of CWR at-------------------
- -
(a) PCC 12.00 m³ 4280 51360
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 26.25 m³ 7500 196867.2375
(b) Nominal slab 6.58 m³ 7500 49359.375
(iii) Columns 0.69 m³ 7500 5210.064381
(iv) Top slab 9.45 m³ 7700 72765
(v) Vertical walls 21.07 m³ 7700 162217.44
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.251418
BOQ for Construction of CWR at-------------------
- -
(a) PCC 9.00 m³ 4280 38520
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 15.81 m³ 7500 118606.9219
(b) Nominal slab 4.43 m³ 7500 33247.96875
(iii) Columns 0.69 m³ 7500 5210.064381
(iv) Top slab 7.31 m³ 7700 56251.3875
(v) Vertical walls 17.96 m³ 7700 138253.5
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ OF R.C.C CWR-100 KL CAPACITY AT SBC-100 KN/SQ.M
Volume Formwor
Sl. Items of Concrete Measurement (m3) k (m2)
1.00 Top slab 1 x 6.80 x 4.80 x 0.15 4.90
1 x 6.80 x 4.80 32.64
3.00 RCC Columns Inside tank p*0.25 x 0.23 x 3.80 x 4.00 0.63
p x 0.23 x 3.80 x 4.00 10.98
Extra for column capital 0.06 1.10
4.00 Type of Foundation Wall footing
25 251.2595
102.375
Length
(m) HYSD Steel (MT)
0.90% 0.40 81.69935
0.35% 0.03
83.75
0.75% 0.100
1.50% 0.20
3.09 85.30441 3093.872
30.93872
0.362686
121.5 30481.92
277.4429
LL F=(2*OO)^G=(2*II)^2 DD=(2*c+bZZ=(2*c-b)i at outer radius
BOQ for Construction of CWR at-------------------
- -
(a) PCC 7.50 m³ 4280 32100
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 12.19 m³ 7500 91452.3975
(b) Nominal slab 2.23 m³ 7500 16689.375
(iii) Columns 0.69 m³ 7500 5210.064381
(iv) Top slab 4.90 m³ 7700 37699.2
(v) Vertical walls 13.79 m³ 7700 106213.8
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ for Construction of CWR at-------------------
- -
(a) PCC 6.16 m³ 4280 26364.8
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 10.02 m³ 7500 75112.90248
(b) Nominal slab 1.83 m³ 7500 13707.54
(iii) Columns 0.86 m³ 7500 6418.799317
(iv) Top slab 4.90 m³ 7700 37699.2
(v) Vertical walls 16.69 m³ 7700 128518.698
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ for Construction of CWR at-------------------
- -
(a) PCC 7.39 m³ 4280 31637.76
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 12.99 m³ 7500 97415.8185
(b) Nominal slab 3.64 m³ 7500 27307.665
(iii) Columns 0.86 m³ 7500 6418.799317
(iv) Top slab 7.31 m³ 7700 56251.3875
(v) Vertical walls 22.12 m³ 7700 170328.312
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
45074.33 N-m
337.3782
BOQ for Construction of CWR at-------------------
- -
(a) PCC 9.86 m³ 4280 42183.68
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 21.56 m³ 7500 161693.6244
(b) Nominal slab 5.41 m³ 7500 40540.5
(iii) Columns 0.86 m³ 7500 6418.799317
(iv) Top slab 9.45 m³ 7700 72765
(v) Vertical walls 25.95 m³ 7700 199851.8861
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.251469
BOQ for Construction of CWR at-------------------
- -
(a) PCC 9.86 m³ 4280 42183.68
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 26.95 m³ 7500 202152.489
(b) Nominal slab 7.27 m³ 7500 54500.985
(iii) Columns 1.42 m³ 7500 10633.07219
(iv) Top slab 12.14 m³ 7700 93442.3875
(v) Vertical walls 31.91 m³ 7700 245697.76
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.221568
BOQ for Construction of CWR at-------------------
- -
(a) PCC 14.78 m³ 4280 63275.52
[3] Providing and casting in situ C.C in
grade M30 for container part
columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 34.51 m³ 7500 258823.0838
(b) Nominal slab 9.13 m³ 7500 68482.26
(iii) Columns 1.42 m³ 7500 10633.07219
(iv) Top slab 14.26 m³ 7700 109771.2
(v) Vertical walls 32.87 m³ 7700 253062.425
(vi) Stair case 3.00 m³ 7700 23100
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.174932
BOQ for Construction of CWR at-------------------
- -
(a) PCC 18.48 m³ 4280 79094.4
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 44.94 m³ 7500 337044.2368
(b) Nominal slab 12.85 m³ 7500 96410.16
(iii) Columns 2.13 m³ 7500 15949.60829
(iv) Top slab 19.00 m³ 7700 146326.95
(v) Vertical walls 43.12 m³ 7700 332042.9728
(vi) Stair case 4.00 m³ 7700 30800
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.111466
BOQ for Construction of CWR at-------------------
- -
(a) PCC 22.18 m³ 4280 94913.28
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 57.81 m³ 7500 433590.696
(b) Nominal slab 16.85 m³ 7500 126347.76
(iii) Columns 2.13 m³ 7500 15949.60829
(iv) Top slab 23.29 m³ 7700 179313.75
(v) Vertical walls 50.05 m³ 7700 385394.4864
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.065155
BOQ for Construction of CWR at-------------------
- -
(a) PCC 22.18 m³ 4280 94913.28
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 69.76 m³ 7500 523221.6251
(b) Nominal slab 21.54 m³ 7500 161552.16
(iii) Columns 2.13 m³ 7500 15949.60829
(iv) Top slab 28.23 m³ 7700 217359.45
(v) Vertical walls 57.23 m³ 7700 440676.4824
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.028682
BOQ for Construction of CWR at-------------------
- -
(a) PCC 5.50 m³ 4280 23540
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 8.94 m³ 7500 67065.0915
(b) Nominal slab 1.63 m³ 7500 12238.875
(iii) Columns 0.76 m³ 7500 5731.070819
(iv) Top slab 4.90 m³ 7700 37699.2
(v) Vertical walls 15.17 m³ 7700 116835.18
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ for Construction of CWR at-------------------
- -
(a) PCC 6.60 m³ 4280 28248
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 11.60 m³ 7500 86978.40938
(b) Nominal slab 3.25 m³ 7500 24381.84375
(iii) Columns 0.76 m³ 7500 5731.070819
(iv) Top slab 7.31 m³ 7700 56251.3875
(v) Vertical walls 19.75 m³ 7700 152078.85
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
45074.33 N-m
337.3782
BOQ for Construction of CWR at-------------------
- -
(a) PCC 8.80 m³ 4280 37664
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 19.25 m³ 7500 144369.3075
(b) Nominal slab 4.83 m³ 7500 36196.875
(iii) Columns 0.76 m³ 7500 5731.070819
(iv) Top slab 9.45 m³ 7700 72765
(v) Vertical walls 23.17 m³ 7700 178439.184
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.157587
BOQ for Construction of CWR at-------------------
- -
(a) PCC 8.80 m³ 4280 37664
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 24.07 m³ 7500 180493.2938
(b) Nominal slab 6.49 m³ 7500 48661.59375
(iii) Columns 1.27 m³ 7500 9493.814459
(iv) Top slab 12.14 m³ 7700 93442.3875
(v) Vertical walls 28.49 m³ 7700 219373
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.128688
BOQ for Construction of CWR at-------------------
- -
(a) PCC 13.20 m³ 4280 56496
[3] Providing and casting in situ C.C in
grade M30 for container part
columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 30.81 m³ 7500 231092.0391
(b) Nominal slab 8.15 m³ 7500 61144.875
(iii) Columns 1.27 m³ 7500 9493.814459
(iv) Top slab 14.26 m³ 7700 109771.2
(v) Vertical walls 32.87 m³ 7700 253062.425
(vi) Stair case 3.00 m³ 7700 23100
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.102678
BOQ for Construction of CWR at-------------------
- -
(a) PCC 16.50 m³ 4280 70620
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 40.12 m³ 7500 300932.3543
(b) Nominal slab 11.48 m³ 7500 86080.5
(iii) Columns 1.90 m³ 7500 14240.72169
(iv) Top slab 19.00 m³ 7700 146326.95
(v) Vertical walls 38.50 m³ 7700 296466.94
(vi) Stair case 4.00 m³ 7700 30800
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.026453
BOQ for Construction of CWR at-------------------
- -
(a) PCC 19.80 m³ 4280 84744
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 51.62 m³ 7500 387134.55
(b) Nominal slab 15.04 m³ 7500 112810.5
(iii) Columns 1.90 m³ 7500 14240.72169
(iv) Top slab 23.29 m³ 7700 179313.75
(v) Vertical walls 44.69 m³ 7700 344102.22
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.01736
BOQ for Construction of CWR at-------------------
- -
(a) PCC 19.80 m³ 4280 84744
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 62.29 m³ 7500 467162.1653
(b) Nominal slab 19.23 m³ 7500 144243
(iii) Columns 1.90 m³ 7500 14240.72169
(iv) Top slab 28.23 m³ 7700 217359.45
(v) Vertical walls 51.10 m³ 7700 393461.145
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.05124
BOQ for Construction of CWR at-------------------
- -
(a) PCC 18.00 m³ 4280 77040
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 56.63 m³ 7500 424692.8775
(b) Nominal slab 17.48 m³ 7500 131130
(iii) Columns 1.73 m³ 7500 12946.11063
(iv) Top slab 28.23 m³ 7700 217359.45
(v) Vertical walls 46.45 m³ 7700 357691.95
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.111787
BOQ OF R.C.C CWR-600 KL CAPACITY AT SBC-100 KN/SQ.M
Volume Formwor
Sl. Items of Concrete Measurement (m3) k (m2)
1.00 Top slab 1 x 15.30 x 12.30 x 0.15 28.23
1 x 15.30 x 12.30 188.19
3.00 RCC Columns Inside tank p*0.25 x 0.30 x 3.70 x 6.00 1.57
p x 0.30 x 3.70 x 6.00 20.92
Extra for column capital 0.16 2.09
4.00 Type of Foundation Wall footing
25 251.2595
Length
(m) HYSD Steel (MT)
0.90% 2.10 74.3929
0.35% 0.10
83.75
0.75% 0.200
1.50% 0.60
12.22 78.57115 12219.22
122.1922
1.555179
121.5 30481.92
277.4429
LL F=(2*OO)^G=(2*II)^2 DD=(2*c+bZZ=(2*c-b)i at outer radius
BOQ for Construction of CWR at-------------------
- -
(a) PCC 18.00 m³ 4280 77040
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 46.93 m³ 7500 351940.5
(b) Nominal slab 13.67 m³ 7500 102555
(iii) Columns 1.73 m³ 7500 12946.11063
(iv) Top slab 23.29 m³ 7700 179313.75
(v) Vertical walls 40.63 m³ 7700 312820.2
(vi) Stair case 5.00 m³ 7700 38500
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.079871
BOQ OF R.C.C CWR-500 KL CAPACITY AT SBC-100 KN/SQ.M
Volume Formwor
Sl. Items of Concrete Measurement (m3) k (m2)
1.00 Top slab 1 x 13.50 x 11.50 x 0.15 23.29
1 x 13.50 x 11.50 155.25
3.00 RCC Columns Inside tank p*0.25 x 0.30 x 3.70 x 6.00 1.57
p x 0.30 x 3.70 x 6.00 20.92
Extra for column capital 0.16 2.09
4.00 Type of Foundation Wall footing
25 251.2595
Length
(m) HYSD Steel (MT)
0.90% 1.70 73.00054
0.35% 0.10
83.75
0.75% 0.200
1.50% 0.60
10.52 80.1531 10519.22
105.1922
1.31239
121.5 30481.92
277.4429
LL F=(2*OO)^G=(2*II)^2 DD=(2*c+bZZ=(2*c-b)i at outer radius
BOQ for Construction of CWR at-------------------
- -
(a) PCC 15.00 m³ 4280 64200
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 36.48 m³ 7500 273574.8675
(b) Nominal slab 10.43 m³ 7500 78255
(iii) Columns 1.73 m³ 7500 12946.11063
(iv) Top slab 19.00 m³ 7700 146326.95
(v) Vertical walls 35.00 m³ 7700 269515.4
(vi) Stair case 4.00 m³ 7700 30800
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
-0.037951
BOQ OF R.C.C CWR-400 KL CAPACITY AT SBC-100 KN/SQ.M
Volume Formwor
Sl. Items of Concrete Measurement (m3) k (m2)
1.00 Top slab 1 x 12.30 x 10.30 x 0.15 19.00
1 x 12.30 x 10.30 126.69
3.00 RCC Columns Inside tank p*0.25 x 0.30 x 3.70 x 6.00 1.57
p x 0.30 x 3.70 x 6.00 20.92
Extra for column capital 0.16 2.09
4.00 Type of Foundation Wall footing
25 251.2595
Length
(m) HYSD Steel (MT)
0.90% 1.40 73.67064
0.35% 0.10
83.75
0.75% 0.200
1.50% 0.50
8.61 80.75017 8611.384
86.11384
1.066423
121.5 30481.92
277.4429
LL F=(2*OO)^G=(2*II)^2 DD=(2*c+bZZ=(2*c-b)i at outer radius
BOQ for Construction of CWR at-------------------
- -
(a) PCC 6.00 m³ 4280 25680
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 10.54 m³ 7500 79071.28125
(b) Nominal slab 2.96 m³ 7500 22165.3125
(iii) Columns 0.69 m³ 7500 5210.064381
(iv) Top slab 7.31 m³ 7700 56251.3875
(v) Vertical walls 17.96 m³ 7700 138253.5
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ OF R.C.C CWR-150 KL CAPACITY AT SBC-100 KN/SQ.M
Volume Formwor
Sl. Items of Concrete Measurement (m3) k (m2)
1.00 Top slab 1 x 8.05 x 6.05 x 0.15 7.31
1 x 8.05 x 6.05 48.70
3.00 RCC Columns Inside tank p*0.25 x 0.23 x 3.80 x 4.00 0.63
p x 0.23 x 3.80 x 4.00 10.98
Extra for column capital 0.06 1.10
4.00 Type of Foundation Wall footing
25 251.2595
155.9688
41547.56 415.4756
Length
(m) HYSD Steel (MT)
0.90% 0.50 68.44276
0.35% 0.03
83.75
0.75% 0.000
1.50% 0.20
3.59 86.5479 3587.693
35.87693
0.414533
121.5 30481.92
277.4429
LL F=(2*OO)^G=(2*II)^2 DD=(2*c+bZZ=(2*c-b)i at outer radius
BOQ for Construction of CWR at-------------------
- -
(a) PCC 5.00 m³ 4280 21400
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 8.13 m³ 7500 60968.265
(b) Nominal slab 1.48 m³ 7500 11126.25
(iii) Columns 0.69 m³ 7500 5210.064381
(iv) Top slab 4.90 m³ 7700 37699.2
(v) Vertical walls 13.79 m³ 7700 106213.8
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
BOQ OF R.C.C CWR-100 KL CAPACITY AT SBC-100 KN/SQ.M
Volume Formwor
Sl. Items of Concrete Measurement (m3) k (m2)
1.00 Top slab 1 x 6.80 x 4.80 x 0.15 4.90
1 x 6.80 x 4.80 32.64
3.00 RCC Columns Inside tank p*0.25 x 0.23 x 3.80 x 4.00 0.63
p x 0.23 x 3.80 x 4.00 10.98
Extra for column capital 0.06 1.10
4.00 Type of Foundation Wall footing
25 251.2595
102.375
Length
(m) HYSD Steel (MT)
0.90% 0.40 81.69935
0.35% 0.02
83.75
0.75% 0.000
1.50% 0.20
2.78 89.7312 2781.423
27.81423
0.309973
121.5 30481.92
277.4429
LL F=(2*OO)^G=(2*II)^2 DD=(2*c+bZZ=(2*c-b)i at outer radius
BOQ for Construction of CWR at-------------------
- -
(a) PCC 8.00 m³ 4280 34240
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 21.88 m³ 7500 164084.8125
(b) Nominal slab 5.90 m³ 7500 44237.8125
(iii) Columns 1.15 m³ 7500 8630.740418
(iv) Top slab 12.14 m³ 7700 93442.3875
(v) Vertical walls 25.90 m³ 7700 199430
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.058325
BOQ OF R.C.C CWR-250 KL CAPACITY AT SBC-100 KN/SQ.M
Volume Formwor
Sl. Items of Concrete Measurement (m3) k (m2)
1.00 Top slab 1 x 10.05 x 8.05 x 0.15 12.14
1 x 10.05 x 8.05 80.90
3.00 RCC Columns Inside tank p*0.25 x 0.30 x 3.70 x 4.00 1.05
p x 0.30 x 3.70 x 4.00 13.95
Extra for column capital 0.10 1.39
4.00 Type of Foundation Wall footing
25 251.2595
256.9125
Length
(m) HYSD Steel (MT)
0.90% 0.90 74.16334
0.35% 0.05
83.75
0.75% 0.100
1.50% 0.20
5.89 85.44735 5892.662
58.92662
0.689625
121.5 30481.92
277.4429
LL F=(2*OO)^G=(2*II)^2 DD=(2*c+bZZ=(2*c-b)i at outer radius
BOQ for Construction of CWR at-------------------
- -
(a) PCC 8.00 m³ 4280 34240
[3] Providing and casting in situ C.C in
grade M30 for container part
/columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 17.50 m³ 7500 131244.825
(b) Nominal slab 4.39 m³ 7500 32906.25
(iii) Columns 0.69 m³ 7500 5210.064381
(iv) Top slab 9.45 m³ 7700 72765
(v) Vertical walls 21.07 m³ 7700 162217.44
(vi) Stair case 2.00 m³ 7700 15400
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.086464
BOQ OF R.C.C CWR-200 KL CAPACITY AT SBC-100 KN/SQ.M
Volume Formwor
Sl. Items of Concrete Measurement (m3) k (m2)
1.00 Top slab 1 x 9.00 x 7.00 x 0.15 9.45
1 x 9.00 x 7.00 63.00
3.00 RCC Columns Inside tank p*0.25 x 0.23 x 3.80 x 4.00 0.63
p x 0.23 x 3.80 x 4.00 10.98
Extra for column capital 0.06 1.10
4.00 Type of Foundation Wall footing
25 251.2595
204.015
Length
(m) HYSD Steel (MT)
0.90% 0.70 74.07407
0.35% 0.04
83.75
0.75% 0.100
1.50% 0.20
4.63 83.96093 4626.137
46.26137
0.550987
121.5 30481.92
277.4429
LL F=(2*OO)^G=(2*II)^2 DD=(2*c+bZZ=(2*c-b)i at outer radius
BOQ for Construction of CWR at-------------------
- -
(a) PCC 12.00 m³ 4280 51360
[3] Providing and casting in situ C.C in
grade M30 for container part
columns/raft using granite, quartzite
trapmetal of size 12mm to 20mm and
6mm to 12mm incl. scaffolding,
centering, formwork, needle vibrated
consolidation, curing and hydraulic
testing etc. complete(excl. cost of
reinforcement)
- -
(i) Foundation raft
(a) Wall footing 28.01 m³ 7500 210083.6719
(b) Nominal slab 7.41 m³ 7500 55586.25
(iii) Columns 1.15 m³ 7500 8630.740418
(iv) Top slab 14.26 m³ 7700 109771.2
(v) Vertical walls 29.88 m³ 7700 230056.75
(vi) Stair case 3.00 m³ 7700 23100
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
T&P article
Mixer
Weigh batcher
Vibrator
---
45074.33 N-m
337.3782
0.03318
BOQ OF R.C.C CWR-300 KL CAPACITY AT SBC-100 KN/SQ.M
Volume Formwor
Sl. Items of Concrete Measurement (m3) k (m2)
1.00 Top slab 1 x 10.80 x 8.80 x 0.15 14.26
1 x 10.80 x 8.80 95.04
3.00 RCC Columns Inside tank p*0.25 x 0.30 x 3.70 x 4.00 1.05
p x 0.30 x 3.70 x 4.00 13.95
Extra for column capital 0.10 1.39
4.00 Type of Foundation Wall footing
25 251.2595
Length
(m) HYSD Steel (MT)
0.90% 1.00 70.1459
0.35% 0.10
83.75
0.75% 0.100
1.50% 0.40
6.94 82.91934 6940.923
69.40923
0.837069
121.5 30481.92
277.4429
LL F=(2*OO)^G=(2*II)^2 DD=(2*c+bZZ=(2*c-b)i at outer radius
BOQ OF R.C.C CWR-300 KL CAPACITY AT SBC-100 KN/SQ.M
Volume
Sl. Items of Concrete Measurement (m3)
1.00 Top Circular slab p x 5.20 x 1.00 x 0.15 12.74
p x 5.20 x 1.00
3.00 RCC Columns Inside tank p*0.25 x 0.30 x 4.30 x 4.00 1.22
p x 0.30 x 4.30 x 4.00
Extra for column capital 0.12
4.00 Type of Foundation Circular footing
3 23100 0.077
Formwor Length
k (m2) (m) HYSD Steel (MT)
1.20% 1.20 94.17452
84.95
1.10% 0.100
16.21
1.62 1.10% 0.011 #REF! #REF! #REF!
0.75% 0.200
7.2
1.50% 0.40
399.44 6.71 89.78345 6710.918
67.10918
0.747456
121.5
II LL F=(2*OO)^G=(2*II)^2 DD=(2*c+bZZ=(2*c-b)i at outer radius
BOQ for Construction of CWR at-------------------
- -
(a) PCC 10.00 m³ 4280 42800
[3] Providing and casting in situ C.C in
grade M30 for container part and M 25
for staging/columns/raft using granite,
quartzite trapmetal of size 12mm to
20mm and 6mm to 12mm incl.
scaffolding, centering, formwork,
needle vibrated consolidation, curing
and hydraulic testing etc.
complete(excl. cost of reinforcement)
- -
(i) Foundation raft
(a) Wall footing 24.88 m³ 7500 186566.7005
(b) Nominal slab 5.77 m³ 7500 43295.07376
(iii) Columns 1.34 m³ 7500 10030.31994
(iv) Top slab 12.74 m³ 7700 98115.70848
(v) Vertical walls 27.02 m³ 7700 208036.2655
(vi) Stair case 3.00 m³ 7700 23100
[4] Supplying, Cutting, bending, binding -
and placing in position as per plan and
design and as per IS 2503 incl. cost of
steel and binding wire for reservoirs
only incl. lift upto 6 mt. height using
TMT bars confirning to relevent IS
[10]
Providing, fabricating and erecting MS
ladder (with MS cage)of 450mm wide
made of 65 x 65 x 6mm angle iron,
20mm MS bars for walk way to top of
the OHSR and for cage flat 3 Nos-75 x
8 as vertical member and flat 40 x 5 as
horizontal member 300 c/c including
cutting, hoistng, fixing in position and 0 Mtr 3450 0
applying a priming coat of approved
steel primer all complete as per
specification and the direction of the
Engineer.
[11]
Providing, fabricating and erecting
hand railing for walkway, top dome
slab, balconey,staircase and landing
consist of two rows ( one at top and
other at middle level) of 20 mm GI
pipe class-B and 900 mm high vertical
angle 65X65X6 mm at spacing 1.50 m
c/c including welding, threading, 0 Mtr 780 0
applying a priming coat of approved
steel primer and embedding in cement
concrete floor complete in all respect as
per specification and the direction of
the Engineer.
[12]
Supply, fabricating & fixing of
anodised (20 to 25 micron) Aluminum
ladder of 450mm wide with 2 nos
rectangular section of 65 x 35 mm (3
mm thick) as vertical post and 25 mm 5 Mtr 1500 7500
bars steps at 300 mm c/c complete in
all respect as per the specification and
the direction of the Engineer.
[13]
Brick work with FPS bricks of class
designation 75 in foundation and plinth
[14] in:
Cement mortar 1:4 (1 cement : 4 coarse
10.00 Cum 3950 39500
sand)
[15] Provision for lightening arrestor 0 LS 40,000 0
T&P article
Mixer
Weigh batcher
Vibrator
---
66.66667