Q9 (R1) Quality Risk Management
Q9 (R1) Quality Risk Management
Q9 (R1) Quality Risk Management
This draft guidance, when finalized, will represent the current thinking of the Food and Drug
Administration (FDA or Agency) on this topic. It does not establish any rights for any person and is not
binding on FDA or the public. You can use an alternative approach if it satisfies the requirements of the
applicable statutes and regulations. To discuss an alternative approach, contact the FDA staff responsible
for this guidance as listed on the title page. The draft guidance has been left in the original International
Council for Harmonisation format. The final guidance will be reformatted and edited to conform with
FDA’s good guidance practice regulation and style.
For questions regarding this draft document contact (CDER) Rick Friedman, Rick.Friedman@fda.hhs.gov.
FOREWORD
The International Council for Harmonisation of Technical Requirements for Pharmaceuticals for
Human Use (ICH) has the mission of achieving greater regulatory harmonization worldwide to
ensure that safe, effective, and high-quality medicines are developed, registered, and maintained
in the most resource-efficient manner. By harmonizing the regulatory expectations in regions
around the world, ICH guidelines have substantially reduced duplicative clinical studies,
prevented unnecessary animal studies, standardized safety reporting and marketing application
submissions, and contributed to many other improvements in the quality of global drug
development and manufacturing and the products available to patients.
ICH is a consensus-driven process that involves technical experts from regulatory authorities and
industry parties in detailed technical and science-based harmonization work that results in the
development of ICH guidelines. The commitment to consistent adoption of these consensus-
based guidelines by regulators around the globe is critical to realizing the benefits of safe,
effective, and high-quality medicines for patients as well as for industry. As a Founding
Regulatory Member of ICH, the Food and Drug Administration (FDA) plays a major role in the
development of each of the ICH guidelines, which FDA then adopts and issues as guidance to
industry.
INTERNATIONAL COUNCIL FOR HARMONISATION OF TECHNICAL
REQUIREMENTS FOR PHARMACEUTICALS FOR HUMAN USE
Draft version
Endorsed on 18 November 2021
Currently under public consultation
At Step 2 of the ICH Process, a consensus draft text or guideline, agreed by the
appropriate ICH Expert Working Group, is transmitted by the ICH Assembly to the
regulatory authorities of the ICH regions for internal and external consultation,
according to national or regional procedures.
Q9(R1)
Document History
Q9
Revision of Q9
Legal notice: This document is protected by copyright and may, with the exception of the ICH
logo, be used, reproduced, incorporated into other works, adapted, modified, translated or
distributed under a public license provided that ICH's copyright in the document is acknowledged
at all times. In case of any adaption, modification or translation of the document, reasonable steps
must be taken to clearly label, demarcate or otherwise identify that changes were made to or
based on the original document. Any impression that the adaption, modification or translation of
the original document is endorsed or sponsored by the ICH must be avoided.
The document is provided "as is" without warranty of any kind. In no event shall the ICH or the
authors of the original document be liable for any claim, damages or other liability arising from
the use of the document.
The above-mentioned permissions do not apply to content supplied by third parties. Therefore,
for documents where the copyright vests in a third party, permission for reproduction must be
obtained from this copyright holder.
ICH HARMONISED GUIDELINE
TABLE OF CONTENTS
1. INTRODUCTION.................................................................................................................. 1
2. SCOPE .................................................................................................................................... 3
3. PRINCIPLES OF QUALITY RISK MANAGEMENT ...................................................... 3
4. GENERAL QUALITY RISK MANAGEMENT PROCESS.............................................. 3
4.1 Responsibilities ........................................................................................................................ 4
4.2 Initiating a Quality Risk Management Process ........................................................................ 5
4.3 Risk Assessment....................................................................................................................... 6
4.4 Risk Control ............................................................................................................................. 7
4.5 Risk Communication................................................................................................................ 8
4.6 Risk Review ............................................................................................................................. 8
5. RISK MANAGEMENT METHODOLOGY ....................................................................... 9
5.1 Formality in Quality Risk Management ................................................................................. 10
5.2 Risk-based Decision Making ..................................................................................................11
6. INTEGRATION OF QUALITY RISK MANAGEMENT INTO INDUSTRY AND
REGULATORY OPERATIONS .........................................................................................................13
7. DEFINITIONS ..................................................................................................................... 16
8. REFERENCES ..................................................................................................................... 18
ANNEX I: QUALITY RISK MANAGEMENT METHODS AND TOOLS .............................. 20
I.1 Basic Risk Management Facilitation Methods....................................................................... 20
I.2 Failure Mode Effects Analysis (FMEA) ............................................................................... 20
I.3 Failure Mode, Effects and Criticality Analysis (FMECA) .................................................... 21
I.4 Fault Tree Analysis (FTA) ............................................................................................................... 21
I.5 Hazard Analysis and Critical Control Points (HACCP) ........................................................ 22
I.6 Hazard Operability Analysis (HAZOP) ................................................................................ 23
I.7 Preliminary Hazard Analysis (PHA) ..................................................................................... 23
I.8 Risk Ranking and Filtering ................................................................................................... 24
I.9 Supporting Statistical Tools............................................................................................................. 24
i
ICH Q9(R1) Guideline
1
ICH Q9(R1) Guideline
1 1. INTRODUCTION
2 Risk management principles are effectively utilized in many areas of business and government
3 including finance, insurance, occupational safety, public health, pharmacovigilance, and by
4 agencies regulating these industries. In the pharmaceutical sector, the principles and framework
5 of ICH Q9, coupled with the official ICH training material that supports this guideline, are
6 instrumental in enhancing the application of effective quality risk management by industry and
7 regulators. The importance of quality systems has been recognized in the pharmaceutical
8 industry, and it is evident that quality risk management is a valuable component of an effective
9 quality system.
26 An effective quality risk management approach can further ensure the high quality of the drug
27 (medicinal) product to the patient by providing a proactive means to identify and control
28 potential quality issues during development and manufacturing. A proactive approach to
29 quality risk management facilitates continual improvement and is of strategic importance in
30 achieving an effective pharmaceutical quality system. Additionally, use of quality risk
31 management can improve the decision making if a quality problem arises. In the development
32 phase, quality risk management is part of building knowledge and understanding risk
1
ICH Q9(R1) Guideline
33 scenarios, so that appropriate risk control can be decided upon during technology transfer, for
34 use during the commercial manufacturing phase. In this context, knowledge is used to make
35 informed risk-based decisions, trigger re-evaluations and stimulate continual improvements.
36 Effective and proactive quality risk management can facilitate better, more informed and timely
37 decisions throughout the lifecycle. This can provide regulators with greater assurance of a
38 company’s ability to deal with potential risks and avert problems, and can beneficially affect
39 the extent and level of direct regulatory oversight.
40 The application of digitalization and emerging technologies in the manufacture and control of
41 medicinal products can present certain challenges. The application of quality risk management
42 to the design, validation and technology transfer of advanced production processes and
43 analytical methods, advanced data analysis methods and computerized systems is important.
44 The purpose of this document is to offer a systematic approach to quality risk management for
45 better, more informed, and timely decisions. It serves as a foundation or resource document
46 that is independent of, yet supports, other ICH Quality documents and complements existing
47 quality practices, requirements, standards, and guidelines within the pharmaceutical industry
48 and regulatory environment. It specifically provides guidance on the principles and some of
49 the tools of quality risk management that can enable more effective and consistent risk based
50 decisions, both by regulators and industry, regarding the quality of drug substances and drug
51 (medicinal) products across the product lifecycle. It is not intended to create any new
52 expectations beyond the current regulatory requirements.
53 An understanding of formality in quality risk management (see Section 5 below) may lead to
54 resources being used more efficiently, where lower risk issues are dealt with via less formal
55 means, freeing up resources for managing higher risk issues and more complex problems that
56 may require increased levels of rigor and effort. An understanding of formality can also
57 support risk-based decision-making, where the level of formality that is applied reflects the
58 degree of importance of the decision, as well as the level of uncertainty, complexity and
59 criticality which may be present.
60 Appropriate use of quality risk management can facilitate but does not obviate industry’s
61 obligation to comply with regulatory requirements and does not replace appropriate
62 communications between industry and regulators. Quality risk management should not be used
63 in a manner where decisions are made that justify a practice that would otherwise, in
2
ICH Q9(R1) Guideline
65
66 2. SCOPE
67 This guideline provides principles and examples of tools for quality risk management that can
68 be applied to different aspects of pharmaceutical quality. These aspects include development,
69 manufacturing, distribution, and the inspection and submission/review processes throughout
70 the lifecycle of drug substances, drug products, biological and biotechnological
71 products (including the use of raw materials, solvents, excipients, packaging and labeling
72 materials in drug products, biological and biotechnological products).
73
76 • The evaluations of the risk to quality should be based on scientific knowledge and
77 ultimately link to the protection of the patient. (Note: Risk to quality includes situations
78 where product availability may be impacted, leading to potential patient harm.)
79 • The level of effort, formality and documentation of the quality risk management process
80 should be commensurate with the level of risk.
81
3
ICH Q9(R1) Guideline
Initiate
Quality Risk Management Process
Risk Assessment
Hazard Identification
Risk Analysis
Risk Evaluation
unacceptable
Risk Acceptance
Risk Review
Review Events
90
91 Decision nodes are not shown in the diagram above because decisions can occur at any point
92 in the process. These decisions might be to return to the previous step and seek further
93 information, to adjust the risk models or even to terminate the risk management process based
94 upon information that supports such a decision. Note: “unacceptable” in the flowchart does not
95 only refer to statutory, legislative or regulatory requirements, but also to indicate that the
96 risk assessment process should be revisited.
97 4.1 Responsibilities
98 Quality risk management activities are usually, but not always, undertaken by interdisciplinary
99 teams. When teams are formed, they should include experts from the appropriate areas (e.g.,
100 quality unit, business development, engineering, regulatory affairs, production operations,
101 sales and marketing, supply chain, legal, statistics and clinical) in addition to individuals who
102 are knowledgeable about the quality risk management process.
103 Subjectivity can impact every stage of a quality risk management process, especially the
104 identification of hazards and estimates of their probabilities of occurrence, the estimation of
105 risk reduction and the effectiveness of decisions made from quality risk management activities.
106 Subjectivity can be introduced in quality risk management through differences in how risks are
107 assessed and in how hazards, harms and risks are perceived by different stakeholders.
4
ICH Q9(R1) Guideline
108 Subjectivity can also be introduced through the use of tools with poorly designed risk scoring
109 scales. While subjectivity cannot be completely eliminated from quality risk management
110 activities, it can be controlled by addressing bias, the proper use of quality risk management
111 tools and maximizing the use of relevant data and sources of knowledge (see ICH Q10, Section
112 II.E.1).
113 All participants involved with quality risk management activities should acknowledge,
114 anticipate, and address the potential for subjectivity.
116 • take responsibility for coordinating quality risk management across various functions and
117 departments of their organization; and
118 • assure that a quality risk management process is defined, deployed and reviewed and that
119 adequate resources and knowledge are available;
120 • assure that subjectivity in quality risk management activities is controlled and minimized,
121 to facilitate scientifically robust risk-based decision making.
126 • Define the problem and/or risk question, including pertinent assumptions identifying the
127 potential for risk;
128 • Assemble background information and/ or data on the potential hazard, harm or human
129 health impact relevant to the risk assessment;
131 • Specify a timeline, deliverables and appropriate level of decision making for the risk
132 management process.
5
ICH Q9(R1) Guideline
144 Hazard identification is a systematic use of information to identify hazards referring to the risk
145 question or problem description. Information can include historical data, theoretical analysis,
146 informed opinions, and the concerns of stakeholders. Hazard identification addresses the “What
147 might go wrong?” question, including identifying the possible consequences. This provides the
148 basis for further steps in the quality risk management process.
149 Risk analysis is the estimation of the risk associated with the identified hazards. It is the
150 qualitative or quantitative process of linking the likelihood of occurrence and severity of harms.
151 In some risk management tools, the ability to detect the harm (detectability) also factors in the
152 estimation of risk.
153 Risk evaluation compares the identified and analyzed risk against given risk criteria. Risk
154 evaluations consider the strength of evidence for all three of the fundamental questions.
155 In doing an effective risk assessment, the robustness of the data set is important because it
156 determines the quality of the output. Revealing assumptions and reasonable sources of
157 uncertainty will enhance confidence in this output and/or help identify its limitations.
158 Uncertainty is due to combination of incomplete knowledge about a process and its expected
159 or unexpected variability. Typical sources of uncertainty include gaps in knowledge gaps in
160 pharmaceutical science and process understanding, sources of harm (e.g., failure modes of a
161 process, sources of variability), and probability of detection of problems.
6
ICH Q9(R1) Guideline
162 The output of a risk assessment is either a quantitative estimate of risk or a qualitative
163 description of a range of risk. When risk is expressed quantitatively, a numerical probability is
164 used. Alternatively, risk can be expressed using qualitative descriptors, such as “high”,
165 “medium”, or “low”, which should be defined in as much detail as possible. Sometimes a "risk
166 score" is used to further define descriptors in risk ranking. In quantitative risk assessments, a
167 risk estimate provides the likelihood of a specific consequence, given a set of risk-generating
168 circumstances. Thus, quantitative risk estimation is useful for one particular consequence at a
169 time. Alternatively, some risk management tools use a relative risk measure to combine
170 multiple levels of severity and probability into an overall estimate of relative risk. The
171 intermediate steps within a scoring process can sometimes employ quantitative risk estimation.
180 • What is the appropriate balance among benefits, risks and resources?
181 • Are new risks introduced as a result of the identified risks being controlled?
182 Risk reduction focuses on processes for mitigation or avoidance of quality risk when it exceeds
183 a specified (acceptable) level (see Fig. 1). Risk reduction might include actions taken to
184 mitigate the severity and probability of harm. Processes that improve the detectability of
185 hazards and quality risks might also be used as part of a risk control strategy. The
186 implementation of risk reduction measures can introduce new risks into the system or increase
187 the significance of other existing risks. Hence, it might be appropriate to revisit the risk
188 assessment to identify and evaluate any possible change in risk after implementing a risk
189 reduction process.
7
ICH Q9(R1) Guideline
190 Risk acceptance is a decision to accept risk. Risk acceptance can be a formal decision to accept
191 the residual risk or it can be a passive decision in which residual risks are not specified. For
192 some types of harms, even the best quality risk management practices might not entirely
193 eliminate risk. In these circumstances, it might be agreed that an appropriate quality risk
194 management strategy has been applied and that quality risk is reduced to a specified
195 (acceptable) level. This (specified) acceptable level will depend on many parameters and
196 should be decided on a case-by-case basis.
212 The output/results of the risk management process should be reviewed to take into account new
213 knowledge and experience. Once a quality risk management process has been initiated, that
214 process should continue to be utilized for events that might impact the original quality risk
215 management decision, whether these events are planned (e.g., results of product review,
216 inspections, audits, change control) or unplanned (e.g., root cause from failure investigations,
217 recall). The frequency of any review should be based upon the level of risk. Risk review might
218 include reconsideration of risk acceptance decisions (section 4.4).
219219
8
ICH Q9(R1) Guideline
225 Traditionally, risks to quality have been assessed and managed in a variety of informal ways
226 (empirical and/ or internal procedures) based on, for example, compilation of observations,
227 trends and other information. Such approaches continue to provide useful information that
228 might support topics such as handling of complaints, quality defects, deviations and allocation
229 of resources.
230 Additionally, the pharmaceutical industry and regulators can assess and manage risk using
231 recognized risk management tools and/ or internal procedures (e.g., standard operating
232 procedures). Below is a non-exhaustive list of some of these tools (further details in Annex 1
233 and chapter 8):
244 It might be appropriate to adapt these tools for use in specific areas pertaining to drug substance
245 and drug product quality. Quality risk management methods and the supporting
9
ICH Q9(R1) Guideline
246 statistical tools can be used in combination (e.g., Probabilistic Risk Assessment). Combined
247 use provides flexibility that can facilitate the application of quality risk management principles.
248 The degree of rigor and formality of quality risk management should reflect available
249 knowledge and be commensurate with the complexity and/ or criticality of the issue to be
250 addressed.
256 When determining how much formality to apply to a given quality risk management activity,
257 certain factors can be considered. These can include, for example, the following:
258 • Uncertainty: The term “uncertainty” in quality risk management means lack of knowledge
259 about risks. The level of uncertainty that is associated with the area being risk assessed
260 informs how much formality may be required to manage potential risks. Systematic
261 approaches for acquiring, analyzing, storing and disseminating scientific information are
262 essential for generating knowledge, which in turn informs all quality risk management
263 activities. Uncertainty may be reduced via effective knowledge management, which enables
264 accumulated and new information (both internal and external) to be used to support risk-
265 based decisions throughout the lifecycle.
266 • Importance: The more important a risk-based decision is, the higher the level of formality
267 that should be applied, and the greater the need to reduce the level of uncertainty associated
268 with it.
269 • Complexity: The more complex a process or subject area is to a quality risk management
270 activity, the higher the level of formality that should be applied to assure product quality.
271 In general, higher levels of uncertainty, importance or complexity require more formal quality
272 risk management approaches to manage potential risks and to support effective risk-based
273 decision making.
274 The overall approach for determining how much formality to apply during quality risk
10
ICH Q9(R1) Guideline
275 management activities should be described within the quality system. Resource constraints
276 should not be used to justify the use of lower levels of formality in the quality risk management
277 process. Regardless of how much formality is applied, the robust management of risk is the
278 goal of the process. This should be based on evidence, science and knowledge, where risk
279 scores, ratings or assessments are supported by data or by an appropriate justification or
280 rationale.
282 • All parts of the quality risk management process (Risk Assessment, Risk Control, Risk
283 Review and Risk Communication) are explicitly performed, and stand-alone quality risk
284 management reports (or related documents) which address all aspects of the process may be
285 generated and are documented (e.g., within the quality system).
286 • Recognized or other quality risk management tools are used in some or all parts of the
287 process.
288 • A cross-functional team is assembled for the quality risk management activity. Use of a
289 trained quality risk management facilitator may be integral to a higher formality process.
291 • One or more parts of the quality risk management process are not performed as stand-alone
292 activities but are addressed within other elements of the quality system which may have risk
293 assessment and risk control activities embedded within them.
294 • Recognized or other quality risk management tools might not be used in some or all parts
295 of the process. A cross functional team might not be necessary.
296 • Stand-alone quality risk management reports might not be generated. The outcome of the
297 quality risk management process is usually documented in the relevant parts of the quality
298 system.
299 Note: Degrees of formality between the above higher and lower levels also exist and can be
300 used.
303 essential foundation for decision makers in an organization. Effective risk-based decision
11
ICH Q9(R1) Guideline
304 making begins with determining the level of effort, formality and documentation that should
305 be applied during the quality risk management process. The outputs of quality risk management
306 activities include decisions in relation to what hazards exist, the risks associated with those
307 hazards, the risk controls required, the acceptability of the residual risk after risk controls, the
308 communication and review of quality risk management activities and outputs.
309 Approaches to risk-based decision-making are beneficial, because they address uncertainty
310 through the use of knowledge, facilitating informed decisions by regulators and the
311 pharmaceutical industry in a multitude of areas, including when allocating resources. They also
312 help recognize where uncertainty remains, so that appropriate risk controls (including
313 improved detectability) can be identified to enhance understanding of those variables and
314 further reduce the level of uncertainty.
315 As all decision making relies on the use of knowledge, see ICH Q10 for guidance in relation
316 to Knowledge Management. It is important also to ensure the integrity of the data that are used
317 for risk-based decision making.
319 There are different processes that can be used to make risk-based decisions; these are directly
320 related to the level of formality that is applied during the quality risk management process.
321 (See Section 5.1 above for guidance on what constitutes formality in quality risk management.)
322 In general, higher levels of formality in quality risk management c a l l f o r higher levels of
323 structure in relation to risk-based decision making. There can be varying degrees of structure
324 with regard to approaches for risk-based decision making. These degrees of structure can be
325 considered to be on a continuum (or spectrum). Below are descriptions for highly structured
326 vs. less structured processes, and for rule-based processes when making risk-based decisions:
327 • Some risk-based decision making processes are highly structured and can involve a formal
328 analysis of the available options that exist before making a decision. They involve an in-
329 depth consideration of relevant factors associated with the available options. Such processes
330 might be used when there is a high degree of importance associated with the decision, and
331 when the level of uncertainty and/or complexity is high.
12
ICH Q9(R1) Guideline
332 • Other risk-based decision making processes are less structured; here, simpler approaches
333 are used to arrive at decisions, and they primarily make use of existing knowledge to support
334 an assessment of hazards, risks and any required risk controls. Such processes might still be
335 used when there is a high degree of importance associated with the decision, but the degree
336 of uncertainty and/or complexity is lower.
337 • Decisions might also be made using rule-based (or standardized) approaches, which do not
338 require a new risk assessment to make such decisions. This is where there are SOPs, policies
339 or well understood requirements in place which determine what decisions must be made.
340 Here, rules (or limits) may be in place which govern such decisions; these can be based on
341 a previously obtained understanding of the relevant risks and they usually lead to
342 predetermined actions or expected outcomes.
343
353 Training of both industry and regulatory personnel in quality risk management processes
354 provides for greater understanding of decision-making processes and builds confidence in
355 quality risk management outcomes.
356 Quality risk management should be integrated into existing operations and documented
357 appropriately. While manufacturing and supply chain diversity can be enablers of product
358 availability, increasingly complex supply chains lead to interdependencies that can introduce
359 systemic quality/manufacturing risks impacting supply chain robustness. Application of quality
360 risk management can proactively mitigate these risks. Preventive measures supporting product
361 availability may be identified through quality risk management activities.
13
ICH Q9(R1) Guideline
362 Annex II provides examples of situations in which the use of the quality risk management
363 process might provide information that could then be used in a variety of pharmaceutical
364 operations. These examples are provided for illustrative purposes only and should not be
365 considered a definitive or exhaustive list. These examples are not intended to create any new
366 expectations beyond the requirements laid out in the current regulations.
367 Examples for industry and regulatory operations (see Annex II):
369 Examples for industry operations and activities (see Annex II):
370 • Development;
373 • Production;
379 While regulatory decisions will continue to be taken on a regional basis, a common
380 understanding and application of quality risk management principles could facilitate mutual
381 confidence and promote more consistent decisions among regulators on the basis of the same
382 information. This collaboration could be important in the development of policies and
383 guidelines that integrate and support quality risk management practices.
384384
385385
14
ICH Q9(R1) Guideline
386 The role of Quality Risk Management in addressing Product Availability Risks
398 Manufacturing Process Variation and State of Control (internal and external):
399 Processes that exhibit excessive variability (e.g., process drift, non-uniformity) have capability
400 gaps that can result in unpredictable outputs and may adversely impact quality, timeliness,
401 yield, and consequently product availability. Quality risk management can help design
402 monitoring systems that are capable of detecting departures from a state of control and
403 deficiencies in manufacturing processes, so they can be investigated to address root causes.
405 A robust facility infrastructure can facilitate reliable supply; it includes suitable equipment and
406 well-designed facilities for manufacturing and packaging. Robustness can be affected by
407 multiple factors, such as an aging facility, insufficient maintenance or an operational design
408 that is vulnerable to human error. Risks to supply can be reduced by addressing these factors,
409 as well as through use of modern technology, such as digitalization, automation, isolation
410 technology, amongst others.
412 Quality system governance includes assuring the acceptability of supply chain partners over
413 the product lifecycle. Approval and oversight of outsourced activities and material suppliers is
414 informed by risk assessments, effective knowledge management, and an effective monitoring
15
ICH Q9(R1) Guideline
415 strategy for supply chain partner performance. A successful manufacturing partnership is
416 strengthened by appropriate communication and collaboration mechanisms. When substantial
417 variability is identified in the quality and safety of supplied materials or in the services
418 provided, enhanced review and monitoring activities are justified (See Section 2.7 of ICH
419 Q10). In some cases, it may be necessary to identify a new supply chain entity (e.g. a pre-
420 qualified backup option) to perform a function.
421421
422 7. DEFINITIONS
423 Decision Maker(s):
424 Person(s) with the competence and authority to make appropriate and timely quality risk
425 management decisions.
426 Detectability:
427 The ability to discover or determine the existence, presence, or fact of a hazard.
428 Harm:
429 Damage to health, including the damage that can occur from loss of product quality or
430 availability.
431 Hazard:
434 The systematic use of information to identify potential sources of harm (hazards) referring to
435 the risk question or problem description.
437 All phases in the life of the product from the initial development through marketing until the
438 product’s discontinuation.
439 Quality:
16
ICH Q9(R1) Guideline
440 The degree to which a set of inherent properties of a product, system or process fulfills
441 requirements (see ICH Q6A definition specifically for "quality" of drug substance and drug
442 (medicinal) products.)
444 A systematic process for the assessment, control, communication and review of risks to the
445 quality of the drug product across the product lifecycle.
447 The sum of all aspects of a system that implements quality policy and ensures that quality
448 objectives are met.
449 Requirements:
450 The explicit or implicit needs or expectations of the patients or their surrogates (e.g., health
451 care professionals, regulators and legislators). In this document, “requirements” refers not only
452 to statutory, legislative, or regulatory requirements, but also to such needs and expectations.
453 Risk:
454 The combination of the probability of occurrence of harm and the severity of that harm
455 (ISO/IEC Guide 51).
459 The estimation of the risk associated with the identified hazards.
461 A systematic process of organizing information to support a risk decision to be made within a
462 risk management process. It consists of the identification of hazards and the analysis and
463 evaluation of risks associated with exposure to those hazards.
17
ICH Q9(R1) Guideline
465 An approach or process that considers knowledge about risks relevant to the decision and
466 whether risks are at an acceptable level.
468 The sharing of information about risk and risk management between the decision maker and
469 other stakeholders.
473 The comparison of the estimated risk to given risk criteria using a quantitative or qualitative
474 scale to determine the significance of the risk.
Risk Management:
The systematic application of quality management policies, procedures, and practices to the tasks of assessing,
Risk Reduction:
Actions taken to lessen the probability of occurrence of harm and the severity of that harm.
Risk Review:
Review or monitoring of output/results of the risk management process considering (if appropriate) new
Severity:
Stakeholder:
Any individual, group or organization that can affect, be affected by, or perceive itself to be affected by a risk.
Decision makers might also be stakeholders. For the purposes of this guideline, the primary stakeholders are
18
ICH Q9(R1) Guideline
Trend:
475
476 8. REFERENCES
477 1. ICH Q8(R2) Pharmaceutical Development.
479 3. ISO/IEC Guide 73:2002 - Risk Management - Vocabulary - Guidelines for use in
480 Standards.
481 4. ISO/IEC Guide 51:2014 - Safety Aspects - Guideline for their inclusion in standards.
483 6. IEC 60812:2018 Failure modes and effects analysis (FMEA and FMECA).
484 7. IEC 61882:2016 - Hazard and operability studies (HAZOP studies) – Application guide.
485 8. ISO 14971:2019 – Medical devices -Application of risk management to medical devices.
19
ICH Q9(R1) Guideline
490 13. WHO Technical Report Series No 908, 2003, Annex 7 Application of Hazard Analysis
491 and Critical Control Point (HACCP) methodology to pharmaceuticals.
492 14. What is Total Quality Control?; The Japanese Way, Kaoru Ishikawa (Translated by David
493 J. Liu), 1985, ISBN 0139524339.
494 15. Failure Mode and Effect Analysis, FMEA from Theory to Execution, 2nd Edition 2003, D.
495 H. Stamatis, ISBN 0873895983.
496 16. Process Mapping by the American Productivity & Quality Center, 2002, ISBN
497 1928593739.
498 17. Parenteral Drug Association. Technical Report No. 54 Implementation of quality risk
499 management for pharmaceutical and biotechnology manufacturing operations. 2012.
500 18. Parenteral Drug Association. Points to consider for aging facilities. 2017.
501 19. Parenteral Drug Association. Technical Report No. 68. Risk-based approach for
502 prevention and management of drug shortages. 2014.
503 20. International Society for Pharmaceutical Engineering. Report on the ISPE Drug shortages
504 survey. 2013.
505 21. International Society for Pharmaceutical Engineering. Drug shortages prevention plan.
506 2014.
507 22. Tabersky D, Woelfle M, Ruess J, Brem S, Brombacher S. Recent regulatory trends in
508 pharmaceutical manufacturing and their impact on the industry. CHIMIA,
509 2018;72(3):146-150.
510 23. O’Donnell K, Tobin D, Butler S, Haddad G, Kelleher D. Understanding the concept of
511 formality in quality risk management. J. Valid. Technol, 2020 Jun; 26(3).
512
20
ICH Q9(R1) Guideline
519 It is neither always appropriate nor always necessary to use highly formal quality risk
520 management methods and tools. The use of less formal quality risk management methods and
521 tools can also be considered acceptable. See Chapter 5 for guidance on what constitutes
522 formality in quality risk management.
526 • Flowcharts;
529 • Cause and Effect Diagrams (also called an Ishikawa diagram or fish bone diagram).
539 FMEA can be used to prioritize risks and monitor the effectiveness of risk control activities.
21
ICH Q9(R1) Guideline
540 FMEA can be applied to equipment and facilities and might be used to analyze a manufacturing
541 operation and its effect on product or process. It identifies elements/operations within the
542 system that render it vulnerable. The output/ results of FMEA can be used as a basis for design
543 or further analysis or to guide resource deployment.
552 FMECA application in the pharmaceutical industry should mostly be utilized for failures and
553 risks associated with manufacturing processes; however, it is not limited to this application.
554 The output of an FMECA is a relative risk “score” for each failure mode, which is used to rank
555 the modes on a relative risk basis.
564 FTA can be used to establish the pathway to the root cause of the failure. FTA can be used to
565 investigate complaints or deviations in order to fully understand their root cause and to ensure
566 that intended improvements will fully resolve the issue and not lead to other issues (i.e. solve
567 one problem yet cause a different problem). FTA is an effective tool for
568 evaluating how multiple factors affect a given issue. The output of an FTA includes a visual
22
ICH Q9(R1) Guideline
569 representation of failure modes. It is useful both for risk assessment and in developing
570 monitoring programs.
578 (1) conduct a hazard analysis and identify preventive measures for each step of the process;
582 (5) establish the corrective action to be taken when monitoring indicates that the critical
583 control points are not in a state of control;
584 (6) establish system to verify that the HACCP system is working effectively;
587 HACCP might be used to identify and manage risks associated with physical, chemical and
588 biological hazards (including microbiological contamination). HACCP is most useful when
589 product and process understanding is sufficiently comprehensive to support identification of
590 critical control points. The output of a HACCP analysis is risk management information that
591 facilitates monitoring of critical points not only in the manufacturing process but also in other
592 life cycle phases.
593593
23
ICH Q9(R1) Guideline
602 HAZOP can be applied to manufacturing processes, including outsourced production and 603
formulation as well as the upstream suppliers, equipment and facilities for drug substances and 604
drug products. It has also been used primarily in the pharmaceutical industry for 605 evaluating
process safety hazards. As is the case with HACCP, the output of a HAZOP analysis 606 is a list of
critical operations for risk management. This facilitates regular monitoring of critical 607 points in the
manufacturing process.
617 PHA might be useful when analyzing existing systems or prioritizing hazards where 618
circumstances prevent a more extensive technique from being used. It can be used for product, 619
process and facility design as well as to evaluate the types of hazards for the general product 620 type,
then the product class, and finally the specific product. PHA is most commonly used early 621 in the
development of a project when there is little information on design details or operating 622 procedures;
thus, it will often be a precursor to further studies. Typically, hazards identified in 623 the PHA are
further assessed with other risk management tools such as those in this section.
24
ICH Q9(R1) Guideline
633 Risk ranking and filtering can be used to prioritize manufacturing sites for inspection/audit by 634
regulators or industry. Risk ranking methods are particularly helpful in situations in which the 635
portfolio of risks and the underlying consequences to be managed are diverse and difficult to 636
compare using a single tool. Risk ranking is useful when management needs to evaluate both 637
quantitatively-assessed and qualitatively-assessed risks within the same organizational 638
framework.
646 - Control Charts with Arithmetic Average and Warning Limits (see ISO 7873);
25
ICH Q9(R1) Guideline
651 • Histograms;
654
660 These examples are provided for illustrative purposes and only suggest potential uses of quality
661 risk management. This Annex is not intended to create any new expectations beyond the current
662 regulatory requirements.
666 To determine the desirability of and/or develop the content for SOPs, guidelines, etc.
668 To determine the appropriateness of initial and/or ongoing training sessions based on
669 education, experience and working habits of staff, as well as on a periodic assessment of
670 previous training (e.g., its effectiveness);
671 To identify the training, experience, qualifications and physical abilities that allow personnel
672 to perform an operation reliably and with no adverse impact on the quality of the product.
674 To provide the basis for identifying, evaluating, and communicating the potential quality
675 impact of a suspected quality defect, complaint, trend, deviation, investigation, out of
676 specification result, etc;
26
ICH Q9(R1) Guideline
677 To facilitate risk communications and determine appropriate action to address significant
678 product defects, in conjunction with regulatory authorities (e.g., recall).
679 Auditing/Inspection
680 To define the frequency and scope of audits, both internal and external, taking into account
681 factors such as:
695 To select, evaluate and interpret trend results of data within the product quality review;
27
ICH Q9(R1) Guideline
701 To evaluate the impact of the changes on the availability of the final product;
702 To evaluate the impact on product quality of changes to the facility, equipment, material,
703 manufacturing process or technical transfers;
704 To determine appropriate actions preceding the implementation of a change, e.g., additional
705 testing, (re)qualification, (re)validation or communication with regulators.
710 To assist with resource allocation including, for example, inspection planning and frequency,
711 and inspection and assessment intensity (see "Auditing" Section in Annex II.1);
712 To evaluate the significance of, for example, quality defects, potential recalls and inspectional
713 findings;
718 To identify risks which should be communicated between inspectors and assessors to facilitate
719 better understanding of how risks can be or are controlled (e.g., parametric release, Process 720
Analytical Technology (PAT)).
28
ICH Q9(R1) Guideline
724 To enhance knowledge of product performance over a wide range of material attributes (e.g., 725
particle size distribution, moisture content, flow properties), processing options and process 726
parameters;
727 To assess the critical attributes of raw materials, solvents, Active Pharmaceutical Ingredient
728 (API) starting materials, APIs, excipients, or packaging materials;
729 To establish appropriate specifications, identify critical process parameters and establish 730
manufacturing controls (e.g., using information from pharmaceutical development studies 731
regarding the clinical significance of quality attributes and the ability to control them during 732
processing);
736 To assess the need for additional studies (e.g., bioequivalence, stability) relating to scale up
737 and technology transfer;
738 To make use of the “design space” concept (see ICH Q8(R2)).
739 II.4 Quality Risk Management for Facilities, Equipment and Utilities
740 Design of facility / equipment
741 To determine appropriate zones when designing buildings and facilities, e.g.,
29
ICH Q9(R1) Guideline
749 To determine appropriate product contact materials for equipment and containers (e.g.,
750 selection of stainless steel grade, gaskets, lubricants);
751 To determine appropriate utilities (e.g., steam, gases, power source, compressed air, heating,
752 ventilation and air conditioning (HVAC), water);
753 To determine appropriate preventive maintenance for associated equipment (e.g., inventory of
754 necessary spare parts).
756 To protect the product from environmental hazards, including chemical, microbiological, and
757 physical hazards (e.g., determining appropriate clothing and gowning, hygiene concerns);
758 To protect the environment (e.g., personnel, potential for cross-contamination) from hazards
759 related to the product being manufactured.
761 To determine the scope and extent of qualification of facilities, buildings, and production
762 equipment and/or laboratory instruments (including proper calibration methods).
764 To differentiate efforts and decisions based on the intended use (e.g., multi- versus single-
765 purpose, batch versus continuous production);
770 To select the design of computer hardware and software (e.g., modular, structured, fault
771 tolerance);
30
ICH Q9(R1) Guideline
780 To provide a comprehensive evaluation of suppliers and contract manufacturers (e.g., auditing,
781 supplier quality agreements).
783 To assess differences and possible quality risks associated with variability in starting materials
784 (e.g., age, route of synthesis).
786 To determine whether it is appropriate to use material under quarantine (e.g., for further internal
787 processing);
790 To assess the adequacy of arrangements to ensure maintenance of appropriate storage and
791 transport conditions (e.g., temperature, humidity, container design);
792 To determine the effect on product quality of discrepancies in storage or transport conditions
793 (e.g., cold chain management) in conjunction with other ICH guidelines;
794 To maintain infrastructure (e.g., capacity to ensure proper shipping conditions, interim storage,
795 handling of hazardous materials and controlled substances, customs clearance);
796 To provide information for ensuring the availability of pharmaceuticals (e.g., ranking risks to
797 the supply chain).
31
ICH Q9(R1) Guideline
800 To identify the scope and extent of verification, qualification and validation activities (e.g.,
801 analytical methods, processes, equipment and cleaning methods);
802 To determine the extent for follow-up activities (e.g., sampling, monitoring and re-validation);
803 To distinguish between critical and non-critical process steps to facilitate design of a validation
804 study.
806 To evaluate the frequency and extent of in-process control testing (e.g., to justify reduced
807 testing under conditions of proven control);
808 To evaluate and justify the use of process analytical technologies (PAT) in conjunction with
809 parametric and real time release.
811 To determine appropriate production planning (e.g., dedicated, campaign and concurrent
812 production process sequences).
813 II.7 Quality Risk Management as Part of Laboratory Control and Stability Studies
814 Out of specification results
815 To identify potential root causes and corrective actions during the investigation of out of
816 specification results.
818 To evaluate adequacy of storage and testing of intermediates, excipients and starting materials.
821 To design the secondary package for the protection of primary packaged product (e.g., to ensure
822 product authenticity, label legibility).
32
ICH Q9(R1) Guideline
826 To design label control procedures based on the potential for mix-ups involving different
827 product labels, including different versions of the same label.
835 To decrease variability in the manufacturing process (e.g., process drift, non-uniformity) and 836
associated capability gaps that can result in unpredictable outputs, adversely impact quality and 837
consequently timeliness, yield and product availability;
838 To design monitoring systems that are capable of detecting departures from a state of control 839
and deficiencies in manufacturing processes, so they can be appropriately investigated to 840
determine root causes and any required risk mitigations.
842 To ensure that facility infrastructure and equipment are suitable and well-designed for
843 manufacturing and packaging;
844 To establish equipment and facility maintenance programs that assure reliable facility and
845 equipment performance;
846 To ensure that the operational design of equipment is not vulnerable to human error;
847 To obtain efficiency gains (e.g. speed, throughput, supply timeliness, etc.) from investing in
848 quality through the utilization of digitalization, automation, isolation technology, and other 849
innovations.
33
ICH Q9(R1) Guideline
851 To enhance review and monitoring activities (see Section 2.7 of ICH Q10) when substantial 852
variability is identified in the quality and safety of supplied materials or in the services 853
provided.
854 To manage external product availability risks relating to quality/manufacturing, (e.g. from raw
855 material suppliers, contracted organizations, service providers, etc.)