Project: K028-Fayyhealth-Polyclinic Risk Assessment For Slab Coring Work
Project: K028-Fayyhealth-Polyclinic Risk Assessment For Slab Coring Work
Project: K028-Fayyhealth-Polyclinic Risk Assessment For Slab Coring Work
NO of
ASSESSMENT,
PROJECT/CONTRACT ACTIVITY ASSESSMENT REVIEWED
BY: BY: REVISION &
DATE
PROJECT: K028-FAYYHEALTH-POLYCLINIC
Deep Excavations Work on over water Falls from height X Fire risk High winds
Buried/Overhead Service COSHH Storage/Lay Down Area Ground Conditions Health surveillance
1. Manual handling of Muscle pain, Back Pain, Moditif Technicians. 2 3 4 TBT to be conducted by work supervisor to 1 2 2 P.E, S.O and
concrete coring Back injury all workers before work start. Foreman
machine Properties Ensure Manual handling training is in place.
Use manual handling techniques in lifting
heavy equipment e.g., 2 people must carry
this coring machine to divide the total weight
of this machine thus making it lighter and
easier to carry.
Barricade the work zone for maximum radius
Place relevant safety signs.
Full PPE to be comply, Hard hat, safety
shoes, safety glasses and cut resistant gloves
and dust mask.
2 Concrete coring Muscle pain Operator, Workers, and 2 3 6 Only trained and authorized person must 1 2 2 P.E, S.O &
machine operator Property damage operate this machine. Foreman
Visually inspect the wires and cables for any
defects or ties to avoid short circuit.
Technicians must keep the electrical cord
LIKELIHOOD RISKIN RATING The above risk assessment has been briefed as fully understood
RISK 3 2 1 SEVERITY
RATING Name Sign
3 Major/injury/pollution/Damage
S Name Sign
2 Minor/Pollution/Damage/Loss
E Name Sign
1 Injury/Low Damage/Loss
V 3 9 6 3 Name Sign
LIKELIHOOD
E
3 Likely Name Sign
R 2 6 4 2
2 Possible Name Sign
I
1 Never/Very Unlikely Name Sign
T 1 3 2 1
Name Date: